Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Packaging”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Key differentiators influencing the choice of robust shielded containers

The NDA's Upstream Optioneering project has examined the potential implications of using an alternative type of waste package and its influence on the waste management lifecycle across the NDA estate. Robust Shielded Containers (RSCs) are radioactive waste packages that provide integral radiological shielding, reducing the need for remote handling. The robustness of the container could remove the need to immobilise waste by cement encapsulation. RSCs are routinely used to package ILW for interim storage in Germany and have fairly recently been considered for use in the UK because RSCs have the potential to simplify the waste management lifecycle and enable risk and hazard reduction. In particular, the current baseline (included in Magnox Limited lifetime plans) follows the strategy set out in the Magnox Operating Decommissioning Programme (MODP), in which Type II MOSAIK and Type VI Ductile Cast Iron Containers (DCICs) are used to package (in non-encapsulated form) most Magnox ILW arising prior to 2050. By considering representative types of Intermediate Level Waste (ILW) and exploring potential packaging options for these wastes, this paper identifies the factors that could differentiate between cases in which RSCs would, or would not, be an appropriate option. The potential role of RSCs across the waste management lifecycle is examined, from retrieval of waste through to emplacement at a Geological Disposal Facility (GDF), including consideration of other potential uses of RSCs, such as temporary storage of raw wastes for which appropriate treatment and conditioning measures have yet to be developed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Generic Crystalline Disposal Reference Case

A generic reference case for disposal of spent nuclear fuel and high-level radioactive waste in crystalline rock is outlined. The generic cases are intended to support development of disposal system modeling capability by establishing relevant baseline conditions and parameters. Establishment of a generic reference case requires that the emplacement concept, waste inventory, waste form, waste package, backfill/buffer properties, EBS failure scenarios, host rock properties, and biosphere be specified. The focus in this report is on those elements that are unique to crystalline disposal, especially the geosphere representation. Three emplacement concepts are suggested for further analyses: a waste packages containing 4 PWR assemblies emplaced in boreholes in the floors of tunnels (KBS-3 concept), a 12-assembly waste package emplaced in tunnels, and a 32-assembly dual purpose canister emplaced in tunnels. In addition, three failure scenarios were suggested for future use: a nominal scenario involving corrosion of the waste package in the tunnel emplacement concepts, a manufacturing defect scenario applicable to the KBS-3 concept, and a disruptive glaciation scenario applicable to both emplacement concepts. The computational approaches required to analyze EBS failure and transport processes in a crystalline rock repository are similar to those of argillite/shale, with the most significant difference being that the EBS in a crystalline rock repository will likely experience highly heterogeneous flow rates, which should be represented in the model. The computational approaches required to analyze radionuclide transport in the natural system are very different because of the highly channelized nature of fracture flow. Computational workflows tailored to crystalline rock based on discrete transport pathways extracted from discrete fracture network models are recommended.

Environmental Protection↗

Teaching Old Packaging New Tricks - 12593

Waste disposition campaigns have been an industry and government focus area since the mid- 1970's. With increased focus on this issue, and a lot of hard work, most waste packaging and transportation issues have been addressed. The material has been successfully shipped and dis-positioned. DOE has successfully de-inventoried materials from multiple sites to meet material consolidation, footprint reduction, nonproliferation, and regulatory obligations with cost savings from reduced maintenance and regulatory compliance. There has been a wide range of certified shipping packagings for the transportation of hazardous materials to meet most of the waste needs. The remaining materials are problematic, generally low volume, and do not meet the certified content of the existing inventory of packaging. Designing, testing and certifying new packaging designs can be a long and expensive process and for small volumes of material it is cost prohibitive. One very cost effective option is to lease and use a certified packaging to overpack waste containers. There are many robust certified packagings available with the capability to envelope the waste content. The capability to use inner containers, inside the current fleet of certified casks or packaging, to address specific content problems of additional shielding (e.g., U-233) or containment (e.g., sodium bonded nuclear material) has successfully expanded the capability for timely cost effective shipment of unique contents. This option has been used successfully in the NAC-LWT, T-3 and other packagings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large Cask, Small Building, AREVA's Safe MLLW Disposal Solution Despite Facility Limitations - 16295

In order to begin decommissioning of a 1950's research reactor, Class C Mixed Low Level Waste (MLLW) had to be removed from the facility and disposed of. The AREVA TN RAM cask, designed and licensed for shipping Type B waste packages, was chosen as the most appropriate shipping solution. Due to the building layout, crane capacity and pool size, the standard TN RAM cask loading process could not be utilized. Unique solutions and approaches had to be developed to complete the project. AREVA designed a smaller liner insert that would house the four MLLW components in a single waste package to solve the problems related to crane capacity and physical pool dimensions. AREVA also designed and fabricated a shield bell to provide radiation shielding while moving the liner insert from the reactor pool to the cask that was staged adjacent to the reactor pool. The AREVA team worked with the disposal facility to cover requirements for disposal of Class B MLLW. This included designing spacers filled with inert material to fulfill the requirement for maximum 10% void space in the waste package. This disposal method for Class C waste met the requirements of macro-encapsulation. Therefore, no additional treatment action was required when disposing of Class C MLLW. AREVA's solution provides a model for disposing MLLW requiring macro-encapsulation in a single waste package. This solution also provides a model for how to adapt large shipping casks and liners to smaller aging commercial, DOE or research facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DECOVALEX-2023: Task F1 Final Report

DECOVALEX-2023 Task F is a comparison of models and methods for post-closure performance assessment (PA) of a deep geologic repository for radioactive waste. The general aims of Task F are to build confidence in the models, methods, and software used for PA and to stimulate additional research and development in PA methodologies. The task objectives are to motivate development of PA modelling skills and capabilities, to examine the influence of model choices on calculated repository performance, and to compare the uncertainties introduced by model choices to other sources of uncertainty. Task F involves no actual experiment or site. It is a PA modelling exercise that requires the conceptual development of hypothetical repository designs and geologic settings. Because three of the teams were interested in salt and the rest of the teams were interested in crystalline rock, Task F was split into two branches: Task F1 for crystalline rock and Task F2 for salt. This report is for Task F1, crystalline rock. Teams from seven countries (Canada, Czech Republic, Germany, Korea, Sweden, Taiwan, and United States) participated in Task F1. The teams worked together to define the features, events, and processes of the reference case repository and established a set of performance measures. In addition, they defined a set of benchmark problems designed to test and compare modelling capabilities for fracture flow and transport at different scales. The repository design and benchmark problems are documented in a Task Specification that evolved over time as the group honed the specifications. The benchmark problems verified that each team can aptly model flow and transport in fractured media in 1-, 2-, and 3-dimensions. Two general approaches were used for the 3-dimensional benchmarks: discrete fracture network (DFN) and equivalent continuous porous medium (ECPM). DFN modelling involves explicit meshing of each fracture while ECPM modelling aims to capture the effective porosity and directional permeability of each cell in a space-filling mesh as affected by intersecting fractures. In some models, a combination of the two is used, i.e., DFN for large known fractures and ECPM for the rest of the domain. Transport is solved by using either the advection-dispersion equation or particle tracking. Although some variation is observed among model breakthrough curves in the benchmark problems, there is strong agreement in breakthrough behaviour up to at least the 75 th percentile for all benchmarks. At the 90 th percentile, breakthrough results show larger differences, suggesting several models retain substantially higher fractions of tracer in regions of slower moving water. In addition to the flow and transport benchmarks, several teams completed the source term benchmark, verifying capabilities for modelling radionuclide decay and ingrowth, waste package breach, instant release fractions, fuel matrix degradation rates, and radionuclide solubility limitations. The reference case is conceptualized as a generic spent fuel repository at a depth of 450 m in fractured crystalline rock. The repository has 50 parallel backfilled drifts, each with 50 deposition holes 6 m apart. Each deposition hole contains a 4-PWR waste package and bentonite buffer. The rock domain is 5 km in length, 2 km in width, and 1 km in depth. It has 6 deterministic fractured deformation zones and a multitude of stochastic fractures. Teams generally used the ECPM approach for the entire rock or a hybrid approach in which the deterministic fracture zones are modelled with a DFN and the rest of the rock is modelled by ECPM. Of the reference case problems specified, only the results of the initial reference case problem are compared in this report. The initial problem focuses on transport from the deposition holes to the surface, i.e., it neglects waste package performance. Tracers are released at all waste package locations at time zero and tracked for their releases to the near field and ground surface. The water fluxes calculated at the ground surface entry and exit regions of the domain are similar for all models except for two that have considerably lower fluxes. For tracer transport, large differences are observed among models in the magnitude of tracer transported. Much of the difference appears to be due to how the repository is implemented and hence the different degrees of repository simplification. Models that exclude the drifts, buffer, and backfill from the domain tend to show greater release of tracers and radionuclides from the repository. The initial study presented here indicates that major differences in modelling important processes within the repository (e.g., diffusion through buffer and backfill) can produce broadly different release and transport results, especially when those processes are excluded. Even for the models that included all specified features, events, and processes, the results show significant differences and demonstrate the importance of examining multiple modelling approaches in performance assessment. The differences in results observed in this study are expected to motivate teams to either increase complexity in future versions of the reference case models or to improve methods to account for the effects of simplified features and processes. Either way, future improvements in these models are expected to produce results that more closely agree.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of Backfill Material Transport for the Future Belgian Geological Disposal Facility - 19071

In Belgium, long-lived, low- and intermediate level waste (B waste) will be conditioned in concrete monoliths B and high-level waste (C waste) in so-called Supercontainers (SC). It is planned to dispose of the waste packages in a Geological Disposal Facility (GDF). The B and C waste shall be disposed of each in one emplacement field at a depth between 200 m and 600 m below the surface. Two access galleries run through each field and connect the disposal galleries with a central shaft and support zone. After the emplacement of a specified number of waste packages, a stepwise backfilling of the voids is planned in order to stabilize the galleries, to limit the amount of voids, and to ensure a favourable chemical environment. Taking into account the objectives of backfilling and the specific material properties of the waste packages two mortars were developed to backfill the disposal galleries. In particular, for reasons of safety at work, the mortars should be hydraulically pumped through pipelines. Accordingly, in any case, it is necessary to operate storage facilities of the raw materials, a mix plant and a pump. The raw materials are foreseen to be supplied by trucks from external producers. Due to this fact, the better accessibility of the plants and with the aim of minimizing noise and dust emissions and the space for technical systems in the GDF, it is advisable to install the technical equipment above ground outside the GDF control area. However, the feasibility of this basic concept depends on the processing time of the backfill materials and the capacity of the transport system. Thus, although short transport times can theoretically be realized if pipelines with a small cross sections are chosen, in this case the required power of the pump increases significantly. If no suitable configuration can be found, the distance of the mixing and pumping system to the backfill segment has to be shortened. In this case a pneumatic conveyor system would have to be installed to transport the solids to a mix plant and pumping unit located in the underground galleries to be able to meet the desired backfill rates. In order to identify the optimum solution, the decision criteria and the advantages and disadvantages of existing and planned transport systems were evaluated. The investigations showed that it is technically feasible to pump the backfill material from above ground into the disposal galleries. As failures of the backfill system would result in interruptions of the general disposal operation, a redundant pump and pipeline system was developed. The two lines can be operated separately or simultaneously in order to realize high flow rates needed for the backfilling of segments far from the shaft. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Design of the Package Handling System for the Deep Borehole Engineering Demonstration - 17064

Deep borehole disposal involves drilling one or more boreholes into crystalline basement rock to a depth of about 5 km, emplacing waste packages in the lower 2 km of the borehole, and sealing and plugging the upper 3 km. These depths are several times deeper than for typical mined repositories. A deep borehole field test (DBFT) is proposed to confirm the safety and feasibility of the deep borehole concept. The primary goals are to demonstrate the construction and characterization of deep boreholes, demonstrate the equipment and operations used for safe waste handling and emplacement downhole, study geologic controls on waste form stability and isolation, and evaluate the overall safety and practicality of the concept. The test will be conducted using simulated waste packages; no radioactive wastes will be handled at the deep borehole field test site. A key component of the DBFT is an engineering demonstration of the equipment and operations needed to transport waste packages to the site, move packages between the transportation and emplacement systems, and lower or retrieve packages into or out of the borehole. This paper describes the conceptualization of test package handling, from transportation and receipt through the interface with the borehole. It also describes the use of an integrated test facility to check out equipment prior to deployment at the DBFT site, and performance of the engineering demonstration at the DBFT site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DPC Disposal Concepts of Operations. Final Report

The U.S. Department of Energy supports an R&D program for evaluating approaches to direct disposal of commercial spent fuel in dual-purpose canisters (DPCs). The major thrusts include alternative measures for treating the possibility of internal criticality events in DPC-based waste packages after thousands of years in a repository. These measures include: 1) injectable fillers, 2) analysis of the consequences of criticality events in a repository should they occur, and 3) options for modifying fuel assemblies or baskets in DPCs at the time they are loaded. This report presents a snapshot of progress in each of these areas drawing on deliverable reports generated during FY18 through FY20. Another aspect of the R&D program is to develop concepts of operations for repositories that would permanently dispose of DPC-based waste packages, considering different generic host media (not site-specific). The idea is to examine whether the disposal of large, heavy, heat-generating waste packages is technically feasible, and to identify the engineering challenges that would arise during implementation of the different disposal concepts. Descriptions of repository features are presented for repositories in salt media, argillite (clay/shale) media, crystalline (e.g., granitic) media, and unsaturated media (considering either alluvium or hard rock). Thermal management criteria for each concept are presented in terms of the maximum waste package thermal power at emplacement, when the repository could be opened, and the duration of repository emplacement operations. The overall message of this report is that direct disposal of commercial spent fuel is technically feasible in different types of geologic host media, but that thermal management and postclosure criticality impose different constraints on each concept. Engineering challenges are recognized and discussed. Treatment of postclosure criticality is identified as an important technical question that receives the majority of attention in the R&D program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RoboCount{sup TM} 2020 - A Robotic Non-Destructive Waste Assay System - 19331

A robotic system for non-destructive assay of radioactive waste - RoboCount{sup TM} 2020ab - has been designed, manufactured, and a prototype delivered to a customer. RoboCount{sup TM} 2020 is based on an industrial 6-axis articulating robot platform, combined with a dedicated waste package platform and a high-resolution HPGe gamma spectrometer. The system enables measurement of waste packages including drums (100-l, 200-l, 400-l), crates (up to 1200 x 800 x 800 mm), 1 m{sup 3} flexible intermediate bulk containers (FIBC), and others. Assay type can be freely defined, ranging from currently accepted protocols such as segmented gamma scan (SGS) or integral gamma scan (IGS) to new protocols developed for specific non-cylindrical waste packages, e.g., measurement of FIBCs from all four sides and the top. As a result of the robotic hardware flexibility, reconfiguration of the system for a new task is a matter of software changes only. In addition, while primarily geared towards waste characterization, the system can be configured for free release (clearance) by installing a second detector and field-of-view shielding. The prototype is currently in operation at a NPP site in Europe where it is used for D and D waste characterization in crates and FIBCs. Additional features beyond the basic functionality have been implemented such as an automatic lead collimator change based on measured HPGe detector dead time and an automatic liquid nitrogen refill, performed by the robot via a docking station at predefined time intervals. (Use of electrically cooled HPGe detectors is also possible). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OECD NEA radioactive waste repository metadata management (RepMet) initiative (2014-2018) - 15614

The OECD/NEA Radioactive Waste Repository Metadata Management (RepMet) initiative aims to bring about a better understanding of the identification and administration of metadata - a key aspect of data management - to support national programmes in managing their radioactive waste repository data, information and records in a way that is both harmonised internationally and suitable for long-term management and use. At this point in the project, the main focus lies on 'waste packages at their storage sites ready for geological disposal' but excluding spent fuel and high level waste (HLW). Later work will deal with metadata collected on spent fuel and HLW as well as with different phases of repository development: design and construction, and operation. In order to develop metadata, RepMet members have provided lists of data items they currently collect and manage for packaged waste. The lists, albeit it non comprehensive, suggest that the number and type of data items varies importantly from organisation to organisation. At term, RepMet plans to generate a comprehensive list of such data items and their metadata. In parallel, RepMet is developing a document which examines a selected number of existing metadata standards. Because of the specialist nature of radioactive waste management, including waste processing facilities, disposal facilities and waste packages, existing metadata standards do not seem to be transferable as defined. Rather, RepMet will explore such standards to identify relevant principles for possible adaptation to the radioactive waste management community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Level Radioactive Wastes Conditioning during Decommissioning of Salaspils Research Reactor

The decommissioning of Salaspils research reactor is connected with the treatment of 2200 tons different materials. The largest part of all materials ({approx}60 % of all dismantled materials) is connected with low level radioactive wastes conditioning activities. Dismantled radioactive materials were cemented in concrete containers using water-cement mortar. According to elaborated technology, the tritiated water (150 tons of liquid wastes from special canalization tanks) was used for preparation of water-cement mortar. Such approach excludes the emissions of tritiated water into environment and increases the efficiency of radioactive wastes management system for decommissioning of Salaspils research reactor. The Environmental Impact Assessment studies for Salaspils research reactor decommissioning (2004) and for upgrade of repository 'Radons' for decommissioning purposes (2005) induced the investigations of radionuclides release parameters from cemented radioactive waste packages. These data were necessary for implementation of quality assurance demands during conditioning of radioactive wastes and for safety assessment modeling for institutional control period during 300 years. Experimental studies indicated, that during solidification of water- cement samples proceeds the increase of temperature up to 81 deg. C. It is unpleasant phenomena since it can result in damage of concrete container due to expansion differences for mortar and concrete walls. Another unpleasant factor is connected with the formation of bubbles and cavities in the mortar structure which can reduce the mechanical stability of samples and increase the release of radionuclides from solidified cement matrix. The several additives, fly ash and PENETRON were used for decrease of solidification temperature. It was found, that addition of fly ash to the cement-water mortar can reduce the solidification temperature up to 62 deg. C. Addition of PENETRON results in increasing of solidification temperature up to 83 deg. C. Experimental data shows, that water/cement ratio significantly influences on water-cement mortar's viscosity and solidified samples mechanical stability. Increasing of water ratio from 0.45 up to 0.65 decreases water-cement mortar's viscosity from 1100 mPas up to 90 mPas. Significant reduction of viscosity is an important factor, which facilitates the fulfillment all gaps and cavities with the mortar during conditioning of solid radioactive wastes in containers. On the other hand, increase water ratio from 0.45 up to 0.65 decreases mechanical stability of water-cement samples from 23 N/mm{sup 2} to the 12 N/mm{sup 2}. It means that water-cement bulk stability significantly decreases with increasing of water content. Technologically is important to increase the tritiated water content in container with cemented radioactive wastes. It gives a possibility to increase the fulfillment of container with radioactive materials. On the other hand, additional water significantly reduces bulk stability of containers with cemented radioactive wastes, which can result in disintegration of radioactive wastes packages in repository during 300 years. Taking into account the experimental results, it is not recommended to exceed the water/cement ratio more than 0.60. Tritium and Cs{sup 137} leakage tests show, that radionuclides release curves has a complicate structure. Experimental results indicated that addition of fly ash result in facilitation of tritium and cesium release in water phase. This is unpleasant factor, which significantly decreases the safety of disposed radioactive wastes. Despite the positive impact on solidification temperature drop, the addition of fly ash to the cement-water mortar is not recommended in case of cementation of radionuclides in concrete containers. In conclusion: The cementation processes of solid radioactive wastes in concrete containers were investigated. The influence of additives on cementation processes was studied. It was shown, that the increasing of water ratio from 0.45 up to 0.65 decreases water-cement mortar's viscosity more than 10 times. Mechanical stability of samples decreases 2 times, which reduces the bulk stability of cemented radioactive wastes package. It is not recommended to increase water ratio more than 0.60 in cement-water mortar. Addition of flay ash to the water-cement mortar decreases the solidification temperature from 83 deg. C to 62 deg. C. However, it was found, that the addition of fly ash to the water-cement mortar facilitate the radionuclides leakage from solidified water-cement matrix. Therefore fly ash is not recommended for radioactive wastes cementation. It was shown that tritiated water can be used for cementation of solid radioactive wastes in concrete containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigations of dual-purpose canister direct disposal feasibility - 15106

Direct disposal of commercial spent nuclear fuel (SNF) in dual-purpose canisters (DPCs) could avoid the cost and complexity of re-packaging spent fuel into smaller purpose-built containers, avoid disposing of the DPC hulls as low-level waste, and potentially decrease worker dose. Technical objectives for disposal are: 1) safety of workers and the public, 2) engineering feasibility; 3) thermal management; and 4) criticality control after permanent closure of a repository. The postclosure safety case for DPC direct disposal would resemble that for any repository-waste isolation would be enhanced by choosing host geology in which radionuclide transport is diffusion dominated, and for which transport properties and pathways are insensitive to the expected temperature history. Containment functions would be assigned to the disposal overpack, and published data show that suitable materials exist for most possible disposal environments. Earlier studies showed that DPC-based waste packages would be only slightly larger and heavier than those proposed for a repository in volcanic tuff. Engineered solutions are available for transporting and emplacing them underground, although some could be the largest of their kind. The cost of DPC direct disposal in various geologic settings has been compared to options involving a change to loading standardized multi-purpose canisters, or continuing to load DPCs and re-packaging all of them for disposal. In general DPC direct disposal would cost tens of billions of dollars less, in packaging and disposal costs. Calculations for emplacement in hard rock and sedimentary rock show that host rock peak temperature targets of 100 to 200 deg.C could be met by managing fuel age and burnup, with repository closure at up to 150 years from reactor discharge. For disposal in salt, DPC-based waste packages could be emplaced at only 50 to 100 years from discharge, depending on burnup. Sedimentary media such as shales pose special challenges especially if they have low thermal conductivity. If backfill is used around DPC-based packages its peak temperature could be 150 to 200 deg.C. Without flooding of waste packages with ground water, criticality can never occur. However, some small number of disposal overpacks could fail within the postclosure performance period due to corrosion or disruptive events. Once flooded, the aluminum-based neutron absorber materials used in most DPCs would readily degrade. Analysis has shown that even without neutron absorbers, virtually all DPCs could be subcritical if flooded with chloride brines such as would occur in a salt repository. The licensing basis for existing DPCs involves criticality analysis that may be conservative compared to fuel that is actually loaded, and the difference provides uncredited reactivity margin. Uncredited margin can offset increases in reactivity associated with flooding and basket degradation. For flooding with fresh water, with loss of neutron absorbers, many DPCs have been shown to be subcritical using uncredited margin. Significantly fewer are subcritical if the fuel basket also degrades. Thus, the materials of DPC basket construction (e.g., aluminum or carbon steel) could be deleterious if they fully corrode, along with the neutron absorbers, during the performance period. Logistical simulations are used to better understand the relationship between the needed DPC decay storage time for disposal, and the timing of future events such as the repository opening date, or a transition to loading multi-purpose (disposable) canisters at nuclear power plants. Results show that the maximum benefit from implementing a new canister design, with respect to shortening the cooling time for all SNF including that in DPCs, is associated with the earliest repository start date. As time passes more of the total SNF inventory will be in DPCs such that the value of a transition to multi-purpose canisters will decline, and the remaining options are DPC direct disposal and re-packaging in purpose-designed disposal canisters. Fuel age at emplacement is of interest to evaluate potential impacts from future changes in the fuel management system that could place fuel age limits on dry storage or transportation. The minimum fuel age at emplacement (best-case) is obtained by re-packaging all DPCs into smaller canisters for disposal, thus drastically decreasing the needed decay storage time for any geologic disposal setting. If the industry transitions to smaller, multi-purpose canisters, and without re-packaging, the fuel age at emplacement would be comparable to the best case if: 1) the emplacement power limit is high enough, or 2) both the transition and the repository start date occur early (e.g., 2036 was analyzed). Technical feasibility evaluation continues to show that direct disposal could be safe and cost effective, for some DPCs and in some geologic settings. Direct disposal of a substantial fraction of existing DPCs, limited mainly by thermal management, uncredited criticality margin, materials of DPC basket construction, and the salinity of ground water in the disposal environment, could be part of the overall waste management system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Nuclear Fuel Cycle Effects on the Treatment of Uncertainty in the Long-Term Assessment of Geologic Disposal Systems - EBS Input

The Used Fuel Disposition (UFD) Campaign within the Department of Energy's Office of Nuclear Energy (DOE-NE) Fuel Cycle Technology (FCT) program has been tasked with investigating the disposal of the nation's spent nuclear fuel (SNF) and high-level nuclear waste (HLW) for a range of potential waste forms and geologic environments. The planning, construction, and operation of a nuclear disposal facility is a long-term process that involves engineered barriers that are tailored to both the geologic environment and the waste forms being emplaced. The UFD Campaign is considering a range of fuel cycles that in turn produce a range of waste forms. The UFD Campaign is also considering a range of geologic media. These ranges could be thought of as adding uncertainty to what the disposal facility design will ultimately be; however, it may be preferable to thinking about the ranges as adding flexibility to design of a disposal facility. For example, as the overall DOE-NE program and industrial actions result in the fuel cycles that will produce waste to be disposed, and the characteristics of those wastes become clear, the disposal program retains flexibility in both the choice of geologic environment and the specific repository design. Of course, other factors also play a major role, including local and State-level acceptance of the specific site that provides the geologic environment. In contrast, the Yucca Mountain Project (YMP) repository license application (LA) is based on waste forms from an open fuel cycle (PWR and BWR assemblies from an open fuel cycle). These waste forms were about 90% of the total waste, and they were the determining waste form in developing the engineered barrier system (EBS) design for the Yucca Mountain Repository design. About 10% of the repository capacity was reserved for waste from a full recycle fuel cycle in which some actinides were extracted for weapons use, and the remaining fission products and some minor actinides were encapsulated in borosilicate glass. Because the heat load of the glass was much less than the PWR and BWR assemblies, the glass waste form was able to be co-disposed with the open cycle waste, by interspersing glass waste packages among the spent fuel assembly waste packages. In addition, the Yucca Mountain repository was designed to include some research reactor spent fuel and naval reactor spent fuel, within the envelope that was set using the commercial reactor assemblies as the design basis waste form. This milestone report supports Sandia National Laboratory milestone M2FT-12SN0814052, and is intended to be a chapter in that milestone report. The independent technical review of this LLNL milestone was performed at LLNL and is documented in the electronic Information Management (IM) system at LLNL. The objective of this work is to investigate what aspects of quantifying, characterizing, and representing the uncertainty associated with the engineered barrier are affected by implementing different advanced nuclear fuel cycles (e.g., partitioning and transmutation scenarios) together with corresponding designs and thermal constraints.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Temperature-package power correlations for open-mode geologic disposal concepts.

Logistical simulation of spent nuclear fuel (SNF) management in the U.S. combines storage, transportation and disposal elements to evaluate schedule, cost and other resources needed for all major operations leading to final geologic disposal. Geologic repository reference options are associated with limits on waste package thermal power output at emplacement, in order to meet limits on peak temperature for certain key engineered and natural barriers. These package power limits are used in logistical simulation software such as CALVIN, as threshold requirements that must be met by means of decay storage or SNF blending in waste packages, before emplacement in a repository. Geologic repository reference options include enclosed modes developed for crystalline rock, clay or shale, and salt. In addition, a further need has been addressed for open modes in which SNF can be emplaced in a repository, then ventilated for decades or longer to remove heat, prior to permanent repository closure. For each open mode disposal concept there are specified durations for surface decay storage (prior to emplacement), repository ventilation, and repository closure operations. This study simulates those steps for several timing cases, and for SNF with three fuel-burnup characteristics, to develop package power limits at which waste packages can be emplaced without exceeding specified temperature limits many years later after permanent closure. The results are presented in the form of correlations that span a range of package power and peak postclosure temperature, for each open-mode disposal concept, and for each timing case. Given a particular temperature limit value, the corresponding package power limit for each case can be selected for use in CALVIN and similar tools.

Hardin, Ernest.↗

Waste Handling and Emplacement Options for Disposal of Radioactive Waste in Deep Boreholes.

Traditional methods cannot be used to handle and emplace radioactive wastes in boreholes up to 16,400 feet (5 km) deep for disposal. This paper describes three systems that can be used for handling and emplacing waste packages in deep borehole: (1) a 2011 reference design that is based on a previous study by Woodward–Clyde in 1983 in which waste packages are assembled into “strings” and lowered using drill pipe; (2) an updated version of the 2011 reference design; and (3) a new concept in which individual waste packages would be lowered to depth using a wireline. Emplacement on coiled tubing was also considered, but not developed in detail. The systems described here are currently designed for U.S. Department of Energy-owned high-level waste (HLW) including the Cesium- 137/Strontium-90 capsules from the Hanford Facility and bulk granular HLW from fuel processing in Idaho.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UNREVIEWED DISPOSAL QUESTION EVALUATION: CENTER SLIT TRENCHES ONE THROUGH FIVE OPERATIONAL COVERS REANALYSIS

Operational inventory limits for the disposal of solid low-level waste in Slit Trenches 1-7 were established by the Special Analysis (SA) performed by Collard and Hamm (2008). To determine disposal limits for the Slit Trenches, the SA followed the methodology used in the 2008 PA (WSRC, 2008) which assumed that the inventories in each trench were instantaneously placed in 12/1995, which is the date when SLIT1 began operation. The 2008 SA analyzed the impact from placing storm-water runoff covers simultaneously over Slit Trenches 1-7 at 5, 10 and 15 years after the inventory was introduced. To include a measure of conservatism in the limits, the lowest of the limits calculated for any storm-water runoff cover placement time or that calculated in the original 2008 PA was chosen as the operational limit for each radionuclide. Through the availability of funding provided by the American Recovery and Reinvestment Act (ARRA), storm-water runoff covers were placed over Slit Trenches 1-5 in December 2010. SRNL was requested to perform a UDQE for this accelerated action. Table 1 below lists the operational dates for Slit Trenches 1-5 and the time elapsed between when the first waste package was disposed in each Slit Trench and when the storm-water runoff covers were placed. As shown in Table 1, SLIT1 was covered 15.0 years after the date of the first waste package disposal. SLIT2 was covered 9.2 years after the date of the first waste package disposal in SLIT2 which falls within the window of {+-} 1.0 year within which the 2008 SA cover time analysis was assumed to be valid (Crowley and Butcher, 2008). Therefore, the analysis of SLIT1 and SLIT2 in the 2008 SA is considered adequate. However, the cover timings for SLIT3, SLIT4 and SLIT5 are from 2.2 to 1.6 years beyond the nearest cover time of 5 years assumed in the 2008 SA analysis and fall outside of the acceptable one-year margin. Therefore, an additional study was conducted by Collard et al. (2011) that assessed the impact on Slit Trench performance from a covering date that is between 12/2010 and 9/2011. Accelerated placement of storm-water runoff covers over Slit Trenches 1-5 put the cover timing outside of the range considered in the 2008 SA (Collard and Hamm, 2008) which establishes Slit Trench disposal limits. Results from a recent study (Collard et al., 2011) demonstrate that the actual cover installation in December 2010 produces acceptable Slit Trench performance. Additionally, covering Slit Trench 5 separately from Slit Trenches 6 and 7, which will be operationally closed at a later date, does not adversely affect performance of the operationally closed trenches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Implementation of IAEA's Borehole Disposal Concept for Sealed Radioactive Sources - 18545

With funding from the Government of Canada, and support from the U.S. Nuclear Regulatory Commission's (NRC's) Office of International Program and many others, the International Atomic Energy Agency (IAEA) is supporting the field deployment of the Borehole Disposal Concept (BDC) for secure disposal of radioactive sources in Ghana, the Philippines and Malaysia. This is a first-of-its-kind implementation. Though small in volume, disused sealed radioactive sources can be intensively radioactive and create a significant safety and security liability for the majority of the 168 Member States in the IAEA. Millions of sealed radioactive sources have been manufactured since 1901, and it is estimated that hundreds of thousands are now unwanted. The irony is that some of the countries with the smallest inventories have the greatest difficulties managing their radioactive wastes. The BDC was originally conceptualized in an IAEA-study undertaken by the South African Nuclear Energy Corporation (NECSA) for countries with small inventories of disused sealed radioactive sources. There are multiple, passive engineered and natural barriers in the BDC design, including an inner stainless-steel capsule (which holds the wastes), an inner cement containment barrier, an outer stainless steel container and outer backfill cement, as well as the surrounding geosphere. In common subsurface geochemical environments, these barriers will isolate the wastes from the biosphere, provide effective containment and ensure long-term safety. To greatly limit the likelihood of inadvertent human intrusion (safety), and deliberate human intrusion (security), these waste packages will be disposed of in a narrow diameter borehole (26 cm) at depths greater than 30 m. This type of borehole disposal creates an exceptionally small footprint, removes the wastes from normal human surficial activities, and isolates the waste packages from near-surface processes. Over the past 20 years, the IAEA, NECSA and many others have advanced the BDC on the shoulders of the IAEA's broader work supporting safe and secure disposal of radioactive wastes and management of sealed radioactive sources. With recent funding and support from many others, the IAEA has assisted Ghana, Malaysia and the Philippines in assessing their inventories and conditioning their disused sealed radioactive sources, in drilling investigation boreholes and characterizing their proposed sites, and in designing their disposal systems. These countries plan to place the uppermost waste package at depths greater than 100 m. While activities in the Philippines remain focused on-site characterization, Ghana is in the latter stages of developing their Safety Case for operational and 'post-closure' safety and Malaysia has completed their Safety Case and submitted a license application to construct and operate a BDC facility. Though this paper identifies the support provided to Member States by the IAEA, it is the Ghana Atomic Energy Commission and the Malaysian Nuclear Agency that are responsible for the safety and security of the disposals and that have been responsible for carrying-out their disposal programs. Once the BDC is licensed by the relevant national regulatory bodies, these first-of-a-kind disposal approaches will provide a template for other countries to safely dispose of their disused sealed radioactive sources - permanently eliminating their safety and security liabilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

What's in WIPP? Packaging TRU Waste to Enhance WIPP's Capacity - 16515

Beginning in 1999, and continuing for 15 years, the US DOE Waste Isolation Pilot Plant (WIPP) repository successfully disposed of defense Transuranic (TRU) waste. Six of the originally planned ten disposal panels were filled before two unrelated accidents temporarily halted disposal operations in February 2014. Based on counting the gross volume of all containers emplaced in WIPP to date, a little more than half of the legislated volume capacity has been subscribed (91,000 cubic meters). This paper describes the many different packaging configurations that have been used to ship TRU waste to WIPP, and makes observations that may enhance the repository capacity when shipments resume. The contents of shipments to WIPP are limited by many requirements of the repository waste acceptance criteria. These criteria derive from three primary sources; 1) the Certificate of Compliance (CoC), issued by the NRC for Type B shipping packaging used by WIPP; 2) The Hazardous Waste Facility Permit, issued by the New Mexico Environment Department; and 3) the WIPP facility's own Documented Safety Analysis (DSA), developed under DOE's regulation 10CFR830. To meet these criteria, various TRU waste forms have been packaged in different ways, with varying packaging efficiency. Of course, there is an overall upper limit on WIPP's volume capacity that was legislated as part of the WIPP Land Withdrawal Act. The volume counted against this limit has been calculated by simply summing the volumes of individual payload containers shipped to and emplaced at WIPP. This method counts significant non-waste volumes inside the containers due to over-packing inner containers and partially filled containers. Without some change to how disposal volumes are calculated, or how waste is packaged, the amount of TRU waste yet to be shipped to WIPP could exceed the legislated capacity. Concepts to enhance the packaging efficiency of future waste shipments to WIPP are presented. Approximate estimates of the waste versus non-waste volumes that have been emplaced to date are discussed. This paper only considers contact handled TRU waste (i.e., contact dose rates < 2 mSv/hr). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗