Search NASA⌕ Search

SEARCH · Search NASA

Results for “Work Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Enhancing In-Flight Transoceanic Communications Using Swift-64 Packet Mode Service

Current aeronautical communications can be divided into two segments. The first provides state of the art, packet switched technology to the cabin passengers so that they have access to e-mail and web services. The second provides basic circuit switch communication technology to the cockpit, which does not use bandwidth as efficiently as packet switching nor promotes resource sharing. This paper explores the research efforts currently being conducted by the NASA/Glenn Research Center (GRC) for transoceanic communications. The goal is to bring packet mode services to both the cabin and the cockpit of the aircraft and be able to attain benefits by sharing the data link with cabin services. First, this paper will outline the goals of the program and detail the benefits and issues related to this research. We will explain our current laboratory setup and show an architecture implemented in the testbed. Finally, we will present a work plan that will show the progression of research over the next year. This plan will describe a complete cycle from conceptual design and laboratory implementation to the final flight testing.

Slywczak, Richard A.↗

EDCCD Detector Development for the Constellation-X Mission

The original proposal was for a 24-month follow-on effort to a one-year grant (NAGS- 12377) received on 7/15/02. During the proposed period, work has been, and will be, performed at both the Center for Space Research on the MIT main campus in Cambridge and Lincoln Laboratory in Lexington, MA. The status of the work planned, and accomplished, for "Year 1" is provided below.

Ricker, George R.↗

LIFT Tenant Is Off and Running

Lewis Incubator for Technology (LIFT) tenant, Analiza Inc., graduated from the incubator July 2000. Analiza develops technology and products for the early diagnosis of diseases, quality control of bio-pharmaceutical therapeutics, and other applications involving protein analyses. Technology links with NASA from existing and planned work are in areas of microfluidics and laser light scattering. Since their entry in LIFT in May, 1997, Analiza has: Received a $750,000 grant from the National Institutes of Health. Collaborated with a Nobel Prize winner on drug design. Collaborated with Bristol-Myers Squibb on the characterization of biological therapeutics. Added a Ph.D. senior scientist and several technicians. Received significant interest from major pharmaceutical companies about collaborating and acquiring Analiza technology.

Steele, Gynelle C.↗

Evaluation of NASA Data Products for RPO Applications

This presentation summarizes preliminary investigations at SSC by NASA's ASD in Air Quality including decision support tools, partner plans, working groups, and committees. An overview of follow-on short-term and long-term objectives is also provided. A table of potential NASA sensors for use with air quality applications is included, along with specifications for MODIS 04 and 06 products. This presentation was originally given by Rich Piorot of the Vermont Department of Environmental Conservation - Air Quality as part of a round-table discussion during "Exploring Collaborative Opportunities in Air Quality Monitoring, Modelling and Communication Workshop" in Boulder, CO, on March 21-22, 2005; verbal consent for this presentation to be provided to Mr. Piorot was given by the NASA SSC ASD Air Quality Program Manager on March 14, 2005.

Frisbie, Troy↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

The CEOS/GEO Constellation Concept

The Constellation concept was first proposed during a discussion at the 19th CEOS Plenary, in London, in November 2005. The first Paper of the Constellation Concept was presented at the CEOS Strategic Implementation Team meeting (SIT-18), in Frascati, in March 2006, and strongly endorsed by the CEOS Principals. The concept attempts to provide agencies with tools for implementation of the elements that have been previously discussed in international forums (GEO Work Plan, GCOS Implementation Plan). This provides a solid foundation from the community providing requirements. Though agency spending is governed by national requirements, CEOS seeks synergies among member agency programs to fulfil GEOSS requirements, defining guidelines and standards to help agencies to determine from the outset what can be achieved. The constellations concept will allow the development of a commonalties approach among different agencies. At the heart of the application of the Constellations concept is the definition of a series of standards (specific to each Constellation) - required to be satisfied for any mission to be included in the constellation - and a process of recognition/acceptance, whereby an agency applies to SIT to have one or more of its missions (ideally from the outset of planning) recognised as meeting the constellation standards and thereby satisfying the relevant user community needs.

Cramer, Bryant↗

Abstracts of the Annual Meeting of Planetary Geologic Mappers, San Antonio, TX, 2009

Topics covered include: Geologic Mapping of the Beta-Atla-Themis (BAT) Region of Venus: A Progress Report; Geologic Map of the Snegurochka Planitia Quadrangle (V-1): Implications for Tectonic and Volcanic History of the North Polar Region of Venus; Preliminary Geological Map of the Fortuna Tessera (V-2) Quadrangle, Venus; Geological Map of the Fredegonde (V-57) Quadrangle, Venus; Geological Mapping of the Lada Terra (V-56) Quadrangle, Venus; Geologic Mapping of V-19; Lunar Geologic Mapping: A Preliminary Map of a Portion of the LQ-10 ("Marius") Quadrangle; Geologic Mapping of the Lunar South Pole, Quadrangle LQ-30: Volcanic History and Stratigraphy of Schr dinger Basin; Geologic Mapping along the Arabia Terra Dichotomy Boundary: Mawrth Vallis and Nili Fossae, Mars; Geologic Mapping Investigations of the Northwest Rim of Hellas Basin, Mars; Geologic Mapping of the Meridiani Region of Mars; Geology of a Portion of the Martian Highlands: MTMs -20002, -20007, -25002 and -25007; Geologic Mapping of Holden Crater and the Uzboi-Ladon-Morava Outflow System; Mapping Tyrrhena Patera and Hesperia Planum, Mars; Geologic Mapping of Athabaca Valles; Geologic Mapping of MTM -30247, -35247 and -40247 Quadrangles, Reull Vallis Region, Mars Topography of the Martian Impact Crater Tooting; Mars Structural and Stratigraphic Mapping along the Coprates Rise; Geology of Libya Montes and the Interbasin Plains of Northern Tyrrhena Terra, Mars: Project Introduction and First Year Work Plan; Geology of the Southern Utopia Planitia Highland-Lowland Boundary Plain: Second Year Results and Third Year Plan; Mars Global Geologic Mapping: About Half Way Done; New Geologic Map of the Scandia Region of Mars; Geologic Mapping of the Medusae Fossae Formation on Mars and the Northern Lowland Plains of Venus; Volcanism on Io: Insights from Global Geologic Mapping; and Planetary Geologic Mapping Handbook - 2009.

Bleamaster, Leslie F., III↗

CEOS Contributions to Informing Energy Management and Policy Decision Making Using Space-Based Earth Observations

Earth observations are playing an increasingly significant role in informing decision making in the energy sector. In renewable energy applications, space-based observations now routinely augment sparse ground-based observations used as input for renewable energy resource assessment applications. As one of the nine Group on Earth Observations (GEO) societal benefit areas, the enhancement of management and policy decision making in the energy sector is receiving attention in activities conducted by the Committee on Earth Observation Satellites (CEOS). CEOS has become the "space arm" for the implementation of the Global Earth Observation System of Systems (GEOSS) vision. It is directly supporting the space-based, near-term tasks articulated in the GEO three-year work plan. This paper describes a coordinated program of demonstration projects conducted by CEOS member agencies and partners to utilize Earth observations to enhance energy management end-user decision support systems. I discuss the importance of engagement with stakeholders and understanding their decision support needs in successfully increasing the uptake of Earth observation products for societal benefit. Several case studies are presented, demonstrating the importance of providing data sets in formats and units familiar and immediately usable by decision makers. These projects show the utility of Earth observations to enhance renewable energy resource assessment in the developing world, forecast space-weather impacts on the power grid, and improve energy efficiency in the built environment.

Eckman, Richard S.↗

Comparisons of Air Radiation Model with Shock Tube Measurements

This paper presents an assessment of the predictive capability of shock layer radiation model appropriate for NASA s Orion Crew Exploration Vehicle lunar return entry. A detailed set of spectrally resolved radiation intensity comparisons are made with recently conducted tests in the Electric Arc Shock Tube (EAST) facility at NASA Ames Research Center. The spectral range spanned from vacuum ultraviolet wavelength of 115 nm to infrared wavelength of 1400 nm. The analysis is done for 9.5-10.5 km/s shock passing through room temperature synthetic air at 0.2, 0.3 and 0.7 Torr. The comparisons between model and measurements show discrepancies in the level of background continuum radiation and intensities of atomic lines. Impurities in the EAST facility in the form of carbon bearing species are also modeled to estimate the level of contaminants and their impact on the comparisons. The discrepancies, although large is some cases, exhibit order and consistency. A set of tests and analyses improvements are proposed as forward work plan in order to confirm or reject various proposed reasons for the observed discrepancies.

Bose, Deepak↗

TBCC TSTO Design for the NASA-AFRL Joint System Study

NASA and the Air Force Research Laboratory are involved in a Joint System Study (JSS) on Two-Stage-to-Orbit (TSTO) vehicles. The JSS will examine the performance, operability and uncertainty of unmanned, fully reusable, airbreathing-based TSTO launch vehicle concepts. NASA is providing a concept using turbine-based combined cycle (TBCC) propulsion on the booster stage and an all-rocket orbiter. The Air Force supplied two vehicle concepts, both utilizing an all-rocket booster; one with an all-rocket orbiter, the other using a rocket-based combined cycle orbiter. For NASA, this study is being used for tool assessment and development, and to identify generic technology gaps, not to choose vehicle types or concepts. This presentation starts with an overview of the major JSS ground rules and assumptions. Second, the NASA TSTO concept, Reusable Airbreathing Launch Vehicle - iteration B (RALV-B) is introduced, including its mission profile and, the vehicle (booster and orbiter) layout and packaging. The high speed propulsion concept is then briefly discussed, including the work performed and lessons learned. The low speed TBCC propulsion system is covered next in some detail. An overview for the low speed system is given; then its development is discussed (starting with initial layout and leading to more detailed analyses performed and results). The low speed system portion is wrapped up with lessons learned and summary. Finally, an overall summary and lessons learned so far for the JSS are given as well as work planned to complete the study.

Snyder, Christopher A.↗

Abstracts of the Annual Meeting of Planetary Geologic Mappers, Flagstaff, AZ, 2010

Topics covered include: Detailed Analysis of the Intra-Ejecta Dark Plains of Caloris Basin, Mercury; The Formation and Evolution of Tessera and Insights into the Beginning of Recorded History on Venus: Geology of the Fortuna Tessera Quadrangle (V-2); Geologic Map of the Snegurochka Planitia Quadrangle (V-1): Implications for the Volcanic History of the North Polar Region of Venus; Geological Map of the Fredegonade (V-57) Quadrangle, Venus: Status Report; Geologic Mapping of V-19; Geology of the Lachesis Tessera Quadrangle (V-18), Venus; Comparison of Mapping Tessera Terrain in the Phoebe Regio (V-41) and Tellus Tessera (V-10) Quadrangles; Geologic Mapping of the Devana Chasma (V-29) Quadrangle, Venus; Geologic Mapping of the Aristarchus Plateau Region on the Moon; Geologic Mapping of the Lunar South Pole Quadrangle (LQ-30); The Pilot Lunar Geologic Mapping Project: Summary Results and Recommendations from the Copernicus Quadrangle; Geologic Mapping of the Nili Fossae Region of Mars: MTM Quadrangles 20287, 20282, 25287, 25282, 30287, and 30282; Geologic Mapping of the Mawrth Vallis Region, Mars: MTM Quadrangles 25022, 25017, 25012, 20022, 20017, and 20012; Evidence for an Ancient Buried Landscape on the NW Rim of Hellas Basin, Mars; New Geologic Map of the Argyre Region of Mars: Deciphering the Geologic History Through Mars Global Surveyor, Mars Odyssey, and Mars Express Data; Geologic Mapping in the Hesperia Planum Region of Mars; Geologic Mapping of the Meridiani Region of Mars; Geologic Mapping in Southern Margaritifer Terra; Geology of -30247, -35247, and -40247 Quadrangles, Southern Hesperia Planum, Mars; The Interaction of Impact Melt, Impact-Derived Sediment, and Volatiles at Crater Tooting, Mars; Geologic Map of the Olympia Cavi Region of Mars (MTM 85200): A Summary of Tactical Approaches; Geology of the Terra Cimmeria-Utopia Planitia Highland Lowland Transitional Zone: Final Technical Approach and Scientific Results; Geology of Libya Montes and the Interbasin Plains of Northern Tyrrhena Terra, Mars: First Year Results and Second Year Work Plan; Mars Global Geologic Mapping Progress and Suggested Geographic-Based Hierarchal Systems for Unit Grouping and Naming; Progress in the Scandia Region Geologic Map of Mars; Geomorphic Mapping of MTMS -20022 and -20017; Geologic Mapping of the Medusae Fossae Formation, Mars, and the Northern Lowland Plains, Venus; Volcanism on Io: Results from Global Geologic Mapping; Employing Geodatabases for Planetary Mapping Conduct - Requirements, Concepts and Solutions; and Planetary Geologic Mapping Handbook - 2010.

Bleamaster, Leslie F., III↗

NASA Tech Briefs, February 2003

opics covered include: Integrated Electrode Arrays for Neuro-Prosthetic Implants; Eroding Potentiometers; Common/Dependent-Pressure-Vessel Nickel-Hydrogen Batteries; 120-GHz HEMT Oscillator With Surface-Wave-Assisted Antenna; 80-GHz MMIC HEMT Voltage-Controlled Oscillator; High-Energy-Density Capacitors; Microscale Thermal-Transpiration Gas Pump; Instrument for Measuring Temperature of Water; Improved Measurement of Coherence in Presence of Instrument Noise; Compact Instruments Measure Helium-Leak Rates; Irreversible Entropy Production in Two-Phase Mixing Layers; Subsonic and Supersonic Effects in Bose-Einstein Condensate; Nanolaminate Mirrors With "Piston" Figure-Control Actuators; Mixed Conducting Electrodes for Better AMTEC Cells; Process for Encapsulating Protein Crystals; Lightweight, Self-Deployable Wheels; Grease-Resistant O Rings for Joints in Solid Rocket Motors; LabVIEW Serial Driver Software for an Electronic Load; Software Computes Tape-Casting Parameters; Software for Tracking Costs of Mars Projects; Software for Replicating Data Between X.500 and LDAP Directories; The Technical Work Plan Tracking Tool; Improved Multiple-DOF SAW Piezoelectric Motors; Propulsion Flight-Test Fixture; Mechanical Amplifier for a Piezoelectric Transducer; Swell Sleeves for Testing Explosive Devices; Linear Back-Drive Differentials; Miniature Inchworm Actuators Fabricated by Use of LIGA; Using ERF Devices to Control Deployments of Space Structures; High-Temperature Switched-Reluctance Electric Motor; System for Centering a Turbofan in a Nacelle During Tests; Fabricating Composite-Material Structures Containing SMA Ribbons; Optimal Feedback Control of Thermal Networks; Artifacts for Calibration of Submicron Width Measurements; Navigating a Mobile Robot Across Terrain Using Fuzzy Logic; Designing Facilities for Collaborative Operations; and Quantitating Iron in Serum Ferritin by Use of ICP-MS.

Source record↗

Solar Array Structures for 300 kW-Class Spacecraft

State-of-the-art solar arrays for spacecraft provide on the order of 20 kW of electrical power, and they usually consist of 3J solar cells bonded to hinged rigid panels about 1 inch in thickness. This structural construction allows specific mass and packaging volumes of up to approximately 70 W/kg and 15 kW/m3 to be achieved. Significant advances in solar array structures are required for future very-high-power spacecraft (300+ kW), such as those proposed for pre-positioning heavy cargo on or near the Moon, Mars, or asteroids using solar electric propulsion. These applications will require considerable increases in both W/kg and kW/m3, and will undoubtedly require the use of flexible-substrate designs. This presentation summarizes work sponsored by NASA's Game Changing Development Program since Oct. 2011 to address the challenge of developing 300+ kW solar arrays. The work is primarily being done at NASA Langley, NASA Glenn, and two contractor teams (ATK and DSS), with technical collaboration from AFRL/Kirtland. The near-tem objective of the project is design, analysis, and testing of 30-50 kW solar array designs that are extensible to the far-term objective of 300+ kW. The work is currently focused on three designs: the MegaFlex concept by ATK, the Mega-ROSA concept by DSS, and an in-house 300-kW Government Reference Array concept. Each of these designs will be described in the presentation. Results obtained to date by the team, as well as future work plans, for the design, analysis, and testing of these large solar array structures will be summarized.

Pappa, Richard↗

Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070

The purpose of this CMI Year 9 AGWMR is to present the actions taken and results obtained during the ninth year of implementation of Corrective Measures (CM) at HMF. Groundwater monitoring activities were conducted in accordance with the CMI Work Plan (Tetra Tech, 2005a) and CMI Site-Specific Safety and Health Plan (Tetra Tech, 2005b). Groundwater monitoring activities detailed in this Year 9 report include pre-startup sampling in February 2014(prior to restarting the air sparging system) and quarterly performance monitoring in March, July, and September 2014.

Remediation↗

Area 3 Support Buildings (A3SB) H5-0992, H5-0996 PRL 218 Confirmatory Sampling Report

The Area 3 Support Buildings site (A3SB) consists of two separate areas located on the north side of Beach Road in the northern portion of Kennedy Space Center, Florida (KSC), outside the secured perimeter of KSC. The A3SB areas are approximately 0.6 miles apart, and were developed as Shiffler's Grocery Store and Service Station (west site) and as a residence (east site) prior to acquisition by the National Aeronautics and Space Administration (NASA) in 1963. Both areas were used by the Bendix Company in support of NASA as chemical laboratories from 1963 through 1969. Both of the buildings were demolished by 1987. The west portion of the site was used by the US Fish & Wildlife Service (F&W) in support of the Merritt Island National Wildlife Refuge (MINWR) for parking at the entrance to the Hammock Trails from 1969 to the present. The east portion of the site was used for intermittent suspect materials staging in the early 1990s and is still used as an apiary location, but is otherwise no longer active. In support of the NASA HSWA permit requirements, this site was identified as Potential Release Location (PRL) 218 and a Solid Waste Management Unit (SWMU) Assessment (SA) was conducted in 2013. Confirmatory Sampling (CS) was recommended and approved by the KSC Remediation Team (KSCRT). Three locations of concern (LOCs) were identified and sampled at the site. The LOCs include two former chemical labs and a former suspect staging area. The CS was conducted in March of 2015 at three locations by means of Direct Push Technology (DPT) groundwater sampling and at one location for soil sampling. The samples were collected and analyzed in accordance with the approved CS Work Plan. There were no exceedances of criteria detected in any of the samples from the three LOCs. The results of this investigation indicate that past and/or present operations have not negatively impacted environmental media at the A3SB. Based upon no confirmed groundwater detections above GCTLs and no soil impacts above applicable screening criteria no further investigation is warranted at the A3SB. A No Further Action (NFA) status for all locations was approved by the KSCRT at the June 2015 meeting.

Confirmatory sampling↗

Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

Johnson, Jill W.↗

Thermal Analysis of Iodine Satellite (iSAT) from Preliminary Design Review (PDR) to Critical Design Review (CDR)

The Iodine Satellite (iSAT) is a 12U cubesat with a primary mission to demonstrate the iodine fueled Hall Effect Thruster (HET) propulsion system. The spacecraft (SC) will operate throughout a one year mission in an effort to mature the propulsion system for use in future applications. The benefit of the HET is that it uses a propellant, iodine, which is easy to store and provides a high thrust-to-mass ratio. This paper will describe the thermal analysis and design of the SC between Preliminary Design Review (PDR) and Critical Design Review (CDR). The design of the satellite has undergone many changes due to a variety of challenges, both before PDR and during the time period discussed in this paper. Thermal challenges associated with the system include a high power density, small amounts of available radiative surface area, localized temperature requirements of the propulsion components, and unknown orbital parameters. The thermal control system is implemented to maintain component temperatures within their respective operational limits throughout the mission, while also maintaining propulsion components at the high temperatures needed to allow gaseous iodine propellant to flow. The design includes heaters, insulation, radiators, coatings, and thermal straps. Currently, the maximum temperatures for several components are near to their maximum operation limit, and the battery is close to its minimum operation limit. Mitigation strategies and planned work to solve these challenges will be discussed.

Mauro, Stephanie↗