Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerator test facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Multipoint-BAX: a new approach for efficiently tuning particle accelerator emittance via virtual objectives

Abstract Although beam emittance is critical for the performance of high-brightness accelerators, optimization is often time limited as emittance calculations, commonly done via quadrupole scans, are typically slow. Such calculations are a type of multipoint query , i.e. each query requires multiple secondary measurements. Traditional black-box optimizers such as Bayesian optimization are slow and inefficient when dealing with such objectives as they must acquire the full series of measurements, but return only the emittance, with each query. We propose a new information-theoretic algorithm, Multipoint-BAX , for black-box optimization on multipoint queries, which queries and models individual beam-size measurements using techniques from Bayesian Algorithm Execution (BAX). Our method avoids the slow multipoint query on the accelerator by acquiring points through a virtual objective , i.e. calculating the emittance objective from a fast learned model rather than directly from the accelerator. We use Multipoint-BAX to minimize emittance at the Linac Coherent Light Source (LCLS) and the Facility for Advanced Accelerator Experimental Tests II (FACET-II). In simulation, our method is 20× faster and more robust to noise compared to existing methods. In live tests, it matched the hand-tuned emittance at FACET-II and achieved a 24% lower emittance than hand-tuning at LCLS. Our method represents a conceptual shift for optimizing multipoint queries, and we anticipate that it can be readily adapted to similar problems in particle accelerators and other scientific instruments.

43 PARTICLE ACCELERATORS↗

A New Measurement of the Neutron Electric Form Factor with the Super Bigbite Spectrometer Apparatus

Protons and neutrons, collectively known as nucleons, make up the nuclei at the core of atoms which form our world. The nucleon has been under intensive study for over 100 years, and yet we still do not fully understand the internal dynamics which govern properties like its spin or its mass-which contributes to almost all of the visible mass in the universe. These dynamics are governed by quantum chromodynamics(QCD), the predictions of which are experimentally tested at high energy accelerator facilities such as Jefferson Lab. TheGEN-II experiment (E12-09-016) is one such experiment. GEN-II is part of the Super Bigbite Spectrometer (SBS) experimental form factor pro gramme taking place in Hall A at Jefferson Lab, which aims to make precision measurements of the nucleon electromagnetic form factors(EMFFs)at record high values of squared four momentum transfer ¿2. EMFFs describe the electric and magnetic moment distributions within the nucleon. They can be measured through elastic electron scattering off the nucleon, and describe the recoil response of the target nucleon at a given energy scale. GEN-II is a double polarized semi-exclusive beam target asymmetry (BTA) experiment, seeking to measure the electric form factor of the neutron,¿¿ ¿,at three new values of squared four-momentum transfer¿2 =2.92,6.74and9.82GeV². The latter two points being at record high ¿2. The form factor is determined through measuring the BTA of quasielliptical scattering of a neutron from a polarized nuclear target. The experiment utilized the CEBAF accelerator to produce longitudinally polarized electrons up to ~85% polarization, which were scattered off neutrons within a novel polarized helium-3 (³He) target. This new polarized ³He target was employed by building on the technology of its precursors which existed in similar preceding experiments. This target was designed to operate at the high luminosities typical of Hall A, and reached a record breaking combination of polarization and beam intensity known as figure of merit, three times larger than those predecessors. The SBS collaboration designed and constructed two brand new high acceptance spectrometers for these experiments, an electron arm named Bigbite (BB) and a hadron arm named Super Bigbite. Both spectrometers featured a large acceptance EM dipole magnet, and complementary detector systems. The electron arm contained gaseous electronmultipliers(GEMs) which were used for high precision tracking of the scattered electrons, a heavy gas cherenkov (GRINCH) which was used for PID between electrons and pions, a plastic i ii scintillator timing hodoscope to provide high resolution timing of the start of events, and a pair of EM calorimeters (BBCal) which provided energy measurements of detected particles, and provided the experimental trigger. The hadron arm also contained a system of GEMs which will be utilized for future SBS experiments, and a hadron calorimeter designed to provide position, timing and energy measurements of the recoiling nucleon. The calibration of all detector subsystems, beam and target data is discussed, with a focus on novel timing calibrations to the hodoscope and hadron calorimeter. An analysis of selecting quasielliptical events and suppressing background contributions from a number of sources which contaminate the final event sample is given. The largest irreducible backgrounds are found to be from misidentified protons, timing accidentals and inelastic events. The physical asymmetry is measured and used to extract a value for the form factor ratio ¿¿ ¿/¿¿ ¿. High precision ¿2 data for ¿¿ ¿ is used to then extract ¿¿ ¿. This work finds at ¿2 = 2.92 GeV2 that ¿¿ ¿ = 0.0129+0.0019 -0.0020. This result is in statistical agreement with existing fits to world data, and predictions from the constituent quark model and Dyson–Schwinger equations, in this region of ¿2.

Penman, Gary [Univ. of Glasgow, Scotland (United K↗

Particle impact tests

Particle impact tests were performed on three types of orbiter surface with a micrometeoroid facility. The test equipment electrostatically accelerated micron sized particles to high velocities simulating micrometeoroid impacts. Test particles were titanium diboride with typical velocities in the range 1 to 2.3 km x sec/1 and equivalent particle diameters in the range 4 to 16 microns. Impact angles to the material surface were 90, 60 and 30 degrees. The particle impact sites were located on the sample surfaces and craters were photographed with a magnification of 400X.

Komatsu, G. K.↗

Cryogenic and safety design of the future high field cable test facility at Fermilab

The HFVMTF (High Field Vertical Magnet Test Facility) is a new experimental facility under development at Fermi National Accelerator Laboratory (FNAL) to test large superconducting magnets (up to 20 tons weight and 1.3 m diameter) in a double bath superfluid helium cryostat (1.9 K and 1.2 bar). Coupled with a superconducting dipole magnet fabricated by Lawrence Berkeley National Laboratory (LBNL), this facility will be able to test future high-temperature superconductor (HTS) cables under a background magnetic field of 15 T for fusion magnets. This paper describes the design of the cryostat and its 1.4-meter diameter lambda plate, as well as the different components for a safe operation of the facility, even during critical events such a magnet quench or a vacuum breaking situation. The project is funded by US DOE Offices of Science, High Energy Physics (HEP), and Fusion Energy Sciences (FES).

43 PARTICLE ACCELERATORS↗

Definition of Capabilities Needed for a Single Event Effects Test Facility

The Federal Aviation Administration (FAA) is contemplating new regulations mandating testing of the vulnerability of flight-critical avionics to single event effects (SEE). A limited number of high-energy neutron test facilities currently serve the SEE industrial and institutional research community. The FAA recognizes that existing facilities have insufficient test capacity to meet new demand from such mandates; it desires more flexible irradiation capabilities to test complete, large systems and would like capabilities to address greater concerns for thermal neutrons. For this reason, the FAA funded this study by Spallation Neutron Source (SNS) staff with the ultimate aim of developing options for SEE test facilities using high-energy neutrons at the SNS complex. After an investigation of current SEE test practices and assessment of future testing requirements, three concepts were identified covering a range of test functionality, neutron flux levels, and fidelity to the atmospheric neutron spectrum. The costs and times required to complete each facility were also estimated. SEE testing is generally performed by accelerating the event rate to a point where the effects are still dominated by single events and double event causes of failures are negligible. In practice, acceleration factors of as high as 10 6 are applicable for component testing, whereas for systems testing acceleration factors of 10 4 seem to be the upper limit. It is strongly desirable that the irradiation facility be tunable over a large range of high-energy neutron fluxes of 10 2 - 10 4 n/cm²/s for systems testing and from 10 4 - 10 7 n/cm²/s for components testing. The most capable, most flexible, and highest-test-capacity option is a new stand-alone target station named the High-Energy neutron Test Station (HETS). It is also the most expensive option, with a cost to complete of approximately $100 million. Dual test enclosures would allow for simultaneous testing activity effectively doubling overall test capacity per HETS operating hour. Using about 1 kilowatt (kW) of proton power extracted from the accelerator before injection in the accumulator ring, its operation would be unnoticeable by neutron scattering users at the SNS target station. The H beam laser stripping technique would allow for control of beam power on the HETS target independent from power delivered to the SNS. Large systems with frontal areas of up to 1 x 2 m² could be accommodated with integral high-energy flux values (above 10 megaelectron-volt, or MeV) to at most 10 4 n/cm²/s; components could also be tested with flux levels to at most 10 7 n/cm²/s on beam sizes of up to 0.2 x 0.2 m². Selectable moderating material and neutron filters would allow tailoring of the neutron spectrum to user demands; charged particle deflectors could be switched to allow or deflect protons, pions, and muons. It is estimated that HETS would take 5 years to complete after award of contract, including engineering design and construction. Commissioning would take at least another 6 months. Interference with SNS principal operations was not considered in the construction time estimate; connection of the proton transport line and tunnel from the accelerator high energy beam transport (HEBT) and construction around existing site utilities would require careful planning and coordination with beam operations at the SNS. A high-energy (HE) neutron test facility using an available beam line on the SNS target station is a technically and financially attractive option. Inspired by the new ChipIR instrument on the ISIS TS 2 spallation source in the UK, a similar facility could be placed on an unused beam line in the SNS instrument hall [e.g., on beam line 8 (both A and B channels would be needed) or on beam line 10]. The performance would approach that of an HETS (~80%), but it would be operationally more limited, with only a single user at a time. Space is more limited, so the maximum system size would be about half of that in an HETS. Flexibility to tailor the spectrum would be somewhat more limited. While this concept was not as fully developed and characterized, preliminary work indicates very high HE flux levels should be possible, with ample thermal neutrons as well. Flux control would be more difficult than at HETS because proton power on target be whatever the SNS was operating at for neutron scattering. Neutron attenuation devices would have to be employed with as-yet undetermined control resolution. However, no new buildings would be needed, and the necessary utilities are already present in the SNS Experiment Hall. The estimated cost for a beam line option is around $15 million; the time to complete would be 3 years after award of contract, plus at least 6 months for commissioning. Interference of construction activities with SNS operations should be negligible. This option would require negotiation with the Department of Energy Basic Energy Sciences (BES) office -- the primary stakeholder of SNS -- for an application outside the usual scope of neutron scattering sciences. Furthermore, these presently open beam lines are highly desirable locations for proposed neutron scattering instruments and obtaining one of them for an SEE test facility will come only with persuasive and timely arguments to SNS leadership and the DOE BES. The third option is a tunnel extension/target cave facility providing the most basic system-level irradiation capability with minimal flexibility. Again not as well developed a concept as HETS, it would use a laser-stripping technique like an HETS, redirecting protons to a tunnel similar to the initial HETS proton transport tunnel. Indeed, this concept is intended to be upgradable to a full HETS facility. Only a small fraction of a watt of proton power would be used in this basic configuration, though. An uncooled target and primitive shielding arrangement would provide beam on modestly sized systems that must be placed in close proximity to the target. The neutron fluence would be less uniform over the system than with the HETS or the beam line option. A data acquisition room and support area would be located on the ground level; access to the target cave would be via elevator and/or stairway. As a result of the required excavation, new tunnel construction, shielding, data acquisition building, utilities, and other items, the estimated cost is $30 million. The time to complete is expected be more than 3 years; here again construction interference with SNS operations has not been accounted for, but it could have a significant impact.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Separate Effects Miniature Fuel Irradiation Testing to Support Fuel Safety

The recent interest in advanced fuel forms that offer increased thermal conductivity and uranium density, as well as modifications (e.g., use of dopants or additives) to traditional UO2 fuel, necessitates a vehicle for performing high-throughput irradiation testing of these fuels before they can be safely deployed. This interest, combined with the recent decommissioning of the Halden Reactor, places a strong burden on the remaining test reactors to provide the scientific data needed to advance these fuels toward commercialization. Oak Ridge National Laboratory is actively working to alleviate some of this burden by commissioning a new “MiniFuel” test facility that will provide a vehicle for performing accelerated separate-effects irradiation testing of sub-sized nuclear fuel specimens. The small size of the fuel allows for a flexible irradiation vehicle capable of exploring a wide range of fuel performance variables within a reasonable time and cost. This paper describes the experiment facility, and the initial irradiation experiments being performed including uranium nitride (UN) kernels, coated tristructural-isotropic (TRISO) UN particles, doped and un-doped (reference) UO2 disks, U3Si2 disks, and fully ceramic microencapsulated (FCM) pellets with UN kernels and a SiC matrix. A focus is placed on the performance of miniature FCM pellets, which are being considered as the ultimate accident tolerant fuel for light water reactors. The experiments described in this paper will provide basic scientific data (e.g., swelling, fission gas release) regarding irradiation performance under well-characterized conditions.

Petrie, Christian↗

Uranium Solubility and Supernate Enrichment Testing for Accelerated Basin De-Inventory Discards to Concentration, Storage, and Transfer Facilities

After future Accelerated Basin De-inventory (ABD) enriched uranium discards into sludge batches (SB), portions of supernate decants during SB preparation will be blended into salt batches (StB) and the resulting feeds must meet the nuclear safety requirements for the Salt Waste Processing Facility (SWPF). During previous SB10 sampling and testing, which involved H-Canyon material containing enriched uranium being mixed with Tank 51 sludge shortly after the H-Canyon stream was neutralized, it was identified that the uranium isotopic enrichment in the supernate deviated from the uranium isotopic enrichment in the slurry. The higher uranium isotopic enrichment in the supernate introduced the risk of challenging the feed requirements of SWPF. The ABD material added to SB11 was isotopically diluted with depleted uranium, mitigating any downstream impacts. However, H-Canyon desires to eliminate or minimize future depleted uranium additions in order to meet the mission schedule.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RTDP: Streaming Readout Real-Time Development and Testing Platform

The Thomas Jefferson National Accelerator Facility (JLab) has created and is currently working on various tools to facilitate streaming readout (SRO) for upcoming experiments. These include reconstruction frameworks with support for Artificial Intelligence/Machine Learning, distributed High Throughput Computing (HTC), and heterogeneous computing which all contribute significantly to swift data processing and analysis. Designing SRO systems that combine such components for new experiments would benefit from a platform that would combine both simulation and execution components for simulation, testing, and validation before large investments are made. The Real-Time Development Platform (RTDP) is being developed as part of an LDRD funded project at JLab. RTDP aims to establish a seamless connection between algorithms, facilitating the seamless processing of data from SRO to analysis, as well as enabling the execution of these algorithms in various configurations on compute and data centers. Individual software components simulating specific hardware can be replaced with actual hardware when it is available.

Gyurjyan, Vardan↗

Concept of Operations: National Technology Test Bed Network for Water Resource Recovery

There is an urgency to advancing wastewater technologies due to aging water infrastructure and emerging regulations. A crosscutting working group proposes a conceptual design for a test bed network to understand and evaluate wastewater technologies to drive acceptance and deployment of new technologies to enhance performance. The working group includes contributors from the U.S. Department of Energy, the U.S. Environmental Protection Agency, the U.S. National Science Foundation, and the Water Research Foundation (formerly known as the Water Environment & Reuse Foundation). Upgrading today's aging wastewater treatment infrastructure to a new generation of water resource recovery facilities (WRRFs) requires the development and deployment of innovative technologies. The path to technology adoption depends on expensive, time consuming, and often repetitive cycles of testing and validation. Existing water resource recovery technology testing facilities (e.g., test beds) are underutilized and cannot, by themselves, broaden technology uptake. It has been proposed that technology adoption could be accelerated by a network linking these test facilities with innovators, manufacturers, utilities, regulators, policymakers, and educators. This document proposes a structure for a National Test bed Network (TBN) for water resource recovery. The concepts for its operation are explored herein. This document identifies drivers to launch a TBN and critical needs for successful implementation of the network. An important driver to technology implementation at WRRFs is the relationship between local utilities and state regulators. The TBN could provide access to validated performance data and facilitate deployment. To link the stakeholders and accelerate deployment, the TBN will require standards for methods, data quality, data management, and data security. These standards will enable validation of performance and will expand the “toolbox” that utilities and regulators could consider. Design, set up, and launch of this toolbox is beyond the scope of operations of utilities and regulators and will likely require external support to achieve full operation. Herein, a pathway is proposed to achieve this full operation. This document defines the function of a WRRF TBN. It also proposes a structure for the TBN to achieve its stated goals and mission. Finally, this document summarizes findings from several sources, including a series of workshops about the TBN concept, operators of test beds in ancillary industries, and discussions with regulators and permitting agencies. A description of this work was published in the peer-reviewed literature (Mihelcic 2017).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Retuning the DARHT Axis-II Linear Induction Accelerator

The Dual-Axis Radiographic Hydrodynamic Test (DARHT) facility uses bremsstrahlung radiation source spots produced by the focused electron beams from two linear induction accelerators (LIAs) to radiograph large hydrodynamic experiments driven by high explosives. The Axis-II 1.7-kA, 1600-ns beam pulse is transported through the LIA by the magnetic field from 91 solenoids as it is accelerated to ~16.5 MeV. The magnetic field produced by the solenoids and 80 steering dipole pairs for a given set of magnet currents is known as the “tune” of the accelerator [1]. From June, 2013 through September, 2014 a single tune was used. This tune was based on measurements of LIA element positions made over several years [2], and models of solenoidal fields derived from actual field measurements [3] [4]. Based on the focus scan technique, changing the tune of the accelerator and downstream transport had no effect on the beam emittance, to within the uncertainties of the measurement. Beam sizes appear to have been overestimated in all prior measurements because of the low magnification of the imaging system. This has resulted in overestimates of emittance by ~50%. The high magnification imaging should be repeated with the old tune for direct comparison with the new tune. High magnification imaging with the new accelerator tune should be repeated after retuning the downstream to produce a much more symmetric beam to reduce the uncertainty of this measurement. Thus, these results should be considered preliminary until we can effect a new tune to produce symmetric spots at our imaging station, for high magnification images.

43 PARTICLE ACCELERATORS↗

Advanced Characterization of Fuel-cladding Chemical Interaction between U-10Zr Fuel and HT9 Cladding Tested in Fast Flux Test Facility

Fuel cladding chemical interaction (FCCI) can greatly accelerate the cladding failure. However, due to the limited space in a fuel cladding assembly, it is historically challenging to gain an mechanistical understanding of the formation mechanism of FCCI and its influence on fuel and cladding performance. With the imminent need to qualify U-10Zr based metallic fuel cladded by HT-9 for advanced reactors demonstration project, it is of vital importance to use advanced characterization method to study FCCI in a unprecedent detailed manner and gain better mechanism understanding of FCCI. Mechanistic Fuel Failure (MFF) series of prototypic fuel elements irradiated in FFTF [1, 2] provides the best samples to study FCCI since the MFF-series assemblies had an axial fuel height the same as proposed length by industry partners. Jason et al. [3] has performed preliminary post-irradiation examination on a MFF fuel pin sample, which was extracted from the HT9 cladded U-10at.%Zr MFF-3 pin MFF-3 pin (#193045) at an axial location of X/L = 0.98. This sample has a peak burnup of 5.7 at.% and peak inner cladding temperature (PICT) of around 615 °C during in-core testing. Scanning electron microscope examination has identified visible FCCI region on more than half of the HT9 circumference [3]. The most striking feature are grain boundary attacking by apparently lanthanides (Lns) rich phase. However, SEM cannot provide accurate assessment of phase and concentration of grain boundary phases and prevented a better understanding of the formation mechanism of such attach. This study, by pairing transmission electron microscope (TEM) characterization and atom probe tomography (APT) techniques with in-situ micro-tensile testing in scanning electron microscope (SEM), aims at gaining in-depth understanding on the formed FCCI region. The identified FCCI region roughly consists of multilayers as illustrated in Figure 1 (c). The main findings are: (1) layer-B shows observable lanthanides (Lns) infiltration along grain boundaries and mechanical softening due to FCCI- and irradiation-induced microstructural and microchemistry changes, particularly the recovery of martensitic lath structure and dissolution of pre-existing M23C6 together with the formation of coarsened Laves phases, (Fe, Cr)2(Mo, W); (2) layer-C is Fe depleted but Lns significantly enriched, becoming very brittle; (3) layer-D is mainly composed of UFe2 and Lns; (4) three FCCI-induced intermetallic U-Fe-Zr phases, ? (Fe0.5Zr0.32U0.18), e (Fe0.3Zr0.4U0.3), ? (Fe0.06Zr0.23U0.71), were identified near layer-E; (5) the ? (Fe0.5Zr0.32U0.18) phase was characterized to be a face centered cubic (FCC) crystal structure. These results will help to better understanding the governing mechanism of FCCI and facilitating the development of theoretical model for assessing the performance of metallic fuel and cladding integrity.

36 MATERIALS SCIENCE↗

Sustainability metrics for assessing water resource recovery facilities of the future

Abstract The recovery of water, energy, and nutrients from water resource recovery facilities ( WRRF s) is needed to address significant global challenges, such as increasing water demand and decreasing availability of nonrenewable resources. To meet these challenges, innovative technological developments must lead to increased adoption of water and resource recovery processes, while addressing stakeholder needs (e.g., innovators, practitioners, regulators). A test bed network of over 90 partner facilities within the United States and abroad will help accelerate innovation and widespread adoption of novel processes through multiscale testing and demonstration of technologies. In this paper, we define a common set of environmental, economic, technical, and social performance metrics for innovative technologies, that will meet the needs of multiple stakeholders in the decision‐making process. These triple bottom line performance metrics can be used to track the sustainability of technologies in a consistent and transparent manner, while aiding the decision‐making process for WRRF s. Practitioner points The Facilities Accelerating Science and Technology (FAST) Water Network includes over 90 test bed facilities dedicated to accelerating innovation and adoption of water energy, and nutrient recovery systems. A common set of environmental, economic, technical, and social performance metrics should be measured and reported when a new technology is evaluated in the FAST Water Network. Performance metrics can aid sustainable decision‐making at WRRF, while meeting the needs of multiple stakeholders.

Cornejo, Pablo K.↗

Design studies and commissioning plans for plasma acceleration research station experimental program

Plasma acceleration research station is an electron beam driven plasma wakefield acceleration test stand proposed for CLARA facility in Daresbury Laboratory. In this paper, the interaction between the electron beam and the plasma is numerically characterised via 2D numerical studies by using VSIM code. The wakefields induced by a single bunch travelling through the plasma were found to vary from 200 MV/m to 3 GV/m for a range of bunch length, bunch radius, and plasma densities. Energy gain for the particles populating the bunch tail through the wakefields driven by the head of the bunch was demonstrated. After determining the achievable field for various beams and plasma configurations, a reference setting was determined for further studies. Considering this reference setting, the beam quality studies were performed for a two-bunch acceleration case. The maximum energy gain as well as the energy spread mitigation by benefiting from the beam loading was investigated by positioning the witness and driver bunches with respect to each other. Emittance growth mechanisms were studied considering the beam-plasma and beam-wakefield interactions. Eventually, regarding the findings, the initial commissioning plans and the aims for the later stages were summarised.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Initial conditions for simulations of beam physics in linear induction accelerators

Flash radiography of hydrodynamic experiments driven by high explosives is a well-known diagnostic technique in use at many laboratories. At Los Alamos, the DualAxis Radiographic Hydrodynamic Test (DARHT) facility two linear induction electron accelerators (LIAs) make the bremsstrahlung radiographic source spots for point projection radiographs from orthogonal views. A new LIA, called Scorpius, is presently under development to advance this technology. To better understand electron-beam physics in these LIAs, numerical simulations are frequently performed with the objective of improving the radiography. At Los Alamos we frequently use the TRAK ray-trace and LSP particle-in-cell (PIC) codes to simulate the injector, and the XTR and LAMDA envelope/centroid codes along with LSP to simulate transport of the accelerated beam through the LIAs. The LIA simulations need the injected beam parameters as initial conditions for calculating beam transport and stability. The determination of these initial conditions is the topic of this note.

43 PARTICLE ACCELERATORS↗

Energy measurement of electron beams by Compton scattering

A method has been proposed to utilize the well-known Compton scattering process as a tool to measure the centroid energy of a high energy electron beam at the 0.01% level. It is suggested to use the Compton scattering of an infrared laser off the electron beam, and then to measure the energy of the scattered gamma-rays very precisely using solid-state detectors. The technique proposed is applicable for electron beams with energies from 200 MeV to 16 GeV using presently available lasers. This technique was judged to be the most viable of all those proposed for beam energy measurements at the nearby Continuous Electron Beam Accelerator Facility (CEBAF). Plans for a prototype test of the technique are underway, where the main issues are the possible photon backgrounds associated with an electron accelerator and the electron and laser beam stabilities and diagnostics. The bulk of my ASEE summer research has been spent utilizing the expertise of the staff at the Aerospace Electronics Systems Division at LaRC to assist in the design of the test. Investigations were made regarding window and mirror transmission and radiation damage issues, remote movement of elements in ultra-high vacuum conditions, etc. The prototype test of the proposed laser backscattering method is planned for this December.

Keppel, Cynthia↗

Ion engine endurance testing at high background pressures

Ion engine endurance testing at vacuum chamber pressures in the low 10 exp -3 Pa range is enabled through the use of a three-grid accelerator system with the decelerator grid biased 50 to 100 volts negative of neutralizer cathode potential. The negative decelerator grid serves to collect the facility induced charge exchange ion current which normally results in rapid erosion of the accelerator grid during testing at elevated vacuum chamber pressures. This screen, accelerator, negative decelerator (SAND) grid configuration enables an order of magnitude reduction in vacuum chamber pumping speeds relative to that required for endurance testing of ion engines with conventional two-grid accelerator systems. A 900-hr test of a 30-cm diameter engine at 6.5 kW and a tank pressure of 3.7 x 10 exp -3 Pa was performed to test the feasibility of the three-grid SAND accelerator system technology. Grid erosion rates from this test are compared to those from a 200-hr test performed with the same discharge chamber, in the same test facility, and at the same background pressure with a conventional two grid accelerator system. The SAND optics resulted in greater than a factor of 100 reduction in accelerator grid erosion rate relative to the two-grid system.

Brophy, John R.↗

Correct Initial Conditions for Simulations of Beam Physics in Linear Induction Accelerators

Flash radiography of hydrodynamic experiments driven by high explosives is a well-known diagnostic technique in use at many laboratories. At Los Alamos, the Dual Axis Radiographic Hydrodynamic Test (DARHT) facility two linear induction electron accelerators (LIAs) make the bremsstrahlung radiographic source spots for point projection radiographs from orthogonal views. A new LIA, called Scorpius, is presently under development to advance this technology. To better understand electron-beam physics in these LIAs, numerical simulations are frequently performed with the objective of improving the radiography. At Los Alamos we frequently use the TRAK ray-trace and LSP particle-in-cell (PIC) codes to simulate the injector, and the XTR and LAMDA envelope/centroid codes along with LSP to simulate transport of the accelerated beam through the LIAs. The LIA simulations need the injected beam parameters as initial conditions for calculating beam transport and stability. The determination of these initial conditions is the topic of this note.

43 PARTICLE ACCELERATORS↗