Search NASA⌕ Search

SEARCH · Search NASA

Results for “asset management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

ARM FY2026 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) User Facility maintains a suite of advanced atmospheric radar systems that serve as critical tools in ARM’s mission to provide continuous, high-quality observations for advancing the understanding and modeling of atmospheric processes. These radar systems enable detailed characterization of clouds, precipitation, and dynamic structures in the atmosphere, supporting a broad range of scientific applications. The number of deployed systems exceeds what current staffing levels can fully support for continuous 24/7/365 operation. As such, it is essential to have a clearly defined and community-informed plan that prioritizes radar operations and communicates ARM’s strategy for sustaining and evolving these observational assets. This FY2026 Radar Plan outlines ARM’s approach to managing its radar portfolio—balancing scientific impact, operational feasibility, and long-term sustainability. It reflects ARM’s continued commitment to delivering calibrated, well-documented radar data products that enable process-level studies and support the development and evaluation of weather and climate models. Through this plan, ARM aims to ensure transparency in decision-making, alignment with user needs, and support for innovative science across the facility’s fixed and mobile observatories. Given uncertainties around the Fiscal Year (FY) 2026 budget, this plan was developed to assume business as usual and will be updated as budgets and plans may change. It should be noted that, given the limited timeframe involved, this plan will be more succinct than previous plans.

47 OTHER INSTRUMENTATION↗

ARPA-E PERFORM datasets

Time-coincident load, wind, and solar data including actual and probabilistic forecast datasets at 5-min resolution for ERCOT, MISO, NYISO, and SPP. Wind and solar profiles are supplied for existing sites as well as planned sites based on interconnection queue projects as of 2021. For ERCOT actuals are provided for 2017 and 2018 and forecasts for 2018, and for the remaining ISOs actuals are provided for 2018 and 2019 and forecasts for 2019. There datasets were produced by NREL as part of the ARPA-E PERFORM project, an ARPA-E funded program that aim to use time-coincident power and load seeks to develop innovative management systems that represent the relative delivery risk of each asset and balance the collective risk of all assets across the grid. For more information on the datasets and methods used to generate them see https://github.com/PERFORM-Forecasts/documentation.

5-min data↗

HybridSystemsSimulations.jl - Solving the Merchant Collocated Facilities with JuMP

The development of new clean-generation technologies also leads to new plant-level architectures that combine several generation and storage assets behind the point of connection. These co-located generation resources (Hybrid Systems) primarily operate as merchant assets that employ automated market bidding models and internal Energy Management Systems (EMS) to comply with the operator's signals. Formulating an optimal bidding model requires embedding the EMS control model into the bidding algorithm, resulting in a bi-level optimization problem. In this presentation, we first showcase using JuMP to formulate and solve this problem effectively for multiple merchant systems and the bidding outcomes considering different model formulations. Second, the bidding outcomes are later integrated into a PowerSimulations.jl (also built with JuMP) simulation to study the system-level effects of the various merchant bidding and the interactions between market-clearing models and the embedded EMS model. We will showcase simulations conducted in the RTS system considering different levels of merchant hybrid systems participation. The presentation provides the following specific insights on JuMP usage: 1) the Formulation of specialized bi-level problems with custom cuts to solve the merchant hybrid system bidding problem; 2) the integration of a modular model within a complex simulation workflow supported by JuMP in PowerSimulations.jl; 3) Accelerating the solution of power systems operations simulation that employ agent optimization problems using JuMP.

energy markets↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Project: Corbomite - Product: ConsoleWorks REACT

TDi Technologies presents ConsoleWorks REACT, an advanced platform designed to tackle the complexities of cyber and operational risk assessment. This comprehensive solution goes beyond asset-focused approaches by considering the impact of both assets and people have on the security and operation of critical infrastructure, specifically targeting preventing gird mis-operation by evaluating real-time human interaction or commands with critical assets. The hypothesis suggests that by integrating the assessment of user commands into the overall risk assessment process, organizations can make more informed decisions, prioritize resources effectively, and respond promptly to potential threats. This hypothesis forms the basis for the development of a proactive and holistic risk management approach that is more comprehensive and context aware than traditional models which only look at assets, patch levels, configuration and threat intel by collecting that information off the network vs directly from the asset, human, and human interaction all in real-time. ConsoleWorks' unique man-in-the-middle architecture is a key feature that sets it apart in the cybersecurity landscape. This architecture enables the real-time observation, enforcement, and commands or interaction risk transparency of user interaction with critical infrastructure to be risk mitigated and audited as they are aggregated with device and human risk factors for a more comprehensive risk threat score across a device or group of devices. This architecture allows ConsoleWorks to act as a secure intermediary between users and critical assets, monitoring all interactions and ensuring that only authorized commands are sent to the asset to be executed. This not only enhances security but also provides a comprehensive audit trail of all user activities, contributing to compliance efforts and facilitating incident investigation and risk management. By integrating this unique architecture with our comprehensive risk assessment methodology, ConsoleWorks REACT provides a powerful solution for managing cyber and operational risks, enabling organizations to maintain a robust security posture and effectively mitigate potential threats. To that end, the primary objective of this project was to research and develop a robust solution that enables the energy industry to mitigate the risks associated with human actions that can compromise the security or operations of assets critical to energy delivery, generation, transmission and operation. ConsoleWorks REACT plays a pivotal role in achieving this goal by leveraging its unique capabilities to monitor and track all user activity. Through its Zero Trust approach, which emphasizes continuous verification, the platform ensures secure access to assets and serves as the centralized human response and notification platform for addressing cyber and operational issues.

97 MATHEMATICS AND COMPUTING↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices: Preprint

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Integrating Cyber-Informed Engineering into Enterprise Risk Management

This document supports the application of Cyber-Informed Engineering (CIE) within the context of Enterprise Risk Management (ERM) to enhance cyber-resilience. It highlights that many critical infrastructure organizations use ERM to manage business risks and emphasizes the importance of evaluating critical systems and assets. The proposed approach can be adopted independently of formal ERM processes and offers a starting point for integrating CIE alongside existing or new ERM practices. Both CIE and ERM are iterative, and their alignment fosters continuous improvement and supports the engineering and operations cultures of an organization.

42 ENGINEERING↗

Tale of Two Domains: Cyber - Physical

As devices and systems continue to modernize and adopt integrated circuits, the use of cyber technology to deploy an application is the expectation. This deployment through cyber assets brings new cyber risk and cybersecurity is the practice of managing this risk. Cyber-risk is constantly changing due to the speed of technology advancement and the changing quality of the adversary. Cyber-Informed Engineering (CIE) mitigates cyber-risk through engineering controls where as the traditional practice of cybersecurity mitigates cyber-risk through cybersecurity controls. By clearly defining the cyber-physical boundary, engineering controls and cybersecurity controls can clearly demonstrate their complementary nature to provide layered defenses and successfully mitigate cyber-risk through independent controls. In this paper, a layered model of device decomposition of the the cyber-physical boundary is presented to provide clarity where engineering controls are used to reduce cyber-risk within the physics, functional materials, electronic, or integrated circuit layers and where cybersecurity controls are used to reduce cyber-risk within the machine code and application layers. By implementing both traditional cybersecurity controls and engineering controls, a more holistic approach to cybersecurity is achieved in protecting modern devices and systems, as well as a clear awareness in identifying, documenting, and authorizing the system’s cybersecurity protection scheme is achieved.

42 - ENGINEERING↗

Integration of Microgrids, DER Aggregators, and DERMS with ADMS

Distributed energy resource (DER) management and control is disjointed, siloed, and at times conflicting. Behind-the-meter (BTM) assets can provide significant flexibility but are poorly integrated with the grid. Centralized control methods alone are not scalable. The objective is to develop and demonstrate an architecture that: provides reliable, resilient, and secure grid services; enables scalable, near-real-time management of utility- and small-scale DERs; supports transactive control, aggregation, and direct control of DERs; and incorporates existing utility management systems.

ADMS↗

Nuclear Safety [Vol. 35, No. 1, January-June 1994]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. THE CHERNOBYL ACCIDENT: 1 Chernobyl Accident Management Actions, A. R Sich; GENERAL SAFETY CONSIDERATIONS: 25 The IAEA-ASSET Approach to Avoiding Accidents is to Recognize the Precursors to Prevent Incidents, F. Reisch; ACCIDENT ANALYSIS: 36 A Review of the Available Information on the Triggering Stage of a Steam Explosion, D. F. Fletcher; 58 Analysis and Modeling of Flow-Blockage-Induced Steam Explosion Events in the High-Flux Isotope Reactor, R. P. Taleyarkhan, V. Georgevich, C. W. Nestor, U. Gat, B. L. Lepard, D. H. Cook, J. Freels, S. J. Chang, C. Luttrell, R. C. Gwaltney, and J. Kirkpatrick; 74 An Analysis of Disassembling the Radial Reflector of a Thermionic Space Nuclear Reactor Power System, M. S. El-Genk and D. V. Paramonov; CONTROL AND INSTRUMENTATION: 86 Standards for High-Integrity Software, D. R. Wallace, D. R. Kuhn, L M. Ippolito, and L. Beltracchi; DESIGN FEATURES: 98 Adoption of New Design Features for the Next Generation Nuclear Power Reactors, L. S. Tong; 114 Review of Nuclear Piping Seismic Design Requirements, G. C. Slagis and S. E. Moore; ENVIRONMENTAL EFFECTS: 128 PC-Based Probabilistic Safety Assessment Study for a Geological Waste Repository Placed in a Bedded Salt Formation, S. A. Khan; OPERATING EXPERIENCES: 142 Managing Aging in Nuclear Power Plants: Insights from NRC’s Maintenance Team Inspection Reports, A. Fresco and M. Subudhi; 150 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 153 Selected Safety-Related Events, Compiled by G. A. Murphy; RECENT DEVELOPMENTS: 158 Reports, Standards, and Safety Guides, D. S. Queener; 168 Proposed Rule Changes as of Dec. 31, 1993; ANNOUNCEMENTS: 177 Symposium on Radioactive and Mixed Waste—Risk as a Basis for Waste Classification; 177 1995 Incineration Conference 178 Ninth Power Plant Dynamics Control and Testing Symposium; 174 The Authors

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Precursor Analysis Report: Conti Ransomware Attack on the Health Service Executive of Ireland 2021

The Conti Ransomware Attack on the Health Service Executive (HSE) of Ireland 2021 Precursor Analysis Report leverages publicly available information about the attack and catalogs anomalous observables for each technique employed by the adversary. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. The HSE provides public healthcare corporate services and operational services throughout Ireland, with critical functions including the acute national ambulance service, acute hospital service, and community healthcare service. On 14 May 2021, Conti ransomware encrypted 80 percent of the HSE’s Information Technology (IT) infrastructure across corporate, hospital, community, and electronic health record services. Conti is a ransomware-as-a-service operation that encrypts local files, uses double extortion against victims, and is facilitated by many intrusion tools. The attack forced the HSE to shut down its entire IT infrastructure to contain the ransomware, forcing employees to revert to pen and paper recordkeeping and leading to the cancellation of many appointments and procedures. The adversary also exfiltrated 700 GB of data, compromising the confidentiality of patients’ protected health information. Had the adversary targeted the COVID-19 cloud systems or operational technology assets, such as Internet of Medical Things medical devices or smart building management systems, the impact of the attack would almost certainly have been far more severe. Researchers and analysts identified 21 unique techniques (used in a sequence of 23 steps) likely utilized during the attack with a total of 1,185 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Twenty-one of the identified techniques used during the attack on the HSE were precursors to the triggering event. Analysis identified 1,086 observables associated with these precursor techniques, 850 of which were assessed to have an increased likelihood of being perceived in the 57 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

A Multi-Site Networked Hardware-in-Loop Platform for Evaluation of Interoperability and Distributed Intelligence at Grid-Edge

Electric power systems have experienced large increases in the number of intelligent, connected and controllable devices being deployed, leading to a high degree of distributed intelligence at the grid-edge. These devices, both utility-owned and consumer-owned, include but are not limited to: renewable generation sources, energy storage, remote switches, voltage regulators, and smart controllable loads such as electric vehicles. These new devices provide significant potential for increased operational flexibility that can be leveraged to achieve system reconfiguration, resiliency improvements, power quality improvements, and distribution system automation. However, there are two significant challenges that must be addressed before these assets can be leveraged for operations: interoperability and system level validation prior to deployment. Because of the complexity of distributed control systems, and their interactions with legacy centralized controls, a purely simulations-based approach for pre-deployment validation is not sufficient. It requires hardware-in-loop testing to emulate the operational hardware devices and evaluate their performance. Additionally, securely integrating multiple test facilities at utility operators and vendors might enable rapid scale-up of evaluation platforms, and remove the need for multiple expensive standalone installations. Presented in this paper, is the development of a multi-site evaluation platform that employs Advanced Distribution Management Systems (ADMS), distributed control devices, real-time hardware-in-loop assets, secure communication links, and protocol adapters. This platform uses standards-based approaches and open-source tools, and hence can serve as a template for other researchers and institutions to implement their multi-site evaluation frameworks for pre-deployment testing.

Essakiappan, Somasundaram↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Chapter 32 - Power Grid Resilience

The new energy paradigm is altering the current power grid trend from synchronous generator reliant system toward power-electronics-based distributed energy resources (DERs). The resilient operation of modern power grid is highly dependent upon cyber and physical reliable operation of DERs. Power grid resilience broadly refers to the ability of the grid to be robust to eventualities and singularities that may disrupt the continuity of reliable power flow. This could involve resilience related to the physical system but more recently, the focus on cyber resilience has been evolving rapidly especially given the burgeoning growth of distributed generation and power-electronics-based DERs under smart grid and given that such threats to reliable operation do not have to evolve localized to where the physical asset is. Commonly, in power grids dominated by DERS, control and energy management are structured at a multitime scale multilayer fashion: (i) primary control layer at microseconds time scale, (ii) secondary control layer at millisecond time scale, and (iii) tertiary control layer at seconds to minutes time scale. The cyber-related issues that may affect the power grid resilience can be introduced in through primary, secondary, and tertiary control layers. The failure of each of these control layers may impact the reliable and resilient operation of the overall network and cause widespread failures which leads to unintended blackouts. As such, this chapter focuses on cyber-related resilience issues in primary control layer, secondary control layer, tertiary control layer, wide area/utility control, and anomaly detection and resilient communication.

anomaly detection↗

Skewering the silos: using Brick to enable portable analytics, modeling and controls in buildings

Nearly all large commercial buildings have heating, ventilation and air conditioning (HVAC) systems, lighting systems, safety and other systems controlled by a computer—a dedicated server with a building energy management system (BMS). However, these BMSs are proprietary with each building’s assets (that is, fans, valves, pumps, and their setpoints) named and coded uniquely by the BMS vendor or engineer; building analytics and control algorithms are written specific to the assets and the building. Thus, any control updates or analytics to improve building performance—especially critical to reduce greenhouse emissions or improve load flexibility—are labor intensive and costly. The Brick schema was developed so the same analysis or control algorithms can work on a variety of buildings if each is digitally represented in a Brick data model. The goal of this project was to further the development of Brick to extend it beyond an academic project with demonstrated success in a small field study, to a practical choice for industrial and commercial stakeholders seeking to realize value from building data. To do this, we executed four objectives: (1) expand the Brick schema including its modeling capabilities and vocabulary, (2) develop tools for integrating Brick with existing digital technologies and representations in buildings, (3) develop an open-source analytics platform to facilitate use of Brick in delivering data value, and (4) demonstrate Brick-driven analytics and controls in real settings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗