Improved Beam Loss Accounting with Fast Data Acquisition (DAQ) Chassis
Identifying the source of beam loss events in the CE-BAF accelerator can be a challenging task. However, with our new prototype system, this task becomes more effi-cient. The system, developed in the fall of 2022, utilizes a dispersive beam position monitor (BPM) and the exist-ing switched electrode electronics BPM hardware. Previ-ously a commercial off-the-shelf data acquisition (DAQ) system was employed to capture BPM wire signals at a sample rate of 20 kS/s. The fast shutdown signal triggered the system, which disables the beam at the injector. Analysis of beam position and energy variation before a beam loss event was used to determine if the beam loss event was associated with an energy transient. The proto-type system, implemented using National Instruments hardware and LabVIEW® software, relied on a software trigger. Manual post-processing was required to ascertain whether the fault was due to an un-tripped cavity with a gradient or phase transient. This work focuses on deploying a Fast DAQ Chassis to monitor BPM hardware in real time and during beam loss events. This system was originally developed and in-stalled in CEBAF to monitor the time-domain RF control signals in the legacy analog RF systems. This technology was leveraged to also monitor BPM signals. As the new system employs a hardware trigger, developing tools to automatically identify faults linked to energy transients unrelated to cavity faults will be straightforward. This paper will discuss the project's initial updates, underlin-ing the crucial role of each member of our team in this achievement