Test Protocols for Advanced Inverter Interoperability Functions – Main Document

Distributed energy resources (DER) such as photovoltaic (PV) systems, when deployed in a large scale, are capable of influencing significantly the operation of power systems. Looking to the future, stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. In 2009, the Electric Power Research Institute (EPRI), Sandia National Laboratories (SNL) with the U.S. Department of Energy (DOE), and the Solar Electric Power Association (SEPA) initiated a large industry collaborative to identify and standardize definitions for a set of DER grid support functions. While the initial effort concentrated on grid-tied PV inverters and energy storage systems, the concepts have applicability to all DER. A partial product of this on-going effort is a reference definitions document (IEC TR 61850-90-7, Object models for power converters in distributed energy resources (DER) systems) that has become a basis for expansion of related International Electrotechnical Commission (IEC) standards, and is supported by US National Institute of Standards and Technology (NIST) Smart Grid Interoperability Panel (SGIP). Some industry-led organizations advancing communications protocols have also embraced this work. As standards continue to evolve, it is necessary to develop test protocols to independently verify that the inverters are properly executing the advanced functions. Interoperability is assured by establishing common definitions for the functions and a method to test compliance with operational requirements. This document describes test protocols developed by SNL to evaluate the electrical performance and operational capabilities of PV inverters and energy storage, as described in IEC TR 61850-90-7. While many of these functions are not currently required by existing grid codes or may not be widely available commercially, the industry is rapidly moving in that direction. Interoperability issues are already apparent as some of these inverter capabilities are being incorporated in large demonstration and commercial projects. The test protocols are intended to be used to verify acceptable performance of inverters within the standard framework described in IEC TR 61850-90-7. These test protocols, as they are refined and validated over time, can become precursors for future certification test procedures for DER advanced grid support functions.

14 SOLAR ENERGY↗

Accelerating the Design of Space Vehicles

One of NASA's key goals is to increase the safety and reduce the cost of space transportation. Thus, a key element of NASA's new Integrated Space Transportation Plan is to develop new propulsion, structures, and operations for future generations of reusable launch vehicles (RLVs). As part of this effort to develop the next RLV, the ClCT Program's Computing, Networking, and Information Systems (CNIS) Project is developing and demonstrating collaborative software technologies that use the collective power of the NASA Grid to accelerate spacecraft design. One of these technologies, called AeroDB, automates the execution and monitoring of computational fluid dynamics (CFD) parameter studies on the NASA Grid. About the NASA Grid The NASA Grid, or Information Power Grid,. is being developed to leverage the distributed resources of NASA's many computers. instruments, simulators, and data storage systems. The goal is to use these combined resources to sdve difficult NASA challenges, such as iimulating the entire flight of a space vehicle from ascent to descent.To realize the vision of the NASA Grid, the CNIS Project is developing the software framework and protocols for building domain-specific environments and interfaces, new Grid services based on emerging industry standards, and advanced networking and computing testbeds to support new Grid-based applications such as AeroDB.

Laufenberg, Larry↗

A Renewably Powered Hydrogen Generation and Fueling Station Community Project

The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

Lyons, Valerie J.↗

Implementing Zero Energy Design with the U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy Solar Decathlon® Design Challenge is a collegiate competition that challenges student teams to design high performance buildings that push the boundaries of the industry. In the 2020 competition, DOE is piloting Design Partners, a low-risk opportunity for builders and building owners to harness student innovation and explore zero energy design for current or upcoming projects. Design Partners provide a student team of architects and engineers with project requirements. By the end of the Challenge, Design Partners receive a zero energy alternative and cost estimate for their project. The collaboration allows Design Partners to incorporate innovative concepts such as grid-interactivity, resilience, and low embodied carbon in a low-risk environment and provides the future generation of engineers and architects with invaluable experience designing a building for a client under real-world circumstances. Attendees will leave understanding the “perfect storm” of policy, technology, health, and economic trends that make zero energy buildings desirable and feasible and the value of the U.S. DOE Solar Decathlon to industry. They will also get a sneak peek at innovative solutions 2020 Design Partner pilot projects are bringing to the building industry and how becoming a Design Partner in 2021 could benefit their organization.

30 DIRECT ENERGY CONVERSION↗

U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy (DOE) Solar Decathlon® Design Challenge is a collegiate competition that challenges student teams to design high-performance buildings that push the boundaries of the industry. In the 2020 Design Challenge, DOE piloted the Design Partners Program, a low-risk opportunity for builders and building owners to harness student innovation and explore zero energy design for current or upcoming projects. Design Partners provide a student team of architects and engineers with project requirements. By the end of the Design Challenge, Design Partners receive a zero-energy design alternative and cost estimate for their project. The collaboration allows Design Partners to incorporate innovative concepts such as grid-interactivity, resilience, and low embodied carbon in a low-risk environment. It also provides the future generation of engineers and architects with invaluable experience designing a building for a client under real-world circumstances. This article summarizes the current policy, technology, health, and economic trends that make zero energy buildings desirable and feasible, and presents the value of the Solar Decathlon to industry. We highlight innovative solutions 2020 Design Partner pilot projects are bringing to the building industry.

30 DIRECT ENERGY CONVERSION↗

Design of water-moderated heterogeneous cores in new STACY facility through JAEA/IRSN collaboration - 14363

In the post-Fukushima prospect, Japan Atomic Energy Agency, JAEA, intends to re-open its Static Experiment Critical Facility STACY, in order to contribute to the validation of fuel debris calculations in conditions close to those affected by the Fukushima Daiichi Nuclear Power Station accident. The reactor core of STACY is being modified by JAEA from homogeneous solution fuel core to heterogeneous pin- type fuel core. The first step of critical experiments is to establish reference experiments involving lattices of UO{sub 2} rods without fuel debris. A design of such experiments is in progress for the widest range of moderation ratios in the frame of JAEA/IRSN collaboration. To anticipate the specification values of materials to be manufactured (grids, rods), an evaluation of uncertainties pertaining to the different parameters driving k{sub eff} is paramount. The following uncertainties of experimental cores are evaluated to estimate the reactivity effect of engineering tolerance/or measurements of the modified STACY: (1) Density of fuel pellets, (2) Enrichment of uranium, (3) Diameter of fuel pellets, (4) Thickness of fuel claddings, (5) Impurities of fuel pellets, (6) Impurities of fuel claddings and (7) Positioning of fuel rods in the lattice. For these calculations, three types of moderation conditions were considered within the experimental parameters of STACY: the lowest moderation (lattice pitch = 1.15 cm; V{sub m}/V{sub f}=1.2), optimum moderation (lattice pitch = 1.5 cm, V{sub m}/V{sub f} = 2.9) and an over moderated case (lattice pitch = 2.55 cm; V{sub m}/V{sub f} = 11). The calculations to derive the overall uncertainty of modified STACY were performed propagating the 1σ uncertainties of parameters of existing STACY in terms of k{sub eff}. For that purpose, a perturbation calculation (differential operator) technique and a stochastic geometry modeling technique were used with the MCNP5 continuous energy Monte Carlo code and a point-wise cross section library based on the JENDL-4.0 evaluated nuclear data library. Moreover, the results of calculations were compared with those calculated by two continuous energy Monte Carlo codes using the correlated sampling technique: - An experimental version of the Japanese MVP2 code combined to the JENDL-4.0 nuclear data library, - The MORET 5 code, developed by IRSN, combined to the JEFF-3.1 nuclear data library. The proposed paper discusses all the aforementioned issues, and confirms that the uncertainty pertaining to the critical experiments of the STACY is sufficiently small. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integrated Design Engineering Analysis (IDEA) Environment Automated Generation of Structured CFD Grids using Topology Methods

This report documents the work performed from March 2010 to March 2012. The Integrated Design and Engineering Analysis (IDEA) environment is a collaborative environment based on an object-oriented, multidisciplinary, distributed framework using the Adaptive Modeling Language (AML) as a framework and supporting the configuration design and parametric CFD grid generation. This report will focus on describing the work in the area of parametric CFD grid generation using novel concepts for defining the interaction between the mesh topology and the geometry in such a way as to separate the mesh topology from the geometric topology while maintaining the link between the mesh topology and the actual geometry.

Kamhawi, Hilmi N.↗

Future Electric Power Industry and Grids—Now What Again is Our Destination?

Having a vision that others agree to support and work toward is highly desirable but hard to achieve. We seem to lack a common and shared understanding of the vision—or worse, multiple visions (vivid mental images or documented statements) with varying areas of focus and details: • some appear to be similar but have differing underlying goals and characteristics, or • some reflect differing viewpoints as to effects on various stakeholders. These desirable and undesirable situations apply to realizing visions for enterprise and industry, including the electricity sector. Multiple industry stakeholder groups have developed goals, industry vision statements, and characterizations of the future. The viewpoints are promoted, discussed, refined by their stakeholder group, and often published to promote broad understanding and to inform or influence others. The GridWise Architecture Council asked itself how well-aligned these characterizations of the future are. If these publications collectively set the overall direction for the industry, it is useful to identify their answers to questions such as, where is the electric industry headed, guided by what objectives, and with what role(s) for the customers, electric utilities, and other stakeholders? Are these goals, visions, and future states moving toward a common vision, do they provide value for the stakeholders, and are they likely to meet the objective stated? This paper addresses these questions via an assessment and characterization of a sampling of stakeholder groups’ publicly available vision and future state reports for the electricity industry. Identified electric power grid architectural topic areas needing further work are described, along with GridWise Architecture Council analysis and observation, potential collaborative work efforts, and suggested next steps.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Safe Grid

The biggest users of GRID technologies came from the science and technology communities. These consist of government, industry and academia (national and international). The NASA GRID is moving into a higher technology readiness level (TRL) today; and as a joint effort among these leaders within government, academia, and industry, the NASA GRID plans to extend availability to enable scientists and engineers across these geographical boundaries collaborate to solve important problems facing the world in the 21 st century. In order to enable NASA programs and missions to use IPG resources for program and mission design, the IPG capabilities needs to be accessible from inside the NASA center networks. However, because different NASA centers maintain different security domains, the GRID penetration across different firewalls is a concern for center security people. This is the reason why some IPG resources are been separated from the NASA center network. Also, because of the center network security and ITAR concerns, the NASA IPG resource owner may not have full control over who can access remotely from outside the NASA center. In order to obtain organizational approval for secured remote access, the IPG infrastructure needs to be adapted to work with the NASA business process. Improvements need to be made before the IPG can be used for NASA program and mission development. The Secured Advanced Federated Environment (SAFE) technology is designed to provide federated security across NASA center and NASA partner's security domains. Instead of one giant center firewall which can be difficult to modify for different GRID applications, the SAFE "micro security domain" provide large number of professionally managed "micro firewalls" that can allow NASA centers to accept remote IPG access without the worry of damaging other center resources. The SAFE policy-driven capability-based federated security mechanism can enable joint organizational and resource owner approved remote access from outside of NASA centers. A SAFE enabled IPG can enable IPG capabilities to be available to NASA mission design teams across different NASA center and partner company firewalls. This paper will first discuss some of the potential security issues for IPG to work across NASA center firewalls. We will then present the SAFE federated security model. Finally we will present the concept of the architecture of a SAFE enabled IPG and how it can benefit NASA mission development.

Chow, Edward T.↗

Advanced Energy Industries, Inc. SEGIS developments

The Solar Energy Grid Integration Systems (SEGIS) initiative is a three-year, three-stage project that includes conceptual design and market analysis (Stage 1), prototype development/testing (Stage 2), and commercialization (Stage 3). Projects focus on system development of solar technologies, expansion of intelligent renewable energy applications, and connecting large-scale photovoltaic (PV) installations into the electric grid. As documented in this report, Advanced Energy Industries, Inc. (AE), its partners, and Sandia National Laboratories (SNL) successfully collaborated to complete the final stage of the SEGIS initiative, which has guided new technology development and development of methodologies for unification of PV and smart-grid technologies. The combined team met all deliverables throughout the three-year program and commercialized a broad set of the developed technologies.

14 SOLAR ENERGY↗

A Framework for Managing Inter-Site Storage Area Networks using Grid Technologies

The NASA Goddard Space Flight Center and the University of Maryland Institute for Advanced Computer Studies are studying mechanisms for installing and managing Storage Area Networks (SANs) that span multiple independent collaborating institutions using Storage Area Network Routers (SAN Routers). We present a framework for managing inter-site distributed SANs that uses Grid Technologies to balance the competing needs to control local resources, share information, delegate administrative access, and manage the complex trust relationships between the participating sites.

Kobler, Ben↗

A Framework for Managing Inter-Site Storage Area Networks using Grid Technologies

The NASA Goddard Space Flight Center and the University of Maryland Institute for Advanced Computer Studies are studying mechanisms for installing and managing Storage Area Networks (SANs) that span multiple independent collaborating institutions using Storage Area Network Routers (SAN Routers). We present a framework for managing inter-site distributed SANs that uses Grid Technologies to balance the competing needs to control local resources, share information, delegate administrative access, and manage the complex trust relationships between the participating sites.

McCall, Fritz↗

Value Streams from Distribution Grid Support Using Utility-Scale Vanadium Redox Flow Battery: NREL-Sumitomo Electric Battery Demonstration Project

The National Renewable Energy Laboratory (NREL) collaborated with Sumitomo Electric to provide research support in modeling and optimally dispatching a utility-scale vanadium redox flow battery (VRFB) energy storage. The objective of the project was to identify value streams from using utility-scale VRFB for local grid support use-cases, including voltage regulation (droop), capacity firming, peak shaving and valley filling, and energy arbitrage. This project was also supported by San Diego Gas and Electric (SDGandE). SDGandE provided data and approval to operate their VRFB energy storage system on an SDGandE distribution feeder. NREL worked with Sumitomo Electric to evaluate optimal dispatch strategies to VRFB, analyze the technical impacts, and calculate the associated cost-benefit ratio of substation-level energy storage on an SDG&E distribution feeder. To support this research, NREL evaluated the impacts of the battery use cases suggested by Sumitomo on the SDGandE host feeder. In addition to evaluating the battery use case, this effort identified possible ways to monetize the benefits from distribution feeder support.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Employing a User-Centered Design Process for Cybersecurity Awareness in the Power Grid

In this paper, we discuss the process we are using in the design and implementation of a tool to improve the situation awareness of cyberattacks in the power grid. We provide details on the steps we have taken to date and describe the steps that still need to be accomplished. The focus of this work is to provide situation awareness (SA) (Endsley, 1995) of the power grid to staff from different, non-overlapping roles in an electrical transmission organization in order to facilitate an understanding of a possible occurrence of a cyberattack. Our approach follows a user-centered design process and includes determining the types of information to display, the format of the displays, and the personnel to whom the display should be shown. Additionally there is the issue of how much help the tool can provide in the way of assessing the probability of a cyberattack given the current status of various portions of the power grid. Regardless, the ability to provide a common operating picture should enable the various groups to collaborate on a response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Gridded NASA Hydrological Data into CUAHSI HIS

The amount of hydrological data available from NASA remote sensing and modeling systems is vast and ever-increasing;but, one challenge persists:increasing the usefulness of these data for, and thus their use by, end user communities. The Hydrology Data and Information Services Center (HDISC), part of the Goddard Earth Sciences DISC, has continually worked to better understand the hydrological data needs of different end users, to thus better able to bridge the gap between NASA data and end user communities. One effective strategy is integrating the data in to end user community tools and environments. There is an ongoing collaborative effort between NASA HDISC, NASA Hydrological Sciences Branch, and CUAHSI to integrate NASA gridded hydrology data in to the CUAHSI Hydrologic Information System (HIS).

Rui, Hualan↗

Probabilistic Cloud Optimized Day-Ahead Forecasting System Based on WRF-Solar (Final Report)

The most persistent challenge in both intraday and day-ahead solar forecasting is to get numerical weather prediction models to produce the right type of clouds with the right frequency at the right time and place. Another challenge is to understand and communicate the forecast uncertainty. The objective of this project was to develop an optimized ensemble-based solar irradiance forecasting system that will (1) demonstrably improve the current state-of-the-art solar forecasts from the deterministic Weather Research and Forecasting-Solar (WRF-Solar) model and (2) provide probabilistic forecasts for grid operations. This probabilistic solar forecasting system, referred to as the WRF-Solar Ensemble Prediction System (WRF-Solar EPS), aims to significantly enhance both the intraday and the day-ahead solar forecasting capability for grid operations. This technical report summarizes the work performed in the past 3 years through a collaboration between the National Renewable Energy Laboratory and the National Center for Atmospheric Research as part of the U.S. Department of Energy's Solar Forecasting 2 program that aims to improve the accuracy of solar energy forecasts and enable increased deployment of solar energy on the electric grid.