Search NASA⌕ Search

SEARCH · Search NASA

Results for “connected vehicles”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Rotatable electric cable connecting system

A cable reel assembly is described which is particularly adapted for, but not limited to, a system for providing electrical connection of power and data signals between an orbiter vehicle, such as a space shuttle, and a recovered satellite. The assembly is comprised of two mutually opposing ring type structures having 180 deg relative rotation with one of the structures being held in fixed position while the other structure is rotatable. Motor controlled berthing latches and umbilical cable connectors for the satellite are located on the rim of the rotatable ring structure. The electrical cable assembly is fed in two sections from the orbiter vehicle into the outer rim portion of the fixed ring structure where they are directed inwardly and attached to two concentrically coiled metal bands whose respective ends are secured to inner and outer post members of circular sets of guide pins located on opposing circular plate members, one rotatable and one fixed. The cable sections are fed out as three output cable sections through openings in the central portion of the circular plate of the rotatable ring structure where they are directed to the latches and connectors located on its rim.

Manges, D. R.↗

Considerations for Improving the Capacity and Performance of AeroMACS

The Aeronautical Mobile Airport Communications System (AeroMACS) has progressed from concept through prototype development, testing, and standards development and is now poised for the first operational deployments at nine US airports by the Federal Aviation Administration. These initial deployments will support fixed applications. Mobile applications providing connectivity to and from aircraft and ground-based vehicles on the airport surface will occur at some point in the future. Given that many fixed applications are possible for AeroMACS, it is necessary to now consider whether the existing capacity of AeroMACS will be reached even before the mobile applications are ready to be added, since AeroMACS is constrained by both available bandwidth and transmit power limitations. This paper describes some concepts that may be applied to improve the future capacity of AeroMACS, with a particular emphasis on gains that can be derived from the addition of IEEE 802.16j multihop relays to the AeroMACS standard, where a significant analysis effort has been undertaken.

radiofrequency spectrum↗

NASA UAS Traffic Management National Campaign Operations across Six UAS Test Sites

NASA's Unmanned Aircraft Systems Traffic Management research aims to develop policies, procedures, requirements, and other artifacts to inform the implementation of a future system that enables small drones to access the low altitude airspace. In this endeavor, NASA conducted a geographically diverse flight test in conjunction with the FAA's six unmanned aircraft systems Test Sites. A control center at NASA Ames Research Center autonomously managed the airspace for all participants in eight states as they flew operations (both real and simulated). The system allowed for common situational awareness across all stakeholders, kept traffic procedurally separated, offered messages to inform the participants of activity relevant to their operations. Over the 3- hour test, 102 flight operations connected to the central research platform with 17 different vehicle types and 8 distinct software client implementations while seamlessly interacting with simulated traffic.

UTM↗

System for imposing directional stability on a rocket-propelled vehicle

An improved system for use in imposing directional stability on a rocket-propelled vehicle is described. The system includes a pivotally supported engine-mounting platform, a gimbal ring mounted on the platform and adapted to pivotally support a rocket engine and an hydraulic actuator connected to the platform for imparting selected pivotal motion. An accelerometer and a signal comparator circuit for providing error intelligence indicative of aberration in vehicle acceleration is included along with an actuator control circuit connected with the actuator and responsive to error intelligence for imparting pivotal motion to the platform. Relocation of the engine's thrust vector is thus achieved for imparting directional stability to the vehicle.

Perkins, H.↗

Potential SSME modifications to provide extended capabilities for future applications

Expendable launch vehicles will be phased out during the first years of shuttle operation and the payloads currently carried to orbit by these vehicles will be placed in low earth orbit by the reusable shuttle. In connection with limitations regarding the weight of the payload which can be launched by the Space Shuttle in its present form, approaches have been considered for increasing the payload capability of the Shuttle. Propulsion systems for Shuttle derived vehicles with larger payload capabilities have been studied. Such systems can potentially be obtained from modifications of the Space Shuttle Main Engine (SSME). Concepts based on modifications to the basic engine include an SSME-35 for low altitude operation with liquid rocket boosters and an SSME-150 for operation over the complete altitude range as might be required in a single-stage-to-orbit vehicle application. Another modification would provide operation with a hydrocarbon fuel instead of hydrogen.

Kirby, F. M.↗

"Fly-by-Wireless" Vehicles and Evaluations of ISA 100 Applications to Space-Flight

"Fly-by-Wireless" (What is it?) Vision: To minimize cables and connectors and increase functionality across the aerospace industry by providing reliable, lower cost, modular, and higher performance alternatives to wired data connectivity to benefit the entire vehicle/program life-cycle. Focus Areas: 1. System Engineering and Integration to reduce cables and connectors. 2. Provisions for modularity and accessibility in the vehicle architecture. 3. Develop Alternatives to wired connectivity (the "tool box").NASA and Aerospace depend more and more on cost-effective solutions that can meet our requirements. ISA-100.11 a is a promising new standard and NASA wants to evaluate it. NASA should be involved in understanding and contributing to other ISA-100 efforts that contribute to "Fly-by-Wireless" and it's objectives. ISA can engage other aerospace groups that are working on similar goals and obtain more aerospace industry perspective.

Studor, George F.↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Operational Lessons Learned from the Ares I-X Flight Test

The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle, Ares I-X will be stacked on a MLP and rolled out to the pad on a Saturn-era crawler-transporter. While Ares I-X was only held in place by the four hold-down posts on its aft skirt during rollout, a new vehicle stabilization system (VSS) attached to the vertical service structure kept the vehicle from undue swaying prior to launch at the pad, LC 39B. Following the launch, the flight test vehicle first stage was recovered with the aid of new parachutes resized to accommodate the five-segment-long first stage, which had a much greater length and mass than the Shuttle s reusable solid rocket boosters. After splashdown, recovery divers exercised extra care when handling the first stage to ensure that the flight data recorders in the fifth segment simulator were not damaged by exposure to sea water. The data recovered from the Ares I-X flight test will be very valuable in verifying the predicted environments and models used to design the vehicle. Lessons learned from Ares I-X will be shared with the Ares Projects through written and verbal reports and through integration of mission team members into the Project workforce.

Davis, Stephan R.↗

Umbilical connect systems.

Umbilical connect systems were studied for the purpose of developing techniques, specifications, and hardware design concepts for prototype systems to be used in the space shuttle program. New techniques are described which permit rapid and reliable mating, connection, and checkout of umbilical carrier assemblies and couplings for vehicle services (cryogenic, electrical, pneumatic, and hydraulic systems).

Valkema, D.↗

Device for coupling a first vehicle to a second vehicle

A device is disclosed, carried by a first vehicle such as an orbiting space shuttle, having a plurality of contact members for engaging and holding an annular ring on a second vehicle such as an orbiting payload. The contact members are connected to manipulator arms which are mounted at a fulcrum point and which are moved by an iris type mechanism. Movement of the manipulator arms causes the contact members to grasp or release the annular ring. Bumper devices are provided to axially align the annular ring and draw the contact members into engagement therewith.

Rudmann, A. A.↗

NASA electric propulsion technology

It is pointed out that the requirements for future electric propulsion cover an extremely large range of technical and programmatic characteristics. A NASA program is to provide options for the many potential mission applications, taking into account work on electrostatic, electromagnetic, and electrothermal propulsion systems. The present paper is concerned with developments regarding the three classes of electric propulsion. Studies concerning electrostatic propulsion are concerned with ion propulsion for primary propulsion for planetary and earth-orbit transfer vehicles, stationkeeping for geosynchronous spacecraft, and ion thruster systems. In connection with investigations related to electromagnetic propulsion, attention is given to electromagnetic launchers, the Hall current thruster, and magnetoplasmadynamic thrusters. In a discussion of electrothermal developments, space station resistojets are considered along with high performance resistojets, arcjets, and a laser thruster.

Berkopec, F. D.↗

Test and evaluation of pressure transducers for a reentry vehicle pressure measurement system

The Pressure Distribution and Air Data System experiment was designed to obtain accurate pressure measurements on the windward surface of an aeroassist flight research vehicle during its aeropass through the earth's atmosphere. These pressure measurements were intended to provide air data and support CFD code validation for future aeroassist orbital transfer vehicle designs. The system consisted of a flush orifice configuration connected by tubing to a specially ranged and selected pressure transducer. The purpose of this paper is to describe the flight acceptance test program and test results leading to the selection of flight transducers.

Gibson, Lorelei S.↗

Master Console System Monitoring and Control Development

The Master Console internship during the spring of 2013 involved the development of firing room displays at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I developed a system health and status display for use by Master Console Operators (MCO) to monitor and verify the integrity of the servers, gateways, network switches, and firewalls used in the firing room.

Brooks, Russell A.↗

Master Console System Monitoring and Control Development

The Master Console internship during the summer of 2013 involved the development of firing room displays and support applications at the John F. Kennedy Space Center (KSC). This position was with the Master Console Product Group (MCPG) on the Launch Control System (LCS) project. This project is responsible for the System Monitoring and Control (SMC) and Record and Retrieval (R&R) of launch operations data. The Master Console is responsible for: loading the correct software into each of the remaining consoles in the firing room, connecting the proper data paths to and from the launch vehicle and all ground support equipment, and initializing the entire firing room system to begin processing. During my internship, I created control scripts using the Application Control Language (ACL) to analyze the health and status of Kennedy Ground Control System (KGCS) programmable logic controllers (PLCs). This application provides a system health and status display I created with summarized data for use by Master Console Operators (MCO) to monitor and verify the integrity of KGCS subsystems.

Brooks, Russell A.↗

Systems and Methods for Collaboratively Controlling at Least One Aircraft

An unmanned vehicle management system includes an unmanned aircraft system (UAS) control station controlling one or more unmanned vehicles (UV), a collaborative routing system, and a communication network connecting the UAS and the collaborative routing system. The collaborative routing system being configured to receive flight parameters from an operator of the UAS control station and, based on the received flight parameters, automatically present the UAS control station with flight plan options to enable the operator to operate the UV in a defined airspace.

Estkowski, Regina I.↗

Controllable Buoys and Networked Buoy Systems

Buoyant sensor networks are described, comprising floating buoys with sensors and energy harvesting capabilities. The buoys can control their buoyancy and motion, and can organize communication in a distributed fashion. Some buoys may have tethered underwater vehicles with a smart spooling system that allows the vehicles to dive deep underwater while remaining in communication and connection with the buoys.

Davoodi, Faranak↗

Controllable Buoys and Networked Buoy Systems

Buoyant sensor networks are described, comprising floating buoys with sensors and energy harvesting capabilities. The buoys can control their buoyancy and motion, and can organize communication in a distributed fashion. Some buoys may have tethered underwater vehicles with a smart spooling system that allows the vehicles to dive deep underwater while remaining in communication and connection with the buoys.

Davoodi, Faranak↗