Search NASA⌕ Search

SEARCH · Search NASA

Results for “connector”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Cross-Laminated Timber Workshop: Pathways and Priorities for Cross-Laminated Timber Building Systems

A virtual workshop titled "BTO Cross-Laminated Timber Workshop: Pathways and Priorities for CLT Building Systems," was held on April 19, 2021, to identify research and development pathways, including the embodied energy content, operational energy efficiency, wall moisture profiles, structural connector durability, and health monitoring systems for CLT wall systems. In the workshop, perspectives were gathered from a wide range of stakeholders across North America from academia, the mass timber industry, trade groups, and federal government departments. The participants had knowledge in one or more areas of CLT building performance, production and construction, supply and demand dynamics of CLT panels, building codes, and recycling of CLT panels. To capture potential research opportunities from the participants in the mass timber field, the workshop was structured with the following objectives: 1. Identify the research and development opportunities to overcome technology gaps, integration issues, and market adoption challenges that are currently preventing the greater deployment of CLT, and 2. Understand what priorities and pathways are needed to advance energy efficient, high- rise CLT building systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Operational and Mission Highlights A Monthly Summary of Top Achievements April 2022

When the Laboratory’s Detonator Production team originally completed manufacturing two ALT939 DEV#1 functional cables — the first development units produced in this lot, team members quickly hit an obstacle when electrical testing for these cables failed. Team members sent the cables out for further testing, which revealed the root cause of failure involved the cables’ connectors. Although a challenging issue to resolve, the team worked together and solved the issue ahead of a stipulated deadline, with the cables completed and shipped to support system tests. The team responsible for this challenging work included members from Detonator Production, Nondestructive Testing & Evaluation, and collaborators from Sandia National Laboratories.

42 ENGINEERING↗

PNNL ARENA Cable Motor Test Bed Update

A major focus of the Light Water Reactor Sustainability (LWRS) Cable Nondestructive Examination (NDE) 2021 research is to acquire new equipment and integrate it with existing NDE instruments for a cable motor test bed which has been dubbed the Accelerated and Real Time Experimental Nodal Analysis or “ARENA”. All the primary components have been received and are being staged in the 2410 Stevens building on PNNL’s Richland campus. Building modifications to support a plug-in 480VAC receptacle have been completed and details of the system operating procedure (SOP) are in review. The approved SOP is required before the system is energized but is expected before July 2021. The ARENA system will support planned cable tests for 2021 and beyond that cannot conveniently be performed with on-site installations of cable test equipment including: (1) NDE Tests including Frequency Domain Reflectometry (FDR), Time Domain Reflectometry (TDR), Tan Delta (TD) Impedance measurements, Low Frequency Dielectric Spectroscopy (DS) measurements, standard multi-meter resistance checks, withstand tests and other bulk and distributed tests from the instrument panel with and without motors connected. (2) Online energized live wire tests using partial discharge instruments and LIVE-WIRE spread-spectrum TDR instruments. (3) Cable tests with partially submerged cable segments (including ability to submerge live cable segments). (4) Cable tests with partially or completely thermally aged segments (including ability to expose energized cable segments to thermal aging and use online monitoring instruments to monitor cable performance. (5) Ability to introduce low resistance simulations of connector or splice faults to off-line and on-line instrument setups.

42 ENGINEERING↗

Development of Quantum Computing Interconnect Based on Aerosol Jet Printing and Electrochemical Deposition of Rhenium

The electrodeposition of rhenium on to a metal seed layer on flexible substrates is presented as a means to creating superconducting flexible cable connectors in an enabling plug-and-play approach for quantum computing. Cryogenic quantum electronics are currently connected using masses of stainless-steel coaxial cables that are bulky, rigid - both in form and design - and lead to significant joule heating, thermal noise, and cross talk. Here, we present an unprecedented approach to integrate an aerosol jet printed (AJP) metal seed layer with rhenium electrodeposition on a flexible substrate in the advancement of superconducting interconnect technologies. Silver and gold were printed using the ‘Nanojet’ aerosol jet printer on Kapton films. Adhesion of gold was found to be far superior to that of silver and adhesion on roughened Kapton surpassed that of its smooth counterpart. Electrodeposition of rhenium was successful on both silver and gold and an amorphous Re film was confirmed by XRD. Results for both materials are presented however due to the poor adhesion of silver to Kapton it was ruled out as a viable candidate. Composite materials were characterized by profilometry, EDS, XRD and FIBSEM. Electrical measurements of the composite at ambient temperature showed a critical temperature (T c ), where the resistance drops to 0, of 5.8 K, well above 4.2 K, the temperature of liquid helium. Stress-strain tests of the Ag-Re and Au-Re composites on roughened and smooth Kapton were completed. Cyclic flexure testing (200 cycles) to 1.25% strain showed smooth Kapton samples reach a stress of ~16 MPa, while Kapton roughened with sandpaper, reaches ~20MPa of stress for the same 1.25% strain.

36 MATERIALS SCIENCE↗

Enabling Parallel Execution of System-level Simulations in SAM

This report summarizes the recent code updates related to “element ghosting” in SAM to enable the parallel execution of system-level simulations using multiple processors/cores. Unlike typical MOOSE-based applications, for system-level simulations, SAM mostly deals with a collection of discrete small pieces of meshes, and the connection of physics on these meshes are realized by using “connector” types of components/code structures, such as conjugate heat transfer and flow junctions. The required code implementation is to correctly mark the necessary ghost elements for each type of such components/code structures; thus, the lower-level libraries can correctly perform the necessary data transfer between processors (CPUs) when executed in parallel mode. After the code updates, SAM can now run system-level simulations in the parallel mode. The parallel execution capability was then tested with an ABTR input model with 23k DOFs. Significant speedup was demonstrated when the optimal number of CPUs were used in parallel mode. Future systematic studies on parallelization performance using additional test cases covering different physics/scenarios will be needed to provide additional insights into the scalability of SAM parallelization.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Nanosecond Gated CMOS Camera (NSGCC) ICD (Rev. 2.1)

The Ultra-Fast X-ray Imager (UXI) program is an ongoing effort at Sandia National Laboratories to create high speed, multi-frame, time-gated Read Out Integrated Circuits (ROICs), and a corresponding suite of photodetectors to image a wide variety of High Energy Density (HED) physics experiments on both Sandia’s Z-Machine and LLNL’s National Ignition Facility (NIF). Several cameras have been designed over the length of the program; one of the most recent is the Icarus, which is an improvement on past imagers (Furi and Hippogriff). A second sensor that can be connected is the Daedalus sensor. The Icarus is a 1024 × 512-pixel array with either 25 μm or 8 µm spatial resolution containing four frames of storage per pixel and has improved timing generation and distribution components while achieved 2 ns time gating. The Daedalus sensor is also a 1024 x 512-pixel array with 25 µm special resolution containing three frames of storage per pixel and has an increased set of features for a wider variety of applications from interlacing of rows in each frame to configurability of all shutters. See Section 14 for details regarding the Icarus implementation of the firmware and Section 15 for details regarding the Daedalus implementation. Due to the unique test environments UXI sensors are targeted for, full custom hardware was required to physically mount an Icarus or Daedalus sensor, manage its various functions, and read out pixel data for transfer to a host computer. Beyond experimental functionality, the hardware also needed to accommodate sensor characterization requirements. Lawrence Livermore National Laboratory’s ‘Version 4.0 Board’ was the result of these efforts. It mounts all the components required to fully utilize the Icarus and Daedalus sensors including analog to digital converters to convert pixel data and various system voltages to digital form for readout and analysis, DAC channels for remote configuration of critical bias voltages, static random-access memories to buffer pixel data, RS422 and Gigabit Ethernet communications for remote access, and an FPGA to tie these components together. This document describes the FPGA electrical interfaces in detail to allow the reader a greater understanding of the device, and to facilitate implementation of custom software to control and manage it. The Version 4.0 Board is a continuation of the Nano-second Gated CMOS hardware design that retains much of the functionality of the Version 1.0 Board while adding features including a DAC instead of digital potentiometers, as well as sensors for pressure and radiation. The Version 4.0 board is intended for applications requiring tight form-factor enclosures. It is composed of two stacking boards; one holds the FPGA and regulators to power the various components of the board while the other contains the mating connector to the sensor, image-readoff ADCs, the DAC, and other components.

42 ENGINEERING↗

NARAC Meteorological Monitoring Tower Maintenance Report: Submarine Base Group Two, Sub Base New London NEWLBASE2 Tower

Comments: The roof-based tower is located on Building 17 on Naval Submarine Base New London. Tower installation date is unknown. A second GFCI outlet in-line with the standard GFCI in the logger enclosure is mounted on conduit out of the tower base pedestal. The roof surface has been replaced and is now safe to walk on. The tower was not climbed during this maintenance visit. After the maintenance visit in 2018, the tower was deemed unsafe to climb due to age, corrosion, and deterioration of the tower components. The wind, air temperature, and relative humidity sensors located on the upper part of the tower require climbing of the tower for servicing and could not be accessed for inspection and maintenance. The tower is scheduled for replacement in FY2023. Tasks to be Completed: Tower system replacement / relocation. Consider replacement or bypassing of the suspect precipitation gauge signal connector.

99 GENERAL AND MISCELLANEOUS↗

Target Multiwire for the Fermilab Booster Neutrino Beamline

The Booster Neutrino Beamline experiment requested a new secondary electron emission multiwire profile monitor installation. The device had to be durable in high radiation conditions and mounted within a large 10 foot airtight steel fixture for installation near the beam target. Previous iterations of multiwire suffered radiation damage to both the connectors and wires. To ensure accurate horizontal and vertical beam profile measurements, an updated design was proposed, designed, and constructed. The new BNB multiwire utilizes 3 mil diameter gold-plated tungsten sense wires soldered to vertical and horizontal Alumina-96 ceramic planes, 50 wires per plane. Radiation hard Kapton insulated 30 gauge wires carry the output signals. Profiles are readout through charge integrator scanner electronics. This paper will detail the design and functionality of the BNB target multiwire and present relevant beam profile data.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Analytic Method to Determine Angle Suitability

A method is presented for determining if the connector adaptor assembly (CAA) for a particular unit, as determined by Coordinate Measurement Machine (CMM), is suitable for use in an Alternate Configuration (AC).

42 ENGINEERING↗

EVSE Characterization, A Next-Gen Profiles Project Report

As part of the U.S. DOE EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization was conducted over a wide range of DC output current and DC voltage charging for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2023 study conducted on electric vehicle supply equipment (EVSE) characterization by Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) include one 350 kW capable EVSE using a liquid-cooled combined charging system-1 (CCS-1, North American version) cable and connector and an ORNL-developed 100-kW polyphase wireless charger. Characterization results during nominal operation show the AC-to-DC power transfer efficiency for the 350kW conductive EVSE is 95.1% peak and is >92% when the AC power is at least 50 kW. The power quality of the 350 kW conductive EVSE is also measured during nominal conditions. The power factor is >0.91 for power transfer above 50 kW AC input during nominal conditions with a maximum power factor of 0.975. The AC current harmonics produced by the EVSE as measured at the AC input connection to the EVSE is <25% harmonics for power transfer greater than 50 kW and <10% harmonics for power transfer greater than 180 kW.

25 ENERGY STORAGE↗

Optimize Topology, Component Sizes, and Operating Strategy of Participant's Protype: Cooperative Research and Development Final Report

The purpose of the project was to complete testing of Shine Technologies LLC’s prototype power system called “Juicebox 3.0.” Testing of the prototype using NREL’s hardware-in-the-loop capabilities, including a DC power supply programmed to simulate PV module output and provide the JuiceBox 3.0 at the specified power level and with a load bank of sufficient capacity to mimic DC and AC loads connected to the outlets of the Juicebox 3.0. The unit is provided with SAE wire connectors. A photo of a JuiceBox 3.0 unit is shown in Figure 1 below.

14 SOLAR ENERGY↗

Electric Medium- and Heavy-Duty Vehicle Charging Infrastructure Attributes and Development

Although more established for light-duty vehicles (LDVs), advancements in electric vehicle (EV) charging technology are being made in the medium- and heavy-duty (MD/HD) sector. Progress is also being made with the electrification of MD/HD vehicles, including transit buses, school buses, MD trucks, and HD trucks. The diverse set of operational requirements and duty cycles for each vocation, as well as the range in the size of fleets, present unique charging and infrastructure requirements. This report focuses on charging requirements for MD/HD vehicles and synergies with LDV infrastructure. This analysis leans toward the qualitative rather than quantitative because relevant model inputs are in development and will not be established for a few years, as EV deployments are more mature in the LDV sectors than MD/HD. The report begins with an overview of MD/HD vehicle classes and types of charging, including depot and residential charging, among others (Section 2). Section 3 analyzes the home bases (overnight dwell locations) of existing MD/HD vehicles, with an emphasis on depot and residential home bases, and discusses implications for charging infrastructure. Section 4 discusses the key characteristics for determining if, when, and where MD/HD vehicles can leverage LDV charging infrastructure rather than requiring dedicated chargers. These considerations include electricity demand, connectors, physical space requirements, payment considerations, and impacts on the grid. Section 5 summarizes shared characteristics for MD/HD vehicles that are appropriate for near-term electrification and includes a summary of the outlook of the electric MD/HD vehicle market. The conclusion (Section 6) summarizes the report's findings and outlines areas for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Standardized Protocol for Real-Time APIs as Required by Title 23 CFR 680.116(c)

Improving the ability of drivers to easily locate working and available chargers is key to improving the public charging experience. Electric vehicle charging providers who are recipients of federal funds through the National Electric Vehicle Infrastructure (NEVI) Formula Program, Charging and Fueling Infrastructure (CFI) Discretionary Grant Program, and other funding programs as identified under Title 23 of the U.S. Code must deploy and maintain an application programming interface (API) to access information about charging stations they operate.1 This includes information about individual charging ports, pricing, and availability in accordance with the Federal Highway Administration’s National Electric Vehicle Infrastructure Standards and Requirements, 23 CFR 680.116(c), herein referred to as the minimum standards (Federal Highway Administration 2023). Specifically outlined in the minimum standards, states and other designated recipients are required to ensure that charging station information including location, connector type, power level, real-time status, and real-time price to charge are available free of charge to third-party software developers through an API. These requirements are intended to enable effective communication with consumers about available charging stations and help consumers make informed decisions about trip planning, including when and where to charge. This document provides a standardized protocol for how to structure data, data update frequency, and practices for making the data required to be shared via API usable for improving public transparency and the customer experience. These are recommendations only and do not modify the Federal Highway Administration’s minimum standards in any way.

33 ADVANCED PROPULSION SYSTEMS↗

Floating photovoltaic power plants: A review of energy yield, reliability, and operation and maintenance

Photovoltaic (PV) systems are essential for the transition to sustainable energy, reducing fossil fuel dependence and mitigating climate change. Although PV requires minimal land area — PV can meet the European Union's energy needs using only 0.26% of its land — space for deployment is often scarce in densely populated regions. Floating photovoltaics (FPV) offer an effective solution to land-use challenges by installing PV systems on floating structures in water bodies. FPV is a growing niche within PV with a cumulative installed capacity reaching 7.7 GW globally by 2023. Almost 90% of the installed FPV capacity is in Asia, with close to 50% of in China alone, while the Netherlands and France are the largest markets outside Asia. FPV shows strong potential to support climate targets, but still faces challenges like regulatory barriers, cost competitiveness compared to ground-based PV (GPV), and uncertainties about environmental impacts and system reliability. FPV systems are currently installed mainly on sheltered inland waters, such as quarry lakes, irrigation ponds and reservoirs. FPV technical standards are still being developed. Guidelines have been published by the World Bank, DNV, and Solar Power Europe, and emerging national standards from South Korea, China, and Singapore address design, components, and safety. The International Electrotechnical Commission (IEC) is working on formal standards for floats, mooring systems, and electrical connectors. However, the published best practices lack quantitative guidance for yield modelling and reliability, which this report aims to address. It provides data-driven insights, models, and parameters essential for accurate energy yield, reliability, and maintenance predictions over FPV systems' lifetimes.

14 SOLAR ENERGY↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lightning Induced Interior Fields And Voltage Bounds For Coaxial Topologies

We assemble bounding formulas for the interior fields and pin voltages inside a cylindrical coaxial Faraday cage which has been struck by lightning. Approximate formulas for penetrations through a circumferential door slot with subsequent coupling to the interior center conductor structure. Fields at the opposite open end are estimated and used to drive a capped connector and estimate interior pin voltages. Finally, penetrations through small circular holes and direct diffusion through the barrier are also addressed.

42 ENGINEERING↗

Engineered Solutions Group's SMR Containment Cable and Electrical Penetration Assembly System

GAIN Project CRADA Number NFE-21-08839, entitled “SMR Containment Cable and EPA System” was initiated by the partnership of Oak Ridge National Laboratory (ORNL) and Engineered Solutions Group (ESG) to test an ESG-designed Electrical Penetration Assembly and Containment Cabling System Qualified for not only legacy LWR designs, but also Small Modular Reactors designs currently being designed by several different suppliers. This project was undertaken to fill the equipment gap of EPA and Cabling Systems that require much more severe environmental requirements than legacy plant applications present due to their smaller containment volumes that result in high energy densities compared to legacy designs. This high energy density results in severe accident environments and more severe normal operating conditions as well. We developed two approaches to qualify Electrical Penetration Assembly (EPA) and Containment Cabling Systems for SMRs and Advanced Reactors. We take into consideration the more severe environmental parameters found with SMR designs. The system will need to meet a qualification test program addressing wear/cyclic aging, potential radiation exposure, thermal aging, vibration aging, thermal cycling, seismic qualification, electrical fault testing (per IEEE 317) and accident simulation. The equipment must meet the requirements of 10CFR50.49, GDC 50 in 10CFR50 Appendix A, and 10CFR50 Appendix J. NRC Regulatory Guides (RGs) identify an acceptable way of meeting regulatory requirements. RGs frequently endorse a standard for meeting these requirements. Specific to this review, equipment would be qualified in accordance with the following IEEE Standards. • IEEE 317-2013 (Electrical Penetration Assemblies), which is endorsed by RG 1.63, Rev. 3, • IEEE 323-2003 and the more current IEC/IEEE 60780-323 (Environmental Qualification of 1E Equipment) which is endorsed by RG 1.89. IEEE 323-2003 is endorsed by RG 1.209, • IEEE 344-2020 (Seismic Qualification. The 2013 version endorsed by RG 1.100, Rev. 4, with exceptions), • IEEE 383-2015 (Electrical Cables) (which is endorsed by RG 1.189 Rev. 4 and the -2003 version endorsed by RG 1.211 rev. 0), • IEEE 572-2019 (Electrical Connectors and Assemblies), which is endorsed by 1.156 Rev 1, and • [IEEE 1202 (endorsed by RG 1.189) would normally be applicable but the advanced cable designs are impervious to this cable flame test.] The primary goal of such a program is to provide an EPA design that can meet the qualification requirements for all legacy light water reactor plants currently operating as well as new plant designs including light water Small Modular Reactors. Thus, these requirements are applicable to plants licensed under 10CFR50 and 10CFR52. Other reactor designs may be evaluated, and this test system and qualification method applied to those applications if the requirements would satisfy the requirements of the intended plant. A secondary benefit of this work is to document some of the history and background in these requirements as there have been recent delays in an SMR licensing process due to NRC Requests for Additional Information in this subject matter area.

42 ENGINEERING↗

High Precision, High Frequency Printed Antennas

An emerging trend in advanced manufacturing is printed electronics and sensors. The ability to print customized electronics and sensors integrated into functional packages is a growing need within a variety of growing markets such as smart manufacturing, internet of things (IoT), and the small satellite industry. Both Oak Ridge National Laboratory (ORNL) and the MITRE Corporation have seedling research efforts evaluating the potential for future printed electronic systems. High frequency, wide-bandwidth phased array antennas (i.e. >45 GHz) open the door to new applications. However, such sensors require currently prohibitively small feature sizes for commercial 3D printing technologies along with increasing challenges with connecting the driving electronics to such features. An additional finding with related advanced manufacturing challenges is the rapid production of 3D additive connectors for integration with commercial printed circuit boards (PCBs), primarily for advanced in-circuit inspection techniques. This work is developing additive manufacturing processes for producing connected and conductive fine scale 3D features. The primary focus was on aerosol-jet printing (AJP), which has a small minimum resolution (<50 µm) but is traditionally printed flat with small height/width aspect ratios <<1, and developing controls to enable fully 3D, high aspect ratio, and unsupported features. In Phase 1 of this effort, baselines of process performance were characterized, and test coupons produced for both ultra-high frequency antennas and microstructures to support reverse engineering of PCBs. In Phase 2, these efforts will be extended for system demonstration of ultra-high frequency antenna arrays, as well as reverse engineering circuitry for dense PCBs.

42 ENGINEERING↗