Search NASA⌕ Search

SEARCH · Search NASA

Results for “cryomodule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Non-linear Wire Rope Isolator Model to Enhance Transportation Simulation of Fragile Equipment

Abstract Introduction Wire rope isolators are often used as means of vibration isolation for the transportation of fragile machine equipment. When deployed as suspension systems in a transportation scenario, a simple spring–damper model is often used to predict the dynamic loads that act on the structure being transported. However, this simple model has proved to be too simplistic to be used in the development of an accurate numerical model that can predict the vibration levels experienced by the inner components of fragile equipment during its transportation. This paper describes the experimental tests conducted on a wire rope isolator used for the transportation of the prototype SSR1 cryomodule. Materials and methods A hysteretic Bouc–Wen model has been used to analytically describe the force–deformation relationship of the wire rope isolators. The developed model of the isolator has been implemented in a larger model to simulate the actual transportation of the prototype SSR1 cryomodule, a section of the new PIP-II linear accelerator under construction at Fermilab. A series of multibody dynamic simulations with rigid and flexible components was used to numerically determine the acceleration of some critical components. Results and conclusions An actual experimental transportation was simulated using two numerical models: the developed Bouc–Wen model and a conventional spring–damper model. It is shown how the Bouc–Wen formulation of the isolator characteristics drastically improves the correspondence between experimental and simulated results if compared to a spring–damper model, especially in the range of 0–30 Hz which is the most critical for transportation problems.

42 ENGINEERING↗

Design options for a superconducting ion linac

Following a review of the design options for a superconducting ion linac, we present here an alternative design for the pre-stripper section of the superconducting driver linac for the rare isotope science project (RISP) of the Institute for Basic Science in Korea. The proposed alternative design takes advantage of the recent accelerator developments at Argonne, namely for the recent ATLAS intensity and efficiency upgrade and the Fermilab proton improvement plan project (PIP-II). In particular, the state-of-the-art performance of quarter-wave (QWRs) and half-wave resonators (HWRs), the integrated steering correctors and cold beam position monitors (BPMs) for a compact cryomodule design. In order to simplify the design and avoid frequency transitions, we used two types of QWRs at 81.25 MHz while the baseline design has QWRs at 81.25 MHz and HWRs at 162.5 MHz. The new QWR types were optimized for β ~0.05 and ~0.11, respectively, and corrected for beam steering effects. Nine cryomodules are required to reach the stripping energy of 18.5 MeV/u for uranium beam. An alternative radio-frequency quadrupole (RFQ) design was also developed. It is optimized with the multi-harmonic buncher (MHB) to produce a much smaller longitudinal emittance, offering much needed flexibility for beam tuning and more tolerance to errors. Following the lattice design optimization, end-to-end beam dynamics simulations including most important sources of machine error were performed. The results showed that the design is robust and tolerant to errors with no beam loss observed for typical machine errors.

43 PARTICLE ACCELERATORS↗

Certification testing of production superconducting quarter-wave and half-wave resonators for $\mathrm{FRIB}$

We report the Facility for Rare Isotope Beams (FRIB) is designed to accelerate ion beams to 200 MeV per nucleon with 46 superconducting radio-frequency cryomodules. The FRIB driver linac uses quarter-wave resonators and half-wave resonators; with a total of 324 resonators, the linac is currently the largest heavy ion accelerator in the world. Production of jacketed resonators began in January 2014 and was completed in December 2019. Dewar certification testing of all the cavities was done before they were installed into cryomodules. The experience and lessons from more than 5 years of FRIB resonator production and certification testing are analyzed and summarized in this paper.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PIP-II cryoplant non thermal cycling updates

The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2 K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated reliability analysis of the PIPII cryoplant. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to mitigate LINAC thermal cycling risks during planned and unplanned subsystem outages.

43 PARTICLE ACCELERATORS↗

Fermilab Cryogenic Test Facilities

Fermi National Accelerator Laboratory (Fermilab) has multiple cryogenic test facilities, undertaking testing of superconducting magnets, Superconducting Radio Frequency (SRF) cavities, SRF cryomodules and other helium cryogenic components. The test areas within Fermilab include: Meson Cryogenic Test facility (Meson), Industrial Building 1 (IB-1), Heavy Assembly Building/Illinois Accelerator Research Center (HAB/IARC), New Muon Lab, (NML) and the Cryomodule Test Facility (CMTF). Meson and HAB/IARC utilize repurposed Tevatron era reciprocating engine based cryogenic refrigerator systems, whereas CMTF and IB-1 utilize gas bearing turbine based coldboxes. Each of these test areas support the various Fermilab projects and collaborations including the Linear Coherent Light Source II (LCLS-II), Proton Improvement Plan II (PIP-II), High Luminosity Large Hadron Collider (HL-LHC), and Mu2e. This paper outlines the diverse and extensive cryogenic test capabilities within Fermilab.

43 PARTICLE ACCELERATORS↗

Initial Implementation Of Machine Learning System for SRF Cavity Fault Classification at CEBAF

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory is high power CW electron accelerator. It uses a mixture of two types of SRF modules, older, lower energy C20/C50 modules and newer higher energy C100 modules, arrayed in two anti-parallel linear accelerators. Accurately classifying the type of cavity faults is essential to maintaining and improving accelerator performance. Each C100 cryomodule contains eight 7-cell cavities. When a cavity fault occurs within a cryomodule, all eight cavities generate 17 waveforms each containing 8192 points. This data is exported from EPICS and saved for review. Analysis of these waveforms is time intensive and requires subject matter expertise (SME). SMEs examine the data from each event and label it according to one of several known cavity fault types. Multiple machine learning models have been developed on this labeled dataset with sufficient performance to warrant the creation of a limited machine learning software system for use by accelerator operations staff. This paper discusses the transition from model development to implementation of a prototype system.

Carpenter, A.↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

Superconducting Radio-frequency Cavity Fault Classification Using Machine Learning at Jefferson Laboratory

We report on the development of machine learning models for classifying C100 superconducting radiofrequency (SRF) cavity faults in the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. Of the 418 SRF cavities in CEBAF, 96 are designed with a digital low-level RF system configured such that a cavity fault triggers recordings of RF signals for each of eight cavities in the cryomodule. Subject matter experts analyze the collected time-series data and identify which of the eight cavities faulted first and classify the type of fault. This information is used to find trends and strategically deploy mitigations to problematic cryomodules. However, manually labeling the data is laborious and time-consuming. By leveraging machine learning, near real-time - rather than postmortem - identification of the offending cavity and classification of the fault type has been implemented. We discuss the performance of the machine learning models during a recent physics run. We also discuss efforts for further insights into fault types through unsupervised learning techniques and present preliminary work on cavity and fault prediction using data collected prior to a failure event.

Tennant, C. D.↗

Observation of Polarization-Dependent Changes in Higher-Order Mode Responses as a Function of Transverse Beam Position in Tesla-Type Cavities at FAST

Higher-order modes (HOMs) in superconducting rf cavities present problems for an electron bunch traversing the cavity in the form of long-range wakefields from previous bunches. These may dilute the emittance of the macropulse average, especially with low emittance beams at facilities such as the European X-ray Free-electron Laser (XFEL) and the upgraded Linac Coherent Light Source (LCLS-II). Here we present observations of HOMs driven by the beam at the Fermilab Accelerator Science and Technology (FAST) facility. The FAST facility features two independent TESLA-type cavities (CC1 and CC2) after a photocathode rf gun followed by an 8-cavity cryomodule. The HOM signals were acquired from cavities using bandpass filters of 1.75 ± 0.15 GHz, 2.5 ± 0.2 GHz, and 3.25 ± 0.2 GHz and recorded using an 8-GHz, 20 GSa/s oscilloscope. The frequency resolution obtained is sufficient to separate polarization components of many of the HOMs. These HOM signals were captured from CC1 and cavities 1 and 8 of the cryomodule for various initial trajectories through the cavities, and we observe correlations between trajectory, HOM signals, and which polarization component of a mode is affected.

Thurman-Keup, Randy Michael↗

Study of Conduction-Cooled Superconducting Quadrupole Magnets Combined with Dipole Correctors for the ILC Main Linac

A superconducting rf (SRF) cryomodule for International Linear Collider(ILC) Main Linac equips focus/steering magnets. The magnets are "superferric" magnets with four superconducting (SC) race track coils conductively cooled from the cryomodule LHe supply pipe. The quadrupole field gradient and dipole field are 40 T/m and 0.1 T, respectively. The magnet length and iron-pole radius are 1 m and 0.045 m, respectively. It is known that dark current is generated at SRF cavities and accelerated through the following linac string. The dark current reaches and heats the SC magnets. It is estimated that the power deposition in the magnet may reach more than a few watts and temperature of the SC coils may locally reach to critical temperature of NbTi. It is important to make the magnet not reach quench with sufficient conduction cooling. We aim to realize the SC magnet which can stably operate under such condition. We plan to develop test coils made of three types of SC materials, NbTi, Nb₃Sn, and MgB₂ and study thermal characteristics and stability . We will develop a short model magnet, based on the test coil results. Here, we will present the magnet design study and the R&D plan.

43 PARTICLE ACCELERATORS↗

CEA Contribution to the PIP-II Linear Accelerator

The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and will deliver 10 low-beta cryomodules as In-Kind Contribution to the PIP-II project, with cavities supplied by LASA-INFN and power couplers and tuning systems supplied by Fermilab. This paper presents the CEA scope of work that includes the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements.

43 PARTICLE ACCELERATORS↗

Evaluation of the first version of the new RFPI system dedicated to PIP-II project accelerator

The Low-Level Radio Frequency (LLRF) control system is one of the most critical superconducting linac infrastructures responsible for the parameters of the beam acceleration. The LLRF system mainly focuses on the electromagnetic field parameters inside the cavity. While it incorporates fast feedback algorithms to optimize energy transfer to the passing particle beam it does not follow other cryomodule or cavity parameter changes. The Radio Frequency Protection Interlock (RFPI) system closely monitors various factors (like cryomodule vacuum, beamline vacuum, field emission probe current level, temperature, RF signal leakage, etc). Its simple but reliable logic has to provide an instant decision about the LLRF system or high-power amplifier output signal blocking in case of safety region excitation. This contribution presents a new version of the RFPI system which logic is implemented in the FPGA chip. The initial work on the prototype of the new system design resulted in the PoC (Proof of Concept) device. The PoC offers the possibility of various protection logic configurations, input signals parameters evaluation, and modularity aspects verification. The structure and test results from the device evaluation are summarized and discussed in this contribution.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Niobium-tin as a transformative technology for low-beta linacs

Niobium-tin has been identified as the most promising next-generation superconducting material for accelerator cavities. This is due to the higher critical temperature (Tc = 18 K) of Nb3Sn compared to niobium (TC = 9.2 K), which leads to greatly reduced RF losses in the cavity during 4.5 K operation. This allows two important changes during cavity and cryomodule design. First, the higher Tc leads to negligible BCS losses when operated at 4.5 K, which allows for a higher frequency to be used, translating to significantly smaller cavities and cryomodules. Second, the reduced dissipated power lowers the required cryogenic cooling capacity, meaning that cavities can feasibly be operated on 5-10 W cryocoolers instead of a centralized helium refrigeration plant. These plants and distribution systems are costly and complex, requiring skilled technicians for operation and maintenance. These fundamental changes present an opportunity for a paradigm shift in how low-beta linacs are designed and operated. Fabrication challenges and first coated cavity test results are discussed.

43 PARTICLE ACCELERATORS↗

Results from extended range SRF cavity tuner tests for LCLS-II-HE

The LCLS-II HE superconducting linac can produce multi-energy beams by supporting multiple undulator lines simultaneously. This could be achieved by using the cavity SRF tuner in the off-frequency detune mode. This off-frequency operation method was tested in 8 cryomodules at Fermilab at 2 K. In all the tests the tuners successfully achieved a frequency shift of -565±80 kHz from the 1.3 GHz value. This study discusses the cavity frequency during each stage of assembly from the cryomodule string to when they are finally tested at 2 K. Monitoring the cavity frequency from this initial stage contributed in reaching this large frequency shift. The specific procedures of tuner setting during assembly will be presented.

43 PARTICLE ACCELERATORS↗

R&D Towards High Gradient CW SRF Cavities

This talk will discuss Fermilab’s recent progress in the surface engineering of superconducting radio-frequency (SRF) cavities geared toward producing simultaneously high quality factors and high accelerating gradients in cryomodules. We investigate possible microscopic mechanisms that drive improved performance by carrying out sequential RF tests on cavities subjected to low temperature baking. We compare performance evolution to observations made with material science techniques and find correlations with material parameters. We also discuss other key advancements that enable high gradient operation in cryomodules.

43 PARTICLE ACCELERATORS↗

Nb$^{3}$Sn Technology for Low-beta linacs

Nb3Sn is the most advanced potential successor for niobium in superconducting RF accelerator cavities. Nb3Sn has a significantly higher critical temperature (18.3 K) compared to that of niobium (9.2 K). This has a large effect on the BCS surface resistance, and therefore, on the dynamic RF losses at 4.5 K. The higher critical temperature allows two important changes for cavity and cryomodule design. First, the lower BCS losses allow the designer to use a higher frequency, translating to physically smaller cavities and cryomodules. Second, the low dynamic losses allow the use of stand-alone cryocoolers instead of complex helium refrigerators and distribution systems. Fabrication of a prototype 218 MHz cavity, test results, and continuing challenges are discussed.

43 PARTICLE ACCELERATORS↗

Shape Evolution of C75 Large-Grain Niobium Half-Cells During Cavity Fabrication

The largely anisotropic deformation of large-grain Nb discs during deep drawing into half-cells poses a challenge for achieving a desired shape accuracy. Two 5-cell cavities for the C75 CEBAF cryomodule rework program have been fabricated at Jefferson Lab from large-grain Nb discs directly sliced from an ingot. The shape of the inner surface of eight half-cells has been inspected using a FARO Edge laser scanner during the fabrication process and compared to the reference shape. On average, approximately 63% of the half-cell inner surface was found to be within 0.1 mm of the reference shape and ~90% to be within 0.2 mm, after the final equator machining. Several 5-cell C75 cavities have also been fabricated at Research Instruments, Germany, and measurements of the shape accuracy using a Zeiss 3D coordinate measuring machine gave similar results. One half-cell was measured both at Research Instruments and Jefferson Lab for comparison.

Ciovati, G.↗