Search NASA⌕ Search

SEARCH · Search NASA

Results for “development design testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Study 2.6 operations analysis mission characterization

An analysis of the current operations concepts of NASA and DoD is presented to determine if alternatives exist which may improve the utilization of resources. The final product is intended to show how sensitive these ground rules and design approaches are relative to the total cost of doing business. The results are comparative in nature, and assess one concept against another as opposed to establishing an absolute cost value for program requirements. An assessment of the mission characteristics is explained to clarify the intent, scope, and direction of this effort to improve the understanding of what is to be accomplished. The characterization of missions is oriented toward grouping missions which may offer potential economic benefits by reducing overall program costs. Program costs include design, development, testing, and engineering, recurring unit costs for logistic vehicles, payload costs. and direct operating costs.

Wolfe, R. R.↗

HELIOS - Co-operative solar probe.

In June 1969, the Federal Republic of Germany and the United States of America agreed on a joint cooperative solar probe project designated HELIOS. This basic agreement provides for the design, development, test and launch of two flight spacecraft (the first in mid-1974 and the second in late 1975) to within 0.3 AU of the sun. The primary purpose of the two spacecraft is to investigate the properties of and processes in interplanetary space in the direction of and close to the sun. In this technical paper, the scientific mission and German and American plans/design to accomplish this mission are presented by the German and United States Project Managers respectively. Emphasis is placed on the advanced technology required to successfully accomplish this mission.

Kutzer, A.↗

Apollo experience report: Guidance and control systems. Lunar module stabilization and control system

A brief functional description of the Apollo lunar module stabilization and control subsystem is presented. Subsystem requirements definition, design, development, test results, and flight experiences are discussed. Detailed discussions are presented of problems encountered and the resulting corrective actions taken during the course of assembly-level testing, integrated vehicle checkout and test, and mission operations. Although the main experiences described are problem oriented, the subsystem has performed satisfactorily in flight.

Shelton, D. H.↗

Space Tug Docking Study. Volume 5: Cost Analysis

The cost methodology, summary cost data, resulting cost estimates by Work Breakdown Structure (WBS), technical characteristics data, program funding schedules and the WBS for the costing are discussed. Cost estimates for two tasks of the study are reported. The first, developed cost estimates for design, development, test and evaluation (DDT&E) and theoretical first unit (TFU) at the component level (Level 7) for all items reported in the data base. Task B developed total subsystem DDT&E costs and funding schedules for the three candidate Rendezvous and Docking Systems: manual, autonomous, and hybrid.

Source record↗

Space transportation system payload interface verification

The paper considers STS payload-interface verification requirements and the capability provided by STS to support verification. The intent is to standardize as many interfaces as possible, not only through the design, development, test and evaluation (DDT and E) phase of the major payload carriers but also into the operational phase. The verification process is discussed in terms of its various elements, such as the Space Shuttle DDT and E (including the orbital flight test program) and the major payload carriers DDT and E (including the first flights). Five tools derived from the Space Shuttle DDT and E are available to support the verification process: mathematical (structural and thermal) models, the Shuttle Avionics Integration Laboratory, the Shuttle Manipulator Development Facility, and interface-verification equipment (cargo-integration test equipment).

Everline, R. T.↗

Letter to Don Fuqua on space shuttle commitment, 12 April 1977

NASA budget committments for the Space Shuttle program are delineated, estimating $6.816 billion (FY 1978 dollars) for the design, development, test and evaluation phase of operations. Current estimates for refurbishment of Orbiters 101 and 102 and procurement of Orbiters 103, 104, and 105 amount to $1.988 billion. Ground support equipment costs are estimated to be an additional $432 million.

Fletcher, J. C.↗

Reliability and the design process at Honeywell Avionics Division

The division's philosophy for designed-in reliability and a comparison of reliability programs for space, manned military aircraft, and commercial aircraft, are presented. Topics include: the reliability interface with design and production; the concept phase through final proposal; the design, development, test and evaluation phase; the production phase; and the commonality among space, military, and commercial avionics.

Bezat, A.↗

Image processing developments and applications for water quality monitoring and trophic state determination

Remote sensing data analysis of water quality monitoring is evaluated. Data anaysis and image processing techniques are applied to LANDSAT remote sensing data to produce an effective operational tool for lake water quality surveying and monitoring. Digital image processing and analysis techniques were designed, developed, tested, and applied to LANDSAT multispectral scanner (MSS) data and conventional surface acquired data. Utilization of these techniques facilitates the surveying and monitoring of large numbers of lakes in an operational manner. Supervised multispectral classification, when used in conjunction with surface acquired water quality indicators, is used to characterize water body trophic status. Unsupervised multispectral classification, when interpreted by lake scientists familiar with a specific water body, yields classifications of equal validity with supervised methods and in a more cost effective manner. Image data base technology is used to great advantage in characterizing other contributing effects to water quality. These effects include drainage basin configuration, terrain slope, soil, precipitation and land cover characteristics.

Blackwell, R. J.↗

Space station - Technology development

The NASA manned space station program's systems technology effort involves the development of novel techniques that will reduce the scope of tasks neeeded for design, development, testing and evaluation of the hardware. Operations technology efforts encompass analyses that will define those techniques best able to improve the efficiency and reduce the costs of space station functions. The technology objective for data management calls for a fault-tolerant, distributed, expandable and adaptable, as well as repairable and user-friendly, flight data management system that employs state-of-the-art hardware and software. The space station's power system includes the largest element, a 'solar blanket', and the heaviest component, the batteries, of all the subsystems. A thermal management system for the power system is of paramount importance. Attention is also given to the exacting demands of attitude control and stabilization and a regenerative life support system of the requisite capacity and reliability.

Carlisle, R. F.↗

Space Transportatioin System (STS) propellant scavenging system study. Volume 3: Cost and work breakdown structure-dictionary

Fundamentally, the volumes of the oxidizer and fuel propellant scavenged from the orbiter and external tank determine the size and weight of the scavenging system. The optimization of system dimensions and weights is stimulated by the requirement to minimize the use of partial length of the orbiter payload bay. Thus, the cost estimates begin with weights established for the optimum design. Both the design, development, test, and evaluation and theoretical first unit hardware production costs are estimated from parametric cost weight scaling relations for four subsystems. For cryogenic propellants, the widely differing characteristics of the oxidizer and the fuel lead to two separate tank subsystems, in addition to the electrical and instrumentation subsystems. Hardwares costs also involve quantity, as an independent variable, since the number of production scavenging systems is not firm. For storable propellants, since the tankage volume of the oxidizer and fuel are equal, the hardware production costs for developing these systems are lower than for cryogenic propellants.

Source record↗

Dual wound dc brush motor gearhead

The design requirements, the design, development tests and problems, the qualification and life test and the findings of the strip examination of a dual wound DC brushed motor gearhead are described. It is the only space qualified dual wound dc brushed motor gearhead in Europe.

Henson, Barrie W.↗

Space station resistojet system requirements and interface definition study

Preliminary resistojet design requirements were established based on initial technical requirements imposed by the results of NASA and Rocketdyne studies. The requirements are directed toward long life, simplicity, flexibility, and commonality with other space station components. The resistojet assembly is comprised of eight resistojets, fluid components downstream of the waste fluid storage system, a power controller, structure, and shielding. It consists of two identical subassemblies, one of which is redundant. Each subassembly consists of four 500-W resistojets, series redundant latch values, a power controller, a water vaporizer, two pressure regulators, filters, check valves, disconnects, fluid tubing, and electrical cables. All components are packaged at the end of the stinger aft of the JEM and Columbus modules. Different flow and power control methods were studied. A constant inlet pressure and a two-power setting controller were tentatively selected based on simplicity and reasonably high specific impulse for the range of waste gas compositions that are anticipated. The constant pressure is supplied by pressure regulators. The two set point power control includes individual power supplies to each resistojet heater and water vaporizer. An embedded data processor, a multiplexer-demultiplexer, and a network interface unit that are standard space station components are included in the power controller. The total dry weight of the resistojet assembly is approximately 172 lb. The total cost for design, development, test, evaluation, qualification, and flight hardware is estimated to be $16 million.

Heckert, Bruce J.↗

Photovoltaic power for Space Station Freedom

Space Station Freedom is described with special attention given to its electric power system. The photovoltaic arrays, the battery energy storage system, and the power management, and distribution system are also discussed. The current design of Freedom's power system and the system requirements, trade studies, and competing factors which lead to system selections are referenced. This will be the largest power system ever flown in space. This system represents the culmination of many developments that have improved system performance, reduced cost, and improved reliability. Key developments and their evolution into the current space station solar array design are briefly described. The features of the solar cell and the array including the development, design, test, and flight hardware production status are given.

Baraona, Cosmo R.↗

Weight and cost forecasting for advanced manned space vehicles

A mass and cost estimating computerized methology for predicting advanced manned space vehicle weights and costs was developed. The user friendly methology designated MERCER (Mass Estimating Relationship/Cost Estimating Relationship) organizes the predictive process according to major vehicle subsystem levels. Design, development, test, evaluation, and flight hardware cost forecasting is treated by the study. This methodology consists of a complete set of mass estimating relationships (MERs) which serve as the control components for the model and cost estimating relationships (CERs) which use MER output as input. To develop this model, numerous MER and CER studies were surveyed and modified where required. Additionally, relationships were regressed from raw data to accommodate the methology. The models and formulations which estimated the cost of historical vehicles to within 20 percent of the actual cost were selected. The result of the research, along with components of the MERCER Program, are reported. On the basis of the analysis, the following conclusions were established: (1) The cost of a spacecraft is best estimated by summing the cost of individual subsystems; (2) No one cost equation can be used for forecasting the cost of all spacecraft; (3) Spacecraft cost is highly correlated with its mass; (4) No study surveyed contained sufficient formulations to autonomously forecast the cost and weight of the entire advanced manned vehicle spacecraft program; (5) No user friendly program was found that linked MERs with CERs to produce spacecraft cost; and (6) The group accumulation weight estimation method (summing the estimated weights of the various subsystems) proved to be a useful method for finding total weight and cost of a spacecraft.

Williams, Raymond↗

Space Station Freedom avionics technology

The Space Station Freedom Program (SSFP) encompasses the design, development, test, evaluation, verification, launch, assembly, and operation and utilization of a set of spacecraft in low earth orbit (LEO) and their supporting facilities. The spacecraft set includes: the Space Station Manned Base (SSMB), a European Space Agency (ESA) provided Man-Tended Free Flyer (MTFF) at an inclination of 28.5 degrees and nominal attitude of 410 km, a USA provided Polar Orbiting Platform (POP), and an ESA provided POP in sun-synchronous, near polar orbits at a nominal altitude of 822 km. The SSMB will be assembled using the National Space Transportation System (NSTS). The POPs and the MTFF will be launched by Expendable Launch Vehicles (ELVs): a Titan 4 for the US POP and an Ariane for the ESA POP and MTFF. The US POP will for the most part use derivatives of systems flown on unmanned LEO spacecraft. The SSMB portion of the overall program is presented.

Edwards, A.↗

Countdown to the 21st century in planetary exploration

The '90s promise to be an exciting decade for planetary exploration, providing a steady stream of challenges and discoveries stretching well into the 21st century. Four major planetary missions - Voyager, Magellan, Galileo, and Ulysses - are already in flight, while the Mars Observer, Comet Rendezvous/Asteroid Flyby, and Cassini missions are well along in their design, development, test, and evaluation phases and will launch in the early to mid-'90s. Studies continue for new missions such as Lunar Observer, Solar Probe, and Mars Environmental Survey, as well as for the space Exploration Initiative. Issues common to many of these missions - current and future - include budgetary concerns, launch vehicles, longer lifecycles, international cooperation, new technology developments, and multimission operations.

Casani, John R.↗

Photovoltaic power for Space Station Freedom

Space Station Freedom is described with special attention to its electric power system. The photovoltaic arrays, the battery energy storage system, and the power management and distribution system are also discussed. The current design of Freedom's power system and the system requirements, trade studies, and competing factors which lead to system selections are referenced. This will be the largest power system ever flown in space. This system represents the culmination of many developments that have improved system performance, reduced cost, and improved reliability. Key developments and their evolution into the current space station solar array design are briefly described. The features of the solar cell and the array including the development, design, test, and flight hardware production status are given.

Baraona, Cosmo R.↗