Search NASA⌕ Search

SEARCH · Search NASA

Results for “disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Efficient Binary Static Code Data Flow Analysis Using Unsupervised Learning

The ever increasing need to ensure that code is reliably, efficiently and safely constructed has fueled the evolution of popular static binary code analysis tools. In identifying potential coding flaws in binaries, tools such as IDA Pro are used to disassemble the binaries into an opcode/assembly language format in support of manual static code analysis. Because of the highly manual and resource intensive nature involved with analyzing large binaries, the probability of overlooking potential coding irregularities and inefficiencies is quite high. In this paper, a light-weight data, unsupervised data flow methodology is described which uses highly-correlated data flow graph (CDFGs) to identify coding irregularities such that analysis time and required computing resources are minimized. Such analysis accuracy and efficiency gains are achieved by using a combination of graph analysis and unsupervised machine learning techniques which allows an analyst to focus on the most statistically significant flow patterns while performing binary static code analysis.

97 MATHEMATICS AND COMPUTING↗

Uranium Disposition Efforts at Los Alamos National Laboratory

Summary: Doing uranium work in a plutonium facility has challenges: NDA is geared to plutonium, Pu contamination, DU discards. The future volume of the feed stream to UED is dependent on pit disassembly. The dilute and dispose Pu disposition option will cause the HEU stream to grow significantly. Shipping HEU metal directly to Y-12 is a long term goal.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Augmented Monitoring and Condition Assessment Program (AMCAP) Material Test Reactor (MTR) (Fuel Inspection Program Report)

The AMCAP MTR Fuel Inspection Program, a special inspection program comprised of four inspection campaigns, examined a total of ten (10) pre-selected aluminum-clad, aluminum-based fuel core spent nuclear fuel assemblies (ASNF) stored in the L Area Disassembly Basin (L Basin) at the Savannah River Site. A full description of the inspections and the results are reported. The fuel had been stored in bundled-tube storage (Vertical Tube Storage) for periods of 18 to 21 years. The prior service experience of the individual 10 assemblies varies, but all included irradiation followed by wet storage at international research reactor sites prior to shipment to the US and storage in L Basin. The 10 assemblies were expected to be among the “worst"’ in terms of prior corrosion damage of the entire inventory of the direct-bundle-stored ASNF in L Basin. The inventory of MTR ASNF in L Basin will continue to be stored in the bundled-tube configuration or in slug-storage buckets with inserts pending retrieval for ultimate disposition. The MTR fuel inspections focused on collecting information for characterization of the material condition of the ASNF considering various types of aluminum fuel corrosion degradation of its assembled materials in water storage. A custom-designed Fuel Inspection Table was used to stage the fuel for remote, enhanced visual examination (close-up video imaging & recording) with controlled lighting and positioning that enables reproducibility of imaging conditions. The inspections were conducted by fuel subject matter expert staff from Spent Fuel Project Engineering (SFPE) and the Savannah River National Laboratory (SRNL). Stills captured from the video records were used to compare the corrosion evolution from previous records, as available. This evaluation of the inspection results including the comparison to the previous inspection results demonstrate that the water quality and the storage configuration of ASNF in L Basin do not cause aggressive corrosion degradation of the fuel; mitigation of the prior corrosion degradation of the fuel also appears to have been achieved with the good water quality conditions of L Basin. Recommendations are made for future inspection of the fuel to trend corrosion degradation and demonstrate continued safe wet storage of the ASNF in L Basin. The next fuel examination is recommended to be performed in 5 years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application and Certification of Comparative Vacuum Monitoring Sensors for Structural Health Monitoring of 737 Wing Box Fittings

Multi-site fatigue damage, hidden cracks in hard-to-reach locations, disbonded joints, erosion, impact, and corrosion are among the major flaws encountered in today's extensive fleet of aging aircraft and space vehicles. The use of in-situ sensors for real-time health monitoring of aircraft structures are a viable option to overcome inspection impediments stemming from accessibility limitations, complex geometries, and the location and depth of hidden damage. Reliable, structural health monitoring systems can automatically process data, assess structural condition, and signal the need for human intervention. Prevention of unexpected flaw growth and structural failure can be improved if on-board health monitoring systems are used to continuously assess structural integrity. Such systems are able to detect incipient damage before catastrophic failures occurs. Condition-based maintenance practices could be substituted for the current time-based maintenance approach. Other advantages of on-board distributed sensor systems are that they can eliminate costly, and potentially damaging, disassembly, improve sensitivity by producing optimum placement of sensors and decrease maintenance costs by eliminating more time- consuming manual inspections. This report presents a Sandia Labs-aviation industry effort to move SHM into routine use for aircraft maintenance. This program addressed formal SHM technology validation and certification issues so that the full spectrum of concerns, including design, deployment, performance and certification were appropriately considered. The Airworthiness Assurance NDI Validation Center (AANC) at Sandia Labs, in conjunction with Boeing, Delta Air Lines, Structural Monitoring Systems Ltd., Anodyne Electronics Manufacturing Corp. and the Federal Aviation Administration (FAA) carried out a certification program to formally introduce Comparative Vacuum Monitoring (CVM) as a structural health monitoring solution to a specific aircraft wing box application. Validation tasks were designed to address the SHM equipment, the health monitoring task, the resolution required, the sensor interrogation procedures, the conditions under which the monitoring will occur, the potential inspector population, adoption of CVM into an airline maintenance program and the document revisions necessary to allow for routine use of CVM as an alternate means of performing periodic structural inspects. To carry out the validation process, knowledge of aircraft maintenance practices was coupled with an unbiased, independent evaluation. Sandia Labs designed, implemented, and analyzed the results from a focused and statistically-relevant experimental effort to quantify the reliability of the CVM system applied to the Boeing 737 Wing Box fitting application. All factors that affect SHM sensitivity were included in this program: flaw size, shape, orientation and location relative to the sensors, as well as operational and environmental variables. Statistical methods were applied to performance data to derive Probability of Detection (POD) values for CVM sensors in a manner that agrees with current nondestructive inspection (NDI) validation requirements and also is acceptable to both the aviation industry and regulatory bodies. This report presents the use of several different statistical methods, some of them adapted from NDI performance assessments and some proposed to address the unique nature of damage detection via SHM systems, and discusses how they can converge to produce a confident quantification of SHM performance An important element in developing SHM validation processes is a clear understanding of the regulatory measures needed to adopt SHM solutions along with the knowledge of the structural and maintenance characteristics that may impact the operational performance of an SHM system. This report describes the major elements of an SHM validation approach and differentiates the SHM elements from those found in NDI validation. The activities conducted in this program demonstrated the feasibility of routine SHM usage in general and CVM in particular for the application selected. They also helped establish an optimum OEM-airline-regulator process and determined how to safely adopt SHM solutions. This formal SHM validation will allow aircraft manufacturers and airlines to confidently make informed decisions about the proper utilization of CVM technology. It will also streamline the regulatory actions and formal certification measures needed to assure the safe application of SHM solutions.

42 ENGINEERING↗

Destructive PIE and Safety Testing of Six AGR-2 UO 2 Capsule 3 Compacts

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s second irradiation experiment (AGR-2) was irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) from June 2010 to October 2013 (Collin 2014). The fuel compacts in this experiment held either tristructural isotropic (TRISO)-coated spherical kernels of uranium oxide (UO2) or TRISO-coated kernels containing both uranium carbide and uranium oxide phases (UCO). There were six separately monitored and controlled capsules in the AGR-2 test train. Capsule 3 held twelve compacts containing UO2-TRISO particles fabricated by BWX Technologies Nuclear Operations Group. The AGR-2 TRISO particles were fabricated in a pilot-scale fluidized-bed chemical vapor deposition (FB-CVD) furnace with a coating chamber inner diameter of 150 mm (Phillips, Barnes, and Hunn 2010), which was a change from the first irradiation experiment (AGR-1) particles that had been coated in a lab-scale FB-CVD coating system with a chamber inner diameter of 50 mm (Lowden 2006). The TRISO particles were overcoated with resinated graphite flake at Oak Ridge National Laboratory (ORNL), and the overcoated particles were pressed into one-inch-long, half-inch-diameter cylinders (Hunn, Montgomery, and Pappano 2010). Each cylindrical compact held an average of 1,543 TRISO particles with 9.6% enriched UO2 kernels that had a nominal diameter of 500 μm (Hunn, Savage, and Silva 2012). Capsule 3 compacts were irradiated to average calculated burnups of 9.01–10.69% fissions per initial metal atom (FIMA), and the average calculated fluences of fast neutrons with energies E n > 0.18 MeV were 3.05–3.53×10 25 n/m 2 (Sterbentz 2014). The calculated time-average, volume-average Capsule 3 compact temperatures were 996–1,062°C. However, Capsule 3 compact temperatures varied several hundred degrees across each compact, and the timeaverage minimum (TA min ) and time-average maximum (TA max ) temperatures were between 889–999°C and 1,072–1,105°C, respectively (Hawkes 2014). After irradiation, the AGR-2 test train was transferred from ATR to the INL Materials and Fuels Complex for inspection and disassembly (Ploger, Demkowicz, and Harp 2015). The initial inspection included dimensional metrology of the compacts and graphite fuel holders. Like all the AGR-2 compacts, the compacts in Capsule 3 shrank slightly during irradiation, as expected, with an average length reduction of 1.07–1.24% and an average diameter reduction of 0.13–0.41%. Post-irradiation examination (PIE) of the capsule components was completed to measure select fission products ( 90 Sr, 110m Ag, 134 Cs, 137 Cs, 144 Ce, and 154 Eu) outside the compacts (Stempien and Demkowicz 2020). This involved gamma counting of the graphite and graphoil spacers at the top and bottom of each capsule, acid leaching for radiochemical analysis of fission products on the metallic capsule components, and burn-leach analysis of the graphite holders. The total amount of 110mAg measured on the Capsule 3 components was 13% of the calculated capsule inventory. This was significantly lower than the amount of 110m Ag measured on the three UCO capsule components, which ranged from 32–70%. The lower 110m Ag release in Capsule 3 was likely due to lower peak temperatures compared with the UCO fuel capsules (Hawkes 2014). Measured inventories of the other select fission products were also lower in Capsule 3.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dilute and Dispose Cost Estimate for Equipment Installation per the LCCE

As directed in the Consolidation Appropriations Act, 2016, the National Nuclear Security Administration (NNSA) initiated the preconceptual design and development of a Lifecycle Cost Estimate for the Surplus Plutonium Disposition (SPD) Dilute and Dispose Program. Based on August 2016 Program Requirements Document and subsequent supplemental guidance, LANL prepared the Lifecycle Cost Estimate under key assumptions that meet the program’s requirements. For Dilute and Dispose, the program would disposition surplus Pu by diluting oxide produced at LANL with inhibitor materials, packaging the materials in containers, and shipping the containers to a deep geologic repository for permanent disposal. The base assumption is that LANL would disassemble pits, convert the Pu metal to oxide, and characterize and package the material for shipment to SRS, where it would be diluted prior to geologic disposal at the WIPP site in New Mexico. Another major assumption for the Dilute and Dispose option is that LANL would increase the current oxide production rate (or throughput) to 1500 kg/year, 5 times higher than the maximum annual production of ~300 Kgs executed by the ARIES Oxide Production Program at LANL. Analysis based on the ARIES program’s throughput model revealed that 15 pieces of equipment would need to be installed within PF-4 and certain facility improvements would need to be accomplished in order to meet the desired throughput levels. The additional equipment would be essentially identical to equipment already used within PF-4 for existing operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gear Test Assembly - Report on Experimental Testing (FY2020)

The Gear Test Assembly (GTA) has completed Campaign #2 of in-sodium testing at the Mechanisms Engineering Test Loop (METL). Campaign #1 was conducted in 2019 and completed 19,600 cycles, correlating to 9,800 fuel assembly maneuvers. Campaign #1 was terminated following a shaft seizure caused by a failed bearing in the sodium gearbox. Campaign #2 was conducted in the spring of 2020 and completed 2,768 cycles, correlating to 1,384 fuel assembly maneuvers. Campaign #2 was terminated following elevated vibration measurements coming from the sodium gearbox. Following cleaning and disassembly, a bearing was found to have failed in the sodium gearbox. Campaign #1 used tapered roller bearings made of 52100 steel with a heat treatment from the manufacturer that allows for operation to 350°C. Campaign #2 used the same tapered roller bearings, but with no heat treatment. A new dynamic shaft seal design was used in Campaign #2 that led to significant reductions in argon consumption and graphite debris generation. A modified external gearbox system led to no external bearing failures and allowed for higher torque output. Finally, modifications to the Carbonation System led to a more effective carbonation process and all-around reduction in turnaround time.

42 ENGINEERING↗

Preliminary Plan for Evaluation of Reactor Pressure Vessel Surveillance Materials from Palisades Nuclear Generating Station

The Palisades Nuclear Generating Station (PNGS), located in Michigan, is owned and operated by Entergy. It is a Combustion Engineering 2-loop pressurized water reactor (PWR) producing 805 MWe (2,565 MWth). The PNGS was built between 1967 and 1970, with approval to operate at full power in 1973; the plant’s original license was due to expire on March 24, 2011. An application for 20-year extension was filed in 2005 with the Nuclear Regulatory Commission and was granted on January 18, 2007. Although the plant was scheduled for decommissioning by 2031, Entergy currently plans to close the PNGS in 2022. The PNGS included in its reactor pressure vessel (RPV) surveillance program a capsule, designated A-60, containing specimens of one of the vessel plates and a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. This capsule was irradiated to a fluence of 1.8 x 10 20 n/cm 2 . The capsule was removed from its surveillance position in 1995 and has been resident in the spent fuel pool since that time. The material is also of special interest because of its very high nickel content and because of the potential for development of NiMnSi (nickel-manganese-silicon) precipitates, dubbed “late blooming phases.” The surveillance program also includes a capsule, designated T-150, dedicated specifically for thermal aging, which would provide results for at least 33 effective full power years, which is beyond the current thermal-aging database for such materials. Given that license extensions to 60 years of operation have been approved by the US Nuclear Regulatory Commission for most of the currently operating light water reactors in the United States, and that the first extension to 80 years was recently approved, there exists the probability that some RPVs will reach and possibly exceed a fast neutron fluence (> 1 MeV) of 1 x 10 20 n/cm 2 . This is a fluence regime with no US surveillance data and very little test reactor data, except for the Light Water Reactor Sustainability Program–sponsored University of California Santa Barbara Advanced Test Reactor (ATR) ATR-2 project. Thus, the materials in the A-60 capsule represent a valuable resource for directly exploring the effects of commercial surveillance irradiation on a typical plate and a high-nickel weld with similar materials irradiated in the ATR-2 test reactor project. This report provides background information for the surveillance program, previous results of surveillance materials testing, the preliminary plan for capsule retrieval and disassembly, and the plan for testing and microstructural examination of the mechanical test specimens of these unique materials to assess the features induced by very high irradiation fluence or very long thermal aging time

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NCERC News (Jan-Mar 2021) [Slides]

The National Criticality Experiments Research Center (NCERC) provides updates on experiments done as part of the HYPATIA and MUSIC campaigns as well as CAAS-3S criticality alarm testing, criticality safety classes, warehouse inventory, and KRUSTY disassembly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dispenser Reliability: Materials R&D. A Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) Report

Dispensers are the top cause of maintenance events and down-time at hydrogen fueling stations. In an effort to help characterize and enable improvements in dispenser reliability, an extensive accelerated lifetime testing set-up was designed and built at NREL involving components typically part of dispensing operations at fueling stations. Device Under Test (DUTs) included different components such as normally open valves, normally closed valves, fueling nozzles, breakaways devices and filters. Conditions of testing included pressures, and flow rates similar to light duty fuel cell electric vehicles fueling at -40°C, and -20°C for thousands of cycles in hydrogen. Tested components (failed and non-failed) were disassembled at SNL and polymeric O-rings were carefully retrieved and cataloged for chemical and physical characterization. Data collected was compared to similar O-rings from unexposed or non-tested components for hydrogen effects, and failure modes. Degradation analyses, based on select polymer chemistries common across all component types, their location within components, visual assessment of damage coupled with strong hydrogen effects from chemical characterization, was completed and presented to NREL and DOE. Overall, the failure rate amongst the components was not as high as expected for the test conditions. Among the component types tested, breakaways were the most susceptible to damage under these test conditions, with fueling nozzles a close second. The proper combination of selection of the right polymer and optimum component design was found to make a strong difference in component reliability under severe dispenser operating conditions. Physical degradation of polymers, rather than chemical changes due to low temperature hydrogen exposure, is more prevalent as failure mode for these test conditions. The nature and the extent of the degradation was much less at -20°C as compared to -40°C. The damage and failure rates were higher at lower temperatures than at higher test temperatures. As expected, increasing the number of cycles at the lowest test temperature (-40°C) increased damage. This indicates that cycling at the low temperature of -40°C required by SAE J2601 can reduce component life in fuel dispensing operations

08 HYDROGEN↗

Commuting again to work on-site? Lab’s first drivers faced their own challenges decades ago

After a long pause in commuting, more and more Lab staff are filling travel mugs, topping off their tanks, and heading up the hill for on-site work. As long as the Lab has existed, workers have snaked through tight mountain roads to get to their jobs. And, back in the early 1940s, drivers faced even more challenges. In the Lab’s earliest years, drivers likely worried about getting stuck in the mud, navigating intense switchbacks, or making sure important equipment, such as a disassembled power plant, didn’t fall off the back of the truck that was hauling it. Creative solutions could go a long way to get out of a jam. As many of us return onsite and get reacquainted with commuting, we look back at how transportation has changed since the Manhattan Project, the U.S. government’s top secret effort at Los Alamos to create the first atomic bombs to help end World War II. These stories and photos are part of the collections in the National Security Research Center, which is the Lab’s classified library and also houses unclassified artifacts from our past.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Increased Fissile Loading Flowsheet Review

A request was made by H-Canyon Process Engineering to assess the impact of blending dissolved, neutralized Spent Nuclear Fuel (SNF) with future sludge batches and their impact on downstream processing facilities including the Concentration, Storage and Transfer Facilities (CSTF), the Salt Waste Processing Facility (SWPF), the Defense Waste Processing Facility (DWPF), Saltstone, and the Effluent Treatment Facility (ETF). The purpose of this change is to accelerate the deinventory of SNF which is currently stored in the L-Area Disassembly Basin. The addition of SNF increases the mass of fissiles in each future sludge batch, due to their high enrichment. This high enrichment has the potential to complicate the programs to eliminate criticality events in the downstream processing facilities and will increase the number of canisters produced by DWPF because of the SNF mass increase. A separate report addressed the impacts to glass. The review and subsequent calculations were based on average predicted compositions of Accelerated Basin Deinventory (ABD) slurry, average compositions for predicted future sludge batches, average past salt batches and average past recycle batches to predict the feeds that will be processed in SWPF, DWPF, Saltstone, the 2H evaporator and ETF. Each of the processes was evaluated for potential issues.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Optimized Carbon Fiber Intermediate Development to Enable High-Volume Manufacturing of Lightweight Automotive Composites

The ongoing pursuit of improved fuel economy and reduced greenhouse gas emissions has resulted in sustained interest for lightweight materials technologies. In this context, carbon fiber composites have captured the imagination of automotive engineers due to the potential to achieve substantial mass reduction when compared to traditional steel construction. That stated, the use of carbon fiber composites in automotive has been limited for the most part to premium supercars and other derivative platforms. In these cases, manufacturing costs are less of an obstacle to implementation, and the performance benefits of carbon fiber have enabled production of structures offering more than 50% weight savings. In practice, translating these low-volume demonstrations onto high-volume vehicle platforms has remained challenging. This can be attributed to several factors, with the absence of suitable high throughput production methodologies being a key impediment. To date, structural, crash critical components have relied upon manufacturing techniques born out of the aerospace industry. This has created a disconnect between automotive production systems that are accustomed to manufacturing multiple parts per minute and the aerospace technologies that have cycle times in the order of hours. Consequently, the focus of this project is the development of manufacturing process technology for carbon fiber composites that can support a mainstream vehicle program at an assumed throughput of 100,000 vehicles per year. In practice, this translates to a part-to-part cycle time of less than 3 minutes. Project participation included contributions from a broad range of academic, industrial and national lab partners. The primary scope of work, being the development of new carbon fiber epoxy compounds that are stable at room temperature and suited to high throughput automated processing. For project management, the work streams were divided into six key areas, with the lead organization in parentheses. • Carbon fiber/epoxy materials formulation development and scale up (Dow) • Simulation of discontinuous near isotropic meso-structure intermediates (Purdue) • Simulation of mechanical performance of compression molded components (Purdue) • Meso-Scale morphological analysis and correlation with structural performance (UTK) • Paint and adhesion durability analysis (MSU) • Demonstrator part design, prototype production, and validation testing (Ford). The primary goal at the commencement of the project was development of a chopped carbon fiber sheet molding compound (SMC) that offered a three times improvement in tensile modulus over a comparable glass-based SMC. In addition to meeting mechanical performance targets, the resin kinetics were modified to achieve a processing cycle time of less than 3 minutes. Other critical-to-quality (CTQ) specifications were also stipulated to account for a broad range of materials and processing characteristics. To achieve the above, staff scientists at Dow Chemical created an extensive series of new epoxy blends for testing and validation. Throughout this development, a key challenge was attaining material performance goals without impacting processing behavior and paintability of finished components. The latter required a new internal mold release system being developed by Dow that was designed to complement the kinetics of the rapid cure epoxy. As a complement to work studies at the industrial partners, the teams from academia executed a series of analytical and experimental studies to investigate potential factors influencing CF-SMC performance. Unit cell models were developed to capture the meso-scale representations of the fiber matrix architecture. Results of this analysis and subsequent morphological investigations led to the design of a novel composite derivative comprising carbon fiber platelets embedded in an epoxy matrix; the platelet size and aspect ratio playing significant role in final composite properties. This approach was a departure from previous research in CF-SMC development whereby bulk filamentization or disassembly of the carbon fiber rovings had been considered the most effective means of achieving both fiber wet through and wet-out. As the course of the academia studies progressed, the aspect ratio of the fiber constituents was further optimized before finalizing material attributes and processing conditions. For the purposes of technology validation, the Ford team led a work stream devoted to the design, fabrication and testing of demonstration components. The carbon fiber SMC material has the potential to displace numerous stampings and castings on an automotive structure but ultimately vehicle closure applications were selected to showcase the abilities of the CF-SMC to achieve both mass reduction and business case for large complex structures. Using target properties established by the Dow staff scientists, the complete closure system for a full-size sedan decklid and a mid-size wagon liftgate were engineered. Prototypes for both applications were fabricated using production representative processing methods to allow for physical testing and performance validation of the CF-SMC structures. Following completion of a testing program that concluded with a FMVSS301 55 mph offset rear crash, the CF-SMC formulation was declared by the Ford team to have met all engineering requirements. To summarize, the joint development activities during this project led to significant technical breakthroughs and achievement of all milestones. The result was the development of a novel, tack-free carbon fiber molding compound that is suited to automated processing. This combined room temperature stability, fast cure kinetics, and internal mold release system facilitates cycle times that are conducive to high-volume production. The VORAFUSE M6400 successfully passed technology validation at Ford and is now eligible for consideration on future production commercial vehicle programs.

36 MATERIALS SCIENCE↗

LANL MLU TRUPACT Loading Survey Document

The following SNL document contains requested radiological survey information, as part of the documentation for the MLU shipment being performed by the LANL MLU team. The survey was performed in TA-5, on October 19th, 2021. This survey was for radiological coverage for the disassembly of two TRUPACTs, the assembly and loading of their payloads, and the reassembly of the TRUPACTs.

61 RADIATION PROTECTION AND DOSIMETRY↗

LANL MLU 20 October TRUPACT Loading Survey Document

This SNL document contains requested radiological survey information, as part of the documentation for the MLU shipment performed by the LANL MLU team on October 20th. The survey was performed in TA-5, on October 20th, 2021. This survey was for radiological coverage for the disassembly of two TRUPACTs, the assembly and loading of their payloads, and the reassembly of the TRUPACTs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Increased Fissile Loading Flowsheet Review

A request was made by H-Canyon Process Engineering to assess the impact of blending dissolved, neutralized Spent Nuclear Fuel (SNF) with future sludge batches and their impact on downstream processing facilities. The purpose of this change is to accelerate the deinventory of SNF which is currently stored in the L-Area Disassembly Basin.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ALDWP Operational Highlights 2021

The Weapons Pit production manufacturing team completed pit build 21-1 assembly operations on December 23, 2020. This build utilized all essential flow sheet steps and included the second -01 long tube cut off extension and welding activity. This is the best build produced in the MC4597-01 pit program to date. Final out-of-line operations, non-destructive evaluation, and radiography was completed during the week of January 4. Depending on the results from high energy radiography, this pit will be considered to be a candidate for CERT-02 and shipment to Lawrence Livermore National Laboratory in support of pit certification. It is notable that this build was completed while concurrently making Plutonium (Pu) metal, producing additional castings, machining Pu parts for Build 22, completing disassembly of two pits, supporting Nightshade B Pu target characterization, and precision machining of Jasper certification base plates.

42 ENGINEERING↗

CORRTEX Analysis Techniques

Continuous Reflectometry for Radius versus Time Experiments, or CORRTEX, is a diagnostic that was developed during nuclear testing to measure the distance at which rock walls were disrupted by an explosive device as a function of the time at which disruption occurred. Distances recorded are dynamic measurements of cable length as the shockwaves from an explosive event crush the experiment cables, reducing their usable length. Applications of the CORRTEX diagnostic have been expanded in recent times to include instrumentation of the explosive device itself, to record phenomena such as the speed of the detonation wave in the explosive charge and the crushing or disassembly of material in the charge housing. The diagnostic has likewise been used to monitor explosive performance in rock blasting and oil well hole-clearing activities.

42 ENGINEERING↗