Search NASA⌕ Search

SEARCH · Search NASA

Results for “docking”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Improved Ball-and-Socket Docking Mechanism

A proposed docking mechanism would form a ball-and-socket joint in the docked condition. The mechanism could tolerate significant initial misalignment because it would include an alignment cone that would guide the ball into the socket. Like other ball-and-socket joints, the joint would have three rotational degrees of freedom. This docking mechanism would be a successor to the one described in Passive Capture Joint With Three Degrees of Freedom (MFS-31146), NASA Tech Briefs, Vol. 22, No. 7 (July 1998), page 65. It would contain most of the components of the prior mechanism, plus some additional components that would expand its capabilities.

Cloyd, Richard↗

Optoelectronic Sensor System for Guidance in Docking

The Video Guidance Sensor (VGS) system is an optoelectronic sensor that provides automated guidance between two vehicles. In the original intended application, the two vehicles would be spacecraft docking together, but the basic principles of design and operation of the sensor are applicable to aircraft, robots, vehicles, or other objects that may be required to be aligned for docking, assembly, resupply, or precise separation. The system includes a sensor head containing a monochrome charge-coupled- device video camera and pulsed laser diodes mounted on the tracking vehicle, and passive reflective targets on the tracked vehicle. The lasers illuminate the targets, and the resulting video images of the targets are digitized. Then, from the positions of the digitized target images and known geometric relationships among the targets, the relative position and orientation of the vehicles are computed. As described thus far, the VGS system is based on the same principles as those of the system described in "Improved Video Sensor System for Guidance in Docking" (MFS-31150), NASA Tech Briefs, Vol. 21, No. 4 (April 1997), page 9a. However, the two systems differ in the details of design and operation. The VGS system is designed to operate with the target completely visible within a relative-azimuth range of +/-10.5deg and a relative-elevation range of +/-8deg. The VGS acquires and tracks the target within that field of view at any distance from 1.0 to 110 m and at any relative roll, pitch, and/or yaw angle within +/-10deg. The VGS produces sets of distance and relative-orientation data at a repetition rate of 5 Hz. The software of this system also accommodates the simultaneous operation of two sensors for redundancy

Howard, Richard T.↗

Overview of LIDS Docking Seals Development

NASA is developing a new docking system to support future space exploration missions to low-Earth orbit, the Moon, and Mars. This mechanism, called the Low Impact Docking System (LIDS), is designed to connect pressurized space vehicles and structures including the Crew Exploration Vehicle, International Space Station, and lunar lander. NASA Glenn Research Center (GRC) is playing a key role in developing the main interface seal for this new docking system. These seals will be approximately 147 cm (58 in.) in diameter. GRC is evaluating the performance of candidate seal designs under simulated operating conditions at both sub-scale and full-scale levels. GRC is ultimately responsible for delivering flight hardware seals to NASA Johnson Space Center around 2013 for integration into LIDS flight units.

Dunlap, Pat↗

A Ground Testbed to Advance US Capability in Autonomous Rendezvous and Docking Project

This project will advance the Autonomous Rendezvous and Docking (AR&D) GNC system by testing it on hardware, particularly in a flight processor, with a goal of testing it in IPAS with the Waypoint L2 AR&D scenario. The entire Agency supports development of a Commodity for Autonomous Rendezvous and Docking (CARD) as outlined in the Agency-wide Community of Practice whitepaper entitled: "A Strategy for the U.S. to Develop and Maintain a Mainstream Capability for Automated/Autonomous Rendezvous and Docking in Low Earth Orbit and Beyond". The whitepaper establishes that 1) the US is in a continual state of AR&D point-designs and therefore there is no US "off-the-shelf" AR&D capability in existence today, 2) the US has fallen behind our foreign counterparts particularly in the autonomy of AR&D systems, 3) development of an AR&D commodity is a national need that would benefit NASA, our commercial partners, and DoD, and 4) an initial estimate indicates that the development of a standardized AR&D capability could save the US approximately $60M for each AR&D project and cut each project's AR&D flight system implementation time in half.

D'Souza, Chris↗

Inter-Module Ventilation Changes to the International Space Station Vehicle to Support Integration of the International Docking Adapter and Commercial Crew Vehicles

The International Space Station (ISS) Environmental Control and Life Support System (ECLSS) is continuing to evolve in the post-Space Shuttle era. The ISS vehicle configuration that is in operation was designed for docking of a Space Shuttle vehicle, and designs currently under development for commercial crew vehicles require different interfaces. The ECLSS Temperature and Humidity Control Subsystem (THC) Inter-Module Ventilation (IMV) must be modified in order to support two docking interfaces at the forward end of ISS, to provide the required air exchange. Development of a new higher-speed IMV fan and extensive ducting modifications are underway to support the new Commercial Crew Vehicle interfaces. This paper will review the new ECLSS IMV development requirements, component design and hardware status, subsystem analysis and testing performed to date, and implementation plan to support Commercial Crew Vehicle docking.

Link, Dwight E., Jr.↗

Imaging Flash Lidar for Safe Landing on Solar System Bodies and Spacecraft Rendezvous and Docking

NASA has been pursuing flash lidar technology for autonomous, safe landing on solar system bodies and for automated rendezvous and docking. During the final stages of the landing from about 1 kilometer to 500 meters above the ground, the flash lidar can generate 3-Dimensional images of the terrain to identify hazardous features such as craters, rocks, and steep slopes. The onboard flight computer can then use the 3-D map of terrain to guide the vehicle to a safe location. As an automated rendezvous and docking sensor, the flash lidar can provide relative range, velocity, and bearing from an approaching spacecraft to another spacecraft or a space station. NASA Langley Research Center has developed and demonstrated a flash lidar sensor system capable of generating 16,000 pixels range images with 7 centimeters precision, at 20 Hertz frame rate, from a maximum slant range of 1800 m from the target area. This paper describes the lidar instrument and presents the results of recent flight tests onboard a rocket-propelled free-flyer vehicle (Morpheus) built by NASA Johnson Space Center. The flights were conducted at a simulated lunar terrain site, consisting of realistic hazard features and designated landing areas, built at NASA Kennedy Space Center specifically for this demonstration test. This paper also provides an overview of the plan for continued advancement of the flash lidar technology aimed at enhancing its performance to meet both landing and automated rendezvous and docking applications.

Amzajerdian, Farzin↗

NASA Docking System (NDS) Interface Definitions Document (IDD)

The contents of this document define the integrated performance and interface design for NASA Docking System (NDS) Block 1 and the International Docking Adapter. The intent of this IDD is to provide the interface design for using, installing, and interfacing to the NDS Block 1 that will enable successful docking to the IDA. This document is under the control of the ISS Development Projects Office (OG).

Tabakman, Alexander↗

Multi-Axis Independent Electromechanical Load Control for Docking System Actuation Development and Verification Using dSPACE

The development of highly complex and advanced actuation systems to meet customer demands has accelerated as the use of real-time testing technology expands into multiple markets at Moog. Systems developed for the autonomous docking of human rated spacecraft to the International Space Station (ISS), envelope multi-operational characteristics which place unique constraints on an actuation system. Real-time testing hardware has been used as a platform for incremental testing and development for the linear actuation system which controls initial capture and docking for vehicles visiting the ISS. This presentation will outline the role of dSPACE hardware as a platform for rapid control-algorithm prototyping as well as an Electromechanical Actuator (EMA) system dynamic loading simulator, both conducted at Moog to develop the safety critical Linear Actuator System (LAS) of the NASA Docking System (NDS).

Oesch, Christopher↗

Spacecraft Docking System

A method and apparatus for docking a spacecraft. The apparatus comprises elongate members, movement systems, and force management systems. The elongate members are associated with a docking structure for a spacecraft. The movement systems are configured to move the elongate members axially such that the docking structure for the spacecraft moves. Each of the elongate members is configured to move independently. The force management systems connect the movement systems to the elongate members and are configured to limit a force applied by the each of the elongate members to a desired threshold during movement of the elongate members.

Ghofranian, Siamak↗

Space Shuttle Program (SSP) Dual Docked Operations (DDO)

This document describes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), International Space Station (ISS) Program (ISSP), and Mission Operations Directorate for implementing Dual Docked Operations (DDO) during mated Orbiter/ISS missions. This work was performed over a number of years. Due to the ever increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during docked operations. This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles.

Sills, Joel W., Jr.↗

Linear Actuator System for the NASA Docking System

The Linear Actuator System (LAS) is a major sub-system within the NASA Docking System (NDS). The NDS Block 1 will be used on the Boeing Crew Space Transportation (CST-100) system to achieve docking with the International Space Station. Critical functions in the Soft Capture aspect of docking are performed by the LAS, which implements the Soft Impact Mating and Attenuation Concept (SIMAC). This paper describes the general function of the LAS, the system's key requirements and technical challenges, and the development and qualification approach for the system.

Dick, Brandon↗

Linear Actuator System for the NASA Docking System

The Linear Actuator System (LAS) is a major sub-system within the NASA Docking System (NDS). The NDS Block 1 will be used on the Boeing Crew Space Transportation (CST-100) system to achieve docking with the International Space Station. Critical functions in the Soft Capture aspect of docking are performed by the LAS. This paper describes the general function of the LAS, the system's key requirements and technical challenges, and the development and qualification approach for the system.

Dick, Brandon N.↗

System and Method for Automated Rendezvous, Docking and Capture of Autonomous Underwater Vehicles

A system for automated rendezvous, docking, and capture of autonomous underwater vehicles at the conclusion of a mission comprising of comprised of a docking rod having lighted, pulsating (in both frequency and light intensity) series of LED light strips thereon, with the LEDs at a known spacing, and the autonomous underwater vehicle specially designed to detect and capture the docking rod and then be lifted structurally by a spherical end strop about which the vehicle can be pivoted and hoisted up (e.g., onto a ship). The method of recovery allows for very routine and reliable automated recovery of an unmanned underwater asset.

Stone, William C.↗

An Analytic Model for Estimating the First Contact Resistance Needed to Avoid Damaging ESD During Spacecraft Docking in GEO

NASA’s Gateway program will involve spacecraft (s/c) docking in the outer radiation belt in order to transfer Gateway elements between s/c for transport to lunar orbit. The charging of these s/c to different potentials prior to docking raises the possibility of a damaging electrostatic discharge (ESD) at the time of first contact between the s/c. A proposed mitigation strategy is for first contact to occur prior to docking through a resistor with resistance R that would lower the potential difference at an optimal rate to a sufficiently low value to prevent ESD damage. The coupling of s/c by a resistor can be modeled by SPIS, but for realistic two s/c models SPIS can take hours to simulate the evolution of the s/c surface charges and potentials to an equilibrium state. Our objective is to develop a simpler model of s/c resistive coupling that runs orders of magnitude faster while providing useful first design estimates of the time variation of the s/c potentials, current through the resistor, and how these vary with R and s/c configuration This configuration is defined by the relative separation and orientation of the s/c, and their solar illumination. The configuration and geometry of the s/c determine their capacitive coupling. The s/c capacitances are computed using Nascap-2K. This poster presents the first version of such a model, and initial tests.

Goodman, Michael L.↗

An Analytic Model for Estimating the First Contact Resistance Needed to Avoid Damaging ESD During Spacecraft Docking in GEO

NASA’s Gateway program is to involve spacecraft (s/c) docking in the outer radiation belt in order to transfer Gateway elements between s/c for transport to lunar orbit. The charging of these s/c to different potentials prior to docking raises the possibility of a damaging electrostatic discharge (ESD) at the time of first contact between the s/c. A proposed mitigation strategy is for first contact to occur prior to docking through a resistor with resistance R that would lower the potential difference at an optimal rate to a sufficiently low value to prevent a damaging ESD. The coupling of s/c by a resistor can be modeled by SPIS (Spacecraft Plasma Interaction System), but for realistic two s/c models SPIS can take hours to simulate the evolution of the s/c surface charges and potentials to an equilibrium state. Our objective is to develop a simpler model of s/c resistive coupling that runs orders of magnitude faster while providing useful first design estimates of the time variation of the s/c potentials, current through the resistor, and how these vary with R and s/c configuration. This configuration is defined by the relative separation and orientation of the s/c, and their solar illumination. The configuration and geometry of the s/c determine their capacitive coupling. The s/c capacitances are computed using Nascap-2K. This abstract and the associated poster describe the first version of such a model, and initial tests.

Goodman, Michael L.↗

International Docking System Standard (IDSS) Interface Definition Document (IDD) Revision F

This IDSS IDD details the physical geometric mating interface and design loads requirements. The physical geometric interface requirements must be strictly followed to ensure physical spacecraft mating compatibility. This includes both defined components and areas that are void of components. The IDD also identifies common design parameters as identified in Section 3.0, e.g., docking initial conditions and vehicle mass properties. This information represents a recommended set of design values enveloping a broad set of design reference missions and conditions, which if accommodated in the docking system design, increases the probability of successful docking between different spacecraft.

Stanley R Donahoe↗

Space Shuttle Program Dual Docked Operations

Due to the ever-increasing visiting vehicle traffic to and from the International Space Station (ISS) during mated Orbiter/ISS missions, it became apparent to both the ISS Program (ISSP) and the Space Shuttle program (SSP) that there would arise occasions where a visiting vehicle docking and/or undocking could overlap when the Space Shuttle Orbiter was docked to the ISS, referred to as Dual Docked Operations (DDO). The primary concerns were that plumes from the visiting vehicles would cause contamination, corrosion, and erosion to Space Shuttle surfaces and present a toxicity hazard to ground personnel when processing the Space Shuttle after landing. This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles. The overarching goal of this effort was to assess the viability and readiness of the SSP to protect for DDO on any given mission. To assess the viability of performing DDO, the ISSP delivered plume particle fluence (i.e., number of particles per unit area) and contamination deposition based on the visiting vehicle’s proximity operations to the SSP for evaluation. This paper summarizes the concept definition, studies, and analysis results generated by the SSP, ISSP, and Mission Operations Directorate (MOD) for implementing DDO involving the Orbiter and Russian vehicles (RVs). Discussion and results presented herein represent a generic assessment of the SSP and ISSP integrated safety and technical evaluations of DDO involving the Orbiter and RVs. Mission-specific analysis and operational impacts were conducted flight-by-flight as they arose.

Launch vehicles↗

Space Shuttle Program Dual Docked Operations

- Dual Docked Operations (DDO) is the docking or undocking of a Russian Vehicle (RV) during Space Shuttle Orbiter/International Space Station (ISS) mated operations. - This paper and presentation summarizes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), ISS Program (ISSP), and Mission Operations Directorate for implementing DDO during mated Orbiter/ISS missions. [1] - Due to the ever-increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during mated Orbiter/ISS operations. - This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles. - Reviews were conducted to assess the viability and readiness of the SSP to protect for DDO on any given mission and it was found to be t echnically feasible

Launch vehicles↗