Search NASA⌕ Search

SEARCH · Search NASA

Results for “dss”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Performance of a 12-GHz fiber-optic system for beam-waveguide antenna stability testing

A 12-GHz fiber-optic system is a critical part of a test configuration that was proposed for measuring the fractional frequency stability of the Deep Space Station (DSS)-13 beam-waveguide (BWG) antenna. This fiber-optic system is used to carry Ku-band (12-GHz) signals from a reference antenna to the DSS-13 BWG pedestal room. Tests performed only on the fiber-optic system portion of the overall test configuration showed that the 12-GHz fiber-optic system (installed at DSS-13) has a frequency stability of about 1.1 x 10(exp -16) for sampling time tau = 1000 sec for a nighttime run. This preliminary result establishes the lowest noise floor that can probably be achieved for the test configuration that will be used to measure the frequency stability of the DSS-13 BWG antenna.

Otoshi, T. Y.↗

The effects of correlated noise in intra-complex DSN arrays for S-band Galileo telemetry reception

A number of the proposals for supporting a Galileo S-band (2.3-GHz) mission involve arraying several antennas to maximize the signal-to-noise ratio (and bit rate) obtainable from a given set of antennas. Arraying is no longer a new idea, having been used successfully during the Voyager encounters with Uranus and Neptune. However, arraying for Galileo's tour of Jupiter is complicated by Jupiter's strong radio emission, which produces correlated noise effects. This article discusses the general problem of correlated noise due to a planet, or other radio source, and applies the results to the specific case of an array of antennas at the DSN's Tidbinbilla, Australia, complex (DSS 42, DSS 43, DSS 45, and the yet-to-be-built DSS 34). The effects of correlated noise are highly dependent on the specific geometry of the array and on the spacecraft-planet configuration; in some cases, correlated noise effects produce an enhancement, rather than a degradation, of the signal-to-noise ratio. For the case considered here--an array of the DSN's Australian antennas observing Galileo and Jupiter--there are three regimes of interest. If the spacecraft-planet separation is approximately less than 75 arcsec, the average effect of correlated noise is a loss of signal to noise (approximately 0.2 dB as the spacecraft-planet separation approaches zero). For spacecraft-planet separations approximately greater than 75 arcsec, but approximately less than 400 arcsec, the effects of correlated noise cause signal-to-noise variations as large as several tenths of a decibel over time scales of hours or changes in spacecraft-planet separation of tens of arcseconds; however, on average its effects are small (less than 0.01 dB). When the spacecraft is more than 400 arcsec from Jupiter (as is the case for about half of Galileo's tour), correlated noise is a less than 0.05-dB effect.

Dewey, R. J.↗

Environmental projects. Volume 15: Environmental assessment: Proposed 1-megawatt radar transmitter at the Mars site

The Goldstone Deep Space Communications Complex (GDSCC), located in the Mojave Desert about 64.5 km (40 mi) north of Barstow, California. and about 258 km (160 mi) northeast of Pasadena, California, is part of the National Aeronautics and Space Administration's (NASA's) Deep Space Network (DSN), one of the world's larger and more sensitive scientific telecommunications and radio navigation networks. The Goldstone Complex is managed, technically directed, and operated for NASA by the Jet Propulsion Laboratory (JPL) of the California Institute of Technology in Pasadena, California. Activities at the GDSCC support the operation of six parabolic dish antennas located at five separate sites called Deep Space Stations (DSS's). Four sites, named Echo, Mars, Uranus, and Apollo, are operational for space missions, while the remaining Venus Site is devoted to research and development activities. The Mars Site at the GDSCC contains two antennas: the Uranus antenna (DSS 15, 34 m) and the Mars antenna (DSS 14, 70 m). This present volume deals solely with the DSS-14 Mars antenna. The Mars antenna not only can act as a sensitive receiver to detect signals from spacecraft, but it also can be used in radar astronomy as a powerful transmitter to send out signals to probe the solar system. At present, the Mars antenna operates as a continuous-wave microwave system at a frequency of 8.51 GHz at a power level of 0.5 MW. JPL has plans to upgrade the Mars antenna to a power level of 1 MW. Because of the anticipated increase in the ambient levels of radio frequency radiation (RFR), JPL retained Battelle Pacific Northwest Laboratories (BPNL), Richland, Washington, to conduct an environmental assessment with respect to this increased RFR. This present volume is a JPL-expanded version of the BPNL report titled Environmental Assessment of the Goldstone Solar System Radar, which was submitted to JPL in Nov. 1991. This BPNL report concluded that the operation of the upgraded Mars antenna at the GDSCC, with its increased potential electromagnetic radiation hazards and interferences, would have no significantly adverse biological, physical, or socioeconomic effects on the environment. Thus, a Finding of No Significant Impact (FONSI) is appropriate in accordance with local, State, Federal, and NASA environmental rules and regulations.

Source record↗

An OSI architecture for the deep space network

The flexibility and robustness of a monitor and control system are a direct result of the underlying inter-processor communications architecture. A new architecture for monitor & Control at the Deep Space Network Communications Complexes has been developed based on the Open System Interconnection (OSI) standards. The suitability of OSI standards for DSN M&C has been proven in the laboratory. The laboratory success has resulted in choosing an OSI-based architecture for DSS-13 M&C. DSS-13 is the DSN experimental station and is not part of the 'operational' DSN; it's role is to provide an environment to test new communications concepts can be tested and conduct unique science experiments. Therefore, DSS-13 must be robust enough to support operational activities, while also being flexible enough to enable experimentation. This paper describes the M&C architecture developed for DSS-13 and the results from system and operational testing.

Heuser, W. Randy↗

Inter-Satellite Communications Considerations and Requirements for Distributed Spacecraft and Formation Flying Systems

In order to avoid selecting inadequate inter-spacecraft cross-link communications standards for Distributed Spacecraft System (DSS) missions, it is first necessary to identify cross-link communications strategies and requirements common to a cross-section of proposed missions. This paper addresses the cross-link communication strategies and requirements derived from a survey of 39 DSS mission descriptions that are projected for potential launch within the next 20 years. The inter-spacecraft communications strategies presented are derived from the topological and communications constraints from the DSS missions surveyed. Basic functional requirements are derived from an analysis of the fundamental activities that must be undertaken to establish and maintain a cross-link between two DSS spacecraft. Cross-link bandwidth requirements are derived from high-level assessments of mission science objectives and operations concepts. Finally, a preliminary assessment of possible cross-link standards is presented within the context of the basic operational and interoperability requirements.

Kwadrat, Carl F.↗

(abstract) Asteroid Radar Astronomy at Goldstone in the 1990s

Since 1990, much effort has been devoted to optimizing Goldstone's capability to study near-Earth objects (NEOs). Three different configurations are now available. The nominal system on the 70-m antenna (DSS 14) uses separate feed horns for transmitting and receiving, and the 15-plus seconds required for transmit-to-receive switching renders the system useless for targets much closer than about 0.025 AU (about 10 lunar distances, about 25 seconds of echo time delay) and unwieldy even for targets twice that far. However, an additional, recently installed single horn system shrinks switching time to about 5 seconds, letting DSS 14 observe NEOs as close as about 5 lunar distances. Closer targets will require two-station observations, with DSS 14 transmitting continuously while DSS 13, a 34-m antenna 22 km away, receives. That configuration, first used for Toutatis, will also be required for delay-Doppler imaging that places thousands of pixels on any NEO whose rotation period P(h) and echo roundtrip time delay RTT (s) satisfy P > RTT. Between January 1990 and June 1994, the Goldstone radar has detected 11 asteroids. During the next 2 years, seven asteroids are scheduled for Goldstane observations. After completion of the Arecibo upgrade, Goldstone will play an important complementary role to that much more sensitive instrument.

asteroids radar Goldstone delay-Doppler imaging Ar↗

Interference estimate around Canberra DSN Station at 2.04 GHz during Huygens release phase from Cassini

During the descent phase of the Huygens Probe released from the Cassini spacecraft and inserted at Titan, the Deep Space Network (DSN) Canberra Deep Space Station (DSS) 43 (with its 70-m antenna) is being considered as a backup station to directly receive the Huygens Probe data being transmitted at 2.04 GHz. This study provides an assessment on the interference level from the major nearby transmitters operating in this frequency band. The minimum trans-horizon attenuations are calculated using terrain topographic data and the Trans-Horizon Interference Propagation Loss (THIPL) Computing Program recently developed based on ITU-R P.452, and the calculations take into account all propagation modes under a 0.1% of time exceeded. We find that there are five terrestrial transmitters within 100 km of DSS 43. Transmitter 1 is the closest to DSS 43, and needs to be coordinated to avoid interference. The rest of the four transmitters will not interfere with DSS 43. The interference levels from these transmitters are all below the DSN protection criteria of 99.9% of time.

Deep Space Network (DSN)↗

Magnetospheric Multiscale (MMS) Mission Attitude Ground System Design

This paper describes the attitude ground system (AGS) design to be used for support of the Magnetospheric MultiScale (MMS) mission. The AGS exists as one component of the mission operations control center. It has responsibility for validating the onboard attitude and accelerometer bias estimates, calibrating the attitude sensors and the spacecraft inertia tensor, and generating a definitive attitude history for use by the science teams. NASA's Goddard Space Flight Center (GSFC) in Greenbelt, Maryland is responsible for developing the MMS spacecraft, for the overall management of the MMS mission, and for mission operations. MMS is scheduled for launch in 2014 for a planned two-year mission. The MMS mission consists of four identical spacecraft flying in a tetrahedral formation in an eccentric Earth orbit. The relatively tight formation, ranging from 10 to 400 km, will provide coordinated observations giving insight into small-scale magnetic field reconnection processes. By varying the size of the tetrahedron and the orbital semi-major axis and eccentricity, and making use of the changing solar phase, this geometry allows for the study of both bow shock and magnetotail plasma physics, including acceleration, reconnection, and turbulence. The mission divides into two phases for science; these phases will have orbit dimensions of 1.2 x 12 Earth radii in the first phase and 1.2x25 Earth radii in the second in order to study the dayside magnetopause and the nightside magnetotail, respectively. The orbital periods are roughly one day and three days for the two mission phases. Each of the four MMS spacecraft will be spin stabilized at 3 revolutions per minute (rpm), with the spin axis oriented near the ecliptic north pole but tipped approximately 2.5 deg towards the Sun line. The main body of each spacecraft will be an eight-sided platform with diameter of 3.4 m and height of 1.2 m. Several booms are attached to this central core: two axial booms of 14.9 m length, two radial magnetometer booms of 5 m length, and four radial wire booms of 60 m length. Attitude and orbit control will use a set of axial and radial thrusters. A four-head star tracker and a slit-type digital Sun sensor (DSS) provide input for attitude determination. In addition, an accelerometer will be used for closed-loop orbit maneuver control. The primary AGS product will be a daily definitive attitude history. Due to power limitations, the star tracker and accelerometer data will not be available at all times. However, tracker data from at least 10 percent of each orbit and continuous DSS data will be provided. An extended Kalman filter (EKF) will be used to estimate the three-axis attitude (i.e., spin axis orientation and spin phase) and rotation rate for all times when the tracker data is valid. For other times, the attitude is generated by assuming a constant angular momentum vector in the inertial frame. The DSS sun pulse will provide a timing signal to maintain an accurate spin phase. There will be times when the Sun is occulted and DSS data is not available. If this occurs at the start or end of a definitive attitude product, then the spin phase will be extrapolated using the mean rate determined by the EKF.

Sedlak, Joseph E.↗

Common Web Mapping and Mobile Device Framework for Display of NASA Real-time Data

Scientists have strategic goals to deliver their unique datasets and research to both collaborative partners and more broadly to the public. These datasets can have a significant impact locally and globally as has been shown by the success of the NASA Short‐term Prediction Research and Transition (SPoRT) Center and SERVIR programs at Marshall Space Flight Center. Each of these respective organizations provides near real‐time data at the best resolution possible to address concerns of the operational weather forecasting community (SPoRT) and to support environmental monitoring and disaster assessment (SERVIR). However, one of the biggest struggles to delivering the data to these and other Earth science community partners is formatting the product to fit into an end user's Decision Support System (DSS). The problem of delivering the data to the end‐user's DSS can be a significant impediment to transitioning research to operational environments especially for disaster response where the deliver time is critical. The decision makers, in addition to the DSS, need seamless access to these same datasets from a web browser or a mobile phone for support when they are away from their DSS or for personnel out in the field. A framework has been developed for MSFC Earth Science program that can be used to easily enable seamless delivery of scientific data to end users in multiple formats. The first format is an open geospatial format, Web Mapping Service (WMS), which is easily integrated into most DSSs. The second format is a web browser display, which can be embedded within any MSFC Science web page with just a few lines of web page coding. The third format is accessible in the form of iOS and Android native mobile applications that could be downloaded from an "app store". The framework developed has reduced the level of effort needed to bring new and existing NASA datasets to each of these end user platforms and help extend the reach of science data.

Burks, Jason E.↗

Common Web Mapping and Mobile Device Framework for Display of NASA Real-time Data

Scientists have strategic goals to deliver their unique datasets and research to both collaborative partners and more broadly to the public. These datasets can have a significant impact locally and globally as has been shown by the success of the NASA Short‐term Prediction Research and Transition (SPoRT) Center and SERVIR programs at Marshall Space Flight Center. Each of these respective organizations provides near real‐time data at the best resolution possible to address concerns of the operational weather forecasting community (SPoRT) and to support environmental monitoring and disaster assessment (SERVIR). However, one of the biggest struggles to delivering the data to these and other Earth science community partners is formatting the product to fit into an end user's Decision Support System (DSS). The problem of delivering the data to the end‐user's DSS can be a significant impediment to transitioning research to operational environments especially for disaster response where the deliver time is critical. The decision makers, in addition to the DSS, need seamless access to these same datasets from a web browser or a mobile phone for support when they are away from their DSS or for personnel out in the field. A framework has been developed for MSFC Earth Science program that can be used to easily enable seamless delivery of scientific data to end users in multiple formats. The first format is an open geospatial format, Web Mapping Service (WMS), which is easily integrated into most DSSs. The second format is a web browser display, which can be embedded within any MSFC Science web page with just a few lines of web page coding. The third format is accessible in the form of iOS and Android native mobile applications that could be downloaded from an "app store". The framework developed has reduced the level of effort needed to bring new and existing NASA datasets to each of these end user platforms and help extend the reach of science data.

Burks, Jason↗

Magnetospheric Multiscale (MMS) Mission Attitude Ground System Design

This paper describes the attitude ground system (AGS) design to be used for support of the Magnetospheric MultiScale (MMS) mission. The AGS exists as one component of the mission operations control center. It has responsibility for validating the onboard attitude and accelerometer bias estimates, calibrating the attitude sensors and the spacecraft inertia tensor, and generating a definitive attitude history for use by the science teams. NASA's Goddard Space Flight Center (GSFC) in Greenbelt, Maryland is responsible for developing the MMS spacecraft, for the overall management of the MMS mission, and for mission operations. MMS is scheduled for launch in 2014 for a planned two-year mission. The MMS mission consists of four identical spacecraft flying in a tetrahedral formation in an eccentric Earth orbit. The relatively tight formation, ranging from 10 to 400 km, will provide coordinated observations giving insight into small-scale magnetic field reconnection processes. By varying the size of the tetrahedron and the orbital semi-major axis and eccentricity, and making use of the changing solar phase, this geometry allows for the study of both bow shock and magnetotail plasma physics, including acceleration, reconnection, and turbulence. The mission divides into two phases for science; these phases will have orbit dimensions of l.2xl2 Earth radii in the first phase and l.2x25 Earth radii in the second in order to study the dayside magnetopause and the nightside magnetotail, respectively. The orbital periods are roughly one day and three days for the two mission phases. Each of the four MMS spacecraft will be spin stabilized at 3 revolutions per minute (rpm), with the spin axis oriented near the ecliptic north pole but tipped approximately 2.5 deg towards the Sun line. The main body of each spacecraft will be an eight-sided platform with diameter of 3.4 m and height of 1.2 m. Several booms are attached to this central core: two axial booms of 14.9 m length, two radial magnetometer booms of 5 m length, and four radial -wire booms of 60 m length. Attitude and orbit control will use a set of axial and radial thrusters. A four-head star tracker and a slit-type digital Sun sensor (DSS) provide input for attitude determination. In addition, an accelerometer will be· used for closed-loop orbit maneuver control. The primary AGS product will be a daily definitive attitude history. Due to power limitations; the star tracker and accelerometer data will not be available at all times. However, tracker data from at least 10 percent of each orbit and continuous DSS data will be provided. An extended Kalman filter (EKF) will be used to estimate the three-axis attitude (i.e., spin axis orientation and spin phase) and rotation rate for all times when the tracker data is valid. For other times, the attitude is generated by assuming a constant angular momentum vector in the inertial frame. The DSS sun pulse will provide a timing signal to maintain an accurate spin phase. There will be times when the Sun is occulted and DSS data is not available. If this occurs at the start or end of a definitive attitude product, then the spin phase will be extrapolated using the mean rate determined by the EKF.

Sedlak, Joseph E.↗

An OSI Architecture for the Deep Space Network

The flexibility and robustness of a monitor and control system are a direct result of the underlying inter-processor communications architecture. A new architecture for monitor & control at the Deep Space Network Communications Complexes has been developed based on the Open System Interconnection (OSI) standards. The suitability of OSI standards for DSN M&C has been proven in the laboratory. The laboratory success has resulted in choosing an OSI-based architecture for DSS-13 M&C. DSS-13 is the DSN experimental station and is not part of the "operational" DSN; it's role is to provide an environment to test new communications concepts can be tested and conduct unique science experiments. Therefore, DSS-13 must be robust enough to support operational activities, while also being flexible enough to enable experimentation. This paper describes the M&C architecture developed for DSS-13 and the results from system and operational testing.

OSI↗

Use of the SPoRT Stoplight Product to Support NWS Decision Support Services

The National Weather Service Forecast Offices (NWSFOs) use many weather tools and observational datasets to provide support for critical decision-making by core partners such as public safety officials, emergency managers, and first responders. These core partners who need weather decision support services (DSS) for outdoor events require up-to-the-minute weather information to ensure the safety and protection of attendees and workers. Storms and lightning, potentially deadly, pose a significant threat during outdoor events and are among the weather phenomena frequently cited as a DSS requirement. According to the National Lightning Safety Council, from 2014 up to August 2024, lightning resulted in 222 fatalities in the U.S. For outdoor events with hundreds to thousands of attendees, having the right tools to detect and monitor lightning activity is of utmost importance to protect lives. Common guidelines for lightning safety include moving inside a substantial structure at the first sight of threatening skies or the first sound of thunder, and waiting 30 minutes after the last lightning flash or thunder before returning outside. Using this guidance as a framework, scientists at the NASA Short-term Prediction Research and Transition (SPoRT) center have developed the Geostationary Lightning Mapper (GLM) Stoplight tool. This experimental tool uses the GLM Flash Extent Density imagery to display the location and recency of lightning flashes. To simplify interpretation, these lightning pixels are color-coded in 10-minute bins, ranging from red (lightning detected 0 to 10 minutes ago) to yellow (10 to 20 minutes ago) to green (20 to 30 minutes ago). The Stoplight tool also allows users to place markers at the location of outdoor events with range rings around the location to help in assessing the location and relative age of lightning flashes near and upstream of the event. The goal is to help NWS forecasters provide core partners with the necessary information to make the best decisions possible. While the Stoplight tool is experimental, forecasters at NWSFO Raleigh, NC, have periodically used the Stoplight guidance to evaluate its utility within NWS DSS. This presentation will discuss how the Stoplight tool was successfully used for DSS for four outdoor events in central NC in 2023 and 2024. Future improvements to this tool, including the addition of AI applications and the merging of ground-based lightning data with GLM data, will be reviewed.

Gail Hartfield↗

Results for the April 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the April 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TARGETS that were established at the time the SWPF DSS sample was obtained. The April 2025 Semiannual sample of the SWPF DSS is a composite from the six months of SWPF processing during the First Quarter Fiscal Year 2025 (1QFY2025) and the Second Quarter Fiscal Year 2025 (2QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results for the October 2025 Semiannual Salt Waste Processing Facility Decontaminated Salt Solution Sample

In this Technical Report, the chemical and radionuclide contaminant results from the October 2025 Semiannual sample of the Salt Waste Processing Facility (SWPF) Decontaminated Salt Solution (DSS) salt solution are presented in tabulated form. The information from this characterization will be used by Savannah River Mission Completion (SRMC) for the transfer of aqueous waste from SWPF to the Saltstone Production Facility (SPF) where the waste will be treated and disposed in the Saltstone Disposal Facility. This Technical Report compares results, where applicable, to SPF Waste Acceptance Criteria (WAC) LIMITS and TAR GETS that were established at the time the SWPF DSS sample was obtained. 1 The October 2025 Semiannual sample of the SWPF DSS is a composite from one month of SWPF processing during the Third Quarter Fiscal Year 2025 (3QFY2025) and two months of SWPF processing during the Fourth Quarter Fiscal Year 2025 (4QFY2025).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tracking and data system support for the Mariner Mars 1971 mission. Prelaunch phase through first trajectory correction maneuver, volume 1

The DSN command system provided the capability to enter commands in a computer at the deep space stations for transmission to the spacecraft. The high-rate telemetry system operated at 16,200 bits/sec. This system will permit return to DSS 14 of full-resolution television pictures from the spacecraft tape recorder, plus the other science experiment data, during the two playback periods of each Goldstone pass planned for each corresponding orbit. Other features included 4800 bits/sec modem high-speed data lines from all deep space stations to Space Flight Operations Facility (SFOF) and the Goddard Space Flight Center, as well as 50,000 bits/sec wideband data lines from DSS 14 to the SFOF, thus providing the capability for data flow of two 16,200 bits/sec high-rate telemetry data streams in real time. The TDS performed prelaunch training and testing and provided support for the Mariner Mars 1971/Mission Operations System training and testing. The facilities of the ETR, DSS 71, and stations of the MSFN provided flight support coverage at launch and during the near-earth phase. The DSSs 12, 14, 41, and 51 of the DSN provided the deep space phase support from 30 May 1971 through 4 June 1971.

Laeser, R. P.↗

DSN research and technology support

The activities of the Venus Station (DSS 13) and the Microwave Test Facility (MTF) during the period April 19 through June 13, 1976, are discussed and progress noted. Continuing reliability testing and computer program refinement of the remote controlled, unattended automated pulsar observing station is noted, along with routine observations of 17 pulsars. Radar observations of a geostationary satellite are reported, along with the routine automatic testing of the stability of the DSS 13 maser-receiving system. Additional testing of thermal characteristics of semiflexible coaxial cables is reported, along with phase stabilization measurements thereon. Routine support of the planetary radio astronomy experiment, with 43.25 hours of observations of Jupiter and various radio calibration sources, is reported, along with 18.75 hours of differential VLBI observations in conjunction with Australia, DSS 43. Modifications of the clock synchronization winterization system are reported, along with a discussion of the activities of the DSN High-Power Transmitter Maintenance Facility.

Jackson, E. B.↗

DSN research and technology support

The ongoing activities at the Venus Station (DSS 13) and the Microwave Test Facility (MTF) discussed include: (1) equipment implementation for unattended operation at DSS 13; (2) salvaging of a 20-kW klystron, at a cost savings of several thousand dollars by the DSN High Power Transmitter Facility; (3) extensive tracking activities with the 26-m antenna including DSN Platform Parameters, Multistation Planetary Radar, Helios II Spectrum Broadening Analysis, VLBI Validation, Planetary Radio Astronomy, and Pulsar Rotation Constancy, for a total time of 219-1/4 observing hours; (4) clock synchronization transmissions from the DSS 13 master clock to the overseas 64-m antenna complexes and special implementation activities in support of PV-78; and (5) implementation of a hydrogen maser frequency standard and the pathfinder installation of a utility control system (UCS) and significant station modification and maintenance.

Jackson, E. B.↗