Search NASA⌕ Search

SEARCH · Search NASA

Results for “electronic scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Thermal Infrared Sensor (TIRS) Instrument Thermal Subsystem Design and Lessons Learned

The Thermal Infrared Sensor (TIRS) is one of two instruments on the Landsat Data Continuity Mission (LDCM), which is scheduled to launch in February of 2013. The TIRS instrument was officially added to the mission later in the flow, which led to a highly aggressive schedule that became one of the main drivers during instrument development. The thermal subsystem design of the TIRS Sensor Unit is comprised of five thermal zones which range in temperature from less than 43 Kelvin to 330 Kelvin. Most zones are proportional heater controlled, and all are within a volume of 35 cu.ft. A two-stage cryocooler is used to cool the "cold stage" including three QWIP detectors to less than 43 Kelvin, and cool the "warm stage" to 105 Kelvin. The excess power dissipation from the cryocooler is rejected via ammonia transport heat pipes to a dedicated Cryocooler Radiator with embedded ammonia heat pipes. The cryogenic subsystem includes a series of shells used to radiatively and conductively isolate the cold stage from the warmer surroundings. The Optical System (telescope) is passively cooled to 180-190 Kelvin using a "thermal link" (comprised of a Flexible Conductive Thermal Strap and an APG Bar) which couples the telescope stage to a dedicated radiator with embedded ethane heat pipes. The Scene Select Mechanism, which is responsible for moving the Scene Select Mirror to three distinct positions (including Nadir, Space, and On-board Black Body Calibrator pointing), runs nominally at 278 Kelvin and is thermally isolated from the cryogenic thermal zones. The On-board Black Body Calibrator requires a dedicated radiator which allows for a temperature range of 260-330 Kelvin at the Source. The detectors are powered by the FPE Box, which is mounted to the nadir external surface of the composite honeycomb structure. There are two additional electronics boxes which are wet-mounted directly to the spacecraft shear panel, the Main Electronics Box and Cryocooler Electronics Box; thermal control of these boxes is the responsibility of Orbital Sciences Corporation, the spacecraft developer. The TIRS thermal subsystem design was successfully verified during months of testing campaign, from component & subsystem level to two instrument-level thermal vacuum tests. The Instrument, despite an aggressive schedule, was delivered to the spacecraft vendor in February of 2012 and is currently undergoing the final stages of spacecraft environmental testing in preparation for launch.

Otero, Veronica↗

Electrical design of payload G-534: The Pool Boiling Experiment

Payload G-534, the Pool Boiling Experiment (PBE), is a Get Away Special that is scheduled to fly on the shuttle in 1992. This paper will give a brief overall description of the experiment with the main discussion being the electrical design with a detailed description of the power system and interface to the GAS electronics. The batteries used and their interface to the experiment Power Control Unit (PCU) and GAS electronics will be examined. The design philosophy for the PCU will be discussed in detail. The criteria for selection of fuses, relays, power semiconductors and other electrical components along with grounding and shielding policy for the entire experiment will be presented. The intent of this paper is to discuss the use of military tested parts and basic design guidelines to build a quality experiment for minimal additional cost.

Francisco, David R.↗

Moon Search Algorithms for NASA's Dawn Mission to Asteroid Vesta

A moon or natural satellite is a celestial body that orbits a planetary body such as a planet, dwarf planet, or an asteroid. Scientists seek understanding the origin and evolution of our solar system by studying moons of these bodies. Additionally, searches for satellites of planetary bodies can be important to protect the safety of a spacecraft as it approaches or orbits a planetary body. If a satellite of a celestial body is found, the mass of that body can also be calculated once its orbit is determined. Ensuring the Dawn spacecraft's safety on its mission to the asteroid Vesta primarily motivated the work of Dawn's Satellite Working Group (SWG) in summer of 2011. Dawn mission scientists and engineers utilized various computational tools and techniques for Vesta's satellite search. The objectives of this paper are to 1) introduce the natural satellite search problem, 2) present the computational challenges, approaches, and tools used when addressing this problem, and 3) describe applications of various image processing and computational algorithms for performing satellite searches to the electronic imaging and computer science community. Furthermore, we hope that this communication would enable Dawn mission scientists to improve their satellite search algorithms and tools and be better prepared for performing the same investigation in 2015, when the spacecraft is scheduled to approach and orbit the dwarf planet Ceres.

planetary sciences↗

Space Weather Monitoring for ISS Geomagnetic Storm Studies

The International Space Station (ISS) space environments community utilizes near real time space weather data to support a variety of ISS engineering and science activities. The team has operated the Floating Potential Measurement Unit (FPMU) suite of plasma instruments (two Langmuir probes, a floating potential probe, and a plasma impedance probe) on ISS since 2006 to obtain in-situ measurements of plasma density and temperature along the ISS orbit and variations in ISS frame potential due to electrostatic current collection from the plasma environment (spacecraft charging) and inductive (vxB) effects from the vehicle motion across the Earth s magnetic field. An ongoing effort is to use FPMU for measuring the ionospheric response to geomagnetic storms at ISS altitudes and investigate auroral charging of the vehicle as it passes through regions of precipitating auroral electrons. This work is challenged by restrictions on FPMU operations that limit observation time to less than about a third of a year. As a result, FPMU campaigns ranging in length from a few days to a few weeks are typically scheduled weeks in advance for ISS engineering and payload science activities. In order to capture geomagnetic storm data under these terms, we monitor near real time space weather data from NASA, NOAA, and ESA sources to determine solar wind disturbance arrival times at Earth likely to be geoeffective (including coronal mass ejections and high speed streams associated with coronal holes) and activate the FPMU ahead of the storm onset. Using this technique we have successfully captured FPMU data during a number of geomagnetic storm periods including periods with ISS auroral charging. This presentation will describe the strategies and challenges in capturing FPMU data during geomagnetic storms, the near real time space weather resources utilized for monitoring the space weather environment, and provide examples of auroral charging data obtained during storm operations.

Minow, Joseph I.↗

Space Weather Monitoring for ISS Geomagnetic Storm Studies

The International Space Station (ISS) space environments community utilizes near real time space weather data to support a variety of ISS engineering and science activities. The team has operated the Floating Potential Measurement Unit (FPMU) suite of plasma instruments (two Langmuir probes, a floating potential probe, and a plasma impedance probe) on ISS since 2006 to obtain in-situ measurements of plasma density and temperature along the ISS orbit and variations in ISS frame potential due to electrostatic current collection from the plasma environment (spacecraft charging) and inductive (vxB) effects from the vehicle motion across the Earth s magnetic field. An ongoing effort is to use FPMU for measuring the ionospheric response to geomagnetic storms at ISS altitudes and investigate auroral charging of the vehicle as it passes through regions of precipitating auroral electrons. This work is challenged by restrictions on FPMU operations that limit observation time to less than about a third of a year. As a result, FPMU campaigns ranging in length from a few days to a few weeks are typically scheduled weeks in advance for ISS engineering and payload science activities. In order to capture geomagnetic storm data under these terms, we monitor near real time space weather data from NASA, NOAA, and ESA sources to determine solar wind disturbance arrival times at Earth likely to be geoeffective (including coronal mass ejections and high speed streams associated with coronal holes) and activate the FPMU ahead of the storm onset. Using this technique we have successfully captured FPMU data during a number of geomagnetic storm periods including periods with ISS auroral charging. This presentation will describe the strategies and challenges in capturing FPMU data during geomagnetic storms, the near real time space weather resources utilized for monitoring the space weather environment, and provide examples of auroral charging data obtained during storm operations.

Minow, Joseph I.↗

Pointing Mechanisms for the Shuttle Radar Laboratory

In December of 1993, the Shuttle Radar Laboratory (SRL) is scheduled for launch on the first of its two missions. The SRL has three major radar instrument, two distributed phased-array antennas that make up the Spaceborne Imaging Radar-C System (SIR-S) and are capable of being electronically steered and one which is an Z-Band Synthetic Aperture Radas (X-SAR) which is pointed mechanically by a suite of mechanisms.

SRL↗

SP-100 Dynamic Power and Lithium-Propellant MPD Nuclear Electric Propulsion Technology Requirements

The objective of this study was to evaluate the requirements (including system integration, design, test requirements, and schedule) for the propulsion and power conversion systems of a nuclear electric propulsion (NEP) vehicle using an SP-100 reactor with a dynamic power conversion system, Li-propellant magnetoplasmadynamic (MPD) thrusters, Li-propellant storage and feed systems, and the power conditioning electronics required to convert the power output from the power system to the form (voltage, current) needed by the thrusters. Potassium-Rankine power conversion systems have the potential for the greatest mission benefit in terms of minimum mass and volume (as compared to Brayton or Stirling power conversion systems), but they require the most development.

Murray, Kathy H.↗

Revolutionary Concepts for Human Outer Planet Exploration (HOPE)

This paper summarizes the content of a NASA-led study performed to identify revolutionary concepts and supporting technologies for Human Outer Planet Exploration (HOPE). Callisto, the fourth of Jupiter's Galilean moons, was chosen as the destination for the HOPE study. Assumptions for the Callisto mission include a launch year of 2045 or later, a spacecraft capable of transporting humans to and from Callisto in less than five years, and a requirement to support three humans on the surface for a minimum of 30 days. Analyses performed in support of HOPE include identification of precursor science and technology demonstration missions and development of vehicle concepts for transporting crew and supplies. A complete surface architecture was developed to provide the human crew with a power system, a propellant production plant, a surface habitat, and supporting robotic systems. An operational concept was defined that provides a surface layout for these architecture components, a list of surface tasks, a 30-day timeline, a daily schedule, and a plan for communication from the surface.

Power electronics↗

MODIS TEB Electronic Crosstalk Correction Update and Impact on L1B Product Uncertainty

The MODIS instruments onboard the Terra and Aqua satellites have been in operation for over22 and 20 years, respectively. The instruments’ calibration accuracy has been maintained, even with instrument degradation. Electronic crosstalk in the thermal emissive bands (TEB) is a known issue with an increasing impact on the calibration and product. The Terra MODIS photovoltaic (PV) longwave infrared (LWIR) bands crosstalk corrections have been applied in Collection 6.1 (C6.1). However, the electronic crosstalk contamination for some detectors in the mid-wave infrared (MWIR) bands and the Aqua PVLWIR bands affect the Level-1B (L1B) product’s measurement accuracy and image quality. In Collection 7 (C7), crosstalk corrections for select detectors in the Terra and Aqua MWIR and Aqua PV LWIR bands are applied. The entire mission crosstalk coefficients for the select detectors and bands are derived from scheduled lunar observations and populated in the form of look-up tables (LUTs). The Aqua PV-LWIR bands exhibit similar downward crosstalk trends as the Terra PV-LWIR bands, especially in recent years. The crosstalk coefficients and their trends provide a guideline for the correction application. Earth measurement analyses before and after the correction provide contamination and correction assessments. It has been shown that the product quality is enhanced with the crosstalk correction applied in C7. For C7, the crosstalk coefficient uncertainty is derived from the fit residuals between the measured values and a linear fit over a three-year sliding window. The uncertainty propagation is modeled and applied in the total uncertainty calculation intheL1B product. The TEB electronic crosstalk LUTs have been processed over the entire Terra and Aqua MODIS missions. This paper presents the C7 crosstalk correction, as well as its assessment and uncertainty propagation algorithm to the TEB uncertainty.

Tiejun Chang↗

Modis TEB Electronic Crosstalk Correction Update and Impact on L1B Product Uncertainty

The MODIS instruments on board the Terra and Aqua satellites have been in operation for over 22 and 20 years, respectively. The instruments’ calibration accuracy has been maintained, even with instrument degradation. Electronic crosstalk in the thermal emissive bands (TEB) is a known issue with an increasing impact on the calibration and product. The Terra MODIS photovoltaic (PV) longwave infrared (LWIR) bands crosstalk corrections have been applied in Collection 6.1 (C6.1). However, the electronic crosstalk contamination for some detectors in the mid-wave infrared(MWIR) bands and the Aqua PVLWIR bands affect the Level-1B(L1B) product’s measurement accuracy and image quality. In Collection 7 (C7), crosstalk corrections for select detectors in the Terra and Aqua MWIR and Aqua PV LWIR bands are applied. The entire mission crosstalk coefficients for the select detectors and bands are derived from scheduled lunar observations and populated in the form of look-up tables (LUTs). The Aqua PV-LWIR bands exhibit similar downward crosstalk trends as the Terra PV-LWIR bands, especially in recent years. The crosstalk coefficients and their trends provide a guideline for the correction application. Earth measurement analyses before and after the correction provide contamination and correction assessments. It has been shown that the product quality is enhanced with the crosstalk correction applied in C7. For C7, the crosstalk coefficient uncertainty is derived from the fit residuals between the measured values and a linear fit over a three-year sliding window. The uncertainty propagation is modeled and applied in the total uncertainty calculation intheL1B product. The TEB electronic cross talk LUT shave been processed over the entire Terra and Aqua MODIS missions. This paper presents the C7 crosstalk correction, as well as its assessment and uncertainty propagation algorithm to the TEB uncertainty.

Tiejun Chang↗

Propulsive Small Expendable Deployer System (ProSEDS) Experiment

ProSEDS is a secondary (i.e. piggyback) payload on a Delta-11 GPS 8 mission scheduled for launch in August 2000. It will test the feasibility of generating generate electrodynamic thrust without propellant using a 5 kilometer conducting wire (tether). The ProSEDS obtains thrust as the tether cuts across the magnetic field, a voltage is induced across the wire. Electrons are attracted to the positively based far end of the wire. Electrons flow downward through the conductive tether. Earth's magnetic field exerts a drag force on the current in the tether segments, that is mechanically transferred via the wire to the stage. The primary objective for the ProSEDs mission is to demonstrate that a significant, measurable electrodynamic thrust through a tether in space. The primary mission will last one day, as the primary battery assures at least three orbits of data will be collected, the remaining power will be provided by the secondary battery, which uses tether generated power to recharge. The extended mission begins using the power provided through the tether, and wil terminate when a system ceases to function; (i.e., either degradation of the tether,through Atomic Oxygen contact, a micrometeoroid or other debris impact, or another malfunction.) The technology has many potential applications. Amongst the applications, which are reviewed in detail, are: (1) satellite deorbit, (2) reboost of the International Space Station, (3) propellantless reusable Orbit Transfer Vehicles, (4) Propulsion and power generation for future Jovian missions.

Johnson, Les↗

Improvements of On-orbit Characterization of Terra MODIS Short-wave Infrared Spectral Bands Out-of-Band Responses

The short-wave infrared (SWIR) bands (5-7, 26) of Terra MODIS, which are co-located with the mid-wav e infrared (MWIR) bands (20-25) on the short and mid-wave infrared (SMIR) Focal Plane Assembly (FPA),have a known issue related to 5.3 μm out-of-band (OOB) thermal leak and electronic crosstalk that was identified prelaunch. As a result, a crosstalk correction algorithm was designed and implemented in the MODIS Level 1B (L1B) calibration. Shortly after the Terra launch, extensive efforts were under taken to help characterize and mitigate the impact due to the OOB response and crosstalk on the SWIR on-orbit calibration and, consequently, the associated L1Bdata products. In addition, special night time day mode (NTDM) operations have been regularly scheduled to derive the crosstalk correction coefficients. Since MODIS does not have a spectral band centered at 5.3 μm, its band 28 (7.325 μm) was chosen as the surrogate sending band to simulate the OOB radiances at 5.3 μm. This was largely based on the measurements from the MODIS Airborne Simulator (MAS) spectrometer field campaigns in the early months after the Terra launch. In the case of Aqua MODIS, the magnitude of the SWIR crosstalk was much smaller and band 25 (4.52 μm) was found to be more effective as the sending band for the crosstalk correction. In recent years, the Terra MODIS photovoltaic (PV) long-wave infrared (LWIR) bands (27-30)electronic crosstalk has increased considerably, especially after the spacecraft safe-mode event occurred in February2016. This accentuated degradation in the PV LWIR performance has also impacted the performance of the SWIR crosstalk correction and thus its calibration and data quality. In this paper, we examine the use of band 25 as the sending band for the Terra MODIS SWIR crosstalk correction and compare its performance with that based on band 28 as the sending band. Results indicate an improvement of on-orbit gain stability for the SWIR calibration and reduced detector to detector and sub-frame to sub-frame striping in the calibrated L1B imagery, especially during the period when the PV LWIR electronic crosstalk has become more severe. This approach has been implemented in the forward production of Terra MODIS Collection 6 and Collection 6.1,starting from July 2019, and is planned to be used for the future reprocessing of MODIS L1B and to help improve the mission-long reflectance calibration and trending stability of the SWIR bands.

MODIS, Terra, Aqua, MODIS, SWIR, calibration, out-↗

Pointing mechanisms for the Shuttle Radar Laboratory

The Shuttle Radar Laboratory (SRL) is scheduled for launch in December of 1993 on the first of its two missions. The SRL has three major radar instruments: two distributed phased-array antennas, which make up the Spaceborne Imaging Radar-C System (SIR-C) and are capable of being electronically steered, and one X-Band Synthetic Aperture Radar (X-SAR), which is pointed mechanically by a suite of mechanisms. This paper will describe these mechanisms and summarize the development difficulties that were encountered in bringing them from the design stage through prototype development and protoflight testing.

Lilienthal, Gerald W.↗

Petabyte Class Storage at Jefferson Lab (CEBAF)

By 1997, the Thomas Jefferson National Accelerator Facility will collect over one Terabyte of raw information per day of Accelerator operation from three concurrently operating Experimental Halls. When post-processing is included, roughly 250 TB of raw and formatted experimental data will be generated each year. By the year 2000, a total of one Petabyte will be stored on-line. Critical to the experimental program at Jefferson Lab (JLab) is the networking and computational capability to collect, store, retrieve, and reconstruct data on this scale. The design criteria include support of a raw data stream of 10-12 MB/second from Experimental Hall B, which will operate the CEBAF (Continuous Electron Beam Accelerator Facility) Large Acceptance Spectrometer (CLAS). Keeping up with this data stream implies design strategies that provide storage guarantees during accelerator operation, minimize the number of times data is buffered allow seamless access to specific data sets for the researcher, synchronize data retrievals with the scheduling of postprocessing calculations on the data reconstruction CPU farms, as well as support the site capability to perform data reconstruction and reduction at the same overall rate at which new data is being collected. The current implementation employs state-of-the-art StorageTek Redwood tape drives and robotics library integrated with the Open Storage Manager (OSM) Hierarchical Storage Management software (Computer Associates, International), the use of Fibre Channel RAID disks dual-ported between Sun Microsystems SMP servers, and a network-based interface to a 10,000 SPECint92 data processing CPU farm. Issues of efficiency, scalability, and manageability will become critical to meet the year 2000 requirements for a Petabyte of near-line storage interfaced to over 30,000 SPECint92 of data processing power.

Chambers, Rita↗

STS-82 Flight Day 05 Highlights

The fifth day of the STS-82 mission begins with the crew, Commander Kenneth D. Bowersox, Pilot Scott J. Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Gregory J. Harbaugh, Steven L. Smith, Joseph R. Tanner, and Steven A. Hawley completing the checkout of spacesuits well ahead of schedule, allowing them to start the second spacewalk of the flight. Harbaugh and Tanner went right to work, replacing a degraded Fine Guidance Sensor and a failed Engineering and Science Tape Recorder with new spares. The astronauts also installed a new unit known as the Optical Control Electronics Enhancement Kit, which will further increase the capability of the new Fine Guidance Sensor. During the spacewalk, the astronauts and flight controllers took note of cracking and wear incurred by thermal insulation which protects several areas of the telescope.

Source record↗

An Experimental Approach to a Rapid Propulsion and Aeronautics Concepts Testbed

Modern aircraft design tools have limitations for predicting complex propulsion-airframe interactions. The demand for new tools and methods addressing these limitations is high based on the many recent Distributed Electric Propulsion (DEP) Vertical Take-Off and Landing (VTOL) concepts being developed for Urban Air Mobility (UAM) markets. We propose that low cost electronics and additive manufacturing can support the conceptual design of advanced autonomy-enabled concepts, by facilitating rapid prototyping for experimentally driven design cycles. This approach has the potential to reduce complex aircraft concept development costs, minimize unique risks associated with the conceptual design, and shorten development schedule by enabling the determination of many "unknown unknowns" earlier in the design process and providing verification of the results from aircraft design tools. A modular testbed was designed and built to evaluate this rapid design-build-test approach and to support aeronautics and autonomy research targeting UAM applications utilizing a complex, transitioning-VTOL aircraft configuration. The testbed is a modular wind tunnel and flight model. The testbed airframe is approximately 80% printed, with labor required for assembly. This paper describes the design process, fabrication process, ground testing, and initial wind tunnel structural and thermal loading of a proof-of-concept aircraft, the Langley Aerodrome 8 (LA-8).

McSwain, Robert G.↗

Real Time Space Weather Support for Chandra X-Ray Observatory Operations

NASA launched the Chandra X-ray Observatory in July 1999. Soon after first light in August 1999, however, degradation in the energy resolution and charge transfer efficiency of the Advanced CCD Imaging Spectrometer (ACIS) x-ray detectors was observed. The source of the degradation was quickly identified as radiation damage in the charge-transfer channel of the front-illuminated CCDs, by weakly penetrating ( soft , 100 500 keV) protons as Chandra passed through the Earth s radiation belts and ring currents. As soft protons were not considered a risk to spacecraft health before launch, the only on-board radiation monitoring system is the Electron, Proton, and Helium Instrument (EPHIN) which was included on Chandra with the primary purpose of monitoring energetic solar particle events. Further damage to the ACIS detector has been successfully mitigated through a combination of careful mission planning, autonomous on-board radiation protection, and manual intervention based upon real-time monitoring of the soft-proton environment. The AE-8 and AP-8 trapped radiation models and Chandra Radiation Models are used to schedule science operations in regions of low proton flux. EPHIN has been used as the primary autonomous in-situ radiation trigger; but, it is not sensitive to the soft protons that damage the front-illuminated CCDs. Monitoring of near-real-time space weather data sources provides critical information on the proton environment outside the Earth s magnetosphere due to solar proton events and other phenomena. The operations team uses data from the Geostationary Operational Environmental Satellites (GOES) to provide near-real-time monitoring of the proton environment; however, these data do not give a representative measure of the soft-proton (< 1 MeV) flux in Chandra s high elliptical orbit. The only source of relevant measurements of sub-MeV protons is the Electron, Proton, and Alpha Monitor (EPAM) aboard the Advanced Composition Explorer (ACE) satellite at L1, with real-time data provided by NOAA s Space Weather Prediction Center. This presentation describes the radiation mitigation strategies to minimize the proton damage in the ACIS CCD detectors and the importance of real-time data sources that are used to protect the ACIS detector system from space weather events.

O'Dell, Stephen L.↗

Real Time Space Weather Support for Chandra X-ray Observatory Operations

NASA launched the Chandra X-ray Observatory in July 1999. Soon after first light in August 1999, however, degradation in the energy resolution and charge transfer efficiency of the Advanced CCD Imaging Spectrometer (ACIS) x-ray detectors was observed. The source of the degradation was quickly identified as radiation damage in the charge-transfer channel of the front-illuminated CCDs, by weakly penetrating ("soft", 100-500 keV) protons as Chandra passed through the Earth s radiation belts and ring currents. As soft protons were not considered a risk to spacecraft health before launch, the only on-board radiation monitoring system is the Electron, Proton, and Helium Instrument (EPHIN) which was included on Chandra with the primary purpose of monitoring energetic solar particle events. Further damage to the ACIS detector has been successfully mitigated through a combination of careful mission planning, autonomous on-board radiation protection, and manual intervention based upon real-time monitoring of the soft-proton environment. The AE-8 and AP-8 trapped radiation models and Chandra Radiation Models are used to schedule science operations in regions of low proton flux. EPHIN has been used as the primary autonomous in-situ radiation trigger; but, it is not sensitive to the soft protons that damage the front-illuminated CCDs. Monitoring of near-real-time space weather data sources provides critical information on the proton environment outside the Earth's magnetosphere due to solar proton events and other phenomena. The operations team uses data from the Geostationary Operational Environmental Satellites (GOES) to provide near-real-time monitoring of the proton environment; however, these data do not give a representative measure of the soft-proton (less than 1 MeV) flux in Chandra s high elliptical orbit. The only source of relevant measurements of sub-MeV protons is the Electron, Proton, and Alpha Monitor (EPAM) aboard the Advanced Composition Explorer (ACE) satellite at L1, with real-time data provided by NOAA's Space Weather Prediction Center. This presentation will discuss radiation mitigation against proton damage, including models and real-time data sources used to protect the ACIS detector system.

O'Dell, Stephen L.↗