Search NASA⌕ Search

SEARCH · Search NASA

Results for “end of discharge”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Vadose Zone Model for LLBG-200W A for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for LLBG-200W A for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a results of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-63 Area for Composite Analysis (Rev. 2)

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transition to Online Cable Insulation Condition Monitoring

Nuclear power plant cables were originally qualified for 40 year life and generally have not required specific test verification to assure service availability through the initial plant qualification period. However, license renewals to 60 and 80 years of operation require a cable aging management program that depends on some form of test and verification to assure fitness for service. Environmental stress (temperature, radiation, chemicals, water, and mechanical) varies dramatically within a nuclear power plant and, in some cases, cables have degraded and required repair or replacement before their qualified end-of-life period. In other cases, cable conditions have been mild and dependable cable performance confirmed to extend well beyond the initial qualified life. Most offline performance-based testing requires cables to be de-coupled and de-energized for specially trained technicians to perform testing. These offline tests constitute an expensive operational burden that limits the economic viability of nuclear power plants. Although initial investment may be higher, new online test practices are emerging as options or complements to offline testing that avoid or minimize the regularly scheduled offline test burden. These online methods include electrical and fiber-optic partial discharge measurement, spread spectrum time or frequency domain reflectometry, distributed temperature profile measurements, and local interdigital capacitance measurement of insulation characteristics. Introduction of these methods must be supported by research to confirm efficacy plus either publicly financed or market driven investment to support the start-up expense of cost-effective instrumentation to monitor cable condition and assure reliable operation. This work summarizes various online cable assessment technologies plus introduces a new cable motor test bed to assess some of these technologies in a controlled test environment.

Glass, Samuel W.↗

Annual Stormwater Report for the Y-12 National Security Complex Oak Ridge, Tennessee

This is the ninth annual stormwater report prepared in accordance with the modified National Pollutant Discharge Elimination System permit issued to the Y-12 National Security Complex (Y-12) on April 1, 2014. This modified permit removed the authorization to augment flow in East Fork Poplar Creek (EFPC) and thus removed the requirement to sample this effluent in conjunction with other major outfalls on EFPC. There are several construction and demolition activities currently in progress at Y-12. These include the construction of the Uranium Processing Facility (UPF), the Mercury Treatment Facility (MTF) on EFPC, the site-wide power grid upgrade, construction of an Emergency Operations Center, construction of a new Fire Station, Security Improvement Revitalization Program (SIRP), West End Protection Area Reduction (WEPAR) Project, and the demolition of the Biology Complex. Current stormwater protections have proven effective in 2021. However, moving forward, challenges to protect stormwater will continue from these projects. Therefore, oversight of these activities, and all other construction and demolition projects, will continue to be a priority in 2022. Y-12 will continue to implement appropriate Best Management Practices and reduce outside material storage areas where possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mechanical Design of the PIP-II ORBUMP Pulsed Dipole Magnet

The Proton Improvement Plan II (PIP-II) project is a vital upgrade to the Fermilab accelerator complex. The magnet pulse rate of the PIP-II Injection system requires an increase from the current rate of 15 Hz to 20 Hz as well as a roughly 30% increase in the magnetic field of the new Orbital Bump (ORBUMP) pulsed dipole magnets in the Booster. Here, the ORBUMP magnet mechanical design is presented in this paper. The ORBUMP magnet is secured in a vacuum box and the core is made up of 0.127 mm thick, low carbon steel laminations with a C-5 inorganic magnesium phosphate coating. The core is clamped using external tie bars welded to the core end plates. ANSYS Finite Element Analysis (FEA) was used to evaluate the clamping design to minimize the deflection of the core post welding of the tie bars. The water-cooled, single turn coil, which shapes the magnetic field by acting as the pole tips, is critical for the integrated field homogeneity. The coil manufacturing tolerances and fabrication techniques were evaluated to ensure the magnetic properties of the magnet could be obtained. The coil is electrically isolated from the core using virgin Polyether ether ketone (PEEK) insulating material in the gap. An investigation into the high voltage performance of the virgin PEEK insulator was conducted via partial discharge testing using a 1:1 scale sample.

Karas, D. [Fermi National Accelerator Laboratory (↗

Time-resolved measurement of neutron energy isotropy in a sheared-flow-stabilized Z pinch

Previous measurements of neutron energy using fast plastic scintillators while operating the Fusion Z Pinch Experiment (FuZE) constrained the energy of any yield-producing deuteron beams to less than 4.65 keV. FuZE has since been operated at increasingly higher input power, resulting in increased plasma current and larger fusion neutron yields. A detailed experimental study of the neutron energy isotropy in these regimes applies more stringent limits to possible contributions from beam-target fusion. The FuZE device operated at -25 kV charge voltage has resulted in average plasma currents of 370 kA and D–D fusion neutron yields of $4\times10^7 \pm 4\times10^6$ neutrons per discharge. Measurements of the neutron energy isotropy under these operating conditions demonstrates the energy of deuteron beams is less than $7.4 \pm 5.6^\mathrm{(stat)} \pm 3.7^\mathrm{(syst)}$ keV. Characterization of the detector response has reduced the number of free parameters in the fit of the neutron energy distribution, improving the confidence in the forward-fit method. Gamma backgrounds have been measured and the impact of these contributions on the isotropy results have been studied. Additionally, a time dependent measurement of the isotropy has been resolved for the first time, indicating increases to possible deuteron beam energies at late times. This suggests the possible growth of m = 0 instabilities at the end of the main radiation event but confirms that the majority of the neutron production exhibits isotropy consistent with thermonuclear origin.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory facility (Project) located at Sandia National Laboratories, 7011 East Avenue, CA. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC. The project proposes converting an asphalt parking lot into a new high bay machine shop building and a low bay office building. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area of 1.6 acres exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

54 ENVIRONMENTAL SCIENCES↗

Stormwater Pollution Prevention Plan (SWPPP) for Site Wide Landscaping Project

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the SNL/CA Site Landscaping Project at Sandia National Laboratories/California (SNL/CA), 7011 East Avenue, Livermore, California (SNL/CA). The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia (NTESS), LLC. The project proposes landscape improvements throughout SNL/CA. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aligning lithium metal battery research and development across academia and industry

Successful integration of metallic lithium anodes into secondary batteries could enhance energy density and enable new forms of electrified transportation. However, the outlook for widespread lithium metal adoption in energy storage devices remains mixed. This comes in part from existing gaps in our understanding of the relationships connecting the initial state of lithium, its evolution with cycling, and end-of-life state. It remains important to develop standardized protocols for material and cell characterization, cycling performance, safety, and recycling procedures for lithium metal-based batteries. In February 2023 a cohort of scientists and engineers from academia, national laboratories, and industry gathered to converge on a list of critical challenges and action items to provide better understanding of lithium metal evolution and to enhance academic, governmental, and industrial partnerships to address these challenges. Here, we highlight the major discussion topics revolving around the manufacturing of lithium metal, its related metrology and integration into battery form factors, and best practices testing its electrochemical performance relevant to automotive applications. We introduce a power-controlled discharge testing protocol for research and development cells, in alignment between major automotive stakeholders, that may reveal lithium metal battery dynamics closer to practical driving behavior.

25 ENERGY STORAGE↗

Physical Properties of Moist, Fermented Corn Kernels

A novel approach to producing corn stover biomass feedstock has been investigated. In this approach, corn grain and stover are co-harvested at moisture contents much less than typical corn silage. The grain and stover are conserved together by anaerobic storage and fermentation and then separated before end use. When separated from the stover, the moist, fermented grain had physical characteristics that differ from typical low-moisture, unfermented grain. A comprehensive study was conducted to quantify the physical properties of this moist, fermented grain. Six corn kernel treatments, either fermented or unfermented, having different moisture contents, were used. Moist, fermented kernels (26 and 36% w.b. moisture content) increased in size during storage. The fermented kernels’ widths and thicknesses were 10% and 15% greater, respectively, and their volume was 28% greater than the dry kernels (15% w.b.). Dry basis particle density was 9% less for moist, fermented kernels. Additionally, the dry basis bulk density was 29% less, and the dry basis hopper-discharged mass flow rate was 36% less. Moist, fermented grain had significantly greater kernel-to-kernel coefficients of friction and angles of repose compared to relatively dry grain. The friction coefficient on four different surfaces was also significantly greater for fermented kernels. Fermented corn kernels had lower individual kernel rupture strengths than unfermented kernels. These physical differences must be considered when designing material handling and processing systems for moist, fermented corn grain.

09 BIOMASS FUELS↗

Preliminary design overview and performance assessment of the ITER low-field side reflectometer

The design of the ITER low-field side reflectometer (LFSR) has matured to a complete end-to-end preliminary design. LFSR will supply three key plasma measurements: (1) electron density profile, (2) electron density fluctuations, and (3) poloidal rotation. Simultaneous measurements of the three quantities are enabled by an array of six monostatic antennas which inject from an equatorial port on the outboard side of the ITER vessel. Low-loss transmission lines, consisting of corrugated, overmoded waveguide and miter bends, transmit the 30–165 GHz, O- and X-mode signals to and from the ITER plasma. Integrated transmission-line components serve a range of purposes, such as protection from high-power stray radiofrequency radiation, accommodation of transmission-line displacement, and simultaneous measurement of reference and plasma phases during the discharge. Broadband transmission signals are realized by full-band microwave transceivers combined with quasi-optical multiplexing. A field-programmable gate array (FPGA) processor demodulates the profile reflectometer signals, enabling real-time density profile measurements for plasma control system feedback. A full-scale transmission line test facility provides an integrated environment to assess the performance of critical LFSR components. Theoretical modeling together with insertion loss measurements provide the basis for a comprehensive power budget, which accounts for transmitted output power, transmission-line losses, antenna coupling, and plasma effects. Results indicate that high signal-to-noise ratios are achievable with the current design. A synthetic reflectometer model, using real design parameters and baseline ITER profiles, has been developed to estimate the return signal. With evolving microwave and data acquisition technologies, full-band, ultrafast sweeps (<1 μs) will be realizable for ITER.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Characterization of Tank 11H Samples from Tank Closure Cesium Removal (TCCR) Batch 3 - Intermediate and Final Samples

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR unit processes dissolved salt from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST) and the effluent is then discharged to Tank 11H. Four interim samples pulled from Tank 11H during and just after the completion of processing of Batch 3 through the TCCR process have been analyzed for 137 Cs activity and density. The 137 Cs activity was found to decrease with each subsequent sample, which is consistent with the addition of decontaminated solution to Tank 11H. When compared to the expected composition from mixing the Tank 10H Batch 3 feed with the material already present in Tank 11H, the bulk chemical composition was as expected. A corrosion control sample collected from Tank 11H in June 2020 showed changes in the chemical composition and 137 Cs activity when compared to the composition measured at the end of Batch 2 processing. As there were no additions made to the tank during this period, these changes were attributed to leaching of the solids present in Tank 11H. Additional analyses of the 4 th interim sample are pending and will be documented in a revision to this report.

11H↗

Characterization of Tank 11H samples from tank closure cesium removal (TCCR) Batch 3 - intermediate and final samples

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR unit processes dissolved salt from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST) and the effluent is then discharged to Tank 11H. Four interim samples pulled from Tank 11H during and just after the completion of processing of Batch 3 through the TCCR process have been analyzed for 137 Cs activity and density. The 137 Cs activity was found to decrease with each subsequent sample, which is consistent with the addition of decontaminated solution to Tank 11H. When compared to the expected composition from mixing the Tank 10H Batch 3 feed with the material already present in Tank 11H, the bulk chemical composition was as expected. A corrosion control sample collected from Tank 11H in June 2020 showed changes in the chemical composition and 137 Cs activity when compared to the composition measured at the end of Batch 2 processing. As there were no additions made to the tank during this period, these changes were attributed to leaching of the solids present in Tank 11H. Revision 1 of this report contains additional analyses of the fourth interim sample including inductively coupled plasma – mass spectrometry (ICP-MS) results and activities of other radionuclides. These results are consistent with the previously reported results, showing leaching from the Tank 11H heel. Notably, the 90 Sr activity was about 2.7x higher than calculated from a mixture of the original Tank 11H supernate and the Tank 10H supernate as treated by TCCR, suggesting additional leaching of Sr from the Tank 11H heel solids. In addition, Revision 1 includes analysis results for the Batch 3 Post-Production surface and variable depth samples collected in October of 2020. The Post-Production surface sample was similar in composition to the fourth interim surface sample, except for the increased Cs-137 and oxalate concentrations that were presumably associated with leaching of the Tank 11H heel solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated operation scenarios: Chapter 6 of the special issue: on the path to tokamak burning plasma operation

Here we report the progress of the development and optimization of operational scenarios for ITER and beyond, focusing upon baseline, hybrid, and steady-state scenarios since 2007. This includes advancements made by the integrated operation scenarios (IOS) topical group of the international tokamak physical activity as well as contributions from the broader tokamak community. The key area of research involves developing IOSs that encompass tokamak physics, operation, and technology by utilizing integrated modeling and control strategies. This requires leveraging available actuators to simultaneously control plasma position and shape, MHD activities that could lead to disruptions, transport, plasma-wall interaction and power exhaust, fuel cycle, fusion burn, and tritium breeding. The control extends from the plasma initiation phase, through the current ramp-up, flattop, start and end of the fusion burn, and current ramp-down, to the plasma termination phase. A review of the currently developed scenarios and modeling is provided in terms of (i) optimizing plasma initiation in ITER, (ii) preparing for the low activation phase to fully commission all tokamak systems and establish and validate physics and scenario conditions in preparation for deuterim-tritium (DT) operation, (iii) developing and preparing baseline and hybrid scenarios to demonstrate the feasibility of achieving these regimes within device constraints, (iv) exploring steady-state scenarios to meet ITER’s steady-state goals, (v) evaluating and preparing actuators for ITER, (vi) developing integrated control solutions using shared actuators. The most notable achievements include; (i) the development of ITER demonstration discharges by matching various dimensionless parameters, (ii) the development of scenarios in an ITER-like tungsten environment and DT operation, and (iii) the development of scenarios in superconducting tokamaks, enabling long-pulse operations with similar coil constraints to ITER. Along with these significant achievements, outstanding issues and recommendations for further research and development are provided. Importantly, this study goes beyond simply updating the ITER Physics Basis; it carries profound implications for the broader field of burning plasma research, offering valuable insights and guidance for the next generation of fusion experiments and devices.

ITER↗

On the emergent scale of bedrock groundwater contribution to headwater mountain streams

We investigated the contribution of bedrock groundwater to streamflow as a function of catchment scale in a headwater stream. Synoptic surveys were conducted during hydrologically important periods of the year using multiple environmental tracers in stream water, soil water, and bedrock groundwater, along a first-order montane stream, in west-central Montana. Sampled analytes included 222 Rn, used to constrain total subsurface flux, and major and minor elements, used in end-member mixing analysis (EMMA) to identify the contributions of soil and bedrock groundwater to the stream. Partitioning between soil-derived and bedrock-derived groundwater was then analyzed as a function of the incremental and accumulated sub-catchment sizes. Radon results indicated that subsurface water contributions accounted for the majority of streamflow at all surveyed times. EMMA results revealed that the bedrock groundwater contribution to streamflow varied between 26% during peak snowmelt and 44% during late summer. Streamflow generation was dominated by soil groundwater contribution along the entire reach, but the bedrock groundwater contribution increased consistently with accumulated sub-catchment size. However, groundwater contributions were not well-correlated with incremental sub-catchment size. The scale at which increased bedrock groundwater discharge can be correlated with sub-catchment size appears to be >1 km 2 for our study. Our results are consistent with a conceptual model where streamflow is predominantly generated by a 3D subsurface nested flow system. Local subsurface heterogeneities control the stream source at local scales but begin to average out at scales >2 km 2 . Our study indicates that, while soil groundwater is the dominant source, bedrock groundwater remains an important and predictable contributor to streamflow throughout the year, even in a snow-dominated, mountainous headwater catchment.

environmental tracers↗

Development of Next Generation Hierarchical Hybrid Cu-Si anode Batteries via Direct-Ink Writing Application: End of (6th) Month Report - November 2025

Sustainable renewable energy continues to be in dire need to effectively combat global warming. Emerging technology for electric vehicles/ devices remains in high demand that is not only lower in cost, more efficient, but safer in comparison to commercial materials on the market. Although first-generation lithium-ion batteries have exhibited extensive commercial application, conventional graphite no longer meets this increasing demand as an efficient anode material. Due to the fact that graphite has a subpar theoretical specific capacity (372 mAh g -1 ), thus significant limitations in rate capability (for potential faster charging at higher C-rates currently commercially available.). Alternatively, silicon has gained significant attention as a superior candidate to potentially surpass graphite. Due to silicon’s exceedingly high theoretical capacity (4,200 mAh g -1 ) in comparison to standard graphite, its abundance thus in turn it’s low-cost, in addition to exhibiting a significantly low working potential (< 0.4 V vs Li/Li + ). However, one of the main (and most detrimental) challenges is silicon’s tendency to expand in volume (> 300%) upon discharge as it begins the lithiation process. As a direct result, it causes not only for the particles to both crack and pulverize under mechanical stress as the volume continues to expand and contract during cycling. Upon assembling the cell, it needs to undergo ‘charging’ for initially discharging/ ‘activating’ the cell, otherwise commonly known as the ‘formation’ step. As a result a solid electrolyte interface (SEI) layer begins to form at the anode surface because some of the electrolyte begins to react during the formation process. However, this (SEI) layer is deemed as a ‘protective’ interlayer because in theory it prevents further reaction as the cell continues to cycle. However, due to the volume change it causes significant degradation at the interface. As cracking starts to occur at the anode surface, it results in a ‘new’ altered surface with each cycle that causes further reaction with the electrolyte as a byproduct quickly consuming active Li/ and more electrolyte. Thus, fracturing this ‘protective layer,’ causing significantly higher impedance as a result, and in turn a decline in capacity due to active Li-loss. In addition to the active material exfoliating off from the current collector, further contributing to the steady decline in capacity and overall performance. Current state of the art Si-anode batteries on the market range between a maximum content of 5-10 Si wt%. It has been previously reported Tesla has utilized SiO x -C anodes containing 5 wt% Si within their ‘Model 3/ Model X’ electric vehicles. However, more recent ‘Model 3’ vehicles have started to incorporate 10 Si wt%, in which they were able to increase their energy density upwards by approximately 30%. Recent effort has been focused on continuing to increase the wt% of Si being utilized, eventually to 100 wt% of Si, to maximize the energy density even further.

36 MATERIALS SCIENCE↗

Investigating the effects of electron bounce-cyclotron resonance on plasma dynamics in capacitive discharges operated in the presence of a weak transverse magnetic field

Recently, Patil et al. [Phys. Rev. Res. 4, 013059 (2022)] have reported the existence of an enhanced operating regime when a low-pressure (5 mTorr) capacitively coupled discharge (CCP) is driven by a very high radio frequency (60 MHz) source in the presence of a weak external magnetic field applied parallel to its electrodes. Their particle-in-cell simulations show that a significantly higher bulk plasma density and ion flux can be achieved at the electrode when the electron cyclotron frequency equals half of the applied radio frequency for a given fixed voltage. In the present work, we take a detailed look at this phenomenon and further delineate the effect of this “electron bounce-cyclotron resonance (EBCR)” on the electron and ion dynamics of the system. We find that the ionization collision rate and stochastic heating are maximum under resonance condition. The electron energy distribution function also indicates that the population of tail-end electrons is highest for the case where EBCR is maximum. Formation of electric field transients in the bulk plasma region is also seen at lower values of applied magnetic field. Finally, we demonstrate that the EBCR-induced effect is a low-pressure phenomenon and weakens as the neutral gas pressure increases. The potential utility of this effect to advance the operational performance of CCP devices for industrial purposes is discussed in this report.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗