Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Manned orbital systems concepts study. Book 2: Requirements for extended-duration missions

In order to provide essential data needed in long-range program planning, the Manned Orbital Systems Concepts (MOSC) study attempted to define, evaluate, and compare concepts for manned orbital systems that provide extended experiment mission capabilities in space, flexibility of operation, and growth potential. Specific areas discussed include roles and requirements for man in future space missions, requirements for extended capability, mission/payload concepts, and preliminary design and operational requirements.

Source record↗

Energy storage considerations for a robotic Mars surface sampler

A Mars Rover capable of obtaining surface samples will need a power system for motive power and to power scientific instrumentation. Several different power systems are considered along with a discussion of the location options. The weight and volume advantages of the different systems are described for a particular power profile. The conclusions are that a Mars Rover Sample Return Mission and Extended Mission can be accomplished utilizing photovoltaics and electrochemical storage.

Odonnell, Patricia M.↗

Energy storage considerations for a robotic Mars surface sampler

A Mars Rover capable of obtaining surface samples will need a power system for motive power and to power scientific instrumentation. Several different power systems are considered in this paper along with a discussion of the location options. The weight and volume advantages of the different systems are described for a particular power profile. The conclusions are that a Mars Rover Sample Return Mission and Extended Mission can be accomplished utilizing photovoltaics and electrochemical storage.

O'Donnell, Patricia M.↗

The Cassini Solstice Mission: Streamlining Operations by Sequencing with PIEs

The Cassini Solstice Mission (CSM) is the second extended mission phase of the highly successful Cassini/Huygens mission to Saturn. Conducted at a much-reduced funding level, operations for the CSM have been streamlined and simplified significantly. Integration of the science timeline, which involves allocating observation time in a balanced manner to each of the five different science disciplines (with representatives from the twelve different science instruments), has long been a labor-intensive endeavor. Lessons learned from the prime mission (2004-2008) and first extended mission (Equinox mission, 2008-2010) were utilized to design a new process involving PIEs (Pre-Integrated Events) to ensure the highest priority observations for each discipline could be accomplished despite reduced work force and overall simplification of processes. Discipline-level PIE lists were managed by the Science Planning team and graphically mapped to aid timeline deconfliction meetings prior to assigning discrete segments of time to the various disciplines. Periapse segments are generally discipline-focused, with the exception of a handful of PIEs. In addition to all PIEs being documented in a spreadsheet, allocated out-of-discipline PIEs were entered into the Cassini Information Management System (CIMS) well in advance of timeline integration. The disciplines were then free to work the rest of the timeline internally, without the need for frequent interaction, debate, and negotiation with representatives from other disciplines. As a result, the number of integration meetings has been cut back extensively, freeing up workforce. The sequence implementation process was streamlined as well, combining two previous processes (and teams) into one. The new Sequence Implementation Process (SIP) schedules 22 weeks to build each 10-week-long sequence, and only 3 sequence processes overlap. This differs significantly from prime mission during which 5-week-long sequences were built in 24 weeks, with 6 overlapping processes.

Vandermey, Nancy↗

A Micro Newton Impulse-Bit Hydrazine Thruster - Design, Test and Mission Applications

Recent and numerous failures of reaction wheels have cut short and/or limited the mission functions of several spacecraft including DAWN, Mars Odyssey, and Kepler among others. A micro Newton impulse-bit hydrazine thruster has the potential to backup or even replace reaction wheels on most missions, thereby extending mission life. This paper will discuss the development and test of a plug-and-play hydrazine thruster with 30 – 130 milliNewton thrust levels, and impulse bits < 50 microNewton-sec. In addition, this paper will address mission applications that include backup for, or even replacement of reaction wheels, delta-V thrust for CubeSats, and primary attitude control for the 20 – 50 kg class of spacecraft.

Parker, J. Morgan↗

Space Hardware Design for Long Life with High Reliability

In 1991, the Cassini Project at JPL funded a study to identify rules for design and test of hardware required to function reliably in space for very long lifetimes. The widest possible range of hardware issues were considered consistent with three constraints: (1) Software and mission rules were addressed only to the extent they affected hardware performance; (2) the rules developed were applicable to a single spacecraft, and multiple spacecraft to achieve mission success were not considered; and (3) high reliability rules were considered only in their relationship to long life. The study was subsequently published as a JPL document. One major conclusion of the workshop was that unattended space missions extending out to 25 years or more are feasible.

hardware↗

Dawn's final mission at Ceres: navigation and mission design experience

On Oct. 31st, 2018, the Dawn spacecraft completed its space journey covering more than 11 years including exploration of Vesta and Ceres, two protoplanets in the main asteroid belt. After successfully completing its prime mission at the dwarf planet Ceres, the Dawn mission was extended twice to pursue new scientific objectives. The second extended mission at Ceres, and the final mission for Dawn, presented a series of challenges that were new to the experienced and accomplished Dawn navigation team. This paper discusses mission design and navigational experiences and challenges during Dawn’s final transfer and orbit at Ceres. Topics include reference orbit design of the final science orbit, mission design and planning for the transfer, periapsis targeting over a surface feature, and analysis for planetary protection requirements.

Karimi, Reza↗

Fabrication and Performance Characterization of Electrospun Nanofibers for Terrestrial and Space Applications

Passive thermal control is vital in space, especially for extended missions involving cryogen storage needing protection from sunlight. This presentation covers the development of a thermal coating with wavelength-selective characteristics using polymeric materials that scatter sunlight with minimal absorption, resulting in high solar reflectance. Furthermore, these coatings allow emission in infrared wavelengths, making them suitable for deep-space missions requiring extended storage. The study chose polymer and surface morphology suitable as solar reflectors that are lightweight, compact, and easily manufacturable, focusing on different multilayered nanofibers made using polytetrafluoroethylene and polyethylene-oxide (PTFE-PEO), polyvinylidene fluoride-hexafluoropropylene (PVDF-HFP), and silica (SiO2). To understand how these materials interact with sunlight, we analyze light propagation through several layers of electrospun nanofibers to determine spectral reflectance, absorptance, and transmittance by solving the Maxwell equations. The model is also compared with measurements of spectral reflectance and transmittance of the various electrospun nanofibers using spectrophotometers interfaced with integrating spheres in the ultraviolet, visible, near-infrared, and mid-infrared wavelengths. The presentation will also describe the design and analysis, fabrication of the nanofibers using electrospinning, and several experimental characterization techniques to determine suitability for space applications. The nanofibers are tested using various tools to determine their suitability for cryogenic applications in space. Lastly, the samples were tested under low vacuum conditions and exposing them to sunlight inside a vacuum chamber maintained at 300 K. Relative to the incoming solar flux (1000 W/m2), only 1% of the energy was absorbed under these operating conditions. With further optimization and testing under high vacuum cryogenic environments, the samples could demonstrate much lower absorption or higher reflection of incoming solar radiation, which can translate to low temperatures suitable for cryogen storage.

Chieloka Ibekwe↗

Hydrazine Conservation for the Dawn Spacecraft Operations at the Dwarf Planet Ceres

Dawn is a low-thrust interplanetary spacecraft currently orbiting the dwarf planet Ceres. After successfully completing its Vesta and Ceres prime missions, Dawn is now in its extended mission, continuously exploring Ceres. After losing the second reaction wheel assembly at the end of the Vesta mission, the feasibility of the Ceres mission was at risk due to the potentially significant increase in hydrazine consumption from using only the reaction control system thrusters. This paper summarizes the intense, collaborative efforts undertaken by the project to conserve hydrazine prior to Vesta departure, during cruise to Ceres, and throughout the Ceres mission. The project’s efforts in minimizing the number of turns are discussed. A special emphasis is given to describing various efforts taken by the Attitude Control Subsystem team in an attempt to reduce hydrazine consumption. These efforts include: changing default slew rates, control gain tuning, changing nadir pointing strategy with Ahead Cross Nadir pointing, hybrid control implementation using hydrazine based thrusters and two remaining reaction wheels, optimal science turn location analysis, and reaction wheel angular momentum management strategies for reducing the number of momentum unloadings. In addition to the Attitude Control Subsystem team’s efforts, the Mission Design and Navigation team’s efforts taken in designing hydrazine friendly orbit transfers are discussed. The trade study performed collaboratively by the Attitude Control Subsystem team and the Science Operations Support Team in choosing hydrazine friendly off-nadir targets is also discussed. Various simulation results are presented and compared against actual flight data obtained. Lastly, remaining hydrazine status at the end of the prime Ceres mission and the hydrazine management planning for the extended mission are discussed.

Salami, Mana↗

Prospects for TTV Detection and Dynamical Constraints with TESS

We consider the potential for the Transiting Exoplanet Survey Satellite (TESS) to detect transit timing variations (TTVs) during both its nominal and extended mission phases. Building on previous estimates of the overall yield of planetary systems from the TESS mission, we predict that during its nominal two-year mission, TESS will observe measurable TTVs in ~30 systems, from which planet will get precise mass measurements from TTVs alone, ~5 planets will have significant constraints placed on their masses from TTVs, and over a dozen systems will be singly transiting TTV systems. We consider a number of different extended mission scenarios, and predict that in a typical scenario, an extended mission will allow TESS to increase the number of systems with measurable TTVs to a total of ~90, from which ~15 planets will have precise mass measurements, another ~15 will have significant constraints placed on their masses, and ~60 will be singly transiting TTV systems. We also describe how follow-up transit observations of multiplanet systems discovered by the TESS mission can be optimally planned to maximize TTV mass and eccentricity constraints.

planets↗

On Structural Design of a Mobile Lunar Habitat with Multi-Layered Environmental Shielding

The future human lunar missions are expected to undertake far more ambitious activities than those of the Apollo program with the possibility of some missions lasting up to several months. Such extended missions require the use of large-size lunar outposts to accommodate living quarters for the astronauts as well as indoor laboratory facilities. The greatest obstacle to the prolonged human presence on the Moon is the threat posed by the harsh lunar environment that is plagued with multi-source high-energy radiation exposure as well as frequent barrage of meteoroids. Hence, for such extended missions to succeed, it is vital that the future lunar outposts be designed to provide a safe habitat for the astronauts. Over the past few years, a variety of ideas and concepts for future lunar outposts and bases have been proposed. With shielding as the primary concern, some have suggested the use of natural structures such as lava tubes while others have taken a more industrial approach and suggested the construction of fixed structures in the form of inflatable, inflatable with rigid elements, and tent-style membrane. For evaluation of these structural design concepts, Drake and Richter1 have proposed a rating system based on such factors as effectiveness, importance, and timing. While all of these designs, in general, benefit from in-situ resource utilization (i.e., lunar regolith) for shielding, they share a common disadvantage of being fixed to one particular location that would limit exploration to the region in close proximity of the outpost.

Rais-Rohani, Masoud↗

Upping the Ante: The TESS Mission Shortens Full Frame Images to 10 Minutes and Introduces a Twenty-Second Data Collection Mode

The Transiting Exoplanet Survey Satellite (TESS) recently completed its initial two-year, near all-sky survey, identifying over 79 exoplanets and over 2000 exoplanet candidates. The mission is well on its way to find at least 50 small, nearby exoplanets for which masses can be ascertained and whose atmospheres can be characterized by ground- and space-based follow-on observations. TESS has unveiled a plethora of exciting non-exoplanet astrophysics results, such as asteroseismology, asteroids, and supernova. In the extended mission, TESS is collecting full frame images (FFIs) at 10-minute intervals rather than at 30-minute intervals, as was the case for the two-year primary mission. TESS is also collecting and providing photometry for up to 1000 20-sec targets in addition to the 20,000 target star postage stamps collected at 2-min intervals. The extended mission will also feature a five-month interval in which the 24°x96° field of view (FOV) will be rotated by 90°from its normal North-South orientation to observe a swath of the ecliptic plane. The FOVs for the remainder of the extended mission will be offset in latitude from those of the prime mission to help fill in the gaps in the full sky coverage. We discuss the performance and behavior of the data products generated by the TESS Science Processing Operations Center (SPOC) at NASA Ames Research Center and highlight the new 20-sec data mode and the 10-min FFIs. The TESS Mission is funded by NASA's Science Mission Directorate as an Astrophysics Explorer Mission.

TESS↗

Potential Biofilm Control Strategies for Extended Spaceflight Missions

Biofilms, surface-adherent microbial communities, are associated with microbial fouling and corrosion in terrestrial water-distribution systems. Biofilms are also present in human spaceflight, particularly in the Water Recovery System (WRS) on the International Space Station (ISS). The WRS is comprised of the Urine Processor Assembly (UPA) and the Water Processor Assembly (WPA) which together recycles wastewater from human urine and recovered humidity from the ISS atmosphere. These wastewaters and various process streams are continually inoculated with microorganisms primarily arising from the space crew microbiome. Biofilm-related fouling has been encountered and addressed in spacecraft in low Earth orbit, including ISS and the Russian Mir Space Station. However, planned future missions beyond low Earth orbit to the Moon and Mars present additional challenges, as resupplying spare parts or support materials would be impractical and the mission timeline would be in the order of years in the case of a mission to Mars. In addition, future missions are expected to include a period of dormancy in which the WRS would be unused for an extended duration. The concepts developed in this review arose from a workshop including NASA personnel and representatives with biofilm expertise from a wide range of industrial and academic backgrounds. Here, we address current strategies that are employed on Earth for biofilm control, including antifouling coatings and biocides and mechanisms for mitigating biofilm growth and damage. These ideas are presented in the context of their applicability to spaceflight and identify proposed new topics of biofilm control that need to be addressed in order to facilitate future extended, crewed, spaceflight missions.

Luis Zea↗

Review of Spaceflight Dental Emergencies

All exploration class missions--extending beyond earth's orbit--differ from existing orbital missions by being of longer duration and often not having a means of evacuation. If an exploration mission extends beyond a year, then there will be a greater lapse since the crewmembers last terrestrial dental exams, which routinely occur each year. This increased time since professional dental care could increase the chance of a dental emergency such as intractable pain, dental decay requiring a temporary filling, crown replacement, exposed pulp, abscess, tooth avulsion, or toothache. Additionally, any dental emergency will have to be treated in-flight with available resources and personnel who may not have extensive training in dental care. Thus, dental emergencies are an important risk to assess in preparation for exploration missions.

Menon, Anil↗

Cassini Attitude and Articulation Control Subsystem Fault Protection Challenges During Saturn Proximal Orbits

NASA's Cassini Spacecraft, launched on October 15th, 1997 arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. As the first spacecraft to achieve orbit at Saturn, Cassini has collected science data throughout its four-year prime mission (2004-08), and has since been approved for a first and second extended mission through 2017. As part of the final extended mission, Cassini will begin an aggressive and exciting campaign of high inclination low altitude flybys within the inner most rings of Saturn, skimming Saturn's outer atmosphere, until the spacecraft is finally disposed of via planned impact with the planet. This final campaign, known as the proximal orbits, presents unique fault protection related challenges, the details of which are discussed in this paper.

Bates, David M.↗

Cassini Operational Sun Sensor Risk Management During Proximal Orbit Saturn Ring Plane Crossings

NASA's Cassini Spacecraft, launched on October 15th, 1997 which arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. As the first spacecraft to achieve orbit at Saturn, Cassini has collected science data throughout its four-year prime mission (2004–08), and has since been approved for a first and second extended mission through 2017. As part of the final extended missions, Cassini will begin an aggressive and exciting campaign of high inclination, low altitude flybys within the inner most rings of Saturn, skimming Saturn’s outer atmosphere, until the spacecraft is finally disposed of via planned impact with the planet. This final campaign, known as the proximal orbits, requires a strategy for managing the Sun Sensor Assembly (SSA) health, the details of which are presented in this paper.

fault protection↗