Search NASA⌕ Search

SEARCH · Search NASA

Results for “ground operational support system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Spaceflight Ground Support Equipment Reliability & System Safety Data

Presented were Reliability Analysis, consisting primarily of Failure Modes and Effects Analysis (FMEA), and System Safety Analysis, consisting of Preliminary Hazards Analysis (PHA), performed to ensure that the CoNNeCT (Communications, Navigation, and Networking re- Configurable Testbed) Flight System was safely and reliably operated during its Assembly, Integration and Test (AI&T) phase. A tailored approach to the NASA Ground Support Equipment (GSE) standard, NASA-STD-5005C, involving the application of the appropriate Requirements, S&MA discipline expertise, and a Configuration Management system (to retain a record of the analysis and documentation) were presented. Presented were System Block Diagrams of selected GSE and the corresponding FMEA, as well as the PHAs. Also discussed are the specific examples of the FMEAs and PHAs being used during the AI&T phase to drive modifications to the GSE (via "redlining" of test procedures, and the placement of warning stickers to protect the flight hardware) before being interfaced to the Flight System. These modifications were necessary because failure modes and hazards were identified during the analysis that had not been properly mitigated. Strict Configuration Management was applied to changes (whether due to upgrades or expired calibrations) in the GSE by revisiting the FMEAs and PHAs to reflect the latest System Block Diagrams and Bill Of Material. The CoNNeCT flight system has been successfully assembled, integrated, tested, and shipped to the launch site without incident. This demonstrates that the steps taken to safeguard the flight system when it was interfaced to the various GSE were successful.

Fernandez, Rene↗

Life Cycle Systems Engineering Approach to NASA's 2nd Generation Reusable Launch Vehicle

The overall goal of the 2nd Generation RLV Program is to substantially reduce technical and business risks associated with developing a new class of reusable launch vehicles. NASA's specific goals are to improve the safety of a 2nd- generation system by 2 orders of magnitude - equivalent to a crew risk of 1 -in- 10,000 missions - and decrease the cost tenfold, to approximately $1,000 per pound of payload launched. Architecture definition is being conducted in parallel with the maturating of key technologies specifically identified to improve safety and reliability, while reducing operational costs. An architecture broadly includes an Earth-to-orbit reusable launch vehicle, on-orbit transfer vehicles and upper stages, mission planning, ground and flight operations, and support infrastructure, both on the ground and in orbit. The systems engineering approach ensures that the technologies developed - such as lightweight structures, long-life rocket engines, reliable crew escape, and robust thermal protection systems - will synergistically integrate into the optimum vehicle. Given a candidate architecture that possesses credible physical processes and realistic technology assumptions, the next set of analyses address the system's functionality across the spread of operational scenarios characterized by the design reference missions. The safety/reliability and cost/economics associated with operating the system will also be modeled and analyzed to answer the questions "How safe is it?" and "How much will it cost to acquire and operate?" The systems engineering review process factors in comprehensive budget estimates, detailed project schedules, and business and performance plans, against the goals of safety, reliability, and cost, in addition to overall technical feasibility. This approach forms the basis for investment decisions in the 2nd Generation RLV Program's risk-reduction activities. Through this process, NASA will continually refine its specialized needs and identify where Defense and commercial requirements overlap those of civil missions.

Thomas, Dale↗

The GSFC Flight Support System for on-orbit satellite servicing

To plan and execute a successful on-orbit satellite servicing mission, space support hardware, a serviceable spacecraft design, and flexible ground operations are required. This paper addresses space support hardware and in particular the Goddard Space Flight Center (GSFC) Satellite Servicing Project's (SSP) Flight Support System (FSS). The FSS is designed to be compatible with the Space Transportation System Orbiter and to support on-orbit servicing of Multimission Modular Spacecraft. It provides mechanical, electrical, and thermal support to the spacecraft during the servicing mission. Standardization of spacecraft design, components, and interfaces is required to make a satellite serviceable. Spacecraft ground operation capabilities must accommodate servicing mission requirements. Space support tools and equipment, such as the Power Ratchet Tool, assists the astronaut during time critical EVA operations to more efficiently perform the servicing mission.

Griffin, Thomas J.↗

Using Pilots to Assess the Value and Approach of CMMI Implementation

At Goddard Space Flight Center (GSFC), we have chosen to use Capability Maturity Model Integrated (CMMI) to guide our process improvement program. Projects at GSFC consist of complex systems of software and hardware that control satellites, operate ground systems, run instruments, manage databases and data and support scientific research. It is a challenge to launch a process improvement program that encompasses our diverse systems, yet is manageable in terms of cost effectiveness. In order to establish the best approach for improvement, our process improvement effort was divided into three phases: 1) Pilot projects; 2) Staged implementation; and 3) Sustainment and continual improvement. During Phase 1 the focus of the activities was on a baselining process, using pre-appraisals in order to get a baseline for making a better cost and effort estimate for the improvement effort. Pilot pre-appraisals were conducted from different perspectives so different approaches for process implementation could be evaluated. Phase 1 also concentrated on establishing an improvement infrastructure and training of the improvement teams. At the time of this paper, three pilot appraisals have been completed. Our initial appraisal was performed in a flight software area, considering the flight software organization as the organization. The second appraisal was done from a project perspective, focusing on systems engineering and acquisition, and using the organization as GSFC. The final appraisal was in a ground support software area, again using GSFC as the organization. This paper will present our initial approach, lessons learned from all three pilots and the changes in our approach based on the lessons learned.

Godfrey, Sara↗

Design of a Multi-mode Flight Deck Decision Support System for Airborne Conflict Management

NASA Langley has developed a multi-mode decision support system for pilots operating in a Distributed Air-Ground Traffic Management (DAG-TM) environment. An Autonomous Operations Planner (AOP) assists pilots in performing separation assurance functions, including conflict detection, prevention, and resolution. Ongoing AOP design has been based on a comprehensive human factors analysis and evaluation results from previous human-in-the-loop experiments with airline pilot test subjects. AOP considers complex flight mode interactions and provides flight guidance to pilots consistent with the current aircraft control state. Pilots communicate goals to AOP by setting system preferences and actively probing potential trajectories for conflicts. To minimize training requirements and improve operational use, AOP design leverages existing alerting philosophies, displays, and crew interfaces common on commercial aircraft. Future work will consider trajectory prediction uncertainties, integration with the TCAS collision avoidance system, and will incorporate enhancements based on an upcoming air-ground coordination experiment.

Barhydt, Richard↗

Smart Coatings for Launch Site Corrosion Protection

Smart, environmentally friendly paint system for early corrosion detection, mitigation, and healing that will enable supportability in KSC launch facilities and ground systems through their operational life cycles. KSC's Corrosion Technology Laboratory is developing a smart, self-healing coating that can detect and repair corrosion at an early stage. This coating is being developed using microcapsules specifically designed to deliver the contents of their core when corrosion starts.

TechPort Portfolio System↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Global Environmental Micro Sensors Test Operations in the Natural Environment

ENSCO, Inc. is developing an innovative atmospheric observing system known as Global Environmental Micro Sensors (GEMS). The GEMS concept features an integrated system of miniaturized in situ, airborne probes measuring temperature, relative humidity, pressure, and vector wind velocity. In order for the probes to remain airborne for long periods of time, their design is based on a helium-filled super-pressure balloon. The GEMS probes are neutrally buoyant and carried passively by the wind at predetermined levels. Each probe contains onboard satellite communication, power generation, processing, and geolocation capabilities. ENSCO has partnered with the National Aeronautics and Space Administration's Kennedy Space Center (KSC) for a project called GEMS Test Operations in the Natural Environment (GEMSTONE) that will culminate with limited prototype flights of the system in spring 2007. By leveraging current advances in micro and nanotechnology, the probe mass, size, cost, and complexity can be reduced substantially so that large numbers of probes could be deployed routinely to support ground, launch, and landing operations at KSC and other locations. A full-scale system will improve the data density for the local initialization of high-resolution numerical weather prediction systems by at least an order of magnitude and provide a significantly expanded in situ data base to evaluate launch commit criteria and flight rules. When applied to launch or landing sites, this capability will reduce both weather hazards and weather-related scrubs, thus enhancing both safety and cost-avoidance for vehicles processed by the Shuttle, Launch Services Program, and Constellation Directorates. The GEMSTONE project will conclude with a field experiment in which 10 to 15 probes are released over KSC in east central Florida. The probes will be neutrally buoyant at different altitudes from 500 to 3000 meters and will report their position, speed, heading, temperature, humidity, and pressure via satellite. The GEMS data will be validated against reference observations provided by current weather instrumentation located at KSC. This paper will report on the results of the GEMSTONE project and discuss the challenges encountered in developing an airborne sensor system.

Adams, Mark L.↗

Bootstrapping Multi-Agent Unmanned Aerial Vehicle (UAV) System Integration Using Ground-Based Assets: Lessons Learned

In support of the Autonomy Teaming and TRAjectories for Complex Trusted Operational Reliability (ATTRACTOR) project, a fleet of unmanned ground vehicles (UGVs) was developed as a test and evaluation (T\&E) platform to reduce system integration gaps between simulation and live flight hardware. While simulation and hardware-in-the-loop bench testing provide adequate environments for preliminary validation, differences in system deployment architecture, software interfaces, and hardware infrastructure increase the risks to safety, property, and the project. Given ATTRACTOR’s goal of establishing a basis of certification of trust and trustworthiness in multi-agent autonomous systems, bridging these gaps was critical to successful project execution and feasibility assessment. In this paper we present the UGV fleet and its role in speeding up system integration, smoothing the transition from simulation to flight, and providing researchers an easy-to-use hardware test bed. An overview of the hardware and software on-board the vehicles is provided along with supporting infrastructure. The system integration process is documented including results in supporting both the overarching design reference mission (DRM) of ATTRACTOR and individual research efforts conducted since the creation of the fleet. Finally, we discuss the practical lessons learned regarding the testing, deployment, and operation of multi-agent autonomous systems.

Matthew P. Vaughan↗

Development of a Space Station Operations Management System

To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.

Brandli, A. E.↗

Launching AI in NASA ground systems

This paper will discuss recent operational successes in implementing expert systems to support the complex functions of NASA mission control systems at the Goddard Space Flight Center, including fault detection and diagnosis for real time and engineering analysis functions in the Cosmic Background Explorer and Gamma Ray Observatory missions and automation of resource planning and scheduling functions for various missions. It will also discuss ongoing developments and prototypes that will lead to increasingly sophisticated applications of artificial intelligence. These include the use of neural networks to perform telemetry monitoring functions, the implementation of generic expert system shells that can be customized to telemetry handling functions specific to NASA control centers, the applications of AI in training and user support, the long-term potential of implementing systems based around distributed, cooperative problem solving, and the use of AI to control and assist system development activities.

Perkins, Dorothy C.↗

Commonality of flight control systems for support of European telecommunications missions

This paper is concerned with the presentation of mission-independent software systems that provide a common software platform to ground data systems for mission operations. The objectives of such common software platforms are to reduce the cost of the development of mission-dedicated software systems and to increase the level of reliability of the ground data systems for mission operations. In accordance with this objective, the Multi-Satellite Support System (MSSS) was developed at the European Space Operations Center (ESOC). Between 1975 and 1992, the MSSS provided support to 16 European Space Agency (ESA) missions, among them very demanding science missions such as GEOS, EXOSAT, and Giotto. The successful support of these missions proved the validity of the MSSS concept with its extended mission-independent platform. This paper describes the MSSS concept and focuses on the wide use of MSSS as a flight control system for geosynchronous telecommunications satellites. Reference is made to more than 15 telecommunications missions that are operated from Western Europe using flight control systems with an underlying MSSS concept, demonstrating the benefits of a commonly used software platform. Finally, the paper outlines the design of the new generation of flight control systems, which is being developed at ESOC for this decade, following a period of more than 15 years of MSSS support.

Debatin, Kurt↗

Operational Assessment of Apollo Lunar Surface Extravehicular Activity

Quantifying the operational variability of extravehicular activity (EVA) execution is critical to help design and build future support systems to enable astronauts to monitor and manage operations in deep-space, where ground support operators will no longer be able to react instantly and manage execution deviations due to the significant communication latency. This study quantifies the operational variability exhibited during Apollo 14-17 lunar surface EVA operations to better understand the challenges and natural tendencies of timeline execution and life support system performance involved in surface operations. Each EVA (11 in total) is individually summarized as well as aggregated to provide descriptive trends exhibited throughout the Apollo missions. This work extends previous EVA task analyses by calculating deviations between planned and as-performed timelines as well as examining metabolic rate and consumables usage throughout the execution of each EVA. The intent of this work is to convey the natural variability of EVA operations and to provide operational context for coping with the variability inherent to EVA execution as a means to support future concepts of operations.

planning and scheduling↗

Status of frequency and time support for NASA systems

NASA has frequency and timing systems at many facilities and centers. Timing systems with specifications tighter than several microseconds are covered. These ground based systems support scientific experiments and spacecraft tracking for the following programs; NASA Satellite Laser Ranging (NSLR); Network Mission Operations Support (NMOS); Kennedy Space Center (KSC); Very Long Baseline Interferometry (VLBI); Tracking Data Relay Satellite System (TDRSS) Ground Terminal Network; and the Deep Space Network (DSN). Major equipment assemblies, specifications, performance, and requirements, both present and future, are presented.

Kuhnle, Paul F.↗

Progress in High Power Density SOFC Material Development for Aerospace Applications

Solid oxide fuel cell (SOFC) systems for aircraft applications require order of magnitude increase in specific power density and long life under aircraft operating conditions. Advanced SOFC materials and fabrication processes are being developed at NASA GRC to increase specific power density and durability of SOFC cell and stack. Initial research efforts for increasing specific power density are directed toward increasing the operating temperature for the SOFC system and reducing the weight of the stack. While significant research is underway to develop anode supported SOFC system operating at temperatures in the range of 650 - 850 C for ground power generation applications, such temperatures may not yield the power densities required for aircraft applications. For electrode-supported cells, SOFC stacks with power densities greater than 1.0 W/sq cm are favorable at temperatures in excess of 900 C. The performance of various commercial and developmental anode supported cells is currently being evaluated in the temperature range of 900 to 1000 C to assess the performance gains and materials reliability. The results from these studies will be presented. Since metal interconnects developed for lower temperature operation are not practical at these high temperatures, advanced perovskite based ceramic interconnects with high electronic conductivity and lower sintering temperatures are being developed. Another option for increasing specific power density of SOFC stacks is to decrease the stack weight. Since the interconnect contributes to a significant portion of the stack weight, considerable weight benefits can be derived by decreasing its thickness. Eliminating the gas channels in the interconnect by engineering the pore structure in both anode and cathode can offer significant reduction in thickness of the ceramic interconnect material. New solid oxide fuel cells are being developed with porous engineered electrode supported structures with a 10 - 20 micron thin electrolyte. The performance data for advanced SOFC cells with engineered porosity in both electrodes will be presented.

Cable, Thomas L.↗

Space Infrared Telescope Facility (SIRTF) - Operations concept

The development and operations costs of the Space IR Telescope Facility (SIRTF) are discussed in the light of minimizing total outlays and optimizing efficiency. The development phase cannot extend into the post-launch segment which is planned to only support system verification and calibration followed by operations with a 70-percent efficiency goal. The importance of reducing the ground-support staff is demonstrated, and the value of the highly sensitive observations to the general astronomical community is described. The Failure Protection Algorithm for the SIRTF is designed for the 5-yr lifetime and the continuous venting of cryogen, and a science driven ground/operations system is described. Attention is given to balancing cost and performance, prototyping during the development phase, incremental development, the utilization of standards, and the integration of ground system/operations with flight system integration and test.

Miller, Richard B.↗

Telescience Resource Kit Software Capabilities and Future Enhancements

The Telescience Resource Kit (TReK) is a suite of PC-based software applications that can be used to monitor and control a payload on board the International Space Station (ISS). This software provides a way for payload users to operate their payloads from their home sites. It can be used by an individual or a team of people. TReK provides both local ground support system services and an interface to utilize remote services provided by the Payload Operations Integration Center (POIC). by the POIC and to perform local data functions such as processing the data, storing it in local files, and forwarding it to other computer systems. TReK can also be used to build, send, and track payload commands. In addition to these features, work is in progress to add a new command management capability. This capability will provide a way to manage a multi- platform command environment that can include geographically distributed computers. This is intended to help those teams that need to manage a shared on-board resource such as a facility class payload. The environment can be configured such that one individual can manage all the command activities associated with that payload. This paper will provide a summary of existing TReK capabilities and a description of the new command management capability. For example, 7'ReK can be used to receive payload data distributed

Schneider, Michelle↗