Search NASA⌕ Search

SEARCH · Search NASA

Results for “human operator support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Surface Support Systems for Co-Operative and Integrated Human/Robotic Lunar Exploration

Human and robotic partnerships to realize space goals can enhance space missions and provide increases in human productivity while decreasing the hazards that the humans are exposed to. For lunar exploration, the harsh environment of the moon and the repetitive nature of the tasks involved with lunar outpost construction, maintenance and operation as well as production tasks associated with in-situ resource utilization, make it highly desirable to use robotic systems in co-operation with human activity. A human lunar outpost is functionally examined and concepts for selected human/robotic tasks are discussed in the context of a lunar outpost which will enable the presence of humans on the moon for extended periods of time.

Mueller, Robert P.↗

Operator-in-the-Loop Study for a Computerized Operator Support System (COSS) – Cross-System and System-Independent Evaluations

The Computerized Operator Support System (COSS) is an operator assistive technology funded by the U.S. Department of Energy Office of Nuclear Energy and developed at Idaho National Laboratory. The project works in collaboration with an advanced prognostics system called PRO-AID developed at Argonne National Laboratory. The COSS provides a human-machine interface to help operators maintain situation awareness and detect faults earlier than would be possible using conventional control room technologies at nuclear power plants. This report represents a status report outlining third-year efforts to develop and validate the COSS. The COSS has now been implemented as a prototype system, with multiple interaction design concepts on multiple plant systems in the simulator from a commercial nuclear power plant. Two studies involving three licensed reactor crews were conducted to evaluate the COSS. This report captures insights into the development of COSS as well as operator feedback and future development guidance derived from the operator-in-the-loop simulator studies.

99 GENERAL AND MISCELLANEOUS↗

CEBAF Accelerator Tunnel Robot Project

Advancements in the field of robotics allow for the use of remotely controlled robots to perform tasks that have typically required human intervention. Jefferson Lab has explored the possibilities of robots placed in the accelerator tunnel to perform remote inspections that would otherwise require powering down equipment and completing lengthy radiological surveys that impact beam operations. A robotic solution ? driven by a human operator ? could not only reduce accelerator down time but also support the Lab's radiation exposure policy (known as "ALARA" - As Low As Reasonably Acceptable) by handling routine tunnel and beamline investigations in place of a human being. However, operating a remote device in a radioactive, high electronic-noise area is not a trivial task and drop-in solutions are rarely as simple as they seem. We will present the past prototypes that were tested as well follow-on technology developed from the project. We will also briefly survey current applications of robots at accelerator facilities with an eye toward future applications.

McGuckin, Theodore↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Design and implementation of HuREX analysis supporting interface - 171

Human error is recognized as one of the main causes to affect to the socio-technical system including nuclear power plant. Therefore, reducing human error through human reliability analysis (HRA) is a critical issue. Moreover, sufficient and reliable human performance data collection is a prerequisite for ensuring the safety of nuclear power plants. Korea Atomic Energy Research Institute developed the HuREX (Human Reliability data Extraction) framework to collect and analyze the responses of human operators from simulator training records of nuclear power plant. Thus, the development and computer software interfaces of the database are essential to efficiently support human reliability analysis. In this study, OPERA database was developed in accordance with the following process. First, the essential data required for the HRA analysis (e.g., plant data, procedures, system and equipment info, operating crews, results of simulator experiments, and so forth) was stored in the database. In addition, standardized procedures and related items were stored in the database to support HRA quantification. A data structure was developed to store crew responses conducted by operators to cope with an emergency situation during simulator experiments. In addition, various interfaces that escalate efficiency of the HuREX applications were developed. The HuREX analysis support interface was developed with HuREX Video Analyzer for observation of simulator collection data (e.g., audio-visual records, plant parameters, operator's action logs) and HuREX Data Analyzer for analysis of operator's conducted task. By using the OPERA database and HuREX analysis support interface developed through this research, maximizing the efficiency of human reliability analysis based on simulator training data. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Performance Risk Model Validation with Operationally Relevant Tasks

Human Research Program aims to develop methods to support astronauts’ health and productivity during spaceflight. The Crew Health and Performance Probabilistic Risk Assessment (CHP-PRA) team uses powerful computational methods to predict mission risk in both domains: medical and performance. Here, we show how CHP-PRA uses the Performance Risk Model (PRisM) to quantify the performance risk and show an application of the model on operationally relevant tasks. There are various metrics adopted across performance researchers that PRisM can accommodate. For data analysis, interpretation, and integration, we use a method of unifying data from multiple sources by converting each to a single metric. We consult subject matter experts prior to integrating the converted data into PRisM. The method we use is inspired by the Cooper-Harper rating scale [1]. Using this unified metric, we can easily combine data from various tests and lab groups. We explain our conversion method in detail and show how it pertains to the process of testing and validation of PRisM on operational tasks. We conducted an initial validation in collaboration with the Behavioral Health and Performance (BHP) lab. We test PRisM using data on their operationally relevant task ROBoT-r, a track-and-capture task for grappling incoming resupply vehicles [2]. Several other labs at NASA Johnson Space Center worked together to design 7 Functional Task Tests (FTTs) in pursuit of simulating the tasks required after landing on a planetary surface and after return to Earth [3]. Here we use the results from both ROBoT-r and the 7 FTTs and compare their experiment data to PRisM’s computational output to demonstrate how PRisM can support operations by predicting crew performance on future missions.

performance modeling↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Beyond the Prototype: The Design Evolution of a Deployed AI System

Our previous experiences with deployed intelligent control agents for NASA advanced life support systems (Schreckenghost et al., 2002) inspired us to develop the Distributed Collaboration and Interaction (DCI) system to help humans and mostly-autonomous software agents work together. We discovered many unaddressed needs for human interaction with control agents that operate continuously over months to years to monitor and perform process control for regenerative life support systems. These systems recover usable water or air from the waste products created by biological systems over time. Through the DCI project, we have addressed the needs for interaction between humans and autonomous control systems. This paper describes the software engineering aspects of our experiences, first, in designing and developing a prototype of the DCI system, and later, in adjusting the implementation to make the leap from initial prototype to a system ready to be applied under varying circumstances to meet different needs. The details in the paper focus primarily on the second stage of development. The DCI system is currently deployed, operating 24/7, to assist humans to interact with an advanced Water Recovery System (WRS). In addition, we have demonstrated an application of DCI to support ground personnel in mission support roles.

Martin, C.↗

Beyond the Prototype: The Design Evolution of a Deployed AI System

Our previous experiences with deployed intelligent control agents for NASA advanced life support systems (Schreckenghost et al., 2002) inspired us to develop the Distributed Collaboration and Interaction (DCI) system to help humans and mostly-autonomous software agents work together. We discovered many unaddressed needs for human interaction with control agents that operate continuously over months to years to monitor and perform process control for regenerative life support systems. These systems recover usable water or air from the waste products created by biological systems over time. Through the DCI project, we have addressed the needs for interaction between humans and autonomous control systems. This paper describes the software engineering aspects of our experiences, first, in designing and developing a prototype of the DCI system, and later, in adjusting the implementation to make the leap from initial prototype to a system ready to be applied under varying circumstances to meet different needs. The details in the paper focus primarily on the second stage of development. The DCI system is currently deployed, operating 24/7, to assist humans to interact with an advanced Water Recovery System (WRS). In addition, we have demonstrated an application of DCI to support ground personnel in mission support roles.

Martin, Cheryl↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Rancor-HUNTER: A Virtual Plant and Operator Environment for Predicting Human Performance

Advances in simulation capabilities to model physical systems have outpaced the development of simulations for humans using those physical systems. There is an argument that the infinite span of potential human behaviors inherently render human modeling more challenging than physical systems. Despite this challenge, the need for modeling humans interacting with these complex systems is paramount. As technologies have improved, many of the failure modes originating from the physical systems have been solved. This means the overall proportion of human errors has increased, such that it is not uncommon to be the primary driver of system failure in modern complex systems. Moreover, technologies such as automated systems may introduce emerging contexts that can cause new, unanticipated modes of human error. Therefore, it is now more important than ever to develop models of human behavior to realize overall system error reductions and achieve established safety margins. To support new and novel concepts of operations for the anticipated wave of advanced nuclear reactor deployments, human factors and human reliability analysis researchers need to develop advanced simulation-based approaches. This talk presents a simulation environment suitable to both collect data and then perform Monte Carlo simulations to evaluate human performance and develop better models of human behavior. Specifically, the Rancor Microworld Simulator models a complex energy production system in a simplified manner. Rancor includes computer-based procedures, which serve as a framework to automatically classify human behaviors without manual, subjective experimenter coding during scenarios. This method supports a detailed level of analysis at the task level. It is feasible for collecting large sample sizes required to develop quantitative modelling elements that have historically challenged traditional full-scope simulator study approaches. Additionally, the other portion of this experimental platform, the Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER), is presented to show how the collected data can be used to evaluate novel scenarios based on the contextual factors, or performance shaping factors, derived from Rancor simulations. Rancor-HUNTER is being used to predict operator performance with new procedures, such as results from control room modernization or new-build situations. Rancor-HUNTER is also proving a useful surrogate platform to model human performance for other complex systems.

99 GENERAL AND MISCELLANEOUS↗

Assessment of Electric Grid Transmission System Simulator for Human Factors Research

Over the past decades, various technologies have been developed for electric grid operations to support clean energy, meet rising electricity demands, and address infrastructure concerns. However, the human factors aspect is often overlooked during rapid integration. Questions persist about how these technologies impact human performance. Simulators play a critical role in supporting investigation of human factors design concepts and conducting comprehensive usability testing to evaluate human performance and assess human reliability. This paper aims to address human factors research simulator requirements and conduct a comparative study of six different simulators. A detailed evaluation reveals that the evaluated simulators lack the ability to customize user interfaces. Additionally, their user interface designs do not fulfill the basic human factors design principles, potentially leading to increased response variability and reduced statistical power when conducting controlled experimental research. In the future, it is essential to develop scripting tools to integrate customizable user interfaces and simulation models, ensuring meeting research requirements.

Li, Ruixuan↗

Human-Centered Operations

Efforts to improve operational safety often focus on preventing human error. But humans don't just make mistakes. They do, in fact, make a tremendous contribution to operational safety, and there is much to learn from what goes right. To support people in their role, the operation should be human-centered. To make the operation human-centered, the framework of the 4Ps can be used to create a clear, coherent, consistent and comprehensive guidance.

flight safety↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Human Exploration System Test-Bed for Integration and Advancement (HESTIA) Support of Future NASA Deep-Space Missions

The Engineering Directorate at the NASA - Johnson Space Center is outfitting a 20-Foot diameter hypobaric chamber in Building 7 to support future deep-space Environmental Control & Life Support System (ECLSS) research as part of the Human Exploration System Test-bed for Integration and Advancement (HESTIA) Project. This human-rated chamber is the only NASA facility that has the unique experience, chamber geometry, infrastructure, and support systems capable of conducting this research. The chamber was used to support Gemini, Apollo, and SkyLab Missions. More recently, it was used to conduct 30-, 60-, and 90-day human ECLSS closed-loop testing in the 1990s to support the International Space Station and life support technology development. NASA studies show that both planetary surface and deep-space transit crew habitats will be 3-4 story cylindrical structures driven by human occupancy volumetric needs and launch vehicle constraints. The HESTIA facility offers a 3-story, 20-foot diameter habitat consistent with the studies' recommendations. HESTIA operations follow stringent processes by a certified test team that including human testing. Project management, analysis, design, acquisition, fabrication, assembly and certification of facility build-ups are available to support this research. HESTIA offers close proximity to key stakeholders including astronauts, Human Research Program (who direct space human research for the agency), Mission Operations, Safety & Mission Assurance, and Engineering Directorate. The HESTIA chamber can operate at reduced pressure and elevated oxygen environments including those proposed for deep-space exploration. Data acquisition, power, fluids and other facility resources are available to support a wide range of research. Recently completed HESTIA research consisted of unmanned testing of ECLSS technologies. Eventually, the HESTIA research will include humans for extended durations at reduced pressure and elevated oxygen to demonstrate very high reliability of critical ECLSS and other technologies.

Marmolejo, Jose↗

Supporting Exploration Missions by Enabling Exploration Mission System Software

Future exploration missions will consist of a multitude of data sources, systems, and operators collaborating to complete mission objectives. Presently, NASA is instantiating the contractual mechanisms, such as the Exploration Extravehicular Activity Services (xEVAS) and Human Landing System (HLS) contracts, to produce these mission assets. Architectural planning is also underway to establish the networking protocols and infrastructure to digitally create and connect mission elements, such as LunaNET. However, without new horizontally integrated data systems, these advancements will be limited in their ability to get mission data appropriately integrated into the plan, train, fly, explore workflow of the flight operations workforce. Here we describe several mission system software development efforts underway that are designed to support human spaceflight missions. This paper describes the current iterations of a suite of tools to support EVA procedure authoring and execution, and mission context creation for both International Space Station (ISS) and Artemis missions. These tools have been developed iteratively and continue to be used in present-day ISS operations on orbit and in several NASA facilities such as the Neutral Buoyancy Lab (NBL) and Artemis field testing. These solutions demonstrate how software development can be aligned with ongoing operations development activities to discover the features that best support both current and future human spaceflight missions.

Matthew J. Miller↗

Supporting Exploration Missions by Enabling Exploration Mission System Software

Future exploration missions will consist of a multitude of data sources, systems, and operators collaborating to complete mission objectives. Presently, NASA is instantiating the contractual mechanisms, such as the Exploration Extravehicular Activity Services (xEVAS) and Human Landing System (HLS) contracts, to produce these mission assets. Architectural planning is also underway to establish the networking protocols and infrastructure to digitally create and connect mission elements, such as LunaNET. However, without new horizontally integrated data systems, these advancements will be limited in their ability to get mission data appropriately integrated into the plan, train, fly, explore workflow of the flight operations workforce. Here we describe several mission system software development efforts underway that are designed to support human spaceflight missions. This paper describes the current iterations of a suite of tools to support EVA procedure authoring and execution, and mission context creation for both International Space Station (ISS) and Artemis missions. These tools have been developed iteratively and continue to be used in present-day ISS operations on orbit and in several NASA facilities such as the Neutral Buoyancy Lab (NBL) and Artemis field testing. These solutions demonstrate how software development can be aligned with ongoing operations development activities to discover the features that best support both current and future human spaceflight missions.

Matthew Miller↗

Robonaut 2 and You: Specifying and Executing Complex Operations

Crew time is a precious resource due to the expense of trained human operators in space. Efficient caretaker robots could lessen the manual labor load required by frequent vehicular and life support maintenance tasks, freeing astronaut time for scientific mission objectives. Humanoid robots can fluidly exist alongside human counterparts due to their form, but they are complex and high-dimensional platforms. This paper describes a system that human operators can use to maneuver Robonaut 2 (R2), a dexterous humanoid robot developed by NASA to research co-robotic applications. The system includes a specification of constraints used to describe operations, and the supporting planning framework that solves constrained problems on R2 at interactive speeds. The paper is developed in reference to an illustrative, typical example of an operation R2 performs to highlight the challenges inherent to the problems R2 must face. Finally, the interface and planner is validated through a case-study using the guiding example on the physical robot in a simulated microgravity environment. This work reveals the complexity of employing humanoid caretaker robots and suggest solutions that are broadly applicable.

Baker, William↗