Search NASA⌕ Search

SEARCH · Search NASA

Results for “launcher”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Rocket/launcher structural dynamics

The equations of motion describing the interactions between a rocket and a launcher were derived using Lagrange's Equation. A rocket launching was simulated. The motions of both the rocket and the launcher can be considered in detail. The model contains flexible elements and rigid elements. The rigid elements (masses) were judiciously utilized to simplify the derivation of the equations. The advantages of simultaneous shoe release were illustrated. Also, the loading history of the interstage structure of a boosted configuration was determined. The equations shown in this analysis could be used as a design tool during the modification of old launchers and the design of new launchers.

Ferragut, N. J.↗

Electromagnetically launched micro spacecraft for space science missions

This paper presents the concept of using very small spacecraft launched by an electromagnetic launcher located in low earth orbit to perform space science missions. This paper includes a discussion of flight time versus distance performance, potential missions, electromagnetic launchers, micro spacecraft concepts, high G technology and a conceptual launcher design. It is suggested that the present is an especially good time to investigate the subject concept due to the current launch vehicle crisis for space science, and due to the large amounts of resources that the SDIO is spending on the development of the technology for electromagnetic launchers and projectiles.

Jones, Ross M.↗

Tether deployment monitoring system, phase 2

An operational Tether Deployment Monitoring System (TEDEMS) was constructed that would show system functionality in a terrestrial environment. The principle function of the TEDEMS system is the launching and attachment of reflective targets onto the tether during its deployment. These targets would be tracked with a radar antenna that was pointed towards the targets by a positioning system. A spring powered launcher for the targets was designed and fabricated. An instrumentation platform and launcher were also developed. These modules are relatively heavy and will influence tether deployment scenarios, unless they are released with a velocity and trajectory closely matching that of the tether. Owing to the tracking range limitations encountered during field trails of the Radar system, final TEDEMS system integration was not completed. The major module not finished was the system control computer. The lack of this device prevented any subsystem testing or field trials to be conducted. Other items only partially complete were the instrumentation platform launcher and modules and the radar target launcher. The work completed and the tests performed suggest that the proposed system continues to be a feasible approach to tether monitoring, although additional effort is still necessary to increase the range at which modules can be detected. The equipment completed and tested, to the extent stated, is available to NASA for use on any future program that requires tether tracking capability.

Source record↗

Langley proposed advanced hypervelocity aerophysics facility - A status report

A ground-based facility capable of performing flight tests on relatively large highly instrumented models and scaled vehicle components at velocities and densities representative of a hypervelocity flight in earth and planetary atmospheres is reviewed. This facility proposed by the Langley Research Center is based on a launcher, a test chamber, and a model impact/deceleration chamber. It would initially utilize existing light-gas gun launcher technology scaled to 4 times present launcher size. It is planned to enhance its velocity and model size capability either by an electromagnetic launcher or a ram accelerator.

Witcofski, Robert D.↗

A New Technique for Achieving Impact Velocities Greater Than 10 km/sec

This Contractor Report describes and presents the results of work that was done in an attempt to develop an augmented acceleration technique that would launch small projectiles of known shape, mass, and state to velocities of 10 km/sec and higher. The higher velocities were to be achieved by adding a third stage to a conventional two-stage, light-gas gun and using a modified firing cycle for the third stage. The technique did not achieve the desired results and was modified for use during the development program. Since the design of the components used for the augmented-acceleration, three-stage launcher could be readily adapted for use as a three-stage launcher that used a single-stage acceleration cycle; the remainder of the contract period was spent performing test firings using the modified three-stage launcher. Work with the modified three-stage launcher, although not complete, did produce test firings in which an 0.11-g cylindrical nylon projectile was launched to a velocity of 8.65 km/sec.

Piekutowski, A. J.↗

Near-Earth Phase Risk Comparison of Human Mars Campaign Architectures

A risk analysis of the launch, orbital assembly, and Earth-departure phases of human Mars exploration campaign architectures was completed as an extension of a probabilistic risk assessment (PRA) originally carried out under the NASA Constellation Program Ares V Project. The objective of the updated analysis was to study the sensitivity of loss-of-campaign risk to such architectural factors as composition of the propellant delivery portion of the launch vehicle fleet (Ares V heavy-lift launch vehicle vs. smaller/cheaper commercial launchers) and the degree of launcher or Mars-bound spacecraft element sparing. Both a static PRA analysis and a dynamic, event-based Monte Carlo simulation were developed and used to evaluate the probability of loss of campaign under different sparing options. Results showed that with no sparing, loss-of-campaign risk is strongly driven by launcher count and on-orbit loiter duration, favoring an all-Ares V launch approach. Further, the reliability of the all-Ares V architecture showed significant improvement with the addition of a single spare launcher/payload. Among architectures utilizing a mix of Ares V and commercial launchers, those that minimized the on-orbit loiter duration of Mars-bound elements were found to exceed the reliability of no spare all-Ares V campaign if unlimited commercial vehicle sparing was assumed

Manning, Ted A.↗

Surface Wave Based Non-conductor-contact Reflectometry Method for Insulation and Jacket Damage Detection in Multi-Conductor Cables

This paper presents a non-conductor-contact surface wave reflectometry technique to locate insulation and jacket damage on multi-conductor cables at a distant location from the sensor. Simulation studies were conducted using Ansys high frequency structure simulator (HFSS). A GHz range surface wave launcher was employed such that maximum surface wave energies were confined in the insulation layer while minimizing attenuation. The wave launcher can potentially be mounted on the outer surface of live cables or cable conduits and requires no physical connection to the conductors. Multiple simulations involving a 4 GHz wave launcher and a three-conductor cable with an 8 mm outer diameter were carried out demonstrating the efficacy of the proposed method. Water leak and different types of insulation/jacket damage were simulated and detected.

reflectometry, multi-conductor cable, frequency do↗

Concept definition study for an extremely large aerophysics range facility

A conceptual design of a very large aeroballistic range is presented, as are its operational characteristics and procedures. The proposed model launcher is a two-stage light-gas gun, having a launch tube diameter of 254 mm, and the capability of accelerating a 14 kg launch mass to 6.1 km/sec. The gun's 91.4 cm diameter piston is driven by pressurized helium. High pressures in the central breech are contained by a multiple disk arrangement. The blast tank and sabot separation tank are described, as are methods for arresting sabot segments. The conceptual design of the range itself includes a 3.3 m diameter test or flight chamber some 330 m in length. Provisions are made for testing of free flight models and tests in which the model is confined by a track system. Methods for model deceleration and recovery are described. Provisions required for future addition of advanced model launchers such as an electromagnetic launcher or ram accelerator are addressed. Siting and safety issues are also addressed.

Swift, Hallock F.↗

Analysis Method for Non-Nominal First Acquisition

First this paper describes a method how the trajectory of the launcher can be modelled for the contingency analysis without having much information about the launch vehicle itself. From a dense sequence of state vectors a velocity profile is derived which is sufficiently accurate to enable the Flight Dynamics Team to integrate parts of the launcher trajectory on its own and to simulate contingency cases by modifying the velocity profile. Then the paper focuses on the thorough visibility analysis which has to follow the contingency case or burn performance simulations. In the ideal case it is possible to identify a ground station which is able to acquire the satellite independent from the burn performance. The correlations between the burn performance and the pointing at subsequent ground stations are derived with the aim of establishing simple guidelines which can be applied quickly and which significantly improve the chance of acquisition at subsequent ground stations. In the paper the method is applied to the Soyuz/Fregat launch with the MetOp satellite. Overall the paper shows that the launcher trajectory modelling with the simulation of contingency cases in connection with a ground station visibility analysis leads to a proper selection of ground stations and acquisition methods. In the MetOp case this ensured successful contact of all ground stations during the first hour after separation without having to rely on any early orbit determination result or state vector update.

Sieg, Detlef↗

Space Propulsion Design and Analysis

This software provides an improved methodology for predicting launcher base pressure and heat loads for RSRM (Reusable Solid Rocket Motor) launchers by accounting for complex anisotropic stress/strains and variable turbulent Prandtl and Schmidt numbers. A "building block" approach to turbulence model development, and validation has been applied for improved missile/launcher base region analysis. Modifications to existing kappa - epsilon turbulence models and application of scalar variance models are incorporated into a RANS-based method for aeropropulsive flow modeling, directly related to base flow methodology. (RANS stands for Reynolds-averaged Navier-Stokes.) The models are applied in a RANS solver framework and can improve analysis of other complex flow fields. The enhanced models provide a more accurate predictive capability for improving the design and analysis of RSRM launcher configuration. The kappa - epsilon model enhancements have been shown to improve the capability for predicting turbulence effects in base blow environments. The scalar variance models have been assessed over a wide range of flow configurations to improve prediction of turbulent scalar mixing.

Sinha, Neeraj↗

Estimating the Reliability of a Soyuz Spacecraft Mission

Once the US Space Shuttle retires in 2010, the Russian Soyuz Launcher and Soyuz Spacecraft will comprise the only means for crew transportation to and from the International Space Station (ISS). The U.S. Government and NASA have contracted for crew transportation services to the ISS with Russia. The resulting implications for the US space program including issues such as astronaut safety must be carefully considered. Are the astronauts and cosmonauts safer on the Soyuz than the Space Shuttle system? Is the Soyuz launch system more robust than the Space Shuttle? Is it safer to continue to fly the 30 year old Shuttle fleet for crew transportation and cargo resupply than the Soyuz? Should we extend the life of the Shuttle Program? How does the development of the Orion/Ares crew transportation system affect these decisions? The Soyuz launcher has been in operation for over 40 years. There have been only two loss of life incidents and two loss of mission incidents. Given that the most recent incident took place in 1983, how do we determine current reliability of the system? Do failures of unmanned Soyuz rockets impact the reliability of the currently operational man-rated launcher? Does the Soyuz exhibit characteristics that demonstrate reliability growth and how would that be reflected in future estimates of success? NASA s next manned rocket and spacecraft development project is currently underway. Though the projects ultimate goal is to return to the Moon and then to Mars, the launch vehicle and spacecraft s first mission will be for crew transportation to and from the ISS. The reliability targets are currently several times higher than the Shuttle and possibly even the Soyuz. Can these targets be compared to the reliability of the Soyuz to determine whether they are realistic and achievable? To help answer these questions this paper will explore how to estimate the reliability of the Soyuz Launcher/Spacecraft system, compare it to the Space Shuttle, and its potential impacts for the future of manned spaceflight. Specifically it will look at estimating the Loss of Mission (LOM) probability using historical data, reliability growth, and Probabilistic Risk Assessment techniques

Lutomski, Michael G.↗

Estimating the Loss of Crew and Loss of Mission for Crew Spacecraft

Once the US Space Shuttle retires in 2011, the Russian Soyuz Launcher and Soyuz Spacecraft will comprise the only means for crew transportation to and from the International Space Station (ISS). The U.S. Government and NASA have contracted for crew transportation services to the ISS with Russia. The resulting implications for the US space program including issues such as astronaut safety must be carefully considered. Are the astronauts and cosmonauts safer on the Soyuz than the Space Shuttle system? Is the Soyuz launch system more robust than the Space Shuttle? The Soyuz launcher has been in operation for over 40 years. There have been only two loss of life incidents and two loss of mission incidents. Given that the most recent incident took place in 1983, how do we determine current reliability of the system? Do failures of unmanned Soyuz rockets impact the reliability of the currently operational man-rated launcher? Does the Soyuz exhibit characteristics that demonstrate reliability growth and how would that be reflected in future estimates of success? NASA s next manned rocket and spacecraft development project will have to meet the Agency Threshold requirements set forth by NASA. The reliability targets are currently several times higher than the Shuttle and possibly even the Soyuz. Can these targets be compared to the reliability of the Soyuz to determine whether they are realistic and achievable? To help answer these questions this paper will explore how to estimate the reliability of the Soyuz Launcher/Spacecraft system, compare it to the Space Shuttle, and its potential impacts for the future of manned spaceflight. Specifically it will look at estimating the Loss of Crew (LOC) and Loss of Mission (LOM) probability using historical data, reliability growth, and Probabilistic Risk Assessment techniques used to generate these numbers.

Lutomski, Michael G.↗

Multidisciplinary Dynamic Testing Challenges in Validating the NASA Artemis Architecture

NASA is in the midst of bold and exciting next steps in human exploration and spaceflight. The designs of the new Space Launch System (SLS), the Orion spacecraft and the Exploration Ground Systems (EGS) for vehicle processing and launch are essentially complete and there has been significant progress in manufacturing and assembly of specific hardware for the Artemis I and Artemis II missions. Equally as important, the program level and integrated system level testing and analyses are also well underway to support integrated verification, validation, and certificate of flight readiness (CoFR) for the first Artemis mission. Testing and analysis are key to addressing technical challenges that the Artemis missions offer. Building block approaches are required that provide the right balance between component, system, and/or element level testing that satisfies verification and validation objectives and where, uncertainties are quantified and minimized. Artemis I is a system of systems that requires a fusion of test and analysis that adeptly characterizes critical interfaces between major program elements. NASA is implementing new in-situ testing that fuse traditional aerospace structures with civil structures, such as the Integrated Modal Test for the Artemis I vehicle where the Mobile Launcher and Crawler Transporter serve as a support structure whose dynamics couple with that of the Artemis I vehicle. This new paradigm requires a closer inspection of structural behavior of the Crawler Transporter and the Mobile Launcher as they now serve multiple purposes. This requires a paradigm shift to look beyond experimental modal techniques and incorporates operational modal analysis techniques to validate dynamic models from data collected during rollout to the launch pad. A further complicating factor is the Crawler Transporter generated ground forces have numerous harmonics making extracting dynamic responses of the Artemis I, Mobile Launcher, and Crawler Transporter coupled system challenging. This discussion explores all these challenges with and attempts to understand how we best build confidence in systems and system-of-systems performance capabilities and margins and understand uncertainties.

Joel W Sills↗

Design of a Jettison System For Space Transit Vehicles

Many options to re-use waste are currently being developed by NASA. These include combustion, compaction, torrefaction, and converting waste materials to an easily stored base polymer for future use. Human exploration missions require large amounts of supplies such as food, clothing and spare parts. A many-month journey to Mars will result in the generation of a substantial amount of problematic waste products. It is thought that this waste must be discarded to enable a Mars transit mission. The most cost-effective, reliable, and safest method to address this problem may be to simply jettison these materials from the spacecraft. The ability to jettison requires a multi-component integrated system design. Major components include a launcher, airlocks, trash bags, and tracking system. Depending upon mission requirements, a jettison dedicated airlock may be necessary. In other cases, the crew airlock might be all that’s needed. Examples of what to jettison include food waste, fecal containers, broken equipment, foam, expendables, hygiene products, health items, wipes, and clothing. The most important design factor is always crew safety. Other features to consider are loss of air due to the inefficiencies of vacuum pumps in the airlock, outgassing from the bags, and liquids condensing on the airlock that result in unwanted coatings. The launching system design must consider many different features: while in planetary orbit, a minimum exit velocity is necessary so the jettisoned material will not complete an orbit only to return and strike the ship. Also, for planetary protection issues, enabling waste to be sent to distant non-critical locations is highly desirable. When the space craft is in planetary transit to say, Mars, the jettison exit velocity should be low if the material is not released along the direction of travel. This is to minimize trajectory perturbations due to jettison-imposed torque on the spacecraft. Design considerations for the launcher include exit velocity, power consumption, volume and mass of material jettisoned, and frequency of jettison. Finally, the launcher must be able to handle many different types and shapes of waste products. This paper will discuss these design issues and give guidance to a pathway forward.

Steve Sepka↗

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

ITER ECH Transmission Line System Design and Status

The electron cyclotron (EC) heating & current drive (H&CD) system on ITER provides plasma heating by generating, transmitting, and launching high-intensity, high-frequency (170 GHz) electromagnetic wave energy steerable across the plasma cross-section. The transmission line (TL) subsystem connects the Matching Optics Unit (MOU) on each of the 24 gyrotrons to the 32 feed points in the four upper launchers and the 24 feed points in the equatorial launcher. Each TL must be able to operate at up to 1.2 MW of input power for up to 1 hour pulse lengths. The TL system contains 50 mm water-cooled corrugated waveguide, 90o miter bends, 140o miter bends, polarizer miter bend pairs, switches, expansion units, pumpouts, DC breaks, MOU-TL adapters, Radio Frequency (RF) loads, and isolation shutter valves. A detailed finite element analysis has been used to verify the thermo-mechanical performance of each component. The microwave performance has been analyzed using a 2-D electromagnetic code combined with a Monte Carlo code. This approach allows the impact of manufacturing and installation tolerances to be assessed and optimized to provide a high probability of achieving the system performance requirements. Prototypes of the waveguide and TL components have been fabricated and tested at high-power. Production contracts are now being issued for fabrication and delivery of the waveguide and components to ITER.

Hanson, Gregory↗