Search NASA⌕ Search

SEARCH · Search NASA

Results for “lift modulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Entry Guidance for the 2011 Mars Science Laboratory Mission

The 2011 Mars Science Laboratory will be the first Mars mission to attempt a guided entry to safely deliver the rover to a touchdown ellipse of 25 km x 20 km. The Entry Terminal Point Controller guidance algorithm is derived from the final phase Apollo Command Module guidance and, like Apollo, modulates the bank angle to control the range flown. For application to Mars landers which must make use of the tenuous Martian atmosphere, it is critical to balance the lift of the vehicle to minimize the range error while still ensuring a safe deploy altitude. An overview of the process to generate optimized guidance settings is presented, discussing improvements made over the last nine years. Key dispersions driving deploy ellipse and altitude performance are identified. Performance sensitivities including attitude initialization error and the velocity of transition from range control to heading alignment are presented.

Mendeck, Gavin F.↗

Post-Flight EDL Entry Guidance Performance of the 2011 Mars Science Laboratory Mission

The 2011 Mars Science Laboratory was the first successful Mars mission to attempt a guided entry which safely delivered the rover to a final position approximately 2 km from its target within a touchdown ellipse of 19.1 km x 6.9 km. The Entry Terminal Point Controller guidance algorithm is derived from the final phase Apollo Command Module guidance and, like Apollo, modulates the bank angle to control the range flown. For application to Mars landers which must make use of the tenuous Martian atmosphere, it is critical to balance the lift of the vehicle to minimize the range error while still ensuring a safe deploy altitude. An overview of the process to generate optimized guidance settings is presented, discussing improvements made over the last nine years. Key dispersions driving deploy ellipse and altitude performance are identified. Performance sensitivities including attitude initialization error and the velocity of transition from range control to heading alignment are presented. Just prior to the entry and landing of MSL in August 2012, the EDL team examined minute tuning of the reference trajectory for the selected landing site, analyzed whether adjustment of bank reversal deadbands were necessary, the heading alignment velocity trigger was in union with other parameters to balance the EDL risks, and the vertical L/D command limits. This paper details a preliminary postflight assessment of the telemetry and trajectory reconstruction that is being performed, and updates the information presented in the former paper Entry Guidance for the 2011 Mars Science Laboratory Mission (AIAA Atmospheric Flight Mechanics Conference; 8-11 Aug. 2011; Portland, OR; United States)

Mendeck, Gavin F.↗

Skylab 1 and 2 - Pilots' report

Details of powered flight are considered, giving attention to the lift-off, engine thrust, and separation from the S-1VB stage. The rendezvous checklist was performed on time and exactly prior to the first phasing maneuver. The Command Service Module was finally maneuvered to a position for hard docking. Attention is given to aspects of extravehicular activity during the mission and delays experienced in the separation procedure.

Charles Conrad, Jr.↗

STS-110/Atlantic/ISS 8A Pre-Launch On Orbit-Landing-Crew Egress

The crew of STS-110, which consists of Commander Michael Bloomfield, Pilot Stephen Frick, and Mission Specialists Rex Walheim, Ellen Ochoa, Lee Morin, Jerry Ross, and Steven Smith is introduced at the customary pre-flight meal. The narrator provides background information on the astronauts during suit-up. Each crew member is shown in the White Room before boarding Space Shuttle Atlantis, and some display signs to loved ones. Launch footage includes the following replays: Beach Tracker, VAB, Pad B, Tower 1, DLTR-3, Grandstand, Cocoa Beach DOAMS, Playalinda DOAMS, UCS-23, SLF Convoy, OTV-154, OTV-163, OTV-170 (mislabeled), and OTV-171 (mislabeled). After the launch, NASA administrator Sean O'Keefe gives a speech to the Launch Control Center, with political dignitaries present. While on-orbit, Atlantis docks with the International Space Station (ISS), and Canadarm 2 on the ISS lifts the S0 Truss out of the orbiter's payload bay. The video includes highlights of three extravehicular activities (EVAs). In the first, the S0 Truss is fastened to the Destiny Laboratory Module on the ISS. During the third EVA, Walheim and Smith assist in the checkout of the handcart on the S0 Truss. The Atlantis crew is shown gathered together with the Expedition 4 crew of the ISS, and again by itself after undocking. Replays of the landing include: VAB, Tower 1, Mid-field, Runway South End, Runway North End, Tower 2, Playalinda DOAMS, Cocoa Beach DOAMS, and Pilot Point of View (PPOV). After landing, Commander Bloomfield lets each of his crew members give a short speech.

Source record↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying a "Proving Ground" near the Moon to conduct human space exploration missions in preparation for future flights to Mars. This paper describes a concept of operations ("conops") for activities in the Proving Ground, focusing on the construction and use of a mobile Cislunar Transit Habitat capable of months-long excursions within and beyond the Earth-Moon system. Key elements in the conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System heavy-lift rocket. Potential additions include commercial launch vehicles and logistics carriers, solar electric propulsion stages to move elements between different orbits and eventually take them on excursions to deep space, a node module with multiple docking ports, habitation and life support blocks, and international robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The conops describes "case studies" of notional missions chosen to guide the design of the architecture and its elements. One such mission is the delivery of a ~10-ton pressurized element, co-manifested with an Orion on a Block 1B Space Launch System rocket, to the Proving Ground. With a large solar electric propulsion stage, the architecture could enable a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to safely quantify the risk of landing deconditioned crews on Mars. The conops also discusses aborts and contingency operations. Early return to Earth may be difficult, especially during later Proving Ground missions. While adding risk, limited-abort conditions provide needed practice for Mars, from which early return is likely to be impossible.

Love, Stanley G.↗

Ares V: Shifting the Payload Design Paradigm

NASA's Ares V heavy-lift cargo launch vehicle is being designed send more crew and cargo to more places on the lunar surface than the 1960s-era Apollo program and provide ongoing support to a permanent lunar outpost. In addition to that role, however, its unmatched mass and volume capability represent a global asset for exploration, science, and commerce. The Ares V also is an enabler of a large class of space missions not thought possible by scientists and engineers since the Saturn V program ended over 30 years ago. Compared to current systems, it will offer approximately 5 times the mass and volume to most orbits and locations. This should allow prospective mission planners to build robust payloads with margins that are 3 to 5 times the industry norm. The space inside the planned payload shroud has enough usable volume to launch the volumetric equivalent of approximately 10 Apollo Lunar Excursion Modules or approximately 5 equivalent Hubble Space Telescopes. This mass and volume capability to Low Earth Orbit enables a host of new scientific and observation platforms, such as telescopes, satellites, planetary and solar missions, as well as being able to provide the lift for future large in-space infrastructure missions, such as space based power and mining, Earth asteroid defense, propellant depots, etc. The Ares V team is engaging the potential payload community now, 2-3 years before System Requirements Review, in order to better understand the potential limitations and or additional requirements that could be added to the Ares V from the mission planning community. If a viable mission is determined and added to the Ares V as a design case, tradeoffs will be conducted to determine if other mission design requirements can be included in the system. Multiple shroud options for the Ares V have been analyzed to identify their impact on performance. Ares V is in a conceptual design stage prior to a formal design phase. The initial concept for the cargo launch vehicle (CaLV) that would later be dubbed "Ares V" was produced by the Exploration Systems Architecture Study in 2005. Since then, it has evolved through hundreds of concepts. The current point-of-departure (POD) concept was approved during the Lunar Capabilities Concept Review/Ares V Mission Concept Review in June 2008. This reference concept serves as a starting point for a renewed set of design trades and detailed analysis into its interaction with the other components of the Constellation architecture and existing launch infrastructure. This paper will discuss the Ares V design evolution, the most recent point-of-departure concept, and its capabilities to support future science missions.

Summrall, Phil↗

Shuttle/Centaur Upper Stage Capability

A joint project to design, develop, procure, and produce Centaur upper stages for use with the Space Shuttle is discussed. A common Centaur G stage 6 meters (19.5 feet) in length is being jointly developed. A longer version designated Centaur G Prime is being developed by NASA to accomplish the Galileo and International Solar-Polar Mission flights in 1986. The Centaur G and G Prime will have the capability to place, respectively, approximately 4540 kilograms (10,000 pounds) and 5910 kilograms (13,000 pounds) into geosynchronous orbit from a standard Shuttle parking orbit of 278 kilometers (150 nautical miles) and Shuttle performance (lift) capability 29,500 kilograms (65,000 pounds). The advent of high energy upper stage capability in 1986 will permit space users and spacecraft developers to utilize spacecraft growth, stage combination concepts with storage modules, teleoperator systems, and other mission peculiar devices to satisfy complex mission demands. These capabilities should greatly enhance the usefulness of the space environment and stimulate mission planners toward conception of innovative means to meet ever increasing mission requirements.

Clark, H. J.↗

PAYCOS: A new multidisciplinary analysis program for hypersonic vehicle design

The Payload Conceptual Sizing Code (PAYCOS), a new multidisciplinary computer program for use in the conceptual development phase of hypersonic lifting vehicles (HV's), is described. The program allows engineers to rapidly determine the feasibility of an HV concept and then improve upon the concept by means of optimization theory. The code contains analysis modules for aerodynamics, thermodynamics, mass properties, flight stability, controls, loads, structures, and packaging. Motivation for the code lies with the increased complexity of HV's over their body-of-revolution ballistic predecessors. With these new shapes, the need to rapidly screen out poor concepts and actively develop new and better concepts is an even more crucial part of the early design process. Preliminary results are given which demonstrate the optimization capabilities of the code.

Stubbe, J. R.↗

Ares V: Shifting the Payload Design Paradigm

NASA is designing the Ares V heavy-lift cargo launch vehicle to send more crew and cargo to more places on the lunar surface than the 1960s-era Saturn V and to provide ongoing support for a permanent lunar outpost. This uncrewed cargo vehicle is designed to operate together with the Ares I crew vehicle (Figure 1). In addition to this role, however, its unmatched mass and volume capability represent a national asset for exploration, science, and commerce. The Ares V also enables or significantly enhances a large class of space missions not thought possible by scientists and engineers since the Saturn V program ended over 30 years ago. Compared to current systems, it will offer approximately five times the mass and volume to most orbits and locations. This should allow prospective mission planners to build robust payloads with margins that are three to five times the industry norm. The space inside the planned payload shroud has enough usable volume to launch the volumetric equivalent of approximately 10 Apollo Lunar Modules or approximately five equivalent Hubble Space Telescopes. This mass and volume capability to low-Earth orbit (LEO) enables a host of new scientific and observation platforms, such as telescopes, satellites, planetary and solar missions, as well as being able to provide the lift for future large in-space infrastructure missions, such as space based solar power and mining, Earth asteroid defense, propellant depots, etc. In addition, payload designers may also have the option of simplifying their designs or employing Ares V s payload as dumb mass to reduce technical and operational risk. The Ares V team is engaging the potential payload community now, two to three years before System Requirements Review (SRR), in order to better understand the additional requirements from the payload community that could be accommodated in the Ares V design in its conceptual phase. This paper will discuss the Ares V reference mission and capability, as well as its potential to perform other missions in the future.

Sumrall, Phil↗

The International Orion Spacecraft Is off Towards the Stars

Following a very successful year of manufacturing, assembly and testing in factories located around the globe, NASA and ESA are preparing to deliver the major Exploration Mission-1 (EM-1) Orion flight elements, including the Crew Module, ESA Service Module and Launch Abort System. This international effort to design and develop a deep space exploration capable human spacecraft is rapidly transitioning from the design, development and test phase to the early test flight and production phase. Two major flight tests, an Ascent Abort test and EM-1, Orion's first flight onboard NASA's new heavy lift Space Launch System, are planned for the near future. Further, Orion will play a crucial role in the ambitious new Deep Space Gateway human exploration Program. This paper gives a short overview of the system and subsystem configuration of the Orion spacecraft, including NASA and ESA contributions, a status of EM-1, AA-2 and EM-2 spacecraft production, and a look at Orion's role in the construction and operation of the Deep Space Gateway. The paper will also address the innovative international cooperation methods being employed to conduct Orion and Service Module integration.

Kirasich, Mark↗

Objectives and Progress on Ground Vibration Testing for the Ares Projects

Integrated vehicle ground vibration testing (IVGVT) will be a vital component for ensuring the safety of NASA s next generation of exploration vehicles to send human beings to the Moon and beyond. A ground vibration test (GVT) measures the fundamental dynamic characteristics of launch vehicles during various phases of flight. The Ares Flight & Integrated Test Office (FITO) will be conducting the IVGVT for the Ares I crew launch vehicle at Marshall Space Flight Center (MSFC) from 2012 to 2014 using Test Stand (TS) 4550. MSFC conducted similar GVT for the Saturn V and Space Shuttle vehicles. FITO will perform the IVGVT on the Ares I crew launch vehicle, which will lift the Orion crew exploration vehicle to low Earth orbit, and the Ares V cargo launch vehicle, which can launch the lunar lander into orbit and send the combined Orion/lander vehicles toward the Moon. Ares V consists of a six-engine core stage with two solid rocket boosters and an Earth departure stage (EDS). The same engine will power the EDS and the Ares I second stage. The current plan is to test six configurations in three unique test positions inside TS 4550. Four Ares I second stage test configurations will be tested in Position 3, consisting of the Upper Stage and Orion crew module in four nominal conditions: J-2X engine ignition, post Launch Abort System (LAS) jettison, critical slosh mass, and J-2X burn-out. Position 2 consists of the entire launch stack at first stage burn-out (using empty first stage segments). Position 1 represents the entire launch stack at lift-off (using inert first stage segments). Because of long disuse, TS 4550 is being repaired and modified for reactivation to conduct the Ares I IVGVT. The Shuttle-era platforms have been removed and are being replaced with mast climbers that provide ready access to the test articles and can be moved easily to support different positions within the test stand. Two new cranes will help move test articles at the test stand and at the Redstone Arsenal rail-head where first stage segments will be received in late 2010. The electrical system for TS 4550 also will be upgraded. The Hydraulic Support Systems (HDSs) used for Saturn and Shuttle are being disassembled and evaluated for use during IVGVT. Analyses indicate that the 45-year-old HDSs can be refurbished to support the Ares I IVGT. An alternate concept for a pneumatic suspension system is also being explored. A decision on which suspension system configuration to use for IVGVT will be made in 2010.

Tuma, Margaret L.↗

Raked circular-cone aerobraking orbital transfer vehicle

An aerobraking orbital transfer vehicle (AOTV) (80) has aerobrake (82) with a blunted raked-off circular-cone configuration. The other components of the AOTV, including command/control module (95), fuel tanks (86, 88, 89 and 91), rocket engines (94) and afterbody (84), are positioned substantially along resultant force axis (104) of the AOTV (80). The axis (104) coincides with the resultant (sum of lift and drag) force vector. Afterbody (84) is mounted behind the aerobrake (82) with its length extending rearwardly from the aerobrake. The base flow clearance angle .phi. of the aerobrake (80) is 25.degree., thus allowing the afterbody (84) to extend rearwardly from the aerobrake (82) to a much greater extent than possible with a raked-off elliptic-cone aerobraking shield configuration. Afterbody size limitation and other problems associated with the raked-off elliptic-cone aerobraking shield configuration are alleviated by the combination of the aerobrake shape and positioning of the fuel tanks (86, 88, 89 and 91), rocket engines (94) and afterbody (84).

Park, Chul↗

Summary of Propulsion System Needs in Support of Project Constellation

In January 2004, the President of the United States established the Vision for Space Exploration (VSE) to return man to the moon and ultimately to extend manned space travel to Mars. This paper will summarize the manned space flight liquid propulsion system needs in support of Project Constellation over the next 10 years. It will include all engine needs to return man to the moon. An overview of engines currently under contract, those baselined but not yet under contract, and those engine needs that hav.e yet to be initiated. Project Constellation includes the components as shown Figure 1. Liquid propulsion systems supporting the manned portion of these elements include the following: the Crew Exploration Vehicle named Orion (crew module reaction control system (CMRCS), service module Orion Main Engine (OME), service module auxiliary RCS, and service module reaction control system (SMRCS)), the Crew Launch Vehicle named Ares 1 (J2X upper stage, first stage roll control system, second stage reaction control system, and the Ares I-X roll control system), the Heavy Lift Launch Vehicle named Ares V (RS68B first stage booster, J-2X upper stage, roll control systems, and the Earth Departure Stage (EDS) (powered by the same Ares V Upper Stage J-2X), and the Lunar Lander named Altair with both descent and ascent stages (lunar orbit insertion and descent main engine, ascent main engine, and attitude control systems for both stages). In addition, there may be additional engine needs for early demonstrators, but those will not be speculated on as part of this paper. Also, other portions of the VSE architecture, including the planned Orion abort demonstrations and the Lunar Precursor Robotic Program, are not addressed here as they either use solid motors or are focused on unmanned precursor missions.

Sumrall, Phil↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying conceptual architectures for a "Proving Ground" near the Moon or in high lunar orbit to conduct human space exploration missions that bridge the gap between today's operations with the International Space Station (ISS) and future human exploration of Mars beginning in the 2030s. This paper describes the framework of a concept of operations ("Conops") for candidate activities in the Proving Ground. The Conops discusses broad goals that the Proving Ground might address, such as participation from commercial entities, support for human landings on the Moon, use of mature technologies, and growth of capability through a steady cadence of increasingly ambitious piloted missions. Additional Proving Ground objectives are outlined in a companion paper. Key elements in the Conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System (SLS) heavy-lift rocket. Potential additions include a new space suit, commercial launch vehicles and logistics carriers, Solar Electric Propulsion (SEP) stages to move elements between different orbits and eventually take them on excursions to deep space, a core module with multiple docking ports, a habitation block, and robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. A module providing advanced regenerative life support functions could launch to the ISS, and later move to the Proving Ground. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The Conops describes notional missions chosen to guide the design of the architecture and its elements. One such mission might be the delivery of a approximately 10-t Transit Habitat element, comanifested with Orion on a Block 1B SLS launcher, to the Proving Ground. In another mission, the architecture might participate in direct human exploration of an asteroidal boulder brought to high lunar orbit by the Asteroid Redirect Mission. The Proving Ground stack could serve as a staging point and tele-operation center for robotic and piloted Moon landings. With the addition of a SEP stage, the architecture could support months-long excursions within and beyond the Earth's sphere of influence, possibly culminating in a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to quantify the risk of landing deconditioned crews on Mars. In a conceptual mission particularly stressing to system design, Proving Ground elements could transit to Mars orbit. Other possible design-driving operations include relocation of the stack with no crew on board, the unpiloted journey of the advanced life support module from ISS to the lunar vicinity, excursions to other destinations in near-Earth space, and additional support for Mars exploration in conjunction with the Evolvable Mars Campaign. The Proving Ground Conops concludes with a discussion of aborts and contingency operations

Love, Stanley G.↗

Moment Tensor Inversion Toolkit

The MTINV toolkit (2002-present) is a collection of computer codes and applications written to invert for the moment tensor of a seismic source given the three components of ground motion recorded at regional seismic stations (e.g., Ichinose et al., 2003). The computer codes and workflow are organized to generate moment tensor solutions for a range of source depths and origin times because of the trade-off between these two quantities. The metric used is the variance reduction and variance reduction modulated by the percent double-couple to determine the best-fit moment-tensor solution. We can solve for a deviatoric moment tensor with a constraint added for no isotropic component although this constraint can be lifted for estimating the full moment tensor like mining collapses or explosion sources.

Ichinose, GeneA↗

Electronically Variable Pressure Regulator (EVPR)

A new programmable electronically variable pressure regulator (EVPR) concept accurately controls the local outlet or remote system pressure. It uses an integral pulse width modulated rare earth permanent magnet motor operating in response to redundant pressure transducer feedback signals. The EVPR is a simple single stage device that does not use dynamic seals or pilot valving. Conversion of partial revolution motor torque to poppet lifting force is accomplished by pure flexure action to avoid using bearings. The flexure drive (called the ROTAX) has a variable lead to minimize motor weight and power consumption. Breadboard tests were completed successfully on two critical design elements of the EVPR: the ROTAX and the motor. The ROTAX cable system was tested for 250,000 cycles without failure. The breadboard motor met the basic design requirements including the design torque and power consumption. Prototype parts were fabricated, and testing of the prototype EVPR has started. It is PC computer controlled to facilitate programming, data acquisition and analysis. A lightweight dedicated microprocessor is planned for the flightweight EVPR.

Reinicke, R. H.↗

Heavy-lift vehicle-launched Space Station method and apparatus

Methods and apparatus are provided for a single heavylift launch to place a complete, operational space station on-orbit. A payload including the space station takes the place of a Shuttle Orbiter using the launch vehicle of the Shuttle Orbiter. The payload includes a forward shroud, a core module, a propulsion module, and a transition module between the core module and the propulsion module. The essential subsystems are pre-integrated and verified on Earth. The core module provides means for attaching international modules with minimum impact to the overall design. The space station includes six control moment gyros for selectably operating in either LVLH (local-vertical local-horizontal) or SI (solar inertial) flight modes.

Wade, Donald C.↗

Heavy-lift vehicle-launched Space Station method and apparatus

Methods and apparatus are provided for a single heavy-lift launch to place a complete, operational space station on-orbit. A payload including the space station takes the place of a shuttle orbiter using the launch vehicle of the shuttle orbiter. The payload includes a forward shroud, a core module, a propulsion module, and a transition module between the core module and the propulsion module. The essential subsystems are preintegrated and verified on Earth. The core module provides means for attaching international modules with minimum impact to the overall design. The space station includes six control moment gyros for selectably operating in either LVLH (local-vertical local-horizontal) or SI (solar inertial) flight modes.

Wade, Donald C.↗