Search NASA⌕ Search

SEARCH · Search NASA

Results for “linear collider”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

One-loop QCD and electroweak corrections to ttZ{sup 0} production at an e{sup +}e{sup -} linear collider

We study the impact of the full O({alpha}{sub s}) QCD and O({alpha}{sub ew}) electroweak (EW) radiative corrections to the e{sup +}e{sup -}{yields}ttZ{sup 0} process in the standard model, and investigate the dependence of the lowest-order (LO), one-loop QCD and EW corrected cross sections on colliding energy {radical}(s). The LO, QCD and EW corrected spectrums of the invariant mass of tt pair and the distributions of the transverse momenta of final top quark and Z{sup 0} boson are presented. The numerical results show that the one-loop QCD correction enhances the LO cross section, but the EW one-loop correction generally suppresses the LO cross section with our chosen parameters. In the case of m{sub H}=120 GeV, the QCD relative corrections can reach 43.16% when {radical}(s)=500 GeV, while the EW relative corrections have the values of -9.24%, -4.36% and -5.81%, when {radical}(s)=500 GeV, 800 GeV, 1.2 TeV, respectively.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Method for the Precision Mass Measurement of the Stop Quark at the International Linear Collider

Many supersymmetric models predict new particles within the reach of the next generation of colliders. For an understanding of the model structure and the mechanism(s) of symmetry breaking, it is important to know the masses of the new particles precisely. In this article the measurement of the mass of the scalar partner of the top quark (stop) at an e{sup +}e{sup -} collider is studied. A relatively light stop is motivated by attempts to explain electroweak baryogenesis and can play an important role in dark matter relic density. A method is presented which makes use of cross-section measurements near the pair-production threshold as well as at higher center-of-mass energies. It is shown that this method not only increases the statistical precision, but also greatly reduces the systematic uncertainties, which can be important. numerical results are presented, based on a realistic event simulation, for two signal selection strategies: using conventional selection cuts, and using an Iterative Discriminant Analysis (IDA). The studies indicate that a precision of {Delta}m{sub {bar t}{sub 1}} = 0.42 GeV can be achieved, representing a major improvement over previous studies. While the analysis of stops is particularly challenging due to the possibility of stop hadronization, the general procedure could be applied to the mass measurement of other particles as well. They also comment on the potential of the IDA to discover a stop quark in this scenario, and they revisit the accuracy of the theoretical predictions for the neutralino relic density.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

International Linear Collider Accelerator Physics R&D

ILC work at Illinois has concentrated primarily on technical issues relating to the design of the accelerator. Because many of the problems to be resolved require a working knowledge of classical mechanics and electrodynamics, most of our research projects lend themselves well to the participation of undergraduate research assistants. The undergraduates in the group are scientists, not technicians, and find solutions to problems that, for example, have stumped PhD-level staff elsewhere. The ILC Reference Design Report calls for 6.7 km circumference damping rings (which prepare the beams for focusing) using “conventional” stripline kickers driven by fast HV pulsers. Our primary goal was to determine the suitability of the 16 MeV electron beam in the AØ region at Fermilab for precision kicker studies.We found that the low beam energy and lack of redundancy in the beam position monitor system complicated the analysis of our data. In spite of these issues we concluded that the precision we could obtain was adequate to measure the performance and stability of a production module of an ILC kicker, namely 0.5%. We concluded that the kicker was stable to an accuracy of ~2.0% and that we could measure this precision to an accuracy of ~0.5%. As a result, a low energy beam like that at AØ could be used as a rapid-turnaround facility for testing ILC production kicker modules. The ILC timing precision for arrival of bunches at the collision point is required to be 0.1 picosecond or better. We studied the bunch-to-bunch timing accuracy of a “phase detector” installed in AØ in order to determine its suitability as an ILC bunch timing device. A phase detector is an RF structure excited by the passage of a bunch. Its signal is fed through a 1240 MHz high-Q resonant circuit and then down-mixed with the AØ 1300 MHz accelerator RF. We used a kind of autocorrelation technique to compare the phase detector signal with a reference signal obtained from the phase detector’s response to an event at the beginning of the run. We determined that the device installed in our beam, which was instrumented with an 8-bit 500 MHz ADC, could measure the beam timing to an accuracy of 0.4 picoseconds. Simulations of the device showed that an increase in ADC clock rate to 2 GHz would improve measurement precision by the required factor of four. As a result, we felt that a device of this sort, assuming matters concerning dynamic range and long-term stability can be addressed successfully, would work at the ILC. Cost effective operation of the ILC will demand highly reliable, fault tolerant and adaptive solutions for both hardware and software. The large numbers of subsystems and large multipliers associated with the modules in those subsystems will cause even a strong level of unit reliability to become an unacceptable level of system availability. An evaluation effort is underway to evaluate standards associated with high availability, and to guide ILC development with standard practices and well-supported commercial solutions. One area of evaluation involves the Advanced Telecom Computing Architecture (ATCA) hardware and software. We worked with an ATCA crate, processor monitors, and a small amount of ATCA circuit boards in order to develop a backplane “spy” board that would let us watch the ATCA backplane communications and pursue development of an inexpensive processor monitor that could be used as a physics-driven component of the crate-level controls system. We made good progress, and felt that we had determined a productive direction to extend this work. We felt that we had learned enough to begin designing a workable processor monitor chip if there were to be sufficient interest in ATCA shown by the ILC community. Fault recognition is a challenging issue in the crafting a high reliability controls system. With tens of thousands of independent processors running hundreds of thousands of critical processes, how can the system identify that a problem has arisen and determine the appropriate steps to take to correct, or compensate, for the failure? One possible solution might come through the use of the OpenClovis supervisory system, which runs on Linux processors and allows a select set of processors to monitor the behavior of individual processes and processors in a large, distributed controls network. We found that OpenClovis exhibited an irritating amount of sensitivity to the exact version of the Linux kernel running on the processors, and that it was poorly equipped to help us sort through problems that arose through conflicts so deep in the operating systems of the processors. But once this issue was addressed, we found that it performed as expected, recognizing crashes and process (and processor) failures.

43 PARTICLE ACCELERATORS↗

Status of Dual-readout R&D for a Linear Collider in T1015 Collaboration

The hadronic energy resolution required for an hadronic operating at lepton collider is at the limits or even exceeds that obtained with traditional techniques. Furthermore, it is a well established fact that the presence of an electromagnetic section in front of an hadron calorimeter, as occurs in the layouts of the majority of detectors operating at a collider, would deteriorate the hadronic energy resolution of the device. The novel $ADRIANO$ technology (\textit{A Dual-readout Integrally Active Non-segmented Option}), currently under development at Fermilab, overcomes the above limitations by complementing an integrally active calorimeter with the dual-readout technique. Detailed Monte Carlo studies indicate that the energy resolution is in the $25\%/\sqrt{E}$ - $38\%/\sqrt{E}$ interval with a linear response of the detector up to an energy of 200 GeV. A baseline configuration is chosen with an estimated energy resolution of $\sigma(E)/E\approx30\%/\sqrt{E}$. Several prototypes have been built by \textit{T1015} Collaboration at Fermilab, to explore the effect of modifications of the layout from the baseline configuration. Preliminary results from several test beams at the \textit{Fermilab Test Beam Facility} (FTBF) of $\sim1\lambda_{I}$ prototypes are presented. Future prospects with ultra-heavy glass are, also, summarized.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Characterization and alignment of a resonant cavity beam position monitor for the Compact LInear Collider (CLIC) project at CERN

Beam diagnostic devices are essential tools to sense the properties of the beam in particle accelerators. Beam Position Monitors (BPMs) are used to detect the transverse beam spatial coordinates. A large number of high-resolution resonant cavity BPMs, operating at 14GHz, are proposed to monitor the orbit of the two main beam linacs of the CLIC project. This paper discusses innovative calibration techniques on a dedicated test bench in the frame of the PACMAN project. The particular location of the electromagnetic center of the resonant cavity BPM is detected utilizing a stretched-wire measurement approach. Measurements, RF characterization and final fiducialization of the BPM electrical offset are treated with details. Initial studies through EM simulations of the cavity BPM are covered. The presented experimental results prove the feasibility of the alignment methodology with nanometric resolution.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design of a 1.3 GHz RF-Dipole Crabbing Cavity for International Linear Collider

The International Liner Collider (ILC) requires crabbing systems to increase the luminosity of the colliding electron and positron bunches. There are several frequency options for the crabbing cavity. We have designed a 1.3 GHz compact 1-cell and 2-cell rf-dipole crabbing cavity to compensate for luminosity degradation due to large crossing angle. This paper presents the 1-cell and 2-cell cavities designed to meet the current specifications including the fundamental power coupler and higher order mode couplers.

De Silva, S.U.↗