Search NASA⌕ Search

SEARCH · Search NASA

Results for “mission management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

The Swift Gamma Ray Burst Mission

Swift is an international mission managed by NASA as part of its MIDEX program. It is a multiwavelength transient observatory for GRB astronomy that will launch in 2004. The goals of the mission are to determine the origin of GRBs and their afterglows and use bursts to probe the early Universe. A wide field gamma-ray camera will detect more than a hundred GRBs per year to 2-5 times fainter than BATSE. Sensitive narrow-field X-ray, and UV/optical telescopes will be pointed at the burst location in 20 to 75 sec by an autonomously controlled 'swift' spacecraft. For each burst, arcsec positions will be determined and optical/UV/x-ray/gamma-ray spectrophotometry performed. Measurements of redshift will be made for many of the bursts. The instrumentation is a combination of superb existing flight-spare hardware and design from XMM and Spectrum-X/JET-X contributed by collaborators in the UK and Italy and development of a coded-aperture camera with a large-area (approx. 0.5 square meter) CdZnTe detector array. The instruments have now completed their fabrication phase and are integrated on the observatory for final testing. Key components of the mission are vigorous follow-up and outreach programs to engage the astronomical community and public in Swift. The talk will describe the mission and its status and give a summary of our plans for GRB operations.

Gehrels, Neil↗

Lessons Learned from Coordinating Relay Activities at Mars

The Mission Management Office at the Jet Propulsion Laboratory was tasked with coordinating the relay of data between multiple spacecraft at Mars in support of the Mars Exploration Rover Missions in early 2004. The confluence of three orbiters (Mars Global Surveyor, Mars Odyssey, and Mars Express), two rovers (Spirit and Opportunity), and one lander (Beagle 2) has provided a challenging operational scenario that required careful coordination between missions to provide the necessary support and to avoid potential interference during simultaneous relay sessions. As these coordination efforts progressed, several important lessons were learned that should be applied to future Mars relay activities.

coordination↗

The Challenges and Opportunities for International Cooperative Radio Science; Experience with Mars Express and Venus Express Missions

Radio Science is an opportunistic discipline in the sense that the communication link between a spacecraft and its supporting ground station can be used to probe the intervening media remotely. Radio science has recently expanded to greater, cooperative use of international assets. Mars Express and Venus Express are two such cooperative missions managed by the European Space Agency with broad international science participation supported by NASA's Deep Space Network (DSN) and ESA's tracking network for deep space missions (ESTRAK). This paper provides an overview of the constraints, opportunities, and lessons learned from international cross support of radio science, and it explores techniques for potentially optimizing the resultant data sets.

MEX↗

STS-97 Mission Highlights Resource Tape

A continuation of 'STS-97 Mission Highlights Resource Tape, Part 1 of 3' (document ID 20010020281) and 'STS-97 Mission Highlights Resource Tape, Part 2 of 3' (document ID 20010020282), the activities of flight days seven through eleven are seen. Footage includes the crew discussing repair procedures for the Solar Array Wing (SAW) with mission managers, shots of the shuttle's payload bay, the International Space Station (ISS) with Earth in the background, the Node Micrometeoroid/Orbital Debris Shield removal, the spacewalks performed by Mission Specialists Joseph Tanner and Carlos Noriega, the undocking of Endeavour and ISS, the Orbital Maneuvering System (OMS) firing, the payload bay doors closing, and the landing sequence of Endeavour. The Aurora Borealis and a night view of the French Rivera are seen from space.

Source record↗

In the Hot Seat: STS-115 Lightning Strike Stand Down Debate - NASA Case Study

There is no way the PIC's could have seen any current' was the gist of Mike Griffin's assessment. Griffin was the NASA Administrator at the time. The buck stopped at his desk. Holding a napkin out to Pat Lampton, Griffin showed Lampton the calculations he'd made over dinner that predicted that the Pyrotechnic Initiator Controllers (PIC's) at the base of the Space Shuttle Solid Rocket Boosters (SRBs) were fine. A lightning strike the day before, the worst ever experienced with a Space Shuttle on the launch pad, caused a halt to the launch count down as technicians, engineers, and managers scrambled identify any damage to the launch system. SRB technicians and engineers assessed the data against their Lightning Strike Re-Test Requirements, determining that all but one of the requirements could be checked if they resumed the countdown. For the one remaining requirement, testing the integrity of the PIC's would require 96 hours to set up, test, and reassemble. The engineers were convinced that there was no way to do calculations to show the PIC's were okay. The only option was to stand down. It was SRB Deputy Project Manager (PM) Pat Lampton's responsibility to decide what the SRB project position needed to be to certify that their hardware was safe to fly. He had to communicate that decision to the Mission Management Team (MMT) as a Go or No Go position to resume the count down. If the answer was Go they could still meet a delayed, but acceptable launch schedule. If the answer was No Go, rescheduling the launch would be a grueling shuffling of hardware, personnel, and mission timelines to accommodate Russian missions to the Space Station, supplies for the launch, and personnel manning launch operations. On top of that, Hurricane Ernesto was spinning off the coast of Florida, threatening the need for the Shuttle to roll back to the hangar if they waited too long.

Kummer, Lizette↗

NASA/ESA CT-990 Spacelab simulation. Appendix A: The experiment operator

A joint NASA/ESA endeavor was established to conduct an extensive spacelab simulation using the NASA CV-990 airborne laboratory. The scientific payload was selected to perform studies in upper atmospheric physics and infrared astronomy with principal investigators from France, the Netherlands, England, and several groups from the United States. Two experiment operators from Europe and two from the U.S. were selected to live aboard the aircraft along with a mission manager for a six-day period and operate the experiments in behalf of the principal scientists. This appendix discusses the experiment operators and their relationship to the joint mission under the following general headings: selection criteria, training programs, and performance. The performance of the proxy operators was assessed in terms of adequacy of training, amount of scientific data obtained, quality of data obtained, and reactions to problems that arose in experiment operation.

Reller, J. O., Jr.↗

Ares I-X Flight Test--The Future Begins Here

In less than two years, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will eventually send humans to the Moon, Mars, and beyond. As the countdown to this first Ares mission continues, personnel from across the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for a 2009 launch. This paper will discuss the hardware and programmatic progress of the Ares I-X mission.

Davis, Stephan R.↗

Ares I-X Flight Test - The Future Begins Here

In less than two years, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will eventually send humans to the Moon, Mars, and beyond. As the countdown to this first Ares mission continues, personnel from across the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for an April 2009 launch. This paper will discuss the hardware and programmatic progress of the Ares I-X mission. Like the Apollo program, the Ares launch vehicles will rely upon extensive ground, flight, and orbital testing before sending the Orion crew exploration vehicle into space with humans on board. The first flight of Ares I, designated Ares I-X, will be a suborbital development flight test. Ares I-X gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack; understand how to control its roll during flight; better characterize the severe stage separation environments that the upper stage engine will experience during future operational flights; and demonstrate the first stage recovery system. NASA also will begin modifying the launch infrastructure and fine-tuning ground and mission operations, as the agency makes the transition from the Space Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

The role of smart systems in rendezvous, close proximity operations and docking maneuvers

Various missions scenarios (Space Station logistics, LEO and GEO services, and SEI operation) will involve flexibility in mission management. This means operations will be one or a combination of the following: autonomous, supervised autonomous, and machine aided manual control. Smart Systems will likely play a significant role in making these missions successful from a safety/reliability perspective and less costly from an operations perspective. This does not imply that Smart Systems need to be super sophisticated. On the contrary, Smart Systems have been described as automated intelligence that if a person had done it wrong, it would be considered stupid. The first part of this paper will describe the types of Smart System techniques involved in AR and CC, their specifications, duties, and interactions. Next will be a discussion of the work performed under the auspice of the ALS Program to further Expert Systems applications imbedded in the control process, NASA/JSC CRAD, and other related IRAD projects. This will include issues pertaining to the following: integration, speed, knowledge encapsulation, and cooperative systems. Finally, a brief description will be offered to outline the major obstacles for the acceptance of Smart Systems in critical applications.

Szatkowski, Gerard P.↗

Second International Microgravity Laboratory (IML-2)

This report highlights the scientific and engineering accomplishments achieved during the 14-day Second International Microgravity Laboratory (IML-2) mission. The mission, managed by the National Aeronautics and Space Administration's Marshall Space Flight Center in Huntsville, Alabama, laid the groundwork for broader international partnerships and scientific alliances. Five other space agencies joined NASA on the mission: the Canadian Space Agency (CSA), the European Space Agency (ESA), the French Space Agency (CNES), the German Space Agency (DARA), and the National Space Development Agency of Japan (NASDA). For the mission, microgravity and life sciences investigations were completed inside Spacelab by a crew working around the clock. The report foreword and introduction describe the mission and the facilities used for IML-2. By the end of the mission, hundreds of primary and secondary experiments were completed. With the help of the principal investigators, most of the primary investigations and some of the co-investigations are described in this document. The lead report authors are cited at the beginning of each experiment description The remainder of the description includes the experiment objectives, flight activities postflight analysis, conclusions, illustrations, and references for further research. The major scientific accomplishments of each investigation are highlighted.

Snyder, Robert S.↗

Intelligent Contingency Management for Urban Air Mobility

The third aviation revolution is seeking to enable transportation where users have access to immediate and flexible air travel; the users dictate trip origin, destination and timing. One of the major components of this vision is urban air mobility (UAM) for the masses. UAM means a safe and efficient system for vehicles to move passengers and cargo within a city. In order to reach UAM’s full market potential the vehicle will have to be autonomous. One of the primary challenges of autonomous flight is dealing with off-nominal events, both common and unforeseen; thus, intelligent contingency management (ICM) is one of the enabling technologies. In this context, the vehicle has to be aware of its internal state and external environment at all times, ascertain its capability and make decisions about mission completion or modification. All of these functions require data to model and assess the environment and then take actions based on these models. Necessarily, there is uncertainty associated with the data and the models generated from it. Since we are dealing with safety-critical systems, one of the main challenges of ICM is to generate sufficient data and to minimize its uncertainty to enable practical and safe decision making. We propose an overall architecture that incorporates deterministic and learning algorithms together to assess vehicle capabilities, project these into the future and make decisions on mission management level. A layered approach allows for mature parts and technologies to be integrated into early highly automated vehicles before the final state of autonomy is reached.

data-driven systems↗

Increasing the Fissile Mass Loading of High-Level Waste Glass Canisters to Greater Than 2,500 g/m 3 at the Savannah River Site

To eliminate future fissile mass loading constraints for the Savannah River Site H-Canyon Facility and Liquid Waste system, the Savannah River National Laboratory recommends a repository evaluation of a uranium fissile mass loading in glass at 7,144 g/m 3 in addition to the existing International Atomic Energy Agency safeguards and security limit of 2,500 g/m 3 total plutonium. This recommended increase above the authorized 2,500 g/m 3 fissile mass loading limit is based on concentrations of uranium and plutonium shown to produce an acceptable glass waste form rather than projections of the maximum fissile mass loading in future sludge batches. An authorized fissile mass loading limit greater than 2,500 g/m 3 will increase facility flexibility, reduce the number of high-level waste canisters produced, and potentially avoid an increase in the Department of Energy Environmental Management mission life without compromising safety or glass product quality.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

STS-54 Diffuse X-Ray Spectrometer

Louis Kaluzienski, Program Scientist, Wilton T. Sanders, Principal Investigator, and Chris Dunker, Diffuse X-Ray Spectrometer (DXS) Mission Manager, each give an overview of the DXS, including the purpose of the DXS, a brief description of x-ray astronomy, the scientific objectives of the DXS, and information on the STS-54 Endeavour mission, in which the DXS is part of the payload. The men then answer questions from the press.

Source record↗

Spacelab Mission Implementation Cost Assessment (SMICA)

A total savings of approximately 20 percent is attainable if: (1) mission management and ground processing schedules are compressed; (2) the equipping, staffing, and operating of the Payload Operations Control Center is revised, and (3) methods of working with experiment developers are changed. The development of a new mission implementation technique, which includes mission definition, experiment development, and mission integration/operations, is examined. The Payload Operations Control Center is to relocate and utilize new computer equipment to produce cost savings. Methods of reducing costs by minimizing the Spacelab and payload processing time during pre- and post-mission operation at KSC are analyzed. The changes required to reduce costs in the analytical integration process are studied. The influence of time, requirements accountability, and risk on costs is discussed. Recommendation for cost reductions developed by the Spacelab Mission Implementation Cost Assessment study are listed.

Guynes, B. V.↗

Hardware and Programmatic Progress on the Ares I-X Flight Test

In less than two years, the National Aeronautics and Space Administration (NASA) will execute the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle; which, together with the Ares V cargo launch vehicle (Figure 1), will eventually send humans to the Moon, Mars, and beyond. As the countdown to this first Ares mission continues, personnel from across the Ares I-X Mission Management Office (MMO) are finalizing designs and, in some cases, already fabricating vehicle hardware in preparation for an April 2009 launch. This paper will discuss the hardware and programmatic progress of the Ares I-X mission.

Davis, Stephan R.↗

Reliability analysis in the Office of Safety, Environmental, and Mission Assurance (OSEMA)

The technical personnel in the SEMA office are working to provide the highest degree of value-added activities to their support of the NASA Langley Research Center mission. Management perceives that reliability analysis tools and an understanding of a comprehensive systems approach to reliability will be a foundation of this change process. Since the office is involved in a broad range of activities supporting space mission projects and operating activities (such as wind tunnels and facilities), it was not clear what reliability tools the office should be familiar with and how these tools could serve as a flexible knowledge base for organizational growth. Interviews and discussions with the office personnel (both technicians and engineers) revealed that job responsibilities ranged from incoming inspection to component or system analysis to safety and risk. It was apparent that a broad base in applied probability and reliability along with tools for practical application was required by the office. A series of ten class sessions with a duration of two hours each was organized and scheduled. Hand-out materials were developed and practical examples based on the type of work performed by the office personnel were included. Topics covered were: Reliability Systems - a broad system oriented approach to reliability; Probability Distributions - discrete and continuous distributions; Sampling and Confidence Intervals - random sampling and sampling plans; Data Analysis and Estimation - Model selection and parameter estimates; and Reliability Tools - block diagrams, fault trees, event trees, FMEA. In the future, this information will be used to review and assess existing equipment and processes from a reliability system perspective. An analysis of incoming materials sampling plans was also completed. This study looked at the issues associated with Mil Std 105 and changes for a zero defect acceptance sampling plan.

Kauffmann, Paul J.↗

STS-114: Engine Cut-Off Sensors Are a No-Go: Teaching Notes for NASA Case Study

This case study format is intended to simulate the experience of facing the same difficult challenges and making the same critical decisions as managers, engineers, and scientists in the Space Shuttle Program. It has been designed for use in the classroom setting to help students develop skills related to decision-making. Students will read about the engine cut-off sensor anomaly which created challenges during the STS-114 mission and have the opportunity to make decisions as lead NASA engineers and Mission Management Team members. Included within this document are three case study presentation options - class discussion, group activity, and open-ended research. Please read the full case prior to in-class presentation to allow ample time for students' analysis and reflection, as well as to prepare additional questions. activities or exercises, material selection, etc. Depending upon the setting of your presentation and the number of participants, please choose at least one presentation format beforehand and plan accordingly. You may expect the following learning objectives by using the proposed formats. Learning Objectives: To enable students to experience the responsibilities of NASA management, engineers, and analysis; to discover possible procedures for investigating system anomalies; to become familiar with the liquid hydrogen low level engine cut-off sensor, including its function, connecting components, and location within the Space Shuttle; and to encourage critical analysis and stimulating discussion of Space Shuttle mission challenges.

Ransom, Khadijah S.↗

EASE/ACCESS ground processing at Kennedy Space Center

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Moates, Deborah J.↗