Search NASA⌕ Search

SEARCH · Search NASA

Results for “modular construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Retractable End Plates for Aircraft Lifting Surfaces

End plates and winglets improve aerodynamic characteristics of aircraft wings and other fixed lifting surfaces. Retractable end plates automatically actuated by same shaft that deflects lifting surface and require little or no extra power and absolutely no control input from cockpit. Besides being modular in construction, easily fitted to any existing aircraft design with only minor modifications.

Harvey, W. D.↗

Transformation of two and three-dimensional regions by elliptic systems

During this contract period, our work has focused on improvements to elliptic grid generation methods. There are two principle objectives in this project. One objective is to make the elliptic methods more reliable and efficient, and the other is to construct a modular code that can be incorporated into the National Grid Project (NGP), or any other grid generation code. Progress has been made in meeting both of these objectives. The two objectives are actually complementary. As the code development for the NGP progresses, we see many areas where improvements in algorithms can be made.

Mastin, C. Wayne↗

HyDE Framework for Stochastic and Hybrid Model-Based Diagnosis

Hybrid Diagnosis Engine (HyDE) is a general framework for stochastic and hybrid model-based diagnosis that offers flexibility to the diagnosis application designer. The HyDE architecture supports the use of multiple modeling paradigms at the component and system level. Several alternative algorithms are available for the various steps in diagnostic reasoning. This approach is extensible, with support for the addition of new modeling paradigms as well as diagnostic reasoning algorithms for existing or new modeling paradigms. HyDE is a general framework for stochastic hybrid model-based diagnosis of discrete faults; that is, spontaneous changes in operating modes of components. HyDE combines ideas from consistency-based and stochastic approaches to model- based diagnosis using discrete and continuous models to create a flexible and extensible architecture for stochastic and hybrid diagnosis. HyDE supports the use of multiple paradigms and is extensible to support new paradigms. HyDE generates candidate diagnoses and checks them for consistency with the observations. It uses hybrid models built by the users and sensor data from the system to deduce the state of the system over time, including changes in state indicative of faults. At each time step when observations are available, HyDE checks each existing candidate for continued consistency with the new observations. If the candidate is consistent, it continues to remain in the candidate set. If it is not consistent, then the information about the inconsistency is used to generate successor candidates while discarding the candidate that was inconsistent. The models used by HyDE are similar to simulation models. They describe the expected behavior of the system under nominal and fault conditions. The model can be constructed in modular and hierarchical fashion by building component/subsystem models (which may themselves contain component/ subsystem models) and linking them through shared variables/parameters. The component model is expressed as operating modes of the component and conditions for transitions between these various modes. Faults are modeled as transitions whose conditions for transitions are unknown (and have to be inferred through the reasoning process). Finally, the behavior of the components is expressed as a set of variables/ parameters and relations governing the interaction between the variables. The hybrid nature of the systems being modeled is captured by a combination of the above transitional model and behavioral model. Stochasticity is captured as probabilities associated with transitions (indicating the likelihood of that transition being taken), as well as noise on the sensed variables.

Narasimhan, Sriram↗

Thermoplastic Joining and Assembly of Bulk Metallic Glass Composites Through Capacitive Discharge

Systems and methods for joining BMG Composites are disclosed. Specifically, the joining of BMG Composites is implemented so as to preserve the amorphicity of their matrix phase and the microstructure of their particulate phase. Implementation of the joining method with respect to the construction of modular cellular structures that comprise BMG Composites is also discussed.

Hofmann, Douglas C.↗

plexosdb: A Modular Library for Programmatic PLEXOS Model Construction

plexosdb is a lightweight Python library for constructing PLEXOS models using a SQLite-backed data structure. It provides a clear, modular interface that maps relational data directly to model components. By leveraging SQLite and idiomatic Python, it enables fast iteration and reproducible workflows. The result is a performant, composable foundation for scalable PLEXOS model development.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modularity-at-scale for advanced reactors presentation

Modularity options have been limited for traditional nuclear energy deployment due to the conventional light water reactor (LWR) safety requirements, such as high pressure retaining heavy and robust containment structures. However, a relatively new regulatory approach called ‘Functional Containment’ has potential to allow less expensive and more flexible designs for non-LWRs. Functional containment provides flexibility in design and deployment based on risk-informed and performance-based criteria, so that reactors are not over-designed. Non-nuclear industry has successfully used modular design approaches in automotive, aerospace, chemical processing, building construction, and ship building. These industries have shown that modular construction reduces construction time by around 30% - 50% compared to the conventional stick-built approach. The nuclear industry can use similar approaches to reduce construction time and costs, balanced with safety requirements, using the functional containment approach. This paper discussing the background of modularity in nuclear energy, examples of less learned, modularity approaches in non-nuclear industries and the potential of cost and schedule savings through the emerging regulatory design flexibilities potentially enabling combination of modular deployment at different scales.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MODULARITY-AT-SCALE FOR COST COMPETITIVE DEPLOYMENT OF NUCLEAR ENERGY

Modularity options have been limited for traditional nuclear energy deployment due to the conventional light water reactor (LWR) safety requirements, such as high pressure retaining heavy and robust containment structures. However, a relatively new regulatory approach called ‘Functional Containment’ has potential to allow less expensive and more flexible designs for non LWRs. Functional containment provides flexibility in design and deployment based on risk informed and performance-based criteria, so that reactors are not over-designed. Non-nuclear industry has successfully used modular design approaches in automotive, aerospace, chemical processing, building construction, and ship building. These industries have shown that modular construction reduces construction time by around 30% - 50% compared to the conventional stick built approach. The nuclear industry can use similar approaches to reduce construction time and costs, balanced with safety requirements, using the functional containment approach. This paper discussing the background of modularity in nuclear energy, examples of less learned, modularity approaches in non-nuclear industries and the potential of cost and schedule savings through the emerging regulatory design flexibilities potentially enabling combination of modular deployment at different scales.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Benefits Of Automated Construction And Energy Efficiency Measures In Modular Homes

This article builds on and adds to a Buildings XV publication that introduced the Transformative Efficiency and Automation in Modular Homes (TEAMH) project. The TEAMH project sought to develop a scalable solution for producing modular homes with 20-50% energy savings and similar cost relative to site-fabricated single-family home construction. A key aspect of the project was assessing the potential for labor cost reductions through automation-assisted construction using light gauge steel (LGS). To quantify the advantages of this approach, side-by-side comparisons were made between traditional wood-framed construction and automation-assisted LGS construction. This demonstration involved constructing one wood-framed wall and several LGS test walls, accompanied by a time-and-motion study. The results indicated that automation assistance could decrease construction time and associated labor costs by as much as 46%. High-performance envelope technologies for exterior insulation and air sealing were evaluated to compare modular homes with site-built homes that meet the International Energy Conservation Code (IECC). A key technology considered was vacuum insulation panels (VIPs) with fiberglass cores. Guarded hot box testing of multiple full-scale wall assemblies containing different combinations of exterior continuous insulation systems containing phenolic foam and VIPs. Testing on various full-scale wall assemblies revealed that, with LGS construction, cavity insulation had minimal impact on exterior wall performance. Omitting cavity insulation can reduce labor and material costs while streamlining manufacturing, as its installation is labor-intensive and not easily automated due to the need for precise placement around wiring and other internal components. Guarded hot box tests of multiple LGS test walls with foam and VIP-based exterior insulation systems achieved R-values of up to 31 hr-ft2-°F/Btu. Finally, building energy modeling of multiple modular home designs indicated that the upgraded envelope assemblies can yield heating energy savings of up to 50% and cooling energy savings of up to 30% compared to IECC 2018 standards.

Shrestha, Som [ORNL] (ORCID:0000000183993797)↗

Construction and Resource Utilization Explorer: Regolith Characterization Using a Modular Instrument Suite and Analysis Tools

The Construction Resource Utilization Explorer (CRUX) is a technology maturation project for the U.S. National Aeronautics and Space Administration to provide enabling technology for lunar and planetary surface operations (LPSO). The CRUX will have 10 instruments, a data handling function (Mapper - with features of data subscription, fusion, interpretation, and publication through geographical information system [GIs] displays), and a decision support system DSS) to provide information needed to plan and conduct LPSO. Six CRUX instruments are associated with an instrumented drill to directly measure regolith properties (thermal, electrical, mechanical, and textural) and to determine the presence of water and other hydrogen sources to a depth of about 2 m (Prospector). CRUX surface and geophysical instruments (Surveyor) are designed to determine the presence of hydrogen, delineate near subsurface properties, stratigraphy, and buried objects over a broad area through the use of neutron and seismic probes, and ground penetrating radar. Techniques to receive data from existing space qualified stereo pair cameras to determine surface topography will also be part of the CRUX. The Mapper will ingest information from CRUX instruments and other lunar and planetary data sources, and provide data handling and display features for DSS output. CRUX operation will be semi-autonomous and near real-time to allow its use for either planning or operations purposes.

Moon↗

Mobile/Modular BSL-4 Facilities for Meeting Restricted Earth Return Containment Requirements

NASA robotic sample return missions designated Category V Restricted Earth Return by the NASA Planetary Protection Office require sample containment and biohazard testing in a receiving laboratory as directed by NASA Procedural Requirement (NPR) 8020.12D - ensuring the preservation and protection of Earth and the sample. Currently, NPR 8020.12D classifies Restricted Earth Return for robotic sample return missions from Mars, Europa, and Enceladus with the caveat that future proposed mission locations could be added or restrictions lifted on a case by case basis as scientific knowledge and understanding of biohazards progresses. Since the 1960s, sample containment from an unknown extraterrestrial biohazard have been related to the highest containment standards and protocols known to modern science. Today, Biosafety Level (BSL) 4 standards and protocols are used to study the most dangerous high-risk diseases and unknown biological agents on Earth. Over 30 BSL-4 facilities have been constructed worldwide with 12 residing in the United States; of theses, 8 are operational. In the last two decades, these brick and mortar facilities have cost in the hundreds of millions of dollars dependent on the facility requirements and size. Previous mission concept studies for constructing a NASA sample receiving facility with an integrated BSL-4 quarantine and biohazard testing facility have also been estimated in the hundreds of millions of dollars. As an alternative option, we have recently conducted an initial trade study for constructing a mobile and/or modular sample containment laboratory that would meet all BSL-4 and planetary protection standards and protocols at a faction of the cost. Mobile and modular BSL-2 and 3 facilities have been successfully constructed and deployed world-wide for government testing of pathogens and pharmaceutical production. Our study showed that a modular BSL-4 construction could result in approximately 90% cost reduction when compared to traditional construction methods without compromising the preservation of the sample or Earth.

Calaway, M. J.↗

Mobile/Modular BSL-4 Containment Facilities Integrated into a Curation Receiving Laboratory for Restricted Earth Return Missions

NASA robotic sample return missions designated Category V Restricted Earth Return by the NASA Planetary Protection (PP) Office require sample containment and biohazard testing upon return to Earth. Since the 1960s, sample containment from an unknown extraterrestrial biohazard have been related to the highest containment standards and protocols known to modern science. Today, this is Biosafety Level (BSL) 4 containment. In the U.S., the Biosafety in Microbiological and Biomedical Laboratories publication authored by the U.S. Department of Health and Human Services (HHS): Public Health Service, Centers for Disease Control and Prevention, and the National Institutes of Health houses the primary recommendations, standards, and design requirements for all BSL labs. Past mission concept studies for constructing a NASA Curation Receiving Laboratory with an integrated BSL-4 quarantine and biohazard testing facility have been estimated in the hundreds of millions of dollars (USD). As an alternative option, we have conducted a trade study for constructing a mobile and/or modular sample containment laboratory that would meet all BSL-4 and planetary protection standards and protocols at a fraction of the cost. Mobile and modular BSL-2 and 3 facilities have been successfully constructed and deployed world-wide for government testing of pathogens and pharmaceutical production. Our study showed that a modular BSL-4 construction could result in ~ 90% cost reduction when compared to traditional BSL-4 construction methods without compromising the preservation of the samples or Earth. For the design/construction requirements of a mobile/modular BSL-4 containment, we used the established HHS document standards and protocols for manipulation of agents in Class III Biosafety Cabinets (BSC; i.e., negative pressure gloveboxes) that are currently followed in operational BSL-4 facilities in the U.S.

Calaway, Michael J.↗

ADVANCED SEISMIC BASE ISOLATION METHODS FOR MODULAR REACTORS

Advanced technologies for structural design and construction have the potential for major impact not only on nuclear power plant construction time and cost, but also on the design process and on the safety, security and reliability of next generation of nuclear power plants. In future Generation IV (Gen IV) reactors, structural and seismic design should be much more closely integrated with the design of nuclear and industrial safety systems, physical security systems, and international safeguards systems. Overall reliability will be increased, through the use of replaceable and modular equipment, and through design to facilitate on-line monitoring, in-service inspection, maintenance, replacement, and decommissioning. Economics will also receive high design priority, through integrated engineering efforts to optimize building arrangements to minimize building heights and footprints. Finally, the licensing approach will be transformed by becoming increasingly performance based and technology neutral, using best-estimate simulation methods with uncertainty and margin quantification. In this context, two structural engineering technologies, seismic base isolation and modular steel-plate/concrete composite structural walls, are investigated. These technologies have major potential to (1) enable standardized reactor designs to be deployed across a wider range of sites, (2) reduce the impact of uncertainties related to site-specific seismic conditions, and (3) alleviate reactor equipment qualification requirements. For Gen IV reactors the potential for deliberate crashes of large aircraft must also be considered in design. This report concludes that base-isolated structures should be decoupled from the reactor external event exclusion system. As an example, a scoping analysis is performed for a rectangular, decoupled external event shell designed as a grillage. This report also reviews modular construction technology, particularly steel-plate/concrete construction using factory prefabricated structural modules, for application to external event shell and base isolated structures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Coordinated control design and verification of the HTR-PM plant - 18485

Through multi-modular scheme, i.e. the superheated steam flows produced by multiple MHTGR-based nuclear supplying system (NSSS) modules are combined together to drive a common thermal load, the inherent safety feature of MHTGR can be applicable to the large-scale nuclear plants at any desired power ratings. Since the plant power control technique of classical single-modular plants cannot be directly applied to multi-modular plants, it is necessary to develop the power control method of the multi-modular plants. In this paper, the plant power control strategy of the two-modular HTR-PM plant, i.e. the first under-constructed multi-modular high temperature gas-cooled nuclear plant in the world is given, which includes both the feedback loops and control algorithms. Then, the control strategy is verified through numerical simulation, and the simulation results in the cases of plant power step and ramp show the satisfactory performance of this control strategy. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Investigation of different magnetic field configurations using an electrical, modular Zeeman slower

We present a method of constructing an automatically reconfigurable, modular, electronic Zeeman slower, which is remotely controlled. This setup is used to investigate the ability of different magnetic field profiles to slow thermal atoms to the capture velocity of a magneto-optical-trap. We show that a simple numerical optimization process yields better results than the commonly used approach for deciding on the appropriate field and comes close to the optimum field, found by utilizing a fast feedback loop which uses a genetic algorithm. Our new numerical method is easily adaptable to a variety of existing slower designs and may be beneficial where feedback is unavailable.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fluid design studies of integrated modular engine system

A study was performed to develop a fluid system design and show the feasibility of constructing an integrated modular engine (IME) configuration, using an expander cycle engine. The primary design goal of the IME configuration was to improve the propulsion system reliability. The IME fluid system was designed as a single fault tolerant system, while minimizing the required fluid components. This study addresses the design of the high pressure manifolds, turbopumps and thrust chambers for the IME configuration. A physical layout drawing was made, which located each of the fluid system components, manifolds and thrust chambers. Finally, a comparison was made between the fluid system designs of an IME system and a non-network (clustered) engine system.

Frankenfield, Bruce↗

Compositions and methods for adoptive and active immunotherapy

Modular aAPCs and methods of their manufacture and use are provided. The modular aAPCs are constructed from polymeric microparticles. The aAPCs include encapsulated cytokines and coupling agents which modularly couple functional elements including T cell receptor activators, co-stimulatory molecules and adhesion molecules to the particle. The ability of these aAPCs to release cytokines in a controlled manner, coupled with their modular nature and ease of ligand attachment, results in an ideal, tunable APC capable of stimulating and expanding primary T cells.

60 APPLIED LIFE SCIENCES↗

Open Architecture for Cost Savings in Advanced Nuclear Reactors

Recently, nuclear power plant build projects in the West have run over budget due to high capital costs and schedule overruns. Compared to other sources of energy, nuclear power plants have higher capital costs. Reactors are often different at every site, resulting in a lack of standardization. Nuclear is expected to compete with other low carbon sources of energy which have lower capital costs making it essential for nuclear to develop ways of reducing costs. Strategies such as standardization, learning rates, modularization, and schedule reduction in advanced reactors can reduce nuclear costs by about 40%. Standardization as a way of cutting capital costs has been explored even in large nuclear power plants. Standardization of certain plant components can result in lower component and installation costs and higher learning from experience. Standardization can be achieved by adopting a criterion of key performance indicators and general design principles for a specific system or component such as the balance of plant. Modularization allows the construction of certain components of SMRs in a factory, which saves time, increases productivity, and encourages higher learning rates. Production learning decreases the time and the cost related to an activity. The potential for modularized components of advanced reactors to be manufactured in factories makes it conducive to achieving higher learning rates. Developing large-capacity nuclear programs through sequential builds cultivates a higher learning rate, which in effect may reduce schedule overruns. Open architecture has been identified as a way to drive standardization among advanced reactor designs and result in cost savings. Open architecture (OA) is defined as a design enabling a diverse supply chain by defining and publishing requirements of systems or equipment in functional and/or interface terms, utilizing technical standards in widespread use. Currently, the nuclear industry’s approach is to use closed architecture, making most designs proprietary. However, collaboration between various advanced reactor vendors and suppliers utilizing the concept of open architecture can result in modular and standardized architecture of subsystems or subcomponents of a nuclear power plant. Completely standardizing nuclear power plants may be impossible, however, certain common subsystems amongst the various reactor designs could be standardized and/or access a wider supply chain and leverage existing learning from other sectors. Open architecture will save time and allocate resources to the parts of the plants that have the most unique features. A key advantage of open architecture is its ability to improve production learning across advanced reactors (AR) types in the industry, by providing and utilizing the same kind of component. Sodium fast reactor (SFR), High Temperature Gas Reactor (HTGR) and Molten Salt Reactor (MSR) are the advanced reactors considered for this project. This paper aims to determine the cost savings in advanced reactor programs due to open architecture learning rate. This work is an extension of work done on light water reactor small modular reactors; the cost methodology was utilized to investigate the impact of open architecture on advanced reactors with a particular focus on sodium fast reactors. The cost data on sodium fast reactors used in the model presented the most adequate information required for the analysis.

Advanced Nuclear Reactors↗

The Circular Home: Development and Demonstration of a Net Negative Carbon, Reusable Residence

This project started the development of an innovative modular building system intended for residential construction. The project was centered around single-family homes that were carbon-negative cradle-to-grave over a 100 year time frame, which is approximately double the current standard for operational life. The project sought to accomplish this objective by designing the modular home in a manner that ensures circularity, where the main house components can be used over several consecutive 50-year lifespans. To accomplish these objectives, this project utilized integrated design with the inclusion of life-cycle assessment to design the single-family house for architectural, structural, energy, mechanical, thermal, and moisture demands, while ensuring carbon negativity and annual net-zero energy use. The core technology of this project was the use of cross-laminated timber and biogenic materials, such as wood-fiber insulation, in the construction of the modular building units. The robustness and factory manufacturing ability of cross-laminated timber allow for factory construction of most of the home, which minimizes on-site time, saving money and reducing construction waste. During this project, initial milestones were met that delivered the architectural plans for the circular home and an initial structural testing matrix. Compared to current code-built homes, which average 13 kg CO2eq. / ft2 and are demolished at their end of life, the circular home has an estimated -30 kg CO2eq. / ft2 of embodied carbon emissions during its first build iteration. It is estimated that approximately 60%-70% of the total building mass could be reused and/or recycled during subsequent rebuilds. This project was concluded at approximately the 1/3 point and a separate project was established to conclude the remaining milestones. This project promises to benefit the public by delivering another option for single-family, and eventually multi-family, housing using a novel building construction system. The system of reusable modular construction facilitates not only lower emissions during the first building iteration, but also lower emissions during subsequent iterations that drastically reduce waste and help society meet its climate goals. Many other industries, such as clothing and technology sectors, are starting to focus on circularity and this project adds the residential building construction industry to that list.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗