Search NASA⌕ Search

SEARCH · Search NASA

Results for “observation planning operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Final Targeting Strategy for the SDSS-IV APOGEE-2S Survey

APOGEE is a high-resolution (R ~ 22,000), near-infrared, multi-epoch, spectroscopic survey of the Milky Way. The second generation of the APOGEE project, APOGEE-2, includes an expansion of the survey to the Southern Hemisphere called APOGEE-2S. This expansion enabled APOGEE to perform a fully panoramic mapping of all of the main regions of the Milky Way; in particular, by operating in the H band, APOGEE is uniquely able to probe the dust-hidden inner regions of the Milky Way that are best accessed from the Southern Hemisphere. In this paper we present the targeting strategy of APOGEE-2S, with special attention to documenting modifications to the original, previously published plan. The motivation for these changes is explained as well as an assessment of their effectiveness in achieving their intended scientific objective. In anticipation of this being the last paper detailing APOGEE targeting, we present an accounting of all such information complete through the end of the APOGEE-2S project; this includes several main survey programs dedicated to exploration of major stellar populations and regions of the Milky Way, as well as a full list of programs contributing to the APOGEE database through allocations of observing time by the Chilean National Time Allocation Committee and the Carnegie Institution for Science. This work was presented along with a companion article, Beaton et al. (2021), presenting the final target selection strategy adopted for APOGEE-2 in the Northern Hemisphere.

79 ASTRONOMY AND ASTROPHYSICS↗

Real-time ensemble microalgae growth forecasting with data assimilation

Accurate short-range (e.g., 7-day) microalgae growth forecasts will be beneficial for both production and harvesting of microalgae. This study developed an operational microalgae growth forecasting system with ensemble data assimilation (DA). The forecasting system was validated against observed Monoraphidium minutum 26B-AM growth in two outdoor pond cultures located in Mesa, Arizona, U.S. We first examined the relative roles of uncertainty in the meteorological forecast and initial conditions (i.e., algal concentration at the time of forecast) in the microalgae 7-day forecast and found initial conditions dominated the microalgae forecasting skill, suggesting the importance of implementing DA to improve initial condition characterization. To correct the systematic bias in biomass simulations, we developed a particle filter with bias estimation (PFBE) DA method to estimate biases and correct the model forecast. We found the DA forecasting system could improve the 7-day microalgae forecasting skill by about 85% on average compared to model forecasts without DA. These results suggest the potential accuracy of biomass growth forecasts may be sufficient to inform real-time operational decisions, such as harvesting planning, for commercial-scale microalgae production.

59 BASIC BIOLOGICAL SCIENCES↗

A Short-Term Solar Forecasting Platform Using a Physics-Based Smart Persistence Model and Data Imputation Method

Electrical energy plays vital role in our socio-economic activity and therefore ensuring the reliability of the electric grid, from the generation, transmission and distribution level is critical. In order to maintain the power system parameter viz., frequency, voltage, etc., optimally, balancing of generation and consumption is very much essential. However, solar energy is infirm power by nature this is due to cloud cover / other local phenomena. Hence, Photovoltaic (PV) power generation brings a significant challenge to the grid operator due to the variability of the solar energy. The complexity of this challenge in terms of planning and dispatch ability of PV resources, aggravates with the high penetration of solar energy into the electric grid. In this setting, reliable solar radiation forecasting models based on accurate and quality input data become essential. In order to develop a suitable model for predicting solar radiation, quality historical / real time measurement is also needed. Under this study NIWE and NREL jointly developed / tested short-term solar forecasting frameworks using a smart persistence and physics-based smart persistence models for intra-hour forecasting of solar radiation (PSPI) and benchmarked 9 different data imputation techniques in 15 Solar Radiation Resource Assessment (SRRA) stations, located at different parts of India. During any measurement campaign, due to various technical reasons, we may miss few observations. However, the missing observation often reduce the performance of any forecasting model. Therefore, suitable data imputation method would assist us to obtain continuous observation of solar radiation. A station-by-station and method-by-method analysis was carried out to understand the performance of each model. Based on our analysis, among all the data imputation methods, the Kalman data imputation method is better for Indian Weather condition. In addition, Kalman StructTS, Linear, Stine and Arima methods yield slightly inferior accuracy compared to Kalman, but outperform the other methods. The extended solar radiation data are used by solar forecasting models to provide the prediction of solar radiation at 15 SRRA stations. As far as short term forecasting model is concerned, the PSPI model outperforms the Smart Persistence model. However, the forecast error is increases with the forecasting horizon.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Republic of Korea–United States Green Shipping Corridor Prefeasibility Study: Cargo Flows

This prefeasibility study, as a part of the decarbonization efforts through the Mission Innovation Zero Emission Shipping Mission, was conducted to provide a high-level assessment of the opportunities and challenges in planning and implementing green shipping corridors between major commercial seaports in the United States of America (USA) and the Republic of Korea (ROK). For each country, three major ports were included in the scope of this study: Seattle, Tacoma, and Everett (all in Washington State) for the USA and Busan, Ulsan, and Masan for the ROK. This prefeasibility study report focuses on describing operation characteristics of major vessel and cargo flows between the two countries. Vessel shipments directly affect energy use and demand. Therefore, it is critically important to understand which major vessel types and cargo types are operated or transported within the selected scope and to identify potential target segments for green shipping. Furthermore, this prefeasibility study also discusses limitations and additional assessments that need to be further analyzed in the next stage of the feasibility study. The summary findings and observations discussed in this report are not intended to be used to determine the final target corridors, but to guide later, deeper assessments of their potential impacts and challenges. In the following section, the data sources used in this study are discussed. Section 0 shows the overall vessel trades between the USA and ROK, considering all ports in the two countries. Then, a more detailed analysis by vessel type and cargo flow is presented in Sections 3–6 based on only the three-to-three ports between the two countries. Finally, Section 7 summarizes the findings with suggested target segmentations for the vessel types and discusses other limitations to be considered during the later feasibility stage.

42 ENGINEERING↗

Development of the TREAT M2 experiment as a transient benchmark

A transient benchmark based on the Transient Reactor Test Facility (TREAT) M2 Calibration experiment (M2-CAL) is under development. TREAT, at Idaho National Laboratory, is a graphite moderated air-cooled research reactor which has been used extensively for fuel material testing under extreme and accident conditions. Accurate benchmark models are a beneficial component in the operations, experimental planning, and development of TREAT. In this work, we present a transient benchmark model for the M2-CAL experiment core loading. The benchmark model incorporates the coupling between the Monte Carlo Code SERPENT and the computational fluid dynamics code OpenFOAM to capture the temperature feedback mechanism. The M2-CAL transient 2580 was simulated in this work. A pre-transient analysis was performed to determine the optimum core composition and conditions before the beginning of the transient. The analysis was validated against historic TREAT kinetic measurements and the worth of the transient rod T-2. The axial power distribution in the flux wire for the M2-CAL experiment was determined and contrasted with the experiment. The model was then used to simulate the M2-CAL transient 2580 experiment based on the reported pre-transient and transient conditions. Several transient observables were calculated and compared to the experiment. The model shows good agreement with the experimental power traces, period, and average increase of power at the power ramp (time > 7.8 s). Inverse point kinetics analysis was performed during the period of the power ramp for the model and the experiment based on that, the temperature feedback component was isolated and contrasted with the experimental feedback. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Heat load measurements for the PIP-II pHB650 cryomodule

This study presents a brief overview of the 1st and 2nd phases and an in-depth analysis of the 3rd phase heat load testing performed on the pHB650 (prototype High Beta 650 MHz) cryomodule at PIP2IT (PIP-II Injector Test Facility), with a focus on both the results and the methodological advancements that have improved testing efficiency and accuracy. A key challenge identified in the testing campaign is the higher-than-expected heat loads observed in the first PIP-II (Proton Improvement Plan II) prototype cryomodules (pSSR1 and pHB650) tested at PIP2IT. Elevated heat loads are concerning given the fixed capacity of the PIP-II cryoplant that is currently being installed at Fermilab. However, understanding the sources of these elevated heat loads offers a critical opportunity to implement effective heat load mitigations on upcoming PIP-II cryomodules to stay within the available capacity of the PIP-II cryoplant. The study includes a summary of test results, descriptions of measurement procedures, and key observations on parameters directly and indirectly related to heat load measurements. Direct observations include measured heat loads and the effectiveness of JT heat exchanger under varying conditions, while indirect observation analyze factors such as the temperature distribution on the two-phase pipe and relief piping under varying conditions. Thermal acoustic oscillations (TAO) were identified during testing, which was mitigated by replacing the original G10 stem with a stainless steel stem equipped with wipers for the cryomodule cooldown valve. A major innovation during pHB650 Phase 3 testing was the development of an automated Python script to streamline data acquisition, analysis, and reporting of heat load results. This script automatically retrieved data from ACNET (Accelerator Control Network), performed heat load calculations, and generated detailed reports featuring plots and tables. This advancement significantly reduced manual labor and enhanced the thoroughness of data analysis compared to earlier campaigns. The heat load test reports were promptly uploaded to the electronic logbook shortly after each test, enabling rapid feedback and collaboration between the SRF and cryogenic teams. The heat load measurements included various components: HTTS (high-temperature thermal shield), LTTS (low-temperature thermal shield), 2K isothermal and non-isothermal heat loads. Results were recorded both within the cryomodule and between the bayonet can supply and return. Measurements were conducted under different operating conditions such as "standard", "linac", and "simulated dynamic". Additionally, HTTS and LTTS heat loads were calculated in real time, allowing for the tracking of thermal stability and identification of changes during testing, both in steady-state and transient conditions. The results of this testing campaign not only provide valuable insights into the performance of the pHB650 cryomodule but also highlight best practices and lessons learned that will inform future cryomodule testing at PIP2IT. These include adopting automated tools for data analysis, refining real-time measurement capabilities, and emphasizing detailed pre-test planning. The framework established in this campaign aims to set an improved standard for cryomodule testing and heat load reporting in future cryomodule test campaigns.

Porwisiak, D. [Fermilab; Wroclaw Tech. U.]↗

ROSE: A reduced-order scattering emulator for optical models

A new generation of phenomenological optical potentials requires robust calibration and uncertainty quantification, motivating the use of Bayesian statistical methods. These Bayesian methods usually require calculating observables for thousands or even millions of parameter sets, making fast and accurate emulators highly desirable or even essential. Emulating scattering across different energies or with interactions such as optical potentials is challenging because of the nonaffine parameter dependence, meaning the parameters do not all factorize from individual operators. Here we introduce and demonstrate the reduced-order scattering emulator ( ROSE ) framework, a reduced basis emulator that can handle nonaffine problems. ROSE is fully extensible and works within the publicly available band framework software suite for calibration, model mixing, and experimental design. As a demonstration problem, we use ROSE to calibrate a realistic nucleon-target scattering model through the calculation of elastic cross sections. This problem shows the practical value of the ROSE framework for Bayesian uncertainty quantification with controlled trade-offs between emulator speed and accuracy as compared to high-fidelity solvers. Finally, planned extensions of ROSE are discussed.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The Dark Energy Spectrographic Instrument (DESI) Guide-Focus Assembly

The specific research of the DESI project is to study in detail the expansion history of the Universe over the past 10 billion years. In order to do this, the project designed, fabricated, tested and commissioned the DESI instrument which has been deployed at the Mayall Telescope at the Kitt Peak National Observatory near Tucson, Arizona. The DESI project was conducted by approximately 30 US and foreign national laboratories. Our CRADA with the The Institut de Física d’Altes Energies (IFAE) in Barcelona (Spain) involved both research planning for eventual observing on the DESI telescope; and in providing hardware jointly designed by LBNL and IFAE; ten guide and focus sensor systems (GFAs) that either provide feedback to the Mayall telescope tracking system or provide focus position information to the DESI corrector hexapod. The key major goals of this CRADA were achieved.For survey planning, Drs. Fernandez, Fosalba, Garcia-Bellido, and Gaztañaga were all important contributors to the working groups to which they were assigned. Their application of redshift techniques, development of simulations to support target selection, exploration of the use of alternative observables to extract cosmological information like AP and void statistics, and the use of PAU data to assist in the optimization of targeting selections have been vital in the early planning for targets during commissioning. The major role in the project involved Drs. Castander, Miquel, Padilla, and Sànchez. They were all directly involved with the development of the Guide-Focus Assembly (GFA) hardware, software and filter validation. In order to accomplish the goals of the DESI Project, the Mayall telescope must track DESI targeted galaxies for up to 15 minutes and the DESI corrector must be repositioned on its hexapod system for different telescope orientations. The guide and focus assemblies (GFA) provide in this information. There are ten GFA modules on the focal plane, six providing tracking information and four providing focus information. A common GFA design supports both functions by a simple switching of its operating mode. IFAE designed, fabricated, tested and delivered twelve GFAs. Once received at LBNL, the GFAs were integrated with the focal plane. This was an iterative process as the GFA’s were delivered as they were made. Our working relationship with the IFAE scientists and engineers was remarkable given the distance and time zone issues. The GFAs have performed extremely well during the commissioning phase of the instrument.

79 ASTRONOMY AND ASTROPHYSICS↗

Space Charge Dominated Momentum Spread and Compensation Strategies in the Post-Linac Section of Proton Improvement Plan-II at Fermilab

The upcoming Proton Improvement Plan-II (PIP-II), designated for enhancements to the Fermilab accelerator complex, features a Beam Transfer Line (BTL) that channels the beam from the linac exit to the booster. In the absence of longitudinal focusing beyond the superconducting linac, the beam experiences an elevated momentum spread, primarily due to nonlinear space-charge forces, surpassing the allowable limit of 2.1e-4. This study presents a detailed examination of the space-charge-induced momentum spread and outlines mitigative strategies. The investigation includes the fine-tuning of a de-buncher cavity, analyzed in terms of operating frequency, longitudinal location, and gap voltage, under both standard and perturbed beam conditions—specifically accounting for momentum jitter and energy variation. The impact of buncher cavity misalignments on the beam's longitudinal phase space is also assessed. The paper concludes by recommending an optimized cavity configuration to effectively mitigate the observed increase in momentum spread along the BTL.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Relationship of Hydrology in the Green River to Colorado Pikeminnow Populations

The Federally listed Colorado Pikeminnow (CP) (Ptychocheilus Lucius) has been declining in the Green River Basin over the last 20 years. Muth et al. (2000) recommended flows and temperatures to benefit endangered fish species downstream of Flaming Gorge Dam on the Green River. The recommendations identified a range of flows during the base flow period (flows that occur after the annual snowmelt runoff period, usually from early summer to the following spring) that were intended to benefit CP. The recommendations indicated that the mean flow for the summer–winter period should be established each year on the basis of anticipated hydrologic conditions, but adjustments could be made if hydrologic conditions change. Flow should gradually decline from peak flow to base flow, with the base flow reached by early to middle summer (depending on hydrologic conditions) and maintained through February. The rate of decline should depend on rates of decline in Yampa River flows and the recommended rates of decline for dam releases. No specific recommendations were made for base flow variation in Reach 1, but variation around the annual mean base flow should be restricted to achieve recommended levels of variation in Reach 2 (middle Green River) (Table 5.5 in Muth et al. 2000). Implementation of the flow and temperature recommendations served as the proposed action for an EIS on Flaming Gorge Dam operations. A Biological Assessment of the impacts on endangered species of implementing the recommendations was prepared and a Biological Opinion that called for development of a study plan to examine the effects of implementation. Projects to address this evaluation were identified in the Green River Study Plan and have been conducted since then. The purpose of the Study Plan was to identify and recommend to the Recovery Program those monitoring or research projects necessary for implementation and evaluation of the flow and temperature recommendations. Those projects included studies to evaluate the anticipated effects of implementing the recommendations (including potential adverse effects identified in the 2006 Biological Opinion) and studies to examine recognized uncertainties of the recommendations. A new recovery program summer base flow study plan was approved in September of 2020 to evaluate stable and elevated summer base flows below Flaming Gorge Dam intended to benefit CP spawning and rearing success. Anecdotal observations suggest CP production may have been higher in years prior to flow restrictions for endangered fish. Based on long-term CP monitoring data in the Green River, Bestgen and Hill (2016) concluded that CP would benefit from higher summer baseflows (1,700-3,000 ft 3 /sec) with flows above or below associated with lower abundance of age-0 CP. Therefore, flexibility in the ROD is currently being utilized to establish higher stable summer base flows in an attempt create more advantageous conditions for spawning and rearing CP. These fish recovery flows are restrictive to WAPA in the summer months, therefore it is necessary to conduct an analysis of historic river data relationships to CP abundance to better understand if the recommended fish flows (elevated and stable base flows) are necessary for fish recovery.

54 ENVIRONMENTAL SCIENCES↗

Evaluation of a 5kW Solid Oxide Electrolysis Cell Stack

Solid oxide electrolysis cells (SOECs) are a developing technology for hydrogen production. They are promising due to their utilization of thermal energy to reduce their electricity consumption. The Department of Energy (DOE) has set goals to reduce the price per kilogram of hydrogen, and Idaho National Laboratory (INL) is conducting research to develop and demonstrate advanced methods and technologies to achieve making hydrogen a more affordable, efficient, and sustainable energy source. In this project, INL is collaborating with a vendor to evaluate and validate the design of a 5kW SOEC stack. The test aims to demonstrate a safe startup, operation, and shutdown on INL’s 5kW test stand, providing third-party validation in a different environment. A successful 50-hour test with stable hydrogen production will pave the way for a subsequent 1000-hour test. This project emphasized learning about electrolysis and the various support systems, referred to as balance of plant (BOP) equipment. These systems required modification while swapping to the vendor 5kW SOEC stack, most prominently the furnace door design and the controls system. It also included gaining skills in creating computer-aided design (CAD) drawings for the new door while using available materials and ensuring it met high-temperature requirements. Upon completion of modifications to the test stand, the SOEC will be test-fitted with respective wiring and piping. Instrumentation and piping will be checked for leaks and quality. This must be completed before the vendor’s engineers arrive to observe the test plan, startup, and a collection of 50 hours of data. The vendor’s engineers will ensure their stack performed sufficiently in the 50-hour test to enable the progression to a 1000-hour test.

08 - HYDROGEN↗

Fiscal Year 2020 Filtration of Hanford Tank Waste 241-AP-105

Bench-scale filtration testing of 15 liters of 241-AP-105 supernatant was conducted using a Mott inline filter Model 6610 (media grade 5) backpulsed dead-end filter (BDEF) in the hot cells of the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. The as-received samples were diluted with raw water from the Hanford Site to assess the propensity for solids to form upon dilution and to assess the impact those solids have on filtration performance. The feed was split into two batches. The first batch was settled and decanted as planned in Tank Side Cesium Removal operations. The BDEF was used to filter this AP-105 feed at a targeted flux of 0.065 gpm/ft 2 and exhibited no measurable pressure increase during filtration. The second batch was fed to the BDEF with solids resuspended. This was also operated at the targeted flux of 0.065 gpm/ft 2 . In this case, the target pressure differential of 2 psid (resistance of 6.24 × 10 10 m -1 ) was reached in slightly more than 12 h. A backpulse restored the filter flux; however, the time to the next backpulse was slightly shorter. These tests indicate that after the addition of raw water, settle and decant effectively removed solids from the feed. It is not possible to assess the time required for these solids to settle based on the result from these tests. However, if sufficient time is allowed for the solids to settle, no measurable filter fouling was observed in current testing. In contrast, if insufficient time is allowed for solids to settle, filter fouling will occur relatively quickly and will likely require backpulses more frequently than every 12 hours (1.91 m 3 /m 2 volume filtered). Solids concentrated from backpulse solutions displayed large variability in composition with Al-silicates and mixed chromium-aluminum oxide phases. Amounts of Mg, Fe, and Ca were also found in the presence of Na and O. These solids could be grouped in three categories: (1) soluble Na-salts that formed large block-like particles but were made up of fibrous materials, (2) amorphous Al-phases, and (3) colloidal iron oxides with an average particle diameter of 4.2 µm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning Amidst Uncertainty: Identifying Core CCS Infrastructure Robust to Storage Uncertainty

Carbon Capture and Storage (CCS) is a critical technology for reducing anthropogenic CO2 emissions, but its large-scale deployment is complicated by uncertainties in geological storage performance. These uncertainties pose significant financial and operational risks, as underperforming storage sites can lead to costly infrastructure modifications, inefficient pipeline routing, and economic shortfalls. To address this challenge, we propose a novel optimization workflow that is based on mixed-integer linear programming and explicitly integrates probabilistic modeling of storage uncertainty into CCS infrastructure design. This workflow generates multiple infrastructure scenarios by sampling storage capacity distributions, optimally solving each scenario using a mixed-integer linear programming model, and aggregating results into a heatmap to identify core infrastructure components that have a low likelihood of underperforming. A risk index parameter is introduced to balance trade-offs between cost, CO2 processing capacity, and risk of underperformance, allowing stakeholders to quantify and mitigate uncertainty in CCS planning. Applying this workflow to a CCS dataset from the US Department of Energy’s Carbon Utilization and Storage Partnership project reveals key insights into infrastructure resilience. Reducing the risk index from 15% to 0% is observed to lead to an 83.7% reduction in CO2 processing capacity and a 77.1% decrease in project profit, quantifying the trade-off between risk tolerance and project performance. Furthermore, our results highlight critical breakpoints, where small adjustments in the risk index produce disproportionate shifts in infrastructure performance, providing actionable guidance for decision-makers. Unlike prior approaches that aimed to cheaply repair underperforming infrastructure, our workflow constructs robust CCS networks from the ground up, ensuring cost-effective infrastructure under storage uncertainty. These findings demonstrate the practical relevance of incorporating uncertainty-aware optimization into CCS planning, equipping decision-makers with a tool to make informed project planning decisions.

Olson, Daniel↗

Analysis of a Disturbance Event with Inverter-Based Resources Using EMT Simulations

Increasing penetration of inverter-based resources (IBRs) necessitates newer methods of planning and analysis of disturbances. The existing phasor-domain transient stability (TS) analysis may not capture the dynamics of IBRs during fault events. Here, in this paper, electromagnetic transient (EMT) simulations using high-fidelity detailed model of power grid and one of the affected photovoltaic (PV) plants during the Angeles Forest disturbance in 2018 are performed. In these simulations, the processes to develop EMT models of power grid from traditional phasor-domain TS data and PV plant from collected data are described. Thereafter, using these simulations, the response of the PV plant during the fault event in 2018 is replicated and a sensitivity analysis is performed. The sensitivity analysis consists of making changes to the components within the PV plant and in the power grid to evaluate the impact they have on the response observed by the PV plant during the fault event. This analysis provides an understanding of the components that impact the operation of a PV plant during fault events and provide guidance to system planners on the studies that need to be performed to maintain a reliable power grid as new IBR plants are integrated.

42 ENGINEERING↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR) 5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of the development and qualification of tri-structural isotropic (TRISO) low enriched fuel for use in high-temperature gas-cooled reactors (HTGR). The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR 5/6/7 experiment were to: 1. Irradiate reference-design fuel particles to support fuel qualification. 2. Establish operating margins for the fuel, beyond normal operating conditions. 3. Provide irradiated-fuel performance data and irradiated-fuel samples for post irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective is to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast (NE) flux trap of the ATR with a planned duration of 500 effective full-power days (EFPDs). The NE flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B?168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 EFPDs. Final burnup values, on a per-compact basis, ranged from 5.66% to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples (TC) had failed (the bottom three capsules lost all TCs). During the first five cycles (162B ? 165A), fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8?10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to the maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particle failures in Capsule 3, which was considered possible at the start of the irradiation, since the experiment was designed to operate beyond the high-temperature gas-cooled reactor (HTGR) normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR)-5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory in support of the development and qualification of tri-structural isotropic low-enriched fuel for use in high-temperature gas-cooled reactors. The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR-5/6/7 experiment were to: • Irradiate reference-design fuel particles to support fuel qualification. • Establish operating margins for the fuel, beyond normal operating conditions. • Provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective was to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR-5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast flux trap of the ATR with a planned duration of 500 effective full-power days. The northeast flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B–168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 effective full-power days. Final burnup values, on a per-compact basis, ranged from 5.66 to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples had failed (the bottom three capsules lost all thermocouples). During the first five cycles (162B – 165A), the fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8–10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to a maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented a fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particles failed in Capsule 3, which was considered possible because the experiment was designed to operate beyond the high-temperature gas-cooled reactor normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to the lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, Cycle 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on the absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lithium, a path to make fusion energy affordable

In this tutorial article, we review the technological, physics, and economic basis for a magnetic fusion device utilizing a flowing liquid lithium divertor (molten metal velocity in the range of cm/s) and operating in a low-recycling plasma regime. When extrapolated to magnetic fusion reactor scale, the observed effects of a liquid lithium boundary on recycling reduction, confinement increase, and anomalous heat transport mitigation may offer a fundamentally distinct and promising alternative route to fusion energy production. In addition, this lithium-driven low recycling regime could accelerate fusion’s commercial viability since such a device would be smaller, dramatically decreasing plant and electricity costs if all technological complexities are solved. First, the theoretical basis of the energy confinement and fusion performance as well as the related possibilities of low recycling regimes driven by flowing lithium plasma-facing components are reviewed. Then the paper emphasizes the technological obstacles that need to be overcome for developing the necessary systems for such a flowing liquid lithium solution at reactor scale and details how many of these have been overcome at laboratory and/or proof-of-concept scale. Finally, the current and planned scientific and engineering endeavors being performed at the University of Illinois at Urbana-Champaign regarding this alternative reactor option are discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Extent-of-Condition Review of Electrical Events Fiscal Year 2019

Sandia National Laboratories has experienced a number of electrical events in recent years. A careful examination of data shows that for the third year in a row, two of the three most frequently categorized Occurrence Reporting and Processing System (ORPS)-reportable event types were unexpected or unintended personal contact with a hazardous energy source and a failure to follow a prescribed hazardous energy control process, as defined in the occurrence reporting criteria of DOE Order 232.2A, Occurrence Reporting and Processing of Operations Information, 2D(1) and 2D(2). Sandia policy CA001.2, Identify and Manage Issues, requires an extent-of-condition review for any high-level reportable occurrence, and the analysts were tasked to perform this EOC in light of high-level reportable occurrence NA-SS-SNL-1000-2019- 0007, Contact with Electrical Energy During Marx Capacitor Troubleshooting. This extent of condition not only evaluated the 10 reportable electrical occurrences for Fiscal Year 2019, but also looked at 11 other related events: those involving control of hazardous energy and electrical events associated with less than hazardous energy.1 This Extent-of-Condition report makes several observations, conclusions, and recommendations for improvement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗