Search NASA⌕ Search

SEARCH · Search NASA

Results for “office building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

More Than A SketchUp

This 2014 summer internship assignment at John F. Kennedy Space Center (K.S.C) was conducted with the National Aeronautics and Space Administration (NASA) Engineering and Technology (NE) group in support of the Control and Data Systems Division (NE-C) within the Test, Operations & Support Software Engineering Branch (NE-C2). The primary focus of this project was to assist Branch Chief Laurie B. Griffin, to support NASA's Small Payload Launch Integrated Testing Services (SPLITS) mission, by mastering the capabilities of 3-D modeling software called SketchUp. I used SketchUp to create a virtual environment for different laboratories of the NE-00 Division. My mission was to have these models uploaded into a K.S.C Partnerships Website and be used as a visual aid to viewers who browsed the site. The leads of this project were Kay L. Craig, Business and Industry Specialist (AD-A) and Steven E. Cain, (FA-C). I teamed with fellow intern Tait Sorenson of the Flight Structures and Thermal Protection Systems Branch (NE-M5) and met with many K.S.C lab managers willing to display their lab's structure and capabilities. The information collected during these lab tours was vital to the building of the K.S.C Partnerships Website. To accomplish this goal Sorenson and I later teamed with fellow Marketing intern Marlee Pereda-Ramos, of the Spaceport Planning Office In Center Planning And Development (AD-A) Along with Ramos, Tait and I toured an array of laboratories and got first hand exposure to their functions and capabilities.

Trimble Corporation↗

Space Launch System Co-Manifested Payload Options for Habitation

The Space Launch System (SLS) has a co-manifested payload capability that will grow over time as the rocket matures and planned upgrades are implemented. The final configuration is planned to be capable of inserting a payload greater than 10 metric tons (mt) into a trans-lunar injection trajectory along with the crew in the Orion capsule and the service module. The co-manifested payload is located below the Orion and its service module in a 10-meter high fairing similar to the way the Saturn launch vehicle carried the lunar lander below the Apollo command and service modules. A variety of approaches have been explored that utilizes this co-manifested payload capability to build up infrastructure in deep space in support of future asteroid, lunar, and Mars mission scenarios. This paper is a report on the findings from the Advanced Concepts Office study team at the NASA Marshall Space Flight Center, working with the Advanced Exploration Systems Program on the Exploration Augmentation Module Project. It includes some of the possible options for habitation in the co-manifested payload volume on SLS. Findings include module designs that can be developed in 10mt increments to support these missions, including overall conceptual layouts, mass properties, and approaches for integration into various scenarios for near-term support of deep space habitat research and technology development, support to asteroid exploration, and long range support for Mars transfer flights.

Smitherman, David↗

The Habitat Demonstration Unit Project

This paper will describe an overview of the NASA-led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a technology-pull project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition. The HDU project will be part of the 2010 Desert Research and Technologies Simulations (DRATS). The purpose of this project is to develop, integrate, test, and evaluate a HDU in the context of the mission architectures and surface operation concepts. This HDU is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. A multi-center approach with be utilized to build, integrate, and test the HDU project through a shared collaborative effort of multiple NASA centers. This project is part of the strategic plan from the ESMD Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment which includes two Lunar Electric Rovers and the HDU during the 2010 analog field test. This paper will describe the overall objectives, its various configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests.

Kennedy, Kriss J.↗

Space Launch System Co-Manifested Payload Options for Habitation

The Space Launch System (SLS) has a co-manifested payload capability that will grow over time as the launch vehicle matures and planned upgrades are implemented. The final configuration is planned to be capable of inserting a payload greater than 10 metric tons (mt) into a trans-lunar injection trajectory along with the crew in the Orion capsule and its service module. The co-manifested payload is located below the Orion and its service module in a 10 m high fairing similar to the way the Saturn launch vehicle carried the lunar lander below the Apollo command and service modules. Various approaches that utilize this comanifested payload capability to build up infrastructure in deep space have been explored in support of future asteroid, lunar, and Mars mission scenarios. This paper reports on the findings of the Advanced Concepts Office study team at NASA Marshall Space Flight Center (MSFC) working with the Advanced Exploration Systems Program on the Exploration Augmentation Module Project. It includes some of the possible options for habitation in the co-manifested payload volume of the SLS. Findings include a set of module designs that can be developed in 10 mt increments to support these co-manifested payload missions along with a comparison of this approach to a large-module payload flight configuration for the SLS.

Smitherman, David↗

The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

Kidd, Luanne↗

Analysis of Possible Explosions at Kennedy Space Center Due to Spontaneous Ignition of Hypergolic Propellants

NASA's Constellation Program plan currently calls for the replacement of the Space Shuttle with the ARES I & V spacecraft and booster vehicles to send astronauts to the moon and beyond. Part of the ARES spacecraft is the Orion Crew Exploration Vehicle (CEV), which includes the Crew Module (CM) and Service Module (SM). The Orion CM's main propulsion system and supplies are provided by the SM. The SM is to be processed off line and moved to the Vehicle Assembly Building (V AB) for stacking to the first stage booster motors prior to ARES move to the launch pad. The new Constellation Program philosophy to process in this manner has created a major task for the KSC infrastructure in that conventional QD calculations are no longer viable because of the location of surrounding facilities near the VAB and the Multi Purpose Processing Facility (MPPF), where the SM will be serviced with nearly 18,000 pounds of hypergolic propellants. The Multi-Payload Processing Facility (MPPF) complex, constructed by NASA in 1994, is located just off E Avenue south of the Operations and Checkout (O&C) building in the Kennedy Space Center industrial area. The MPPF includes a high bay and a low bay. The MPPF high bay is 40.2 m (132 ft) long x 18.9 m (60 ft) wide with a ceiling height of 18.9 m (62 ft). The low bay is a 10.4 m (34 ft) long x 10.4 m (34 ft) wide processing area and has a ceiling height of6.1 m (20 ft). The MPPF is currently used to process non-hazardous payloads. Engineering Analysis Inc. (EAI), under contract with ASRC Aerospace, Inc. in conjunction with the Explosive Safety Office, NASA, Kennedy Space Center (KSC), has carried out an analysis of the effects of explosions at KSC in or near various facilities produced by the spontaneous ignition ofhypergolic fuel stored in the CEV SM. The facilities considered included (1) Vehicle Assembly Building (VAB) (2) Multi-Payload Processing Facility (MPPF) (3) Canister Rotation Facility (CRF) Subsequent discussion deals with the MPPF analysis. Figure 1 provides a view of the MPPF from the northwest. An interior view ofthe facility is shown in Figure 2. The study was concerned with both blast hazards and hazardous fragments which exceed existing safety standards, as described in Section 2.0. The analysis included both blast and fragmentation effects and was divided into three parts as follows: (1) blast (2) primary fragmentation (3) secondary fragmentation Blast effects are summarized in Section 3.0, primary fragmentation in Section 4.0, and secondary fragmentation (internal and external) in Section 5.0. Conclusions are provided in Section 6.0, while references cited are included in Section 7.0. A more detailed description of the entire study is available in a separate document.

Brown, Stephen↗

Work Term Assignment Spring 2017

My tour in the Engineering Robotics directorate exceeded my expectations. I learned lessons about Creo, manufacturing and assembly, collaboration, and troubleshooting. During my first tour, last spring, I used Creo on a smaller project, but had limited experience with it before starting in the Dynamic Systems Test branch this spring. I gained valuable experience learning assembly design, sheet metal design and designing with intent for manufacturing and assembly. These skills came from working both on the hatch and the floor. I also learned to understand the intent of other designers on models I worked with. While redesigning the floor, I was modifying an existing part and worked to understand what the previous designer had done to make it fit with the new model. Through working with the machine shop and in the mock-up, I learned much more about manufacturing and assembly. I used a Dremel, rivet gun, belt sander, and countersink for the first time. Through taking multiple safety training for different machine shops, I learned new machine shop safety skills specific to each one. This semester also gave me new collaborative opportunities. I collaborated with engineers within my branch as well as with Human Factors and the building 10 machine shop. This experience helped me learn how to design for functionality and assembly, not only for what would be easiest in my designs. In addition to these experiences, I learned many lessons in troubleshooting. I was the first person in my office to use a Windows 10 computer. This caused unexpected issues with NASA services and programs, such as the Digital Data Management Server (DDMS). Because of this, I gained experience finding solutions to lockout and freeze issues as well as Creo specific settings. These will be useful skills to have in the future and will be implemented in future rotations. This co-op tour has motivated me more to finish my degree and pursue my academic goals. I intend to take a machining Career Gateway Elective in the Fall to improve my skills in building as well as designing with manufacturing intent. I am also inspired to take more mechatronics CGE courses before I graduate to learn more about the crossover between mechanical and electrical engineering. This semester, I worked on multiple projects and had the opportunity to learn from engineers of different disciplines. I became proficient in Creo 2.0, a program I had not used significantly before. I finished modifying the hatch for 3D print and made sizeable modifications to the nose floor support design. I also gained hands-on experience that will be useful in my engineering career in the future. I would consider all of these major achievements from this spring semester. Lastly, I learned to ask more questions and to search for the right people to find answers which I know will be a valuable skill in the future. This summer, I will be completing my last rotation in the Flight Operations Directorate at Ellington Air Field. After this last tour, I will be returning to school for the Fall, Spring and Summer. I will graduate in August of 2018. I am looking forward to learning more about the different jobs available to engineers. This division works directly with many different types of aircrafts and I am excited to learn more about this focus of engineering. The Aircraft Operations Division values team work greatly and I intend to improve my interpersonal skills by working with them this summer.

Sico, Mallory↗

Chemical research projects office functions accomplishments programs

Basic and applied research in the fields of polymer chemistry, polymeric composites, chemical engineering, and biophysical chemistry is summarized. Emphasis is placed on fire safety and human survivability as they relate to commercial and military aircraft, high-rise buildings, mines and rapid transit transportation. Materials systems and other fire control systems developed for aerospace applications and applied to national domestic needs are described along with bench-scale and full-scale tests conducted to demonstrate the improvements in performance obtained through the utilization of these materials and fire control measures.

Heimbuch, A. H.↗

NASA's Ares I and Ares V Launch Vehicles--Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) is charting a renewed course for lunar exploration, with the fielding of a new human-rated space transportation system to replace the venerable Space Shuttle, which will be retired after it completes its missions of building the International Space Station (ISS) and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Altair Lunar Lander, which will be delivered by the Ares V Cargo Launch Vehicle (fig. 1). This configuration will empower rekindled investigation of Earth's natural satellite in the not too distant future. This new exploration infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit (LEO) for extended lunar missions and preparation for the first long-distance journeys to Mars. All space-based operations - to LEO and beyond - are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective architecture solutions to sustain this multi-billion-dollar program across several decades. Leveraging SO years of lessons learned, NASA is partnering with private industry and academia, while building on proven hardware experience. This paper outlines a few ways that the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Constellation Program and its project offices to streamline ground operations concepts by designing for operability, which reduces lifecycle costs and promotes sustainable space exploration.

Singer, Christopher E.↗

Dropping in on Mars

Here I was: 26 years old, I had never worked on a flight project before, and all eyes were on me. Every time I walked by the Pathfinder project office, Tony Spear, the project manager, would throw his arm around me and announce, 'Hey everybody, the whole mission is riding on this guy right here.' Our task was to design and build airbags for Pathfinder s landing on Mars - an approach that had never been used on any mission. Airbags may seem like a simple, low-tech product, but it was eye-opening to discover just how little we knew about them. We knew that the only way to find out what we needed to learn was to build prototypes and test them. We just didn t know how ignorant we were going to be. Airbags seemed like a crazy idea to a lot of people. Nobody ever said that, mind you, but there seemed to be a widespread feeling that the airbags weren t going to work. 'We ll let you guys go off and fool around until you fall flat on your faces.' That was the unspoken message I received day after day.

Rivellini, Tommaso P.↗

Command and Control of Space Assets Through Internet-Based Technologies Demonstrated

The NASA Glenn Research Center successfully demonstrated a transmission-control-protocol/ Internet-protocol- (TCP/IP) based approach to the command and control of onorbit assets over a secure network. This is a significant accomplishment because future NASA missions will benefit by using Internet-standards-based protocols. Benefits of this Internet-based space command and control system architecture include reduced mission costs and increased mission efficiency. The demonstration proved that this communications architecture is viable for future NASA missions. This demonstration was a significant feat involving multiple NASA organizations and industry. Phillip Paulsen, from Glenn's Project Development and Integration Office, served as the overall project lead, and David Foltz, from Glenn's Satellite Networks and Architectures Branch, provided the hybrid networking support for the required Internet connections. The goal was to build a network that would emulate a connection between a space experiment on the International Space Station and a researcher accessing the experiment from anywhere on the Internet, as shown. The experiment was interfaced to a wireless 802.11 network inside the demonstration area. The wireless link provided connectivity to the Tracking and Data Relay Satellite System (TDRSS) Internet Link Terminal (TILT) satellite uplink terminal located 300 ft away in a parking lot on top of a panel van. TILT provided a crucial link in this demonstration. Leslie Ambrose, NASA Goddard Space Flight Center, provided the TILT/TDRSS support. The TILT unit transmitted the signal to TDRS 6 and was received at the White Sands Second TDRSS Ground Station. This station provided the gateway to the Internet. Coordination also took place at the White Sands station to install a Veridian Firewall and automated security incident measurement (ASIM) system to the Second TDRSS Ground Station Internet gateway. The firewall provides a trusted network for the simulated space experiment. A second Internet connection at the demonstration area was implemented to provide Internet connectivity to a group of workstations to serve as platforms for controlling the simulated space experiment. Installation of this Internet connection was coordinated with an Internet service provider (ISP) and local NASA Johnson Space Center personnel. Not only did this TCP/IP-based architecture prove that a principal investigator on the Internet can securely command and control on-orbit assets, it also demonstrated that valuable virtual testing of planned on-orbit activities can be conducted over the Internet prior to actual deployment in space.

Foltz, David A.↗

First Commerical Operations on the International Space Station

As part of NASA's mission of furthering the commercial development of space, the Space Product Development Office has sponsored the flight of seven commercial payloads to the International Space Station (ISS) during calendar year 2001. Most of these payloads, which are among the first users of this new laboratory, build upon successful commercial investigations that previously were restricted to the limited flight duration of the Space Shuttle. These commercial operations range from multi-media, in the form of Dreamtime, to biotechnology such as in Advanced Astroculture, to advanced materials such as Zeolite Crystal Growth. Industry investment in the commercial program has continued to remain high, while awaiting long term access to space, which the ISS provides. While the majority of early commercial use of the ISS is in the area of biotechnology, there is a significant shift towards commercial materials research over the next two years. In order to take fall advantage of the ISS, much of the commercial hardware is designed to be left on Station, while the Shuttle brings samples up and down. This not only makes good use of this valuable space resource, it has the added benefit of having commercial hardware available on the ISS for scientific users. In order to provide benefit to the entire NASA microgravity program, the scientific community on a space available basis can use a variety of commercial apparatus at very low cost. In addition to the solution crystal growth capability of Creosote Crystal Growth, in 2002 containerless processing will be available in the form of Space-DRUMS, and in 2003, thermophysical properties research can be performed in the Vulcan furnace. The first commercial operations on the ISS provides not only a much needed capability to the commercial development of space program, it also has the potential to augment the science program as well.

Nall, Mark E.↗

The Habitat Demonstration Unit Project Overview

This paper will describe an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) Project. The HDU project is a "technology-pull" project that integrates technologies and innovations from numerous NASA centers. This project will be used to investigate and validate surface architectures, operations concepts, and requirements definition of various habitation concepts. The first habitation configuration this project will build and test is the Pressurized Excursion Module (PEM). This habitat configuration - the PEM - is based on the Constellation Architecture Scenario 12.1 concept of a vertically oriented habitat module. The HDU project will be tested as part of the 2010 Desert Research and Technologies Simulations (D-RATS) test objectives. The purpose of this project is to develop, integrate, test, and evaluate a habitat configuration in the context of the mission architectures and surface operation concepts. A multi-center approach will be leveraged to build, integrate, and test the PEM through a shared collaborative effort of multiple NASA centers. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Lunar Surface Systems Project Office (LSSPO) to test surface elements in a surface analog environment. The 2010 analog field test will include two Lunar Electric Rovers (LER) and the PEM among other surface demonstration elements. This paper will describe the overall objectives, its various habitat configurations, strategic plan, and technology integration as it pertains to the 2010 and 2011 field analog tests. To accomplish the development of the PEM from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using a set of design standards to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into PEM are planned to facilitate the integration process.

Kennedy, Kriss J.↗

Global NWP Impacts of Infrared Sounders from Geostationary Orbit

The Geostationary eXtended Observations (GeoXO) program, expected to launch in the 2030s, includes a proposed infrared (IR) sounder that would provide persistent atmospheric profile observations over much of the western hemisphere. In preparation, the National Aeronautics and Space Administration (NASA) Global Modeling and Assimilation Office (GMAO) observing system simulation experiment (OSSE) framework was used to assess the impact of such an instrument on global numerical weather prediction (NWP) as part of a global “ring” of such instruments. Building on previous preliminary studies, an evaluation of the impact of geostationary IR sounders will be presented with foci on the analysis, forecasts, and the forecast sensitivity observation impact (FSOI) metric, including an examination of the consequences for tropical cyclone representation. Overall, assimilation of geostationary IR provide a beneficial impact for NWP applications.

Erica L. Mcgrath-spangler↗

IAC Abstract for Orbital Debris Phase II Report

Orbital debris poses a growing risk for spacecraft operations. This risk has most often been measured by proxies, like the number of debris or expected collisions, but few have attempted quantify the consequences of orbital debris or the costs and benefits of different methods to address the problem. This has made it difficult to assess the trade-offs and relative value among proposed actions for the mitigation, tracking, and remediation of debris. In March of 2023, the NASA Office of Technology, Policy, and Strategy (OTPS) took a step toward quantifying these relative values when we released Cost and Benefit Analysis of Orbital Debris Remediation. Since that time, OTPS has continued to build on this work. We have increased the fidelity of our risk model. For example, we added an ensemble of risk models that use varying assumptions of debris populations and lethality, included debris as small as 1mm, and incorporated atmospheric drag to naturally deorbit debris. We have also expanded our cost-benefit calculations to include action that mitigate and track debris, both large and small. The analysis has several important findings regarding the conditions under which debris remediation is more cost-effective than mitigation and tracking, the value of increased shielding of spacecraft and faster timelines for post-mission disposal, and how changes in the portfolio have interdependent effects. This presentation summarizes the body of work, with a particular focus on the risks and benefits to the global spacecraft population.

orbital debris↗

The Office of the Materials Division

I was assigned to the Materials Division, which consists of the following branches; the Advanced Metallics Branch/5120-RMM, Ceramics Branch/5130-RMC, Polymers Branch/5150-RMP, and the Durability and Protective Coatings Branch/5160-RMD. Mrs. Pamela Spinosi is my assigned mentor. She was assisted by Ms.Raysa Rodriguez/5100-RM and Mrs.Denise Prestien/5100-RM, who are both employed by InDyne, Inc. My primary assignment this past summer was working directly with Ms. Rodriguez, assisting her with setting up the Integrated Financial Management Program (IFMP) 5130-RMC/Branch procedures and logs. These duties consisted of creating various spreadsheets for each individual branch member, which were updated daily. It was not hard to familiarize myself with these duties since this is my second summer working with Ms Rodriguez at NASA Glenn Research Center. RMC ordering laboratory, supplies and equipment for the Basic Materials Laboratory (Building 106) using the IF'MP/Purchase Card (P-card), a NASA-wide software program. I entered into the IFMP/Travel and Requisitions System, new Travel Authorizations for the 5130-RMC Civil Servant Branch Members. I also entered and completed Travel Vouchers for the 5130-RMC Ceramics Branch. I assisted in the Division Office creating new Emergency Contact list for the Materials Division. I worked with Dr. Hugh Gray, the Division Chief, and Dr. Ajay Misra, the 5130-RMC Branch Chief, on priority action items, with a close deadline, for a large NASA Proposal. Another project was working closely with Ms. Rodriguez in organizing and preparing for Dr. Ajay K. Misra's SESCDP (two year detail). This consisted of organizing files, file folders, personal information, and recording all data material onto CD's and printing all presentations for display in binders. I attended numerous Branch meetings, and observed many changes in the Branch Management organization.

Ramsey, amanda J.↗

Design of a GaAs/Ge Solar Array for Unmanned Aerial Vehicles

Unmanned Aerial Vehicles (UAV) are being proposed for many applications including surveillance, mapping and atmospheric studies. These applications require a lightweight, low speed, medium to long duration airplane. Due to the weight, speed, and altitude constraints imposed on such aircraft, solar array generated electric power is a viable alternative to air-breathing engines. Development of such aircraft is currently being funded under the Environmental Research Aircraft and Sensor Technology (ERAST) program. NASA Lewis Research Center (LeRC) is currently building a Solar Electric Airplane to demonstrate UAV technology. This aircraft utilizes high efficiency Applied Solar Energy Corporation (ASEC) GaAs/Ge space solar cells. The cells have been provided by the Air Force through the ManTech Office. Expected completion of the plane is early 1995, with the airplane currently undergoing flight testing using battery power.

Scheiman, David A.↗

The Origin of Systematic Errors in the GCM Simulation of ITCZ Precipitation over Oceans

This study provides explanations for some of the experimental findings of Chao (2000) and Chao and Chen (2001) concerning the mechanisms responsible for the ITCZ in an aqua-planet model. These explanations are then applied to explain the origin of some of the systematic errors in the GCM simulation of ITCZ precipitatin over oceans. The ITCZ systematic errors are highly sensitive to model physics and by extension model horizontal resolution. The findings in this study along with those of Chao (2000) and Chao and Chen (2001, 2004) contribute to building a theoretical foundation for ITCZ study. A few possible methods of alleviating the systematic errors in the GCM simulaiton of ITCZ are discussed. This study uses a recent version of the Goddard Modeling and Assimilation Office's Goddard Earth Observing System (GEOS-5) GCM.

Chao, Winston C.↗