Search NASA⌕ Search

SEARCH · Search NASA

Results for “optimal control allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

148 records · Page 9

Coarse-Grain Bandwidth Estimation Scheme for Large-Scale Network

A large-scale network that supports a large number of users can have an aggregate data rate of hundreds of Mbps at any time. High-fidelity simulation of a large-scale network might be too complicated and memory-intensive for typical commercial-off-the-shelf (COTS) tools. Unlike a large commercial wide-area-network (WAN) that shares diverse network resources among diverse users and has a complex topology that requires routing mechanism and flow control, the ground communication links of a space network operate under the assumption of a guaranteed dedicated bandwidth allocation between specific sparse endpoints in a star-like topology. This work solved the network design problem of estimating the bandwidths of a ground network architecture option that offer different service classes to meet the latency requirements of different user data types. In this work, a top-down analysis and simulation approach was created to size the bandwidths of a store-and-forward network for a given network topology, a mission traffic scenario, and a set of data types with different latency requirements. These techniques were used to estimate the WAN bandwidths of the ground links for different architecture options of the proposed Integrated Space Communication and Navigation (SCaN) Network. A new analytical approach, called the "leveling scheme," was developed to model the store-and-forward mechanism of the network data flow. The term "leveling" refers to the spreading of data across a longer time horizon without violating the corresponding latency requirement of the data type. Two versions of the leveling scheme were developed: 1. A straightforward version that simply spreads the data of each data type across the time horizon and doesn't take into account the interactions among data types within a pass, or between data types across overlapping passes at a network node, and is inherently sub-optimal. 2. Two-state Markov leveling scheme that takes into account the second order behavior of the store-and-forward mechanism, and the interactions among data types within a pass. The novelty of this approach lies in the modeling of the store-and-forward mechanism of each network node. The term store-and-forward refers to the data traffic regulation technique in which data is sent to an intermediate network node where they are temporarily stored and sent at a later time to the destination node or to another intermediate node. Store-and-forward can be applied to both space-based networks that have intermittent connectivity, and ground-based networks with deterministic connectivity. For groundbased networks, the store-and-forward mechanism is used to regulate the network data flow and link resource utilization such that the user data types can be delivered to their destination nodes without violating their respective latency requirements.

Cheung, Kar-Ming↗

Supply and Resource Management to Progressively Enable EIMO

BACKGROUND: Current medical operations in Low Earth Orbit (LEO) allow for real-time audio-video communication with a flight surgeon at mission control, resupply, and medical evacuation to earth on the order of hours. As mission profiles change from LEO to the Moon, Mars, and beyond, medical risk as a contribution to overall mission risk is anticipated to rise substantially. Concurrently, due to the distance, the medical systems on board vehicles proposed for these mission types are expected to have reduced mass and volume allocation. Together, astronaut crews will be at a higher risk of major medical events, be required to perform a broader set of tasks, and have substantially reduced resources and support to do so. Earth Independent Medical Operations (EIMO) aims to identify and fill the gaps present in this progressively changing paradigm. OVERVIEW: Medical supplies, resources, and skills are central to spaceflight medical systems. Vehicles used for non-LEO missions are anticipated to be smaller and thus the medical system will also need to have reduced mass, volume, and power. Medical resources are another form of consumable and may need resupply or pre-deployment to meet crew needs. One particular concern is the degradation of medications which become less efficacious and potentially toxic with time, particularly given environmental conditions such as temperature, humidity, oxygen, and radiation which have not yet been fully studied. Supply and resource management in LEO is dependent on resupply, however the supply chain of transporting equipment does not yet have a clear infrastructure for missions beyond LEO. DISCUSSION: EIMO is intended to systemically identify and fill these gaps with forward-looking solutions. In mission monitoring of resources with technology like RFID, improving medical resource longevity, targeted resupply and careful pre-mission planning will be central to facilitate crew health and performance. One approach to optimizing resources is the Informing Mission Planning via Analysis of Complex Tradespaces (IMPACT) tool, which uses probabilistic risk assessment (PRA) to quantitatively predict medical risk and identify resources and skills that mitigate this risk. This evidence based, quantitative analysis prediction tool and several other approaches to meeting the challenge of supply and resource management are discussed.

Arian Anderson↗

Aerocapture Trajectory Design for Uranus Orbiter

Introduction: The recently released National Academies Planetary Science and Astrobiology Decadal Survey 2023-2032 [1] identified the Ice Giants as the top priority science destination. While the survey acknowledged the potential for either a Uranus Orbiter and Probe (UOP) mission or a Neptune-Triton Odyssey mission, it ultimately identified the former as the highest priority new flagship mission. UOP missions calls for a launch window of opportunity between 2031-2038 with 12-15 year interplanetary cruise time along with a fully-propulsive Uranus Orbit Insertion burn on the order of a few km/s. However, a mission to Uranus with the same science payload could utilize aerocapture for orbit insertion to achieve both a significant reduction in the interplanetary cruise time and reduction in propulsive burn costs. Why Aerocapture: Aerocapture is a promising propellant and time-saving orbital insertion technique for planetary destinations with an atmosphere. Although not flight-proven, previous aerocapture systems studies in the literature have demonstrated both the validity and robustness of the technique at various planetary destinations. With respect to the Ice Giant planets, Neptune has seen more of the analysis in the literature. For science missions at Neptune, aerocapture can enable 1.4 times more delivered mass to orbit than an all-propulsive mission for the same launch vehicle while reducing interplanetary cruise times by more than 3 years [2] Additionally with modern guidance and control, Neptune aerocapture with blunt-body aeroshells is realizable [3][4]. There are limited papers in the literature investigating Uranus aerocapture with those available providing a preliminary feasibility assessment [5]. Consequently, the two-year funded NASA Space Technology Mission Directorate (STMD)-funded project, titled Aerocapture System as an Enabling Technology for Ice Giants Missions, aims to mature the analysis and technology state of Uranus aerocapture. Trajectory Design: This paper presents the current state of the trajectory design in support of the new aerocapture project. The project design philosophy is inspired from recent Neptune aerocapture studies, which employed modern guidance and control, in the sense that blunt-body aeroshells are analyzed. An assessment of the theoretical flight path angle corridor width is conducted for a range of ballistic coefficients and lift-to-drag ratios for both Space Launch System and Falcon Heavy Launch Vehicle interplanetary trajectory solutions. The results from the corridor width assessment provide an assessment of the aerocapture design-space and qualitative metrics on trajectory design considerations. The Program to Optimize Simulated Trajectories II (POST2) is utilized to run Monte Carlo simulations of Uranus aerocapture three-degree-of-freedom bank angle modulated trajectories using a closed-loop numerical-predictor corrector guidance algorithm. UranusGRAM 2021 is utilized as the atmospheric model [6]. A Uranus-developed aerodatabase, originally derived from Mars Science Laboratory (MSL), is utilized to provide vehicle aerodynamics over a wide range of hypersonic flow regimes. A MSL-derived 70 deg 4.5m diameter sphere-cone aeroshell that houses the UOP payload mass is assumed. Robustness testing and performance analysis is conducted, including the assessment of entry state errors, atmosphere density variations, and aerodynamic dispersions. Post-aerocapture Delta-V and aerothermal statistics are formulated into propellant mass and TPS requirements. The results presented in the paper will demonstrate the trajectory viability of Uranus aerocapture. Preliminary Results: Preliminary trajectory design results indicates successful Uranus aerocapture with a blunt-body aeroshell housing the same payload mass as the UOP mission from an Earth-to-Uranus interplanetary trajectory arriving in less than 7 years. From this interplanetary trajectory, aerocapture provides an orbit insertion Delta-V capability of 6.9 km/s requiring less than 300 m/s for post-aerocapture correction burns (15% of wet mass allocated to propellant). To put this into perspective, the UOP study utilized an Earth-to-Uranus trajectory that arrives in 13 years and requires more than 1000 m/s for fully-propulsive orbit insertion (40% of wet mass allocated to propellant). Achieving the same 6.9 km/s Delta-V capability fully-propulsively is mass prohibitive (97% of wet mass allocated to propellant). Nevertheless, aerocapture has the potential to reduce interplanetary transit times to Uranus by half while delivering the same payload mass to orbit in a reduced propellant mass footprint.

Rohan Deshmukh↗

Successful Completion of the JWST OGSE2 Cryogenic Test at JSC Chamber-A While Managing Numerous Challenges

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.

JWST OGSE2 Cryogenic Test↗