Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbit plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

The 1981 Jupiter Orbiter Probe mission

Plans for the 1981 Jupiter Orbiter Probe (JOP) mission are presented in some detail. The need for a Jupiter entry probe, remote sensing of the planet, and an orbiter, in addition to flybys, is made clear. Launch hardware, using the Space Shuttle flight system and Interim Upper Stage, is described, along with scientific tasks laid out for the entry probe and the orbiter. Combined analysis of the Jovian magnetosphere and other orbiter missions calls for a two-part orbiter with one part spun and the other de-spun. Related design problems and solutions are described and diagrammed. Jovian moon flybys and orbiter path adjustments by subsequent earth-launched flybys are discussed. The importance of Jupiter data for solar system evolution and possible analysis of early stages of stellar evolution or of a binary system are also treated.

Moore, J. W.↗

Titian/Centaur D-1TTC-4 Viking A flight data report

Titan/Centaur TC-4 was launched from the Eastern Test Range, Complex 41, at 05:22 PM EDT on Wednesday, August 20, 1975. This was the second operational flight of the newest NASA unmanned launch vehicle. The spacecraft was the Viking A, the first of two orbiting and landing missions to Mars planned for the 1975 Martian launch opportunity. The objective of the launch phase of the mission, to inject the Viking spacecraft onto the planned transfer orbit to Mars, was successfully accomplished. This report presents a review of the launch vehicle system flight data.

Source record↗

Titan/Centaur D-1T TC-3 Viking B Flight Data Report

Titan/Centaur TC-3 was launched from the Eastern Test Range, Complex 41, at 02:34 PM EDT on Tuesday, September 9, 1975. This was the third operational flight of the newest NASA unmanned launch vehicle. The spacecraft was the Viking B, the second of two orbiting and landing missions to Mars planned for the 1975 Martian launch opportunity. The objective of the launch phase of the mission, to inject the Viking spacecraft onto the planned transfer orbit to Mars, was successfully accomplished. A review of the launch vehicle system flight data is presented.

Source record↗

Space Shuttle status and performance improvements

Following nearly a decade of studies and development, the Space Shuttle is beginning its flight test phase. This paper reviews the status of the program, and preparations of the space vehicle and facilities for flight. The launch preparations, including conduct of the Mission Verification Test, which comprises a Flight Readiness Firing prior to the actual launch, is discussed. This simulation was designed to test the readiness of the complete organization and all ground and flight equipment for commitment to the first manned orbital flight. The plan of the orbital flight program is outlined indicating how each succeeding flight is made more complex and severe to incrementally test the Space Shuttle. Completion of this four flight program readies the Space Shuttle for operations in late 1982. Payload performance to orbit is increased as the program progresses through the development flights and on into operations.

Day, L. E.↗

Planning satellite communication services and spectrum-orbit utilization

The relationship between approaches to planning satellite communication services and spectrum-orbit utilization is considered, with emphasis on the fixed-satellite and the broadcasting-satellite services. It is noted that there are several possible approaches to planning space services, differing principally in the rigidity with which technical parameters are prescribed, in the time for which a plan remains in force, and in the procedures adopted for implementation and modifications. With some planning approaches, spectrum-orbit utilization is fixed at the time the plan is made. Others provide for greater flexibility by making it possible to postpone some decisions on technical parameters. In addition, the two political questions of what is equitable access and how it can be guaranteed in practice play an important role.

Sawitz, P. H.↗

The subscale orbital fluid transfer experiment

The Subscale Orbital Fluid Transfer Experiment (SOFTE) is a planned Shuttle Orbiter fluid transfer experiment. CASP (Center for Advanced Space Propulsion) performed certain aspects of the conceptual design of this experiment. The CASP work consisted of the conceptual design of the optical system, the search for alternative experimental fluids, the determination of the flow meter specifications and the examination of materials to use for a bladder that will empty one of the tanks in the experiment.

Collins, Frank G.↗

Orbiter Auxiliary Power Unit Flight Support Plan

This paper discussed the development of an integrated Orbiter Auxiliary Power Unit (APU) and Improved APU (IAPU) Flight Suuport Plan. The plan identifies hardware requirements for continued support of flight activities for the Space Shuttle Orbiter fleet. Each Orbiter vehicle has three APUs that provide power to the hydraulic system for flight control surface actuation, engine gimbaling, landing gear deployment, braking, and steering. The APUs contain hardware that has been found over the course of development and flight history to have operating time and on-vehicle exposure time limits. These APUs will be replaced by IAPUs with enhanced operating lives on a vehicle-by-vehicle basis during scheduled Orbiter modification periods. This Flight Support Plan is used by program management, engineering, logistics, contracts, and procurement groups to establish optimum use of available hardware and replacement quantities and delivery requirements for APUs until vehicle modifications and incorporation of IAPUs. Changes to the flight manifest and program delays are evaluated relative to their impact on hardware availability.

Guirl, Robert↗

Epithermal Neutron Observations and Lunar South Pole Targeting for LCROSS Impact Planning using the Lunar Reconnaissance Orbiter (LRO), Lunar Exploring Neutron Detector (LEND)

LCROSS impact targeting and planning efforts included quantifying South Polar epithermal neutron flux depressions in early LEND mapped results to maximize the expected plume Hydrogen (H) yield. Epithermal neutron surface fluxes are a key geochemical indicator of surface Hydrogen (H) concentration inferred to be elevated in polar permanent shadow regions (PSR). LCROSS impact target regions were delineated as (PSR) using illumination modeling of polar topography. To quantify targets potential yield for LCROSS, LEND epithermal neutron flux observations were integrated over LCROSS targets of interest and compared to background observations. Discussion will define methods review impact prior estimates and contrast post impact results.

McClanahan, T. P.↗

A Journey with MOM

In late 2013, the Indian Space Research Organization (ISRO) launched its "Mars Orbiter Mission" (MOM). ISRO engaged NASA's Jet Propulsion Laboratory (JPL) for navigation services to support ISRO's objectives of MOM achieving and maintaining Mars orbit. The navigation support included planning, documentation, testing, orbit determination, maneuver design /analysis, and tracking data analysis. Several of MOM's attributes had an impact on navigation processes, e.g., S -band telecommunications, Earth Orbit Phase maneuvers, and frequent angular momentum desaturation s (AMDs). The primary source of tracking data was NASA/ JPL's Deep Space Network (DSN); JPL also conducted a performance assessment of Indian Deep Space Network (IDSN) tracking data. Planning for the Mars Orbit Insertion (MOI) was complicated by a pressure regulator failure that created uncertainty regarding MOM's main engine and raised potential planetary protection issues. A successful main engine test late on approach resolved these issues; it was quickly followed by a successful MOI on 24-September - 2014 at 02:00 UTC. Less than a month later, Comet Siding Spring's Mars flyby necessitated plans to minimize potential spacecraft damage. At the time of this writing, MOM's orbital operations continue, and plans to extend JPL 's support are in progress. This paper covers the JPL 's support of MOM through the Comet Siding Spring event.

Mars orbiter↗

Structural Verification of the First Orbital Wonder of the World - The Structural Testing and Analysis of the International Space Station (ISS)

The International Space Station (ISS) can be considered one of the structural engineering wonders of the world. On par with the World Trade Center, the Colossus of Rhodes, the Statue of Liberty, the Great Pyramids, the Petronas towers and the Burj Khalifa skyscraper of Dubai, the ambition and scope of the ISS structural design, verification and assembly effort is a truly global success story. With its on-orbit life projected to be from its beginning in 1998 to the year 2020 (and perhaps beyond), all of those who participated in its development can consider themselves part of an historic engineering achievement representing all of humanity. The structural design and verification of the ISS could be the subject of many scholarly papers. Several papers have been written on the structural dynamic characterization of the ISS once it was assembled on-orbit [1], but the ground-based activities required to assure structural integrity and structural life of the individual elements from delivery to orbit through assembly and planned on-orbit operations have never been totally summarized. This paper is intended to give the reader an overview of some of the key decisions made during the structural verification planning for the elements of the U.S. On-Orbit Segment (USOS) as well as to summarize the many structural tests and structural analyses that were performed on its major elements. An effort is made for this paper to be summarily comprehensive, but as with all knowledge capture efforts of this kind, there are bound to be errors of omission. Should the reader discover any of these, please feel free to contact the principal author. The ISS (Figure 1) is composed of pre-integrated truss segments and pressurized elements supplied by NASA, the Russian Federal Space Agency (RSA), the European Space Agency (ESA) and the Japanese Aerospace Exploration Agency (JAXA). Each of these elements was delivered to orbit by a launch vehicle and connected to one another either robotically or autonomously. The primary structure of each element was assembled and verified by teams of responsible structural engineers within and among their respective agencies and agency contractors.

Zipay, John J.↗

Applications of tethers for planetary missions

Ideas of deep space exploration are considered. The role of tethers in deep space is of most concern. A proposal of a tethered instrument package in orbit about the Moon is explored. The idea of a sling on the surface of the Moon which would take solar energy and build up momentum of the sling is studied. The NASA idea of a Mars Aeronomy Orbiter which would use a tether to enhance the planned Mars Orbiter is reviewed. It is also proposed that a tether can be attached to an asteroid during a spacecraft flyby. The possibility of using tethers to provide a transportation system for payloads which are coming to the surface from escape, and which are leaving Mars and escaping from Mars itself is also studied. A proposal from the Jet Propulsion Lab. on collecting comet or asteroid samples and returning them to Earth is reviewed. A tethered penetrator which could collect core samples is the proposed way. Also considered is the area of electrodynamic tethers at Jupiter.

Penzo, P.↗

Cassini / Huygens at Saturn and Titan

The Cassin/Huygens Project is a joint undertaking between NASA, the European Space Agency, and the Italian Space Agency to conduct an in-depth exploration of the Saturnian system. The spacecraft consists of an orbiter vehicle and an atmospheric probe which has completed its mission in the atmosphere and on the surface of Titan, the largest moon of Saturn. The spacecraft was launched on October 15, 1997, has completed its nearly seven years of interplanetary flight, and by the time of the 56th IAC, it will have completed 17 of its planned 75 orbits during its four-year prime orbital mission. This paper gives an overview of the mission, and describes in detail the accomplishments and events over the past year, including the spectacularly successful descent of the .European Space Agency's Huygens probe to the surface of Titan. Initial scientific results from both the Huygens mission as well as from the first one-and-a-quarter years of orbiting Saturn are summarized. The plans for the remainder of the orbiter's tour of the Saturn system and the many flybys of Titan and the smaller icy satellites are described.

Cassini↗

Guidance system operations plan for manned cm earth orbital and lunar missions using program Colossus 3. Section 2: Data links

The data links for use with the guidance system operations plan for manned command module earth orbital and lunar missions using program Colossus 3 are presented. The subjects discussed are: (1) digital uplink to CMC, (2) command module contiguous block update, (3) CMC retrofire external data update, (4) CMC digital downlink, and (5) CMC entry update.

Hamilton, M. H.↗

Precise orbit determination for NASA's Earth Observing System using GPS

A precision orbit determination technique for NASA's Earth Observing System (EOS) is discussed. The technique exploits the redundant geometric information from GPS carrier phase and P-code pseudorange measurements and minimizes the requirements for precision dynamical modeling. Performance estimates for the application of the technique to the orbit geometry planned for the EOS platforms show that decimeter accuracies of orbit position may be obtained. The sensitivity of the predicted orbit uncertainties to model errors for station locations, nongravitational platform accelerations, and earth gravity are presented.

Williams, Bobby G.↗