Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrogen Production System Scaling Using a High-Fidelity Simulation-Optimization Framework

Proton exchange membrane (PEM) electrolyzers are widely used for hydrogen production, yet few validated, high-fidelity tools can reliably guide scale-up. Using measured performance from a 50-hour hardware-in-the-loop pilot test, a physics-based, plant-level model of a 1.25 MW PEM electrolyzer and its balance-of-plant (BoP) subsystems is developed and validated. The model couples electrochemistry and thermal/flow submodels and is calibrated against pilot test data via a genetic algorithm (GA) workflow. Validation yields a mean absolute percentage error (APE) of 0.43% for cell voltage and stack power. Two scale-out strategies are then benchmarked under a common 7-day wind-and-photovoltaic (PV) profile: (i) linear duplication of 1.25 MW blocks and (ii) shared-BoP architectures. Sharing BoP between stacks reduces BoP energy by 27% at 10 MW and 34% at 100 MW (vs. linear duplication) and improves system specific energy consumption (SEC) to 52.9 and 52.6 kWh/kg, respectively (from 54.0 kWh/kg with linear duplication). Partial-load studies (25-100% set-point) show that cumulative hydrogen production remains nearly constant down to 50% load because all cases use the same weekly renewable-energy input. Below 50%, the power cap limits how much energy can be used within 168 h, which reduces hydrogen output. The model further indicates that the practical operating optimum lies between 50% and 85% load, where efficiency gains begin to appear without significant loss in hydrogen output. Moreover, the efficiency gains at lower loads are offset by reduced production. The validated framework supports scenario-based engineering trade-off studies for large configurations (10-100 MW) and for operating policies under variable renewables.

08 HYDROGEN↗

The spherical tokamak advanced reactor (STAR) fusion power plant design

Scientific and technical advancements have been made that improve fusion’s prospects to provide a new energy source, showing enhanced plasma confinement conditions with plasma temperatures reaching or exceeding 100 million degrees. Overshadowing this progress is the challenge involved in developing an economically viable fusion power plant design. Many proposed next-step DEMO and pilot plant designs are extensions of existing physics-focused experimental devices defined to understand and control plasma operations to achieve and sustain a fusion reaction. Transitioning scientific and technical advancements into a functional power plant requires a dedicated focus on architectural designs that integrate diverse technologies, while optimizing physics conditions, with a focus on economic viability. This holistic approach is essential in turning the promise of fusion energy into a reality. The Spherical Tokamak Advanced Reactor (STAR) is a fusion power plant conceptual design with the architectural focus that strives to balance physics, engineering, and cost considerations. In conclusion, it has been set up to introduce relevant physics, engineering and concept features that an intermediate pilot plant might follow, with the goal of meeting system performances and economic requirements that lead to a commercially competitive fusion power plant.

Blanket segmentation↗

An end-to-end pipeline for succinic acid production at an industrially relevant scale using Issatchenkia orientalis

Abstract Microbial production of succinic acid (SA) at an industrially relevant scale has been hindered by high downstream processing costs arising from neutral pH fermentation for over three decades. Here, we metabolically engineer the acid-tolerant yeast Issatchenkia orientalis for SA production, attaining the highest titers in sugar-based media at low pH (pH 3) in fed-batch fermentations, i.e. 109.5 g/L in minimal medium and 104.6 g/L in sugarcane juice medium. We further perform batch fermentation using sugarcane juice medium in a pilot-scale fermenter (300×) and achieve 63.1 g/L of SA, which can be directly crystallized with a yield of 64.0%. Finally, we simulate an end-to-end low-pH SA production pipeline, and techno-economic analysis and life cycle assessment indicate our process is financially viable and can reduce greenhouse gas emissions by 34–90% relative to fossil-based production processes. We expect I. orientalis can serve as a general industrial platform for production of organic acids.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Operational Modes of a 2.0 MWth Chloride Molten-Salt Pilot-Scale System

The limit of traditional solar-salt thermal stability is around 600 °C with ambient air as the cover gas. Nitrate molten salt concentrating solar power (CSP) systems are currently deployed globally and are considered to be state-of the art heat transfer fluids (HTFs) for present day high-temperature operation. However, decomposition challenges occur with these salts for operation beyond 600 C. Although slightly higher limits may be possible with solar salt, to fully realize SunShot efficiency goals of $15/kWhth HTFs and an LCOE of 6¢/kWh, molten-salt technologies working at higher temperatures (e.g., 650 °C to 750 °C) will require an alternative salt chemistry composition, such as chlorides. In this investigation a 2.0MWth Pilot-scale CSP plant design is developed to assess thermodynamic performance potential for operation up to 720 C. Here, an Engineering Equation Solver (EES) model is developed with respect to 14 state-points from the base of a solar tower at the Sandia National Laboratories, National Solar Thermal Test Facility (NSTTF), to solar receiver mounted 120 ft. above the ground. The system design considers a ternary chloride ternary chloride (20%NaCl/40%MgCl/40%KCl by mol%) salt as the HTF, with 6 hrs. of storage and a 1 MWth primary salt to sCO2 heat exchanger. Preliminary system modelling results indicate a minimum non-dimensional Cv of 60 required for both cold and hot-side throttle recirculation valves for the operational pump operating between speeds of 1800 and 2400 RPM. Further receiver comparison study results suggest that the ternary salt requires an average 15.2% higher receiver flux with a slightly lower calculated receiver efficiency when compared to a binary carnelite salt to achieve a 2.0 MWth desired input power design.

associated liquids↗

Water quality data collected from the Muskegon River (MI, USA) using AquaBOT June-July 2024.

This dataset contains processed output from AquaBOT, which combines 30-second interval measurements of GPS location and YSI water quality parameters (temperature (degrees Celsius), dissolved oxygen (mg/l), specific conductance(microSiemens/cm at 25 degrees Celsius), and turbidity (NTU)), for 3 sections of the Muskegon River in Michigan, USA. The file aquabot2024_MuskegonRiver.csv has information on locations, dates and times, and observations. The data were processed by removing observations recorded before and after AquaBOT was in the water and observations where no data values were recorded. No other QA/QC was done. This research was performed as part of the DOE Research Development and Partnership Pilot award “Expanding Collaborative Capacity to Address Climate Resiliency in the Great Lakes Region”, which aims to expand collaborations between researchers at Central Michigan University and U.S. Department of Energy labs and projects focused on enhancing climate resilience in Great Lakes communities and ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Front-End Engineering Design (FEED) Study for a Carbon Capture Plant Retrofit to a Natural Gas-Fired Gas Turbine Combined Cycle Power Plant

A comprehensive front-end engineering design (FEED) study has been undertaken for a post-combustion capture (PCC) unit located at Panda’s Sherman natural gas–combined cycle (NGCC) power plant in Sherman, Texas. This is described in a full and unredacted FEED study report with all supporting documents, numbering over 150, also publicly available.

20 FOSSIL-FUELED POWER PLANTS↗

Front-End Engineering Design (FEED) Study for a Carbon Capture Plant Retrofit to a Natural Gas-Fired Gas Turbine Combined Cycle Power Plant (2x2x1 Duct-Fired 758-MWe Facility with F Class Turbines)

A comprehensive front-end engineering design (FEED) study has been undertaken by Bechtel National Inc. (Bechtel) for locating a post-combustion capture and compression (PCC) unit at Panda’s Sherman natural gas–combined cycle (NGCC) power plant in Sherman, Texas. This is described in the unredacted FEED Study report (Attachment 1) with all supporting documents, numbering over 150. The Study Report is publicly available. Sizing of the PCC plant is based on treating an amount of flue gas equivalent to that produced when generating 420 MW, which is approximately 68% of the total flue gas emitted by the NGCC power plant operating at guarantee condition with duct burners off. A reduced power plant capacity factor was used for sizing the PCC plant because the gas turbines at the site often operate at reduced load due to the high penetration of renewable power in the ERCOT region. The cost of carbon capture is primarily driven by capital cost (and therefore is highly sensitive to capacity factor). Sizing the capture unit so that when used it is nearly always operating at full capacity is critical to the economic viability of the proposed investment.

03 NATURAL GAS↗

Model Formulations: Market clearing models, market design specifications, and dispatch simulation

This document provides various model formulations that will be implemented for the Energy Storage Participation Algorithm pilot competition (ESPA-Comp). This competition will assess the performance of different storage offer algorithms in terms of their ability to maximize the value of storage resources participating under various market designs that vary in the range of complexity of possible storage offers. The model formulations include a general market clearing optimization model and specification to implement it in various market designs. We provide specifications for three market designs to be tested in ESPA-Comp, which we call the two-settlement, multi-settlement, and rolling horizon forward markets. The market designs include different trading frequencies and offer formats. Storage resources participating in the market are provided with primitive values for the resource’s physical capabilities, and they are provided with a storage offer format that their algorithms will be tasked with populating. A detailed physical model is used to assess each storage resource’s ability to maintain its scheduled dispatch according to its state-of-charge, operating temperature, and power conversion efficiency.

25 ENERGY STORAGE↗

The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The Hydrogen Production, Grid Integration, and Scaling for the Future project will inform clean hydrogen production deployment across the planning, procurement, and operation stages of hydrogen production on the grid. Hydrogen production from renewables is a clean source of fuel which is near zero for greenhouse gas emissions and criteria pollutants. The results from this project will inform entities looking to build clean energy projects that produce good paying jobs in manufacturing, installation, maintenance and operation of these facilities. This project provides system characterization examples, multiple configurations, optimizations, and suggested metering and custody transfer points through multiple scenarios and hardware testing of NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios. This work also creates a digital twin for emulation in the Advanced Research on Integrated Systems (ARIES) virtual environment and performs hardware-in-the-loop (HIL) testing of pilot-scale, decentralized, and centralized hydrogen systems.

centralized hydrogen production↗

Efficiency and emissions of NH3-diesel/bio-pilot dual-fuel combustion in a high-speed four-stroke engine

While dual-fuel ammonia engines are starting to be commercialized for the large low-speed 2-stroke marine engine market, there are still challenges with utilizing ammonia on 4-stroke engines used as auxiliary engines for ocean going vessels and within inland and coastal marine applications. The shorter timescales for high-speed engines pose a particular challenge for low-cetane, high ignition energy fuels like ammonia. In addition to achieving maximum ammonia substitution levels, N2O emissions are a key factor that needs to be understood. This paper reports the results of experiments using a single-cylinder 107mm bore Cummins B-series diesel engine modified for port-fuel injection of gaseous anhydrous ammonia with a direct injection of diesel fuel near-TDC to ignite the premixed ammonia. Combustion data as well as emissions data from an FTIR including NO, NO2, N2O, and unburned ammonia are presented for selected operating points with a focus on high-load operation at 1200rpm with high ammonia energy substitution (over 95% by fuel energy). Several air/fuel ratio conditions are included, sweeping from diesel-like airflow to stoichiometric conditions. The impact of biofuels (biodiesel and renewable diesel) as pilot fuels is also considered. Comparisons for emissions, greenhouse gas performance, and efficiency are made with a conventional diesel combustion baseline. The impact of fuel injection strategy on NOx, N2O, and NH3 emissions is quantified, and the dual-fuel ammonia results on this high-speed 4-stroke engine are expected to provide fundamental insights into further combustion development opportunities for the larger engines used across marine applications.

Kaul, Brian [ORNL] (ORCID:0000000184813620)↗

Manufacture of Carbon Foam in Continuous Process at Atmospheric Pressure

CFOAM LLC has been manufacturing vitreous carbon foam from coal in panel form for several years. The process is currently set up in batch mode as two steps, where the first step is conducted at very high pressure. In order to reduce cost and increase capacity, a new process for making carbon foam is being developed that can be performed at atmospheric pressure. This advance in turn would enable the development of a continuous manufacturing process, which is also being pursued. Both carbon foam panels and light weight aggregates are being investigate. Construction of the pilot scale manufacturing plant has been completed and results of processing, microstructure, properties and performance of carbon foam products made using this new process will be discussed. This project is being supported by a cooperative agreement with the Department of Energy – National Energy Technology Laboratory (DE-FOA-0002185, Area of Interest 4: Coal-Derived Carbon Foam Produced via a Continuous Process, award number DE-FE-0031992).

01 COAL, LIGNITE, AND PEAT↗

Energy use of piperazine with the advanced stripper from pilot plant testing

Here, piperazine with the Advanced Stripper (PZAS™) was tested at the National Carbon Capture Center (NCCC) at coal and NGCC conditions. Energy performance was measured with accounting for heat loss. The net heat duty was found to be identical at 2.45 GJ/tonne for both 4 and 12% CO 2 at 90% CO 2 removal. The average measured heat loss was 0.38 GJ/tonne and represented 30% of the gross heat rate. For PZAS, the warm rich piping before the control valve is the largest in surface area. Heat loss at this location increased heat duty by 80% of the heat loss value. Therefore, the total heat duty was decreased by 80% of the heat loss. The Independence™ model was validated using 112 steady-state pilot plant runs and predicted average net heat duty with an error of 9% and lean loading with an error of 10%. The model was used to simulate process impacts of heat loss for the PZAS and simple stripper configurations. For both strippers, heat loss was found to impact heat duty at locations other than just the steam heater. While heat loss in the steam heater was the most important for PZAS, heat loss in the column was the most important for the simple stripper due to a large top-side pinch and CO 2 reabsorption at the same location. CO 2 reabsorption in PZAS occurred only at high heat loss values (~0.14 GJ/hr), compared to low heat loss values (~ 0.03 GJ/hr) in the PZ-simple stripper. Excessive packing in the PZ-simple stripper caused a large top-side pinch at 0.23 mol/mol lean loading, making the column very sensitive to heat loss. Heat loss in the PZ-simple stripper increased heat duty by 120–150% at typical heat loss values and lean loading of 0.23 mol/mol. Heat loss in the MEA-simple stripper only increased heat duty by 1–13% in a typical lean loading range of 0.1–0.2 mol/mol. A large bottom side pinch at low lean loading for 7 m MEA made the effect of heat loss less pronounced.

42 ENGINEERING↗

State of Innovation 2025: Progress in Accelerating Next-Generation Cement and Concrete Technologies

The cement and concrete sectors are entering a decisive period as next-generation technologies advance from laboratory research to demonstration, early deployment, and first-of-a-kind commercial plants. Building on the 2024 State of Innovation report, the 2025 outlook highlights both the rapid acceleration of innovation and the urgent need for coordinated action across the value chain. Venture capital activity into the cement and concrete space stabilized following the record surge of 2022-2023, yet landmark financings, such as Sublime Systems' $200 million round and Terra CO2's $124 million Series B, signal continued investor confidence in companies approaching commercialization. Corporate procurement has become a powerful new catalyst, with Microsoft, Amazon, and CRH (Cement Roadstone Holdings) Ventures providing long-term commitments that underpin the first wave of next-generation cementitious products. The sector is shifting from early-stage experimentation toward the scaling of well-capitalized leaders capable of bridging the critical "capitalization gap." Early innovators continue to expand the toolkit through novel binders, electrochemical cements, biogenic limestone, and carbonate mineralization pathways. Going into 2026, cost competitiveness, durability validation, and scalability enabled by resilient supply chains remain the decisive factors for market adoption. At the 2025 Next Generation Cement and Concrete Critical Technologies Meeting, attendees emphasized dual-track funding strategies that integrate federal grants with private capital as key to enabling market breakthrough. State programs and corporate demand are sustaining momentum, while successful companies increasingly demonstrate both economic value and reduced dependence on imported materials. The National Concrete Pavement Technology Center and others underscored that broad integration of next-generation materials will hinge on standards compatibility, verified field performance, and workforce readiness. Colorado continues to serve as a proving ground through pilot programs that combine supplier training, phased implementation, and real-world data to de-risk innovation and provide replicable models for other regions. The 2025 Cement and Concrete Critical Technologies Workshop reinforced that scaling next-generation materials will require alignment among technology innovation, performance validation, and market demand. Stakeholders must move beyond siloed efforts toward collaborative frameworks that coordinate standards, funding, and infrastructure deployment. As a neutral convener and technical validator, the National Laboratory of the Rockies (NLR) plays a pivotal role in bridging innovation and market adoption through collaborative research, technology validation, and entrepreneurship programs. By uniting innovators, incumbents, policymakers, contractors, and investors, NLR and its partners are helping chart a credible pathway toward widespread commercialization in the decade ahead.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Comparison of Radiation Models for a Turbulent Piloted Methane/Air Jet Flame: A Frozen-Field Study

Numerical modeling of radiative transfer in nongray reacting media is a challenging problem in computational science and engineering. The choice of radiation models is important for accurate and efficient high-fidelity combustion simulations. Different applications usually involve different degrees of complexity, so there is yet no consensus in the community. In this paper, the performance of different radiative transfer equation (RTE) solvers and spectral models for a turbulent piloted methane/air jet flame are studied. The flame is scaled from the Sandia Flame D with a Reynolds number of 22,400. Three classes of RTE solvers, namely the discrete ordinates method, spherical harmonics method, and Monte Carlo method, are examined. The spectral models include the Planck-mean model, the full-spectrum k-distribution (FSK) method, and the line-by-line (LBL) calculation. The performances of different radiation models in terms of accuracy and computational cost are benchmarked. The results have shown that both RTE solvers and spectral models are critical in the prediction of radiative heat source terms for this jet flame. The trade-offs between the accuracy, the computational cost, and the implementation difficulty are discussed in detail. The results can be used as a reference for radiation model selection in combustor simulations.

David, Chloe↗

Pilot Testing of Amine-Based Solvent at Low-Rank Coal Fired Power System

Conference presentation for the 2023 International Freiberg Conference on Circular Carbon Technologies, Rotterdam, Netherlands, September 24–29, 2023. This presentation describes pilot testing of an amine-based CO₂ capture system at Coal Creek Station, examining solvent performance, system design, and operating conditions for a low-rank coal-fired power plant. The Mitsubishi Heavy Industries KM CDR (KS-1) process is assessed using pilot-scale data to inform capture efficiency, solvent condition, and integration considerations.

01 COAL, LIGNITE, AND PEAT↗

Humate Amendment Injection Viability Testing – Supplementary Batch Mixture and Soil Column Studies

Groundwater in the Lost Lake Aquifer Zone (LLAZ) in the Southern Sector of the M-Area Hazardous Waste management Facility (HWMF) is contaminated with chlorinated ethenes, including trichloroethylene (TCE) and tetrachloroethylene (PCE). Treatment of contaminated groundwater with humic acid is being evaluated as a potential corrective action for these volatile organic compounds (VOCs) in the LLAZ in Southern Sector (SRNS, 2019). Pilot scale injections of Huma-K brand humic acid for groundwater treatment were previously performed in M-Area between 2017 and 2020 (Amidon, 2023). Groundwater was extracted from the Lost Lake Aquifer Zone (LLAZ), then a solution of humate was mixed with recovered groundwater and subsequently re-injected into the same aquifer unit. Operations of the historical humate pilot testing were discontinued in 2020 due to COVID-19 restrictions, low injection rates, and recirculation fluid spillage. No further field scale or laboratory research to investigate humate amended groundwater injection was performed at the SRS until 2024. At the request of Area Completion Projects (ACP), the Savannah River National Laboratory (SRNL) performed supplementary testing to help determine the viability of further injection of humate as a remedial option for VOCs within the LLAZ in the Southern Sector of the M-Area HWMF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗