Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning and development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Plan for Developing TRISO Fuel Processing Technologies

This Plan demonstrates the availability of technologies for processing TRISO used nuclear fuel for waste management and actinide recovery purposes. These technologies are judged to be at a very low level of technology readiness and as such they constitute a fertile research area for the DOE-NE’s Office of Materials and Chemical Technologies. Strategies to mature the technologies to a point where they can reasonably be considered in engineering alternatives analyses typically involve laboratory-scale tests using fuel simulant to characterize process streams and demonstrate key engineering features. Several criteria are available to help selecting candidate technologies for further maturation

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Develop a plan for establishing global aerosol backscatter coefficient data base

A potential improvement on measuring atmospheric winds by using a coherent Doppler system has led to a need for detailed knowledge concerning the aerosol backscattering characteristics, especially at CO2 wavelengths. In order to meet this requirement, a plan of study has been developed to establish a global data base of atmospheric aerosol backscattering coefficients.

Chang, Ho-Pen↗

Space technology research plans

Development of new technologies is the primary purpose of the Office of Aeronautics and Space Technology (OAST). OAST's mission includes the following two goals: (1) to conduct research to provide fundamental understanding, develop advanced technology and promote technology transfer to assure U.S. preeminence in aeronautics and to enhance and/or enable future civil space missions: and (2) to provide unique facilities and technical expertise to support national aerospace needs. OAST includes both NASA Headquarters operations as well as programmatic and institutional management of the Ames Research Center, the Langley Research Center and the Lewis Research Center. In addition. a considerable portion of OAST's Space R&T Program is conducted through the flight and science program field centers of NASA. Within OAST, the Space Technology Directorate is responsible for the planning and implementation of the NASA Space Research and Technology Program. The Space Technology Directorate's mission is 'to assure that OAST shall provide technology for future civil space missions and provide a base of research and technology capabilities to serve all national space goals.' Accomplishing this mission entails the following objectives: y Identify, develop, validate and transfer technology to: (1) increase mission safety and reliability; (2) reduce flight program development and operations costs; (3) enhance mission performance; and (4) enable new missions. Provide the capability to: (1) advance technology in critical disciplines; and (2) respond to unanticipated mission needs. In-space experiments are an integral part of OAST's program and provides for experimental studies, development and support for in-space flight research and validation of advanced space technologies. Conducting technology experiments in space is a valuable and cost effective way to introduce advanced technologies into flight programs. These flight experiments support both the R&T base and the focussed programs within OAST.

Hook, W. Ray↗

Center Planning and Development: Multi-User Spaceport Initiatives

The Vehicle Assembly building at NASAs Kennedy Space Center has been used since 1966 to vertically assemble every launch vehicle, since the Apollo Program, launched from Launch Complex 39 (LC-39). After the cancellation of the Constellation Program in 2010 and the retirement of the Space Shuttle Program in 2011, the VAB faced an uncertain future. As the Space Launch System (SLS) gained a foothold as the future of American spaceflight to deep space, NASA was only using a portion of the VABs initial potential. With three high bays connected to the Crawler Way transportation system, the potential exists for up to three rockets to be simultaneously processed for launch. The Kennedy Space Center (KSC) Master plan, supported by the Center Planning and Development (CPD) Directorate, is guiding Kennedy toward a 21st century multi-user spaceport. This concept will maintain Kennedy as the United States premier gateway to space and provide multi-user operations through partnerships with the commercial aerospace industry. Commercial aerospace companies, now tasked with transporting cargo and, in the future, astronauts to the International Space Station (ISS) via the Commercial Resupply Service (CRS) and Commercial Crew Program (CCP), are a rapidly growing industry with increasing capabilities to make launch operations more economical for both private companies and the government. Commercial operations to Low Earth Orbit allow the government to focus on travel to farther destinations through the SLS Program. With LC-39B designated as a multi-use launch pad, companies seeking to use it will require an integration facility to assemble, integrate, and test their launch vehicle. An Announcement for Proposals (AFP) was released in June, beginning the process of finding a non-NASA user for High Bay 2 (HB2) and the Mobile Launcher Platforms (MLPs). An Industry Day, a business meeting and tour for interested companies and organizations, was also arranged to identify and answer any additional questions posed by potential proposers. After amending the AFP and posting additional material for potential users to consider, proposals are being accepted until July 31, at which point they will be evaluated to determine the proposer which best meets the objectives of the government. By identifying VAB HB2 as available and seeking proposals from the commercial sector for VAB HB2 and MLP use, Center Planning and Development is ensuring Kennedy Space Centers relevance in the evolving launch industry of the 21st century.

AFP↗

JPL antenna technology development

Plans for evaluating, designing, fabricating, transporting and deploying cost effective and STS compatible offset wrap rib antennas up to 300 meters in diameter for mobile communications, Earth resources observation, and for the orbiting VLBI are reviewed. The JPL surface measurement system, intended for large mesh deployable antenna applications will be demonstrated and validated as part of the antenna ground based demonstration program. Results of the offset wrap rib deployable antenna technology development will include: (1) high confidence structural designs for antennas up to 100 meters in diameter; (2) high confidence estimates of functional performance and fabrication cost for a wide range of antenna sizes (up to 300 meters in diameter); (3) risk assessment for fabricating the large size antennas; and (4) 55 meter diameter flight quality hardware that can be cost effectively completed toto accommodate a flight experiment and/or application.

Freeland, R. E.↗

DPC Direct Disposal R&D Independent Technical Review: Plan

Developing and evaluating approaches for direct geologic disposal of commercial spent nuclear fuel (SNF) in dual-purpose canisters (DPCs) is a cross-cutting multi-disciplinary activity that is directly tied to the implementation of DPCs by the nuclear industry. The ultimate goal of the DPC direct disposal R&D program is to facilitate and maximize safe, cost-effective, licensed direct disposal. Independent Technical Review (ITR) is needed to maximize the impact of the R&D program on future implementation. The review will involve a team of experts representing the nuclear industry, repository sciences, and licensing. The team will be charged to review a set of representative technical reports and other information, and answer a set of questions that focus on R&D steering.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Preliminary Research Plan for Development of a Photosynthetic Link in a Closed Ecological Life Support System

The use of higher plants in a closed ecological life support system for long duration space missions involving large numbers of people is considered. The approach to planning and developing both the habitat for a long term space mission and closed ecological life support systems are discussed with emphasis on environmental compatibility and integrated systems design. The requirements of photosynthetic processes are summarized and evaluated in terms of their availability within a closed ecological life support environment. Specific references are recommended as a data base for future research on this topic.

Morgan, P. W.↗

Safety inputs to development program plans

Safety engineers integration into overall system through basic development programs, involving management, manufacturing, testing and integrated logistic support

Ball, L. W.↗

Phased project planning and development in anticipation of operational programs

The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

Stroud, W. G.↗

Tracking the Short Term Planning (STP) Development Process

Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

Price, Melanie↗

Test plan. GCPS task 7, subtask 7.1: IHM development

The overall objective of Task 7 is to identify cost-effective life cycle integrated health management (IHM) approaches for a reusable launch vehicle's primary structure. Acceptable IHM approaches must: eliminate and accommodate faults through robust designs, identify optimum inspection/maintenance periods, automate ground and on-board test and check-out, and accommodate and detect structural faults by providing wide and localized area sensor and test coverage as required. These requirements are elements of our targeted primary structure low cost operations approach using airline-like maintenance by exception philosophies. This development plan will follow an evolutionary path paving the way to the ultimate development of flight-quality production, operations, and vehicle systems. This effort will be focused on maturing the recommended sensor technologies required for localized and wide area health monitoring to a technology readiness level (TRL) of 6 and to establish flight ready system design requirements. The following is a brief list of IHM program objectives: design out faults by analyzing material properties, structural geometry, and load and environment variables and identify failure modes and damage tolerance requirements; design in system robustness while meeting performance objectives (weight limitations) of the reusable launch vehicle primary structure; establish structural integrity margins to preclude the need for test and checkout and predict optimum inspection/maintenance periods through life prediction analysis; identify optimum fault protection system concept definitions combining system robustness and integrity margins established above with cost effective health monitoring technologies; and use coupons, panels, and integrated full scale primary structure test articles to identify, evaluate, and characterize the preferred NDE/NDI/IHM sensor technologies that will be a part of the fault protection system.

Greenberg, H. S.↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

54 ENVIRONMENTAL SCIENCES↗

Soil Gas Survey Results Supporting Groundwater Correction Action Plan (GCAP) Development for the Moab Site

A soil gas survey was performed at the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site during the week of November 6, 2023. Soil gas surveys are used to characterize residual subsurface sources of volatile contaminants, such as volatile organic compounds, as well as contaminants that generate a surrogate indicator gas or otherwise influence soil gas composition. The primary objective of the Moab soil gas survey was to confirm, identify, quantify, and refine secondary contaminant source area locations for uranium and ammonium/ammonia (NH 4 + /NH 3 ) in the vadose zone and shallow groundwater. The overarching goal was to provide information to assist in developing the technical basis for the Groundwater Compliance Action Plan (GCAP). Specifically, the soil gas data will support the deployment of source control technologies; e.g., where supplementary capping, removal actions, or amendments might be beneficial.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Systems Development Environment (GSDE) software configuration management

This report presents a review of the software configuration management (CM) plans developed for the Space Station Training Facility (SSTF) and the Space Station Control Center. The scope of the CM assessed in this report is the Systems Integration and Testing Phase of the Ground Systems development life cycle. This is the period following coding and unit test and preceding delivery to operational use. This report is one of a series from a study of the interfaces among the Ground Systems Development Environment (GSDE), the development systems for the SSTF and the SSCC, and the target systems for SSCC and SSTF. This is the last report in the series. The focus of this report is on the CM plans developed by the contractors for the Mission Systems Contract (MSC) and the Training Systems Contract (TSC). CM requirements are summarized and described in terms of operational software development. The software workflows proposed in the TSC and MSC plans are reviewed in this context, and evaluated against the CM requirements defined in earlier study reports. Recommendations are made to improve the effectiveness of CM while minimizing its impact on the developers.

Church, Victor E.↗