Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning scheduling architecture”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Autonomous planning and scheduling on the TechSat 21 mission

The Autonomous Sciencecraft Experiment (ASE) will fly onboard the Air Force TechSat 21 constellation of three spacecraft scheduled for launch in 2006. ASE uses onboard continuous planning, robust task and goal-based execution, model-based mode identification and reconfiguration, and onboard machine learning and pattern recognition to radically increase science return by enabling intelligent downlink selection and autonomous retargeting.

AI architectures applications intelligent agents m↗

Mission Operations Centers (MOCs): Integrating key spacecraft ground data system components

In an environment characterized by decreasing budgets, limited system development time, and user needs for increased capabilities, the Mission Operations Division (MOD) at the National Aeronautics and Space Administration Goddard Space Flight Center initiated a new, cost-effective concept in developing its spacecraft ground data systems: the Mission Operations Center (MOC). In the MOC approach, key components are integrated into a comprehensive and cohesive spacecraft planning, monitoring, command, and control system with a single, state-of-the-art graphical user interface. The MOD is currently implementing MOC's, which feature a common, reusable, and extendable system architecture, to support the X-Ray Timing Explorer (XTE), Tropical Rainfall Measuring Mission (TRMM), and Advanced Composition Explorer (ACE) missions. As a result of the MOC approach, mission operations are integrated, and users can, with a single system, perform real-time health and safety monitoring, real-time command and control, real-time attitude processing, real-time and predictive graphical spacecraft monitoring, trend analysis, mission planning and scheduling, command generation and management, network scheduling, guide star selection, and (using an expert system) spacecraft monitoring and fault isolation. The MOD is also implementing its test and training simulators under the new MOC management structure. This paper describes the MOC concept, the management approaches used in developing MOC systems, the technologies employed and the development process improvement initiatives applied in implementing MOC systems, and the expected benefits to both the user and the mission project in using the MOC approach.

Harbaugh, Randy↗

Integrated Hybrid System Architecture for Risk Analysis

A conceptual design has been announced of an expert-system computer program, and the development of a prototype of the program, intended for use as a project-management tool. The program integrates schedule and risk data for the purpose of determining the schedule applications of safety risks and, somewhat conversely, the effects of changes in schedules on changes on safety. It is noted that the design has been delivered to a NASA client and that it is planned to disclose the design in a conference presentation.

Moynihan, Gary P.↗

A System for Planning Ahead

A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

Source record↗

Lessons Learned: Using UTM Paradigm for Urban Air Mobility

Urban Air Mobility (UAM) aims to reduce congestion on the roads and highways by offering air taxi as an alternative to driving on surface roads. Integration of UAM operations in the National Airspace System (NAS) has been the focus of the research conducted at NASA Ames Research Center. A simulation was performed in collaboration with Uber Technologies Inc to investigate if NASA’s UTM architecture and its implementation as demonstrated in the 2019 UTM field tests were extensible for UAM operations, and if the data exchange between multiple operators as planned under UTM were adequate for UAM operations in the shared airspace. In order to explore these research questions, three Use Cases were defined to investigate different airspace management challenges. This paper will describe the lessons learned from exercising the uses cases and the airspace management services including scheduling and separation developed to facilitate initial UAM operations.

Urban Air Mobility↗

Lessons Learned: Using UTM paradigm for Urban Air Mobility Operations

Urban Air Mobility (UAM) aims to reduce congestion on the roads and highways by offering air taxi as an alternative to driving on surface roads. Integration of UAM operations in the National Airspace System (NAS) has been the focus of the research conducted at NASA Ames Research Center. A simulation was performed in collaboration with Uber Technologies Inc to investigate if NASA’s UTM architecture and its implementation as demonstrated in the 2019 UTM field tests were extensible for UAM operations, and if the data exchange between multiple operators as planned under UTM were adequate for UAM operations in the shared airspace. In order to explore these research questions, three Use Cases were defined to investigate different airspace management challenges. This paper will describe the lessons learned from exercising the uses cases and the airspace management services including scheduling and separation developed to facilitate initial UAM operations.

Urban Air Mobility↗

Architecting the Human Space Flight Program with Systems Modeling Language (SysML)

The next generation of missions in NASA's Human Space Flight program focuses on the development and deployment of highly complex systems (e.g., Orion Multi-Purpose Crew Vehicle, Space Launch System, 21st Century Ground System) that will enable astronauts to venture beyond low Earth orbit and explore the moon, near-Earth asteroids, and beyond. Architecting these highly complex system-of-systems requires formal systems engineering techniques for managing the evolution of the technical features in the information exchange domain (e.g., data exchanges, communication networks, ground software) and also, formal correlation of the technical architecture to stakeholders' programmatic concerns (e.g., budget, schedule, risk) and design development (e.g., assumptions, constraints, trades, tracking of unknowns). This paper will describe how the authors have applied System Modeling Language (SysML) to implement model-based systems engineering for managing the description of the End-to-End Information System (EEIS) architecture and associated development activities and ultimately enables stakeholders to understand, reason, and answer questions about the EEIS under design for proposed lunar Exploration Missions 1 and 2 (EM-1 and EM-2).

scheduling↗

Knowledge-based simulation

An architecture for a knowledge-based simulator is described. The task of scheduling represents an area in which such a tool might be applied. More specifically, scheduling for crew and ground support activities for the shuttle and space station would benefit from the application of knowledge-based simulation. The knowledge-based simulator would allow the crew and support personnel to schedule and reschedule activities in a timely and flexible manner in order to examine and test possible plans.

Newman, P. A.↗

Commercialization and Standardization Progress Towards an Optical Communications Earth Relay

NASA is planning to launch the next generation of a space based Earth relay in 2025 to join the current Space Network, consisting of Tracking and Data Relay Satellites in space and the corresponding infrastructure on Earth. While the requirements and architecture for that relay satellite are unknown at this time, NASA is investing in communications technologies that could be deployed to provide new communications services. One of those new technologies is optical communications. The Laser Communications Relay Demonstration (LCRD) project, scheduled for launch in 2018 as a hosted payload on a commercial communications satellite, is a critical pathfinder towards NASA providing optical communications services on the next generation space based relay. This paper will describe NASA efforts in the on-going commercialization of optical communications and the development of inter-operability standards. Both are seen as critical to making optical communications a reality on future NASA science and exploration missions. Commercialization is important because NASA would like to eventually be able to simply purchase an entire optical communications terminal from a commercial provider. Inter-operability standards are needed to ensure that optical communications terminals developed by one vendor are compatible with the terminals of another. International standards in optical communications would also allow the space missions of one nation to use the infrastructure of another.

lasers↗

NASA Space Rocket Logistics Challenges

The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discreet programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as commonality especially problematic. Additionally, a very low manifest rate of one flight every four years makes logistics comparatively expensive. That, along with the SLS architecture being developed using a block upgrade evolutionary approach, exacerbates long-range planning for supportability considerations. These common and unique logistics challenges must be clearly identified and tackled to allow SLS to have a successful program. This paper will address the common and unique challenges facing the SLS programs, along with the analysis and decisions the NASA Logistics engineers are making to mitigate the threats posed by each.

Neeley, James R.↗

BRAINSTACK – A Platform for Artificial Intelligence & Machine Learning Collaborative Experiments on a Nano-Satellite

As space missions continue to become more ambitious, complex, and distant to Earth, the need for advanced on-board intelligent decision making to guide everything from mission operations to fault detection and recovery has become a major front of space research. While the prevalence of research on such Artificial Intelligence / Machine Learning (AI/ML) modules has exploded, the capacity to experimentally validate such modules in space in a rapid and inexpensive format has not. To this end, the Nano Orbital Workshop (NOW) group at NASA Ames Research Center has been at the forefront of performing initial flight evaluation tests of ‘commercially’ available AI/ML computational platforms via the TechEdSat (TES-n) flight series as part of what is programmatically referred to as the BRAINSTACK. BRAINSTACK will provide an orbital AI/ML evaluation laboratory where computational experiments are pre-loaded into memory prior to launch, and then executed as desired during the mission, with results reported back and program tweaks or new data sets uploaded as needed. Processors selected as part of the BRAINSTACK are of ideal size, packaging, and power consumption for easy integration into a cube satellite structure. These experiments have included the evaluation of small, high-performance GPUs and more recently, neuromorphic processors in LEO operations. Neuromorphic processors are of particular interest due to their superior computational power efficiency over GPUs. The first TES-n flight test of an Intel first-generation Loihi neuromorphic processor launched on January 13, 2022 and continues to operate in orbit despite almost no space environment modifications. The Intel Loihi Gen-1 is characterized by a 14nm 128-core Spiking Neural Network (SNN) able to support on-chip training. This experiment utilized a Loihi packaged in the ‘Kapoho Bay’ USB module, providing a relatively straight-forward interface to the bus avionics system. The Kapoho Bay was in turn managed by a host Intel Pentium single-board computer to handle scheduling of the AI/ML application payloads, and communications with the satellite vehicle manager. The recently released Intel Loihi Gen-2, able to support integer-valued spike payloads and produced using 7nm process, will form part of the basis of the evolving BRAINSTACK in the upcoming three TES-n/NOW flights. Additionally, it is planned to measure the radiation environment these processors experience to understand any degradation or computational artifacts caused by long term space radiation exposure on these novel architectures. This evolving flexible and collaborative environment involving various research teams across NASA and other organizations is intended to be a convenient orbital test platform from which many anticipated future space AI/ML applications may be initially tested.

Artificial Intelligence↗

BRAINSTACK – A Platform for Artificial Intelligence & Machine Learning Collaborative Experiments on a Nano-Satellite

As space missions continue to become more ambitious, complex, and distant to Earth, the need for advanced on-board intelligent decision making to guide everything from mission operations to fault detection and recovery has become a major front of space research. While the prevalence of research on such Artificial Intelligence / Machine Learning (AI/ML) modules has exploded, the capacity to experimentally validate such modules in space in a rapid and inexpensive format has not. To this end, the Nano Orbital Workshop (NOW) group at NASA Ames Research Center has been at the forefront of performing initial flight evaluation tests of ‘commercially’ available AI/ML computational platforms via the TechEdSat (TES-n) flight series as part of what is programmatically referred to as the BRAINSTACK. BRAINSTACK will provide an orbital AI/ML evaluation laboratory where computational experiments are pre-loaded into memory prior to launch, and then executed as desired during the mission, with results reported back and program tweaks or new data sets uploaded as needed. Processors selected as part of the BRAINSTACK are of ideal size, packaging, and power consumption for easy integration into a cube satellite structure. These experiments have included the evaluation of small, high-performance GPUs and more recently, neuromorphic processors in LEO operations. Neuromorphic processors are of particular interest due to their superior computational power efficiency over GPUs. The first TES-n flight test of an Intel first-generation Loihi neuromorphic processor launched on January 13, 2022 and continues to operate in orbit despite almost no space environment modifications. The Intel Loihi Gen-1 is characterized by a 14nm 128-core Spiking Neural Network (SNN) able to support on-chip training. This experiment utilized a Loihi packaged in the ‘Kapoho Bay’ USB module, providing a relatively straight-forward interface to the bus avionics system. The Kapoho Bay was in turn managed by a host Intel Pentium single-board computer to handle scheduling of the AI/ML application payloads, and communications with the satellite vehicle manager. The recently released Intel Loihi Gen-2, able to support integer-valued spike payloads and produced using 7nm process, will form part of the basis of the evolving BRAINSTACK in the upcoming three TES-n/NOW flights. Additionally, it is planned to measure the radiation environment these processors experience to understand any degradation or computational artifacts caused by long term space radiation exposure on these novel architectures. This evolving flexible and collaborative environment involving various research teams across NASA and other organizations is intended to be a convenient orbital test platform from which many anticipated future space AI/ML applications may be initially tested.

Artificial Intelligence↗

Mars Design Reference Architecture 5.0 Study: Executive Summary

The NASA Mars Design Reference Architecture 5.0 Study seeks to update its long term goals and objective for human exploration missions; flight and surface systems for human missions and supporting infrastructure; operational concept for human and robotic exploration of Mars; key challenges including risk and cost drivers; and, its development schedule options. It additionally seeks to assess strategic linkages between lunar and Mars strategies and develop and understanding of methods for reducing the cost/risk of human Mars missions through investment in research, technology development, and synergy with other exploration plans. Recommendations are made regarding conjunction class (long-stay) missions which are seen as providing the best balance of cost, risk, and performance. Additionally, this study reviews entry, descent, and landing challenges; in-space transportation systems; launch vehicle and Orion assessments; risk and risk mitigation; key driving requirements and challenges; and, lunar linkages.

Drake, Bret G.↗

Contact Graph Routing

Contact Graph Routing (CGR) is a dynamic routing system that computes routes through a time-varying topology of scheduled communication contacts in a network based on the DTN (Delay-Tolerant Networking) architecture. It is designed to enable dynamic selection of data transmission routes in a space network based on DTN. This dynamic responsiveness in route computation should be significantly more effective and less expensive than static routing, increasing total data return while at the same time reducing mission operations cost and risk. The basic strategy of CGR is to take advantage of the fact that, since flight mission communication operations are planned in detail, the communication routes between any pair of bundle agents in a population of nodes that have all been informed of one another's plans can be inferred from those plans rather than discovered via dialogue (which is impractical over long one-way-light-time space links). Messages that convey this planning information are used to construct contact graphs (time-varying models of network connectivity) from which CGR automatically computes efficient routes for bundles. Automatic route selection increases the flexibility and resilience of the space network, simplifying cross-support and reducing mission management costs. Note that there are no routing tables in Contact Graph Routing. The best route for a bundle destined for a given node may routinely be different from the best route for a different bundle destined for the same node, depending on bundle priority, bundle expiration time, and changes in the current lengths of transmission queues for neighboring nodes; routes must be computed individually for each bundle, from the Bundle Protocol agent's current network connectivity model for the bundle s destination node (the contact graph). Clearly this places a premium on optimizing the implementation of the route computation algorithm. The scalability of CGR to very large networks remains a research topic. The information carried by CGR contact plan messages is useful not only for dynamic route computation, but also for the implementation of rate control, congestion forecasting, transmission episode initiation and termination, timeout interval computation, and retransmission timer suspension and resumption.

Burleigh, Scott C.↗

Technology Applications that Support Space Exploration

Several enabling technologies have been identified that would provide significant benefits for future space exploration. In-Space demonstrations should be chosen so that these technologies will have a timely opportunity to improve efficiencies and reduce risks for future spaceflight. An early window exists to conduct ground and flight demonstrations that make use of existing assets that were developed for the Space Shuttle and the Constellation programs. The work could be mostly performed using residual program civil servants, existing facilities and current commercial launch capabilities. Partnering these abilities with the emerging commercial sector, along with other government agencies, academia and with international partners would provide an affordable and timely approach to get the launch costs down for these payloads, while increasing the derived benefits to a larger community. There is a wide scope of varied technologies that are being considered to help future space exploration. However, the cost and schedule would be prohibitive to demonstrate all these in the near term. Determining which technologies would yield the best return in meeting our future space needs is critical to building an achievable Space Architecture that allows exploration beyond Low Earth Orbit. The best mix of technologies is clearly to be based on our future needs, but also must take into account the availability of existing assets and supporting partners. Selecting those technologies that have complimentary applications will provide the most knowledge, with reasonable cost, for future use The plan is to develop those applications that not only mature the technology but actually perform a useful task or mission. These might include such functions as satellite servicing, a propulsion stage, processing lunar regolith, generating and transmitting solar power, cryogenic fluid transfer and storage and artificial gravity. Applications have been selected for assessment for future consideration and are addressed in this paper. These applications have been made available to the various NASA study groups that are determining the next steps the Agency must take to secure a sound foundation for future space exploration The paper also addresses how follow-on demonstrations, as launch performance grows, can build on the earlier applications to provide increased benefits for both the commercial and scientific communities. The architecture of incrementally building upon previous successes and insights dramatically lowers the overall associated risk for developing and maturing the key enabling technologies. The goal is to establish a potential business case that encourages commercial activity, thereby reducing the cost for the demonstration while using the technology maturation in developing readiness for future space exploration with overall less risk.

Henderson, Edward M.↗

Innovative Development of a Cross-Center Timeline Planning Tool

The Payload Operations Integration Center (POIC) at Marshall Space Flight Center (MSFC) supports planning, coordination and scheduling of science activities for the International Space Station (ISS) in coordination with other NASA centers, international partners, and payload developers. The ability to efficiently plan and re-plan in response to change is critical to the flight planning teams. With the achievement of supporting a fourth crew member aboard the ISS and an increasing amount of payload science activities, came the need for a dynamic, more efficient way of building timeline planning reports that could be readily updated as fast as payload science plans could change. This paper addresses software architecture considerations in the successful cross-center development of an automated planning tool with multiple data sources. It also discusses the practical implementation of a time-boxed, hybrid Agile Software Development (ASD) approach to deliver customer-driven value despite changing requirements with respect to low-Earth orbit operational planning activities. The goal of this paper is to open discussion with members of the international community and trade effective strategies for cross-center architectural and customer-developer driven collaborations, to support increasing utilization of planning and conducting science activities in space.

Pedoto, Ramon W.↗

Standards Roadmapping for Mission Assurance in Commercial Spaceflight

This paper explores the application of established roadmapping approaches in standards planning and roadmap development to support mission assurance objectives. Mission assurance requires proactive planning across multiple domains including technical, schedule, cost, organizational, and policy. The intersection of these domains happens at the enterprise level, and enterprise systems engineering processes can systematically guide mission assurance activities, including development of standards roadmaps. Standards planning and development is a critical contributor to an effective mission assurance strategy, although standards are often developed and adopted reactively. Technology and standards planning is a key Enterprise Process Management activity, as identified by the Systems Engineering Body of Knowledge, and technology and standards roadmaps are strategic tools used to enable that process. Technology roadmapping has proven effective in guiding enterprise architecture and concept design, and standards planning supports enterprise requirements definition and management. However, there are limited methodologies to guide such standards planning activities. The application of technology roadmapping principles to standards planning formalizes the process and establishes a repeatable framework for standards development and integration. The framework development described in this paper fills a methodological gap by adapting proven roadmapping techniques to standards planning. Through a comparison of roadmapping methodologies and a case study analysis, this approach outlines a systematic process for anticipating and planning standards needs. In the case of developing a standards integration roadmap for NASA’s Office of Safety and Mission Assurance (OSMA), technology roadmapping principles were adapted to develop a roadmap framework to allow NASA and OSMA to define an agency-wide standards integration plan for commercial and industry safety and mission assurance standards. The outcome highlights key adaptations required for roadmapping in a standards context and describes the process steps to formalize a standards planning activity. The roadmapping framework adapted for standards development and integration enables more strategic, forward-looking standards planning and allows for better alignment between evolving capabilities and mission assurance requirements. Beyond its application to mission assurance, this methodology can be transferred to other domains requiring standards development, providing a systematic approach that integrates systems engineering principles into policy strategy and decision-making processes.

Enterprise Systems Engineering↗

Automated Platform Management System Scheduling

The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

Hull, Larry G.↗