Alternatives to MARVEL Power Conversion -- Comparison of Stirling Engine Thermal Efficiency and Design to Other Power Conversion Cycles

PRESENTATION for CONFERENCE PAPER: The Microreactor Applications, Research, Validation, and Evaluation (MARVEL) Reactor is a small liquid-metal thermal reactor that will be built at the Idaho National Laboratory to demonstrate design and operating processes for microreactors, microgrid integration, and process heat applications. Power conversion in the MARVEL design is provided by Stirling engines, which have disadvantages in nuclear environments. Compared to Stirling engine performance, some alternative power cycles can increase power production when coupled to a liquid-metal thermal reactor. In this paper, the thermal efficiency of MARVEL’s power production with Stirling engines is compared to the thermal efficiency of power production with MARVEL and alternative power cycles. Those cycles include a superheated Rankine cycle, open and closed Brayton cycles, and a supercritical carbon dioxide cycle. All cycles (except the Stirling engines) were modeled with an intermediate helium loop to meet MARVEL’s principal design criteria. All models are simple designs with conservative assumptions for consistent comparison. Detailed optimization will depend largely on reactor location and application, and the relative merit of each cycle is discussed for different environmental conditions. The study informs significant early decisions on power cycle design and economics for deployment of advanced microreactors as they move from theory and concept to execution.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Pilot Testing of a Highly Efficient Pre-combustion Sorbent-based Carbon Capture System

TDA developed and demonstrated a highly efficient pre-combustion carbon capture system. The overall objective of this work was to develop a new sorbent-based pre-combustion carbon capture technology for Integrated Gasification Combined Cycle (IGCC) power plants. In this project our goal was to demonstrate the techno-economic viability of the new technology by 1) demonstrating it in large-scale slipstream tests, and 2) carrying out a high fidelity engineering and cost analysis. TDA’s process used an advanced physical adsorbent that selectively removes CO 2 from coal-derived synthesis gas above the dew point of the gas at temperatures as high as 300°C. The sorbent consists of a mesoporous carbon whose surface was grafted with functional groups that remove CO 2 via a well-known acid-base interaction. As documented in bench-scale experiments and field tests with actual coal gas, the sorbent achieved a very high capacity for CO 2 at temperatures as high as 300°C. The sorbent bound CO 2 more strongly than common physical adsorbents, providing the chemical potential needed for the high temperature operation. However, because CO 2 does not form a true covalent bond with the surface sites (as is the case with chemical absorbents), the sorbent regeneration could be carried out with only a very small energy input. The heat input to regenerate our sorbent was only 4.9 kcal per mol of CO 2 , which is much lower than that for chemical absorbents (e.g., 29.9 kcal/mol CO 2 for sodium carbonate) and was similar to the requirements of physical solvents (e.g., 4 kcal/mol CO 2 for Selexol TM ). Because the sorbent operates above the dew point of the synthesis gas (unlike the Selexol TM process), a higher power cycle efficiency can be achieved. With previous DOE/NETL funding (Contract No. DE-FE-0000469), we demonstrated the techno-economic viability of the technology in bench-scale tests and slipstream demonstrations at the National Carbon Capture Center (NCCC), Wilsonville, Alabama and Wabash River IGCC plant in Terra Haute, Indiana. We demonstrated a stable working CO 2 capacity for over 11,650 cycles with simulated synthesis gas. We also evaluated its performance with actual synthesis gas in two test campaigns at the Wabash River IGCC Plant, Terre Haute, IN and the National Carbon Capture Center (NCCC), Wilsonville, AL. The slipstream tests clearly showed that the actual coal gas constituents and potential contaminants (e.g. trace metals, halides, tars) had no effect on the sorbent’s ability to remove CO 2 (the same sorbent beds were used in both field tests with no sign of deactivation for 2,000 cycles with over 26,750 SCF of gas treated). As expected, due to the high temperature CO 2 removal capability and low energy needed to regenerate the sorbent, the power cycle efficiency with our process was greater than 34% on a higher heating value (HHV) basis; in comparison, the same IGCC plant equipped with the Selexol TM solvent for carbon capture can only achieve 31.4% HHV efficiency. The capital cost for an IGCC system with TDA’s process is estimated as $2,417/kW e , which is 12% lower than that of the IGCC/ Selexol TM process. The levelized cost for electricity including the transport, storage and monitoring (TS&M) cost for CO 2 was calculated as $\$ $92.9/MWh (lowest reported to our knowledge), which is much better than the $105.2/MWh estimated for the IGCC/ Selexol TM process. In this project (DE-FE0013105), TDA Research, in collaboration with our partners Gas Technology Institute (GTI), Illinois Clean Coal Institute (ICCI), University of California, Irvine (UCI), University of Alberta (UOA), Siemens, NCCC and Sinopec advanced the technical maturity of the technology; scaling it up by a factor of 100. We optimized the reactor design using computational fluid dynamics (CFD); using adsorption modeling we improved the pressure swing adsorption (PSA) cycle sequence. We carried out two field test campaigns with a fully-equipped 0.1 MW e prototype unit (for a total of 844 hours) using actual synthesis gas to prove the viability of the new technology. A successful 30 day (707 hrs) evaluation was completed at NCCC under air blown gasification conditions. We demonstrated 97.3% carbon capture at 1,500 SLPM, 93% carbon capture at 1,800 SLPM, and 90% carbon capture at 2,100 SLPM in the NCCC tests. We also demonstrated the system for 137 hours at a Sinopec petrochemical plant under oxygen blown gasification, demonstrating 86% carbon capture at 2,660 SLPM. In collaboration with University of California, Irvine (UCI), we completed a techno-economic analysis (TEA) for TDA’s warm gas cleanup technology integrated to IGCC power plant. The net plant efficiencies (on a coal HHV basis) for the warm gas cleanup cases were estimated to be 34.0% for E-GasTM gasifier, 34.4% for GE gasifier, 33.4 for the Shell gasifier and 34.2 for the TRIG TM gasifier (Cases 2, 4, 6 and 8 in this study) with a catalytic combustor for CO 2 purification, which are significantly higher than those for the Cold Gas Case, or an increase of as much as 12% in the heat rate for Case 2, 6% for Case 4, 9% for Case 6, and 9% for Case 8. The 1st year cost of electricity with the transport, storage and monitoring (TS&M) costs for the CO 2 included was $\$ $129.2/MWh for the E-GasTM gasifier Warm Gas Cleanup Case, $\$ $131.9/MWh for the GE gasifier Warm Gas Cleanup Case, $\$ $146.8/MWh for the Shell Gasifier Warm Gas Cleanup Case, and $\$ $129.9/MWh for the TRIG TM gasifier Warm Gas Cleanup Case. For comparison, the costs for the baseline Cold Gas CO 2 removal with Selexol for the different gasifiers were: $\$ $146.6/MWh for the E-Gas TM gasifier, $\$ $142.2/MWh for the GE gasifier, $\$ $159.0/MWh for the Shell gasifier and $\$ $144.3/MWh for the TRIG TM gasifier. In summary, the costs for our system were 7 to 12% lower than the corresponding Cold Gas Cleanup cases. The results of this techno-economic analysis suggested that TDA’s high temperature PSA-based Warm Gas Clean-up Technology can make a substantial improvement in the IGCC plant thermal performance for achieving near zero CO 2 emissions for E-Gas TM , GE, Shell and TRIG TM gasifier based IGCC power plants. The capital expenses were estimated to be lower than that of Selexol’s™. Taken together, the higher net plant efficiency and lower capital and operating costs resulted in substantial reduction in the cost of carbon capture for the IGCC plant equipped with TDA’s high temperature PSA-based carbon capture system. Finally, in collaboration with Gas Technology Institute (GTI) we completed the environmental health and safety assessment for TDA’s warm gas carbon capture technology.

01 COAL, LIGNITE, AND PEAT↗

Ultra efficient turbo-compression cooling systems

Aspects of the present disclosure include a system for turbo-compression cooling. The system may be aboard a marine vessel. The system includes a power cycle and a cooling cycle. The power cycle includes a first working fluid, a waste heat boiler configured to evaporate the working fluid, a turbine, and a condenser. The condenser condenses the working fluid to a saturated or subcooled liquid. The cooling cycle includes a second working fluid, a first compressor configured to increase the pressure of the second working fluid, a condenser configured to condense the second working fluid to a saturated or subcooled liquid after exiting the first compressor, an expansion valve, and an evaporator. The turbine and first compressor are coupled one to the other. The waste heat boiler receives waste heat from engine jacket water and lubricating oil from a ship service generator. The evaporator cools water in a shipboard cooling loop.

Bandhauer, Todd M.↗

Integrated Optimization and Control of a Hybrid Gas Turbine/sCO 2 Power System

During phase-I, the project team led by Echogen Power Systems (EPS) had two primary objectives based on investigating the application of gas turbines with supercritical carbon dioxide (sCO 2 ) power cycles. The first objective was to improve the overall efficiency and performance of a hybrid gas turbine/sCO 2 power system through a joint optimization of the two subsystems (gas turbine and sCO 2 power cycle) using non-linear optimization techniques that simultaneously evaluate thermal performance of the combined cycle. The hybrid power system included several points of interaction, including (but not limited to) gas turbine exhaust, fuel heating, inlet chilling and turbine cooling. The second objective was to establish a baseline transient response model of the hybrid power system and a notional microgrid and begin steps to integrate the control systems of the three major elements (gas turbine, sCO 2 cycle and grid controller). The project team established a baseline performance for a combined cycle power plant using a production gas turbine and scaled sCO 2 power cycle only utilizing exhaust heat recovery. Echogen’s non-linear techno-economic optimization code was extended by adding gas turbine component models derived from a in-house developed gas turbine design code. With the two cycles coupled by the gas turbine exhaust, design parameters of both cycles were allowed to vary simultaneously to determine performance opportunity versus isolated designs. Returning to the baseline gas turbine/sCO 2 power cycle transient models: Echogen had in-house developed sCO 2 cycle transient model in GT-Suite system simulation software, and had partnered with Siemens Finspång for gas turbine transient model, and Siemens PTI group to provide micro-grid load profile as well as hybrid power cycle generated load (power and frequency) analysis. The transient model for the SGT-750 Siemens gas turbine was a “black-box” functional mock-up interface (FMI) model developed by Siemens Industrial Turbomachinery in Finspång, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8°C. The transient model for sCO 2 power cycle was developed by Echogen in GT-SUITE 1D system simulation software platform. The basic CO 2 flow circuit has single-shaft turbomachinery with net 11.5 MW electrical power output at design conditions. The power turbine has a double-ended shaft with one end connected to synchronous generator through a fixed-ratio gearbox. The other end of power turbine is connected to the compressor through a continuously variable transmission. The major components of the sCO 2 power cycle modeled include air cooled condenser/cooler, CO 2 compressor, recuperator, two waste heat exchanger coils, power turbine, continuous variable transmission, gearbox and generator. Integration of SGT-750 transient model and sCO 2 power cycle transient model was done in Matlab Simulink. In the integrated model, the gas turbine and sCO 2 power cycle interacted at two points, first one being the gas turbine exhaust gas flow rate and temperature, which were inputs to sCO 2 power cycle model. The second point was the distribution of micro-grid load demand signal between the SGT-750 generator and sCO 2 cycle generator. For a given combined-cycle load demand, the gas turbine load demand was equal to the total demand minus the sCO 2 cycle power generated. In the present study the integrated model was simulated for two cases of grid load demand: (i) for a step change, both positive-step and negative-step, in grid load demand (ii) for a micro-grid load demand curve provided by Siemens PTI group. Finally, the time series plots representing load demand versus integrated system response were presented including the sCO 2 power cycle control system performance plots. The actual generated power and frequency of both the generators, gas turbine and sCO 2 power cycle, was supplied to Siemens PTI group for dynamic grid assessment, results of which are provided in appendices.

03 NATURAL GAS↗

Microfabricated rankine cycle steam turbine for power generation and methods of making the same

In accordance with the present invention, an integrated micro steam turbine power plant on-a-chip has been provided. The integrated micro steam turbine power plant on-a-chip of the present invention comprises a miniature electric power generation system fabricated using silicon microfabrication technology and lithographic patterning. The present invention converts heat to electricity by implementing a thermodynamic power cycle on a chip. The steam turbine power plant on-a-chip generally comprises a turbine, a pump, an electric generator, an evaporator, and a condenser. The turbine is formed by a rotatable, disk-shaped rotor having a plurality of rotor blades disposed thereon and a plurality of stator blades. The plurality of stator blades are interdigitated with the plurality of rotor blades to form the turbine. The generator is driven by the turbine and converts mechanical energy into electrical energy.

Frechette, Luc↗

Design analysis of a particle-based thermal energy storage system for concentrating solar power or grid energy storage

Energy storage is becoming indispensable for expanding renewable energy integration, and it is critical to the future low-carbon energy supply. Large-capacity, grid scale energy storage can support the integration of solar and wind power and support grid resilience with the diminishing capacity of baseload fossil power plants. With the development of thermal energy storage (TES) for concentrating solar power systems, standalone TES for grid integration becomes attractive due to the declining renewable generation cost and an increasing need for energy storage. The standalone TES system introduced in this paper can play a big role in the carbon-free energy future with capacity larger than batteries and cost likely lower than other energy storage methods such as pumped storage hydropower and compressed air energy storage, both of which also have geological limitations. To this end, we describe a TES system that uses stable, inexpensive solid particles as a TES media to provide scalable, low cost energy storage. The particle-based TES has the ability to drive various thermal power cycles including conventional steam-Rankine, air Brayton turbine with combined-cycle ability, or the emerging supercritical carbon dioxide Brayton power cycle. This work describes the containment design method including a concrete silo and an internal-insulation layer for the particle-TES system. The economic analysis shows significantly low storage cost when the particle-TES is integrated with Brayton combined-cycle power generation. The paper shows the design approach of the particle-TES system and its economic potential for bulk energy storage. The advantage of the particle-TES system as a promising bulk energy storage method is its ability to economically support dispatchable renewable grid penetration for larger capacity and longer discharging hours than current battery storage technologies.

25 ENERGY STORAGE↗

Enabling Robust Compressor Operation Under Various sCO 2 Conditions at Compressor Inlet

The supercritical carbon dioxide (sCO 2 ) power cycle is one of the most investigated power conversion systems in last decade. The reason for this is its wide range of potential applications from fossil fuels (Natural gas), nuclear (Fusion, Fission), through concentrated solar power, energy storage system and waste heat recovery systems to power-to-x systems. The main advantage of the sCO 2 power cycle is very similar operation conditions, especially for the compressor, for all potential applications. Because of this the potential cost of the system can be reduced. However, the sCO 2 power cycle has still several issue that needs to address before commercial application. The current key issue is design of the primary compressor. The primary compressor is one of the key components in the sCO 2 power cycle; it operates with inlet conditions just above the critical point of CO 2 to maintain high fluid density and reduce power requirements.