Search NASA⌕ Search

SEARCH · Search NASA

Results for “priorities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Performance comparison of token ring protocols for hard-real-time communication

The ability to guarantee the deadlines of synchronous messages while maintaining a good aggregate throughput is an important consideration in the design of distributed real-time systems. In this paper, we study two token ring protocols, the priority driven protocol and the timed token protocol, for their suitability for hard real-time systems. Both these protocols use a token to control access to the transmission medium. In a priority driven protocol, messages are assigned priorities and the protocol ensures that messages are transmitted in the order of their priorities. Timed token protocols do not provide for priority arbitration but ensure that the maximum access delay for a station is bounded. For both protocols, we first derive the schedulability conditions under which the transmission deadlines of a given set of synchronous messages can be guaranteed. Subsequently, we use these schedulability conditions to quantitatively compare the average case behavior of the protocols. This comparison demonstrates that each of the protocols has its domain of superior performance and neither dominates the other for the entire range of operating conditions.

Kamat, Sanjay↗

High Spatial Resolution Studies of Blastwave Interactions in the Vela Supernova Remnant

The report targeted two interaction zones within the Vela supernova remnant for HRI observation and data reduction and analysis. Approximately 40 ksec of HRI integration time was awarded for each of the awarded target regions, one at priority 2 and one at priority 3. The observations have been completed for the priority 2 observation. Some observations have been made of the priority 3 target, however the data have not yet been received by the PI. The priority 2 data have been received and analyzed and the results have been prepared for publication. The chief results are as follows: (1) the radial profile of the X-ray emission from the western rim is characterized by a sudden increase in emission at the blastwave interaction region which is unresolved spatially at HRI resolution. The profile is consistent with the expanding blastwave from the remnant encountering a large, coherent structure in the surrounding ISM; (2) the X-ray emission lags slightly 'behind', approx. 10(exp 16)cm the H(alpha) and OIII optical filaments, consistent with the expected spatial profile of the emission assuming parameters derived from earlier PSPC observations of the region. the combination of the X-ray and optical interference filter data allow us to set limits on the distance to the Vela remnant and the general nature of the blastwave interactions in the remnant.

Craig, William↗

Instrumentation Working Group Summary

The Instrumentation Working Group compiled a summary of measurement techniques applicable to gas turbine engine aerosol precursors and particulates. An assessment was made of the limits, accuracy, applicability, and technology readiness of the various techniques. Despite advances made in emissions characterization of aircraft engines, uncertainties still exist in the mechanisms by which aerosols and particulates are produced in the near-field engine exhaust. To adequately assess current understanding of the formation of sulfuric acid aerosols in the exhaust plumes of gas turbine engines, measurements are required to determine the degree and importance of sulfur oxidation in the turbine and at the engine exit. Ideally, concentrations of all sulfur species would be acquired, with emphasis on SO2 and SO3. Numerous options exist for extractive and non-extractive measurement of SO2 at the engine exit, most of which are well developed. SO2 measurements should be performed first to place an upper bound on the percentage of SO2 oxidation. If extractive and non-extractive techniques indicate that a large amount of the fuel sulfur is not detected as SO2, then efforts are needed to improve techniques for SO3 measurements. Additional work will be required to account for the fuel sulfur in the engine exhaust. Chemical Ionization Mass Spectrometry (CI-MS) measurements need to be pursued, although a careful assessment needs to be made of the sampling line impact on the extracted sample composition. Efforts should also be placed on implementing non-intrusive techniques and extending their capabilities by maximizing exhaust coverage for line-of-sight measurements, as well as development of 2-D techniques, where feasible. Recommendations were made to continue engine exit and combustor measurements of particulates. Particulate measurements should include particle size distribution, mass fraction, hydration properties, and volatile fraction. However, methods to ensure that unaltered samples are obtained need to be developed. Particulate speciation was also assigned a high priority for quantifying the fractions of carbon soot, PAH, refractory materials, metals, sulfates, and nitrates. High priority was also placed on performing a comparison of particle sizing instruments. Concern was expressed by the workshop attendees who routinely make particulate measurements about the variation in number density measured during in-flight tests by different instruments. In some cases, measurements performed by different groups of researchers during the same flight tests showed an order of magnitude variation. Second priority was assigned to measuring concentrations of odd hydrogen and oxidizing species. Since OH, HO2, H2O2, and O are extremely reactive, non-extractive measurements are recommended. A combination of absorption and fluorescence is anticipated to be effective for OH measurements in the combustor and at the engine exit. Extractive measurements of HO2 have been made in the stratosphere, where the ambient level of OH is relatively low. Use of techniques that convert HO2 to OH for combustor and engine exit measurements needs to be evaluated, since the ratio of HO2/OH may be 1% or less at both the combustor and engine exit. CI-MS might be a viable option for H2O2, subject to sampling line conversion issues. However, H2O2 is a low priority oxidizing species in the combustor and at the engine exit. Two candidates for atomic oxygen measurements are Resonance Enhanced Multi-Photon Ionization (REMPI) and Laser-Induced Fluorescence (LIF). Particulate measurement by simultaneous extractive and non-extractive techniques was given equal priority to the oxidizer measurements. Concern was expressed over the ability of typical ground test sampling lines to deliver an unaltered sample to a remotely located instrument. It was suggested that the sampling probe and line losses be checked out by attempting measurements using an optical or non-extractive technique immediately upstream of the sampling probe. This is a possible application for Laser Induced Incandescence (LII) as a check on the volume fraction of soot. Optical measurements of size distribution are not well developed for ultrafine particles less than about 20 nm in diameter, so a non-extractive technique for particulate size distribution cannot be recommended without further development. Carbon dioxide measurements need to be made to complement other extractive measurement techniques. CO2 measurements enable conversion of other species concentrations to emission indices. Carbon monoxide, which acts as a sink for oxidizing species, should be measured using non-extractive techniques. CO can be rapidly converted to CO2 in extractive probes, and a comparison between extractive and non-extractive measurements should be performed. Development of non-extractive techniques would help to assess the degree of CO conversion, and might be needed to improve the concentration measurement accuracy. Measurements of NO(x) will continue to be critical due to the role of NO and NO2 in atmospheric chemistry, and their influence on atmospheric ozone. Time-resolved measurements of temperature, velocity, and species concentrations were included on the list of desired measurement. Thermocouples are typically adequate for engine exit measurements. PIV and LDV are well established for obtaining velocity profiles. The techniques are listed in the accompanying table; are divided into extractive and non-extractive techniques. Efforts were made to include a measurement uncertainty for each technique. An assessment of the technology readiness was included.

Zaller, Michelle↗

A Fast-Time Study of Aircraft Reordering in Arrival Sequencing and Scheduling

In order to ensure that the safe capacity of the terminal area is not exceeded, Air Traffic Management ATM often places restrictions on arriving flights transitioning from en route airspace to terminal airspace. This restriction of arrival traffic is commonly referred to as arrival flow management, and includes techniques such as metering, vectoring, fix-load balancing, and the imposition of miles-in-trail separations. These restrictions are enacted without regard for the relative priority which airlines may be placing on individual flights based on factors such as crew criticality, passenger connectivity, critical turn times, gate availability, on-time performance, fuel status, or runway preference. The development of new arrival flow management techniques which take into consideration priorities expressed by air carriers will likely reduce the economic impact of ATM restrictions on the airlines and lead to increased airline economic efficiency by allowing airlines to have greater control over their individual arrival banks of aircraft. NASA and the Federal Aviation Administration (FAA) have designed and developed a suite of software decision support tools (DSTs) collectively known as the Center TRACON Automation System (CTAS). One of these tools, the Traffic Management Advisor (TMA) is currently being used at the Fort Worth Air Route Traffic Control Center to perform arrival flow management of traffic into the Dallas/Fort Worth airport (DFW). The TMA is a time-based strategic planning tool that assists Traffic Management Coordinators (TMCs) and En Route Air Traffic Controllers in efficiently balancing arrival demand with airport capacity. The primary algorithm in the TMA is a real-time scheduler which generates efficient landing sequences and landing times for arrivals within about 200 no a. from touchdown. This scheduler will sequence aircraft so that they arrive in a first- come - first-served (FCFS) order. While FCFS sequencing establishes a fair order based on estimated times of arrival, it does not take into account individual airline priorities among incoming flights. NASA is exploring the possibility of allowing airlines to express relative arrival priorities to air traffic management through the development of new CTAS scheduling algorithms which take into consideration airline arrival preferences. The accommodation of airline priorities in arrival sequencing and scheduling would under most circumstances result in a deviation from a "natural" or FCFS arrival order. As a First step toward developing airline influenced sequencing algorithms, an investigation was conducted to determine the feasibility of reordering arrival traffic from a strict FCFS sequence. A fast-time simulation has been developed which allows statistical evaluation of sequencing and scheduling algorithms for arrival traffic at the Dallas/Fort Worth Airport. In contrast to real-time simulation or field tests, which would require on the order of ninety minutes to examine a single traffic rush period, the fast-time simulation allows examination of multiple rush periods in a matter of seconds.

Carr, Greg↗

Pilot Interactions in an Over-Constrained Conflict Scenario as Studied in a Piloted Simulation of Autonomous Aircraft Operations

Feasibility and safety of autonomous aircraft operations were studied in a multi-piloted simulation of overconstrained traffic conflicts to determine the need for, and utility of, priority flight rules to maintain safety in this extraordinary and potentially hazardous situation. An overconstrained traffic conflict is one in which the separation assurance objective is incompatible with other objectives. In addition, a proposed scheme for implementing priority flight rules by staggering the alerting time between the two aircraft in conflict was tested for effectiveness. The feasibility study was conducted through a simulation in the Air Traffic Operations Laboratory at the NASA Langley Research Center. This research activity is a continuation of the Distributed Air-Ground Traffic Management feasibility analysis reported in the 4th USA/Europe Air Traffic Management R&D Seminar in December 2001 (paper #48). The over-constrained conflict scenario studied here consisted of two piloted aircraft that were assigned an identical en-route waypoint arrival time and altitude crossing restriction. The simulation results indicated that the pilots safely resolved the conflict without the need for a priority flight rule system. Occurrences of unnecessary maneuvering near the common waypoint were traced to false conflict alerts, generated as the result of including waypoint constraint information in the broadcast data link message issued from each aircraft. This result suggests that, in the conservative interests of safety, broadcast intent information should be based on the commanded trajectory and not on the Flight Management System flight plan, to which the aircraft may not actually adhere. The use of priority flight rules had no effect on the percentage of the aircraft population meeting completely predictable which aircraft in a given pair would meet the constraints and which aircraft would make the first maneuver to yield right-of-way. Therefore, the proposed scheme for implementing priority flight rules through staggering the alerting time between the two aircraft was completely effective. The data and observations from this experiment, together with results from the previously reported study, support the feasibility of autonomous aircraft operations.

Wing, David J.↗

A Performance Assessment of NASA's Heliophysics Program

Recognizing the importance of distributed observations of all elements of the Sun-to-Earth system and the synergies between observation and theory and between basic and targeted research, the National Research Council's 2003 solar and space physics decadal survey laid out an integrated research strategy that sought to extend and augment what has now become the Heliophysics Great Observatory as well as to enhance NASA, NOAA, NSF, and DOD's other solar and space physics research activities. The Integrated Research Strategy provided a prioritized list of flight missions and theory and modeling programs that would advance the relevant physical theories, incorporate those theories in models that describe a system of interactions between the Sun and the space environment, obtain data on the system, and analyze and test the adequacy of the theories and models. As directed by Congress in the NASA Authorization Act of 2005, the purpose of this report is to assess the progress of NASA's Heliophysics Division at the 5-year mark against the NASA goals and priorities laid out in the decadal survey. In addition to the Integrated Research Strategy, the decadal survey also considered non-mission-specific initiatives to foster a robust solar and space physics program. The decadal survey set forth driving science challenges as well as recommendations devoted to the need for technology development, collaborations and cooperation with other disciplines, understanding the effects of the space environment on technology and society, education and public outreach, and steps that could strengthen and enhance the research enterprise. Unfortunately, very little of the recommended NASA program priorities from the decadal survey s Integrated Research Strategy will be realized during the period (2004-2013) covered by the survey. Mission cost growth, reordering of survey mission priorities, and unrealized budget assumptions have delayed or deferred nearly all of the NASA spacecraft missions recommended in the survey. As a result, the status of the Integrated Research Strategy going forward is in jeopardy, and the loss of synergistic capabilities in space will constitute a serious impediment to future progress. Some of these factors were largely outside NASA's control, but as the assessments in Chapter 2 of this report detail, many factors were driven by subsequent NASA decisions about mission science content, mission size, and mission sequence. Overcoming these challenges, as well as other key issues like launch vehicle availability, will be critical if NASA is to realize more of the decadal survey's priorities over the next 5 years as well as priorities in solar and space physics research in the long term. Chapter 3 of this report provides recommendations about how NASA can better fulfill the 2003 decadal survey and improve future decadal surveys in solar and space physics.

Source record↗

Jovian system science issues and implications for a Mariner Jupiter Orbiter mission

Science goals for missions to Jupiter in the early 1980's are reviewed and a case is made for the science community to play the key role in assigning relative priorities for these goals. A reference set of measurement requirements and their priorities is established and those high priority goals that are most demanding on spacecraft and mission design are used to develop a reference mission concept. An orbiter mission is required to satisfy a majority of the measurements, and a spacecraft data handling capability as least equivalent to the Mariner Jupiter/Saturn spacecraft is the major system design driver. This reference Mission Concept is called Mariner Jupiter Orbiter. The remaining measurement requirements are reviewed in light of the potential science return of this mission, and certain options are developed to augment this science return. Two attractive options fulfill high priority objectives not achieved by the reference Mariner Jupiter Orbiter mission alone: an atmospheric entry probe, released prior to orbit insertion; and a daughter satellite dedicated to particle and fields measurements, ejected into an independent orbit about Jupiter.

Beckman, J. C.↗

Collision-free trajectory planning algorthm for manipulators

Collision-free trajectory planning for robotic manipulators is investigated. The task of the manipulator is to move its end-effector from one point to another point in an environment with polyhedral obstacles. An on-line algorithm is developed based on finding the required joint angles of the manipulator, according to goals with different priorities. The highest priority is to avoid collisions, the second priority is to plan the shortest path for the end effector, and the lowest priority is to minimize the joint velocity for smooth motion. The pseudo-inverse of the Jacobian matrix is applied for inverse kinematics. When a possible collision is detected, a constrained inverse kinematic problem is solved such that the collision is avoided. This algorithm can also be applied to a time-variant environment.

Pourboghrat, F.↗

Educational affairs plan: A five-year strategy

A five-year plan is presented to guide the use of NASA resources in administering a focused and consistent set of aeronautics and space science education programs. Major initiatives outlined in this plan fall into two categories: programmatic priorities and institutional priorities. Programmatic priorities for this plan include elementary education, teacher education, underrepresented minority participation, educational technology and the Aerospace Education Services Project (AESP). Institutional priorities highlighted in this plan include university programs, educational publications and their distribution, educational partnerships with public and private organizations, educational research and evaluation, and activities of the educational affairs administration. The plan's aim is to directly and indirectly help to ensure an adequate pool of talented scientists, engineers and technical personnel to keep NASA at the forefront of advancements for the 21st century.

Source record↗

Performance-based workload assessment: Allocation strategy and added task sensitivity

The preliminary results of a research program investigating the use of added tasks to evaluate mental workload are reviewed. The focus of the first studies was a reappraisal of the traditional secondary task logic that encouraged the use of low-priority instructions for the added task. It was believed that such low-priority tasks would encourage subjects to split their available resources among the two tasks. The primary task would be assigned all the resources it needed, and any remaining reserve capacity would be assigned to the secondary task. If the model were correct, this approach was expected to combine sensitivity to primary task difficulty with unintrusiveness to primary task performance. The first studies of the current project demonstrated that a high-priority added task, although intrusive, could be more sensitive than the traditional low-priority secondary task. These results suggested that a more appropriate model of the attentional effects associated with added task performance might be based on capacity switching, rather than the traditional optimal allocation model.

Vidulich, Michael A.↗

User modeling techniques for enhanced usability of OPSMODEL operations simulation software

The PC based OPSMODEL operations software for modeling and simulation of space station crew activities supports engineering and cost analyses and operations planning. Using top-down modeling, the level of detail required in the data base can be limited to being commensurate with the results required of any particular analysis. To perform a simulation, a resource environment consisting of locations, crew definition, equipment, and consumables is first defined. Activities to be simulated are then defined as operations and scheduled as desired. These operations are defined within a 1000 level priority structure. The simulation on OPSMODEL, then, consists of the following: user defined, user scheduled operations executing within an environment of user defined resource and priority constraints. Techniques for prioritizing operations to realistically model a representative daily scenario of on-orbit space station crew activities are discussed. The large number of priority levels allows priorities to be assigned commensurate with the detail necessary for a given simulation. Several techniques for realistic modeling of day-to-day work carryover are also addressed.

Davis, William T.↗

Fast simulation of packet loss rates in a shared buffer communications switch

This paper describes an efficient technique for estimating, via simulation, the probability of buffer overflows in a queueing model that arises in the analysis of ATM (Asynchronous Transfer Mode) communication switches. There are multiple streams of (autocorrelated) traffic feeding the switch that has a buffer of finite capacity. Each stream is designated as either being of high or low priority. When the queue length reaches a certain threshold, only high priority packets are admitted to the switch's buffer. The problem is to estimate the loss rate of high priority packets. An asymptotically optimal importance sampling approach is developed for this rare event simulation problem. In this approach, the importance sampling is done in two distinct phases. In the first phase, an importance sampling change of measure is used to bring the queue length up to the threshold at which low priority packets get rejected. In the second phase, a different importance sampling change of measure is used to move the queue length from the threshold to the buffer capacity.

Chang, Cheng-Shang↗

Economical ground data delivery

Data delivery in the Deep Space Network (DSN) involves transmission of a small amount of constant, high-priority traffic and a large amount of bursty, low priority data. The bursty traffic may be initially buffered and then metered back slowly as bandwidth becomes available. Today both types of data are transmitted over dedicated leased circuits. The authors investigated the potential of saving money by designing a hybrid communications architecture that uses leased circuits for high-priority network communications and dial-up circuits for low-priority traffic. Such an architecture may significantly reduce costs and provide an emergency backup. The architecture presented here may also be applied to any ground station-to-customer network within the range of a common carrier. The authors compare estimated costs for various scenarios and suggest security safeguards that should be considered.

Markley, Richard W.↗

Strategic workload management and decision biases in aviation

Thirty pilots flew three simulated landing approaches under conditions of low, medium, and high workload. Workload conditions were created by varying time pressure and external communications requirements. Our interest was in how the pilots strategically managed or adapted to the increasing workload. We independently assessed the pilot's ranking of the priority of different discrete tasks during the approach and landing. Pilots were found to sacrifice some aspects of primary flight control as workload increased. For discrete tasks, increasing workload increased the amount of time in performing the high priority tasks, decreased the time in performing those of lowest priority, and did not affect duration of performance episodes or optimality of scheduling of tasks of any priority level. Individual differences analysis revealed that high-performing subjects scheduled discrete tasks earlier in the flight and shifted more often between different activities.

Raby, Mireille↗

A Practical Approach to Implementing Real-Time Semantics

This paper investigates implementations of process algebras which are suitable for modeling concurrent real-time systems. It suggests an approach for efficiently implementing real-time semantics using dynamic priorities. For this purpose a proces algebra with dynamic priority is defined, whose semantics corresponds one-to-one to traditional real-time semantics. The advantage of the dynamic-priority approach is that it drastically reduces the state-space sizes of the systems in question while preserving all properties of their functional and real-time behavior. The utility of the technique is demonstrated by a case study which deals with the formal modeling and verification of the SCSI-2 bus-protocol. The case study is carried out in the Concurrency Workbench of North Carolina, an automated verification tool in which the process algebra with dynamic priority is implemented. It turns out that the state space of the bus-protocol model is about an order of magnitude smaller than the one resulting from real-time semantics. The accuracy of the model is proved by applying model checking for verifying several mandatory properties of the bus protocol.

Luettgen, Gerald↗

Phase IV: Deploying ESE Pilot Information Programs for State and Local Government in the Northeast, the Education Community and the Commercial Sector

This Summary of Research report is a final report which summarizes significant accomplishments achieved during NASA grant NAG 13-00044 entitled Phase IV: Deploying ESE Pilot Information Programs for State and Local Government in the Northeast, the Education Community and the Commercial Sector , for the period of September 27,2000 through September 26,2004. All activities under this grant have been successfully completed. It has been requested by NASA reviewers that the material contained herein also be considered in $iew of NASA s twelve national priority areas. During the grant period, the nature of the Earth Science Enterprise (ESE) Application Program has been significantly amended (two major restructurings). These amendments have been reviewed at several meetings, including a national gathering held in Washington DC. Additional meetings have occurred with NASA officials at headquarters and at IAGT offices as the newly emerging programs have become defined. The work described herein is considered "cross-cutting", meaning that it has relevancy to several of the national priority areas. The time period covered requires that the twelve national priority areas initially articulated by NASA be considered. (Subsequent NASA revision has eliminated "community growth" as a focus area. It is not clear how this area might be treated in the future NASA organizational structure, but it is noted that the work reported herein includes clear potential for application to the previously defined community growth area, as well as most of the other application areas.) As indicated in the accompanying figure, activity reports throughout this report can be "mapped" to the priority areas.

Brower, Robert N.↗

Evaluation of Contrail Reduction Strategies Based on Aircraft Flight Distances

This paper evaluates a set of contrail reduction strategies based on the flight range of aircraft as contrail reduction strategies have different impacts on aircraft depending on how they plan to fly. In general, aircraft with longer flight distances cruise at the altitudes where contrails are more likely to form. The concept of the contrail frequency index is used to quantify contrail impacts. The strategy for reducing the persistent contrail formation is to minimize the contrail frequency index by altering the aircraft's cruising altitude. A user-defined factor is used to trade off between contrail reduction and extra CO2 emissions. A higher value of tradeoff factor results in more contrail reduction and extra CO2 emissions. Results show that contrail reduction strategies using various tradeo factors behave differently from short-range flights to long-range ights. Analysis shows that short-distance flights (less than 500 miles) are the most frequent flights but contribute least to contrail reduction. Therefore these aircraft have the lowest priority when applying contrail reduction strategies. Medium-distance flights (500 to 1000 miles) have a higher priority if the goal is to achieve maximum contrail reduction in total; long-distance flights (1000 to 1500 miles) have a higher priority if the goal is to achieve maximum contrail reduction per flight. The characteristics of transcontinental flights (greater than 1500 miles) vary with different weather days so the priority of applying contrail reduction strategies to the group needs to be evaluated based on the locations of the contrail areas during any given day. For the days tested, medium-distance ights contribute up to 42.6% of the reduction among the groups during a day. The contrail frequency index per 1,000 miles for medium-distance, long-distance, and transcontinental flights can be reduced by an average of 75%. The results provide a starting point for developing operational policies to reduce the impact of aviation on climate based on aircraft flight distances.

Chen, Neil Y.↗

Requirements, Resource Planning and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44P on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the ISS ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment replanning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28S, the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority, with the Increment pairs 29 and 30, and 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗