Search NASA⌕ Search

SEARCH · Search NASA

Results for “probability risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Hierarchical Estimation For Planetary Protection

The software uses Bayes' theorem to describe the probability of an event based on prior knowledge of conditions that might be related to the event. The purpose of Bayesian analysis is to determine posterior probabilities based on prior probabilities where new information can be used in the decision-making process as additional data is gathered. The software will be used in Probabilistic Risk Assessments (PRAs) related to the Europa Clipper mission, which is one of NASA’s top priorities. Ultimately, the mission entails sending the Europa Clipper spacecraft to Jupiter’s Europa moon to orbit the planet and collect data for research and development. Europa is the smallest of the four Galilean moons orbiting Jupiter and is believed by researchers to be the most promising place to look for present-day environments suitable for life. Europa is thought to have an iron core, a rocky mantle, and a salt-water ocean covered by an ice-layered surface.

Gribok, Andrei [Idaho National Laboratory (INL), I↗

Accelerated Monte Carlo Simulation for Safety Analysis of the Advanced Airspace Concept

Safe separation of aircraft is a primary objective of any air traffic control system. An accelerated Monte Carlo approach was developed to assess the level of safety provided by a proposed next-generation air traffic control system. It combines features of fault tree and standard Monte Carlo methods. It runs more than one order of magnitude faster than the standard Monte Carlo method while providing risk estimates that only differ by about 10%. It also preserves component-level model fidelity that is difficult to maintain using the standard fault tree method. This balance of speed and fidelity allows sensitivity analysis to be completed in days instead of weeks or months with the standard Monte Carlo method. Results indicate that risk estimates are sensitive to transponder, pilot visual avoidance, and conflict detection failure probabilities.

Thipphavong, David↗

Pre-Flight Hazardous Gas Assessment Methodology for the Space Launch System

The complexity of the Artemis I liquid rocket propulsion systems produces many sources of hazards during the operation of the vehicle. Pre-flight hazardous gas leakages pose fire and explosion risks to rocket that could potentially lead to loss of the vehicle, mission, and crew. The National Aeronautics and Space Administration (NASA) uses a probability risk assessment strategy to assess the likelihood of the hazard and the consequence should the hazardous situation occur. For high probability hazards that pose a potentially catastrophic consequence to the vehicle, the most effective strategy for reducing the risk is accomplished by engineering and implementing systems that actively mitigate the hazard. A hazards analysis is completed to determine the likelihood and severity of each hazard. These hazard analyses are informed using relevant empirical data and physics-based analytical models. Time-accurate Computational Fluid Dynamics models used to quantify and understand the risks posed to Artemis I due to expulsions of hazardous gas near the vehicle. Several sources of hazardous gas that posed a risk to Artemis I during nominal pre-flight operations are analyzed in this work. The results of the analyses were used to develop flight rationale and make risk acceptance decisions for the Artemis I launch.

Brian R. Richardson↗

Pre-Flight Hazardous Gas Assessment Methodology for the Space Launch System

The complexity of the Artemis I liquid rocket propulsion systems produces many sources of hazards during the operation of the vehicle. Pre-flight hazardous gas leakages pose fire and explosion risks to rocket that could potentially lead to loss of the vehicle, mission, and crew. The National Aeronautics and Space Administration (NASA) uses a probability risk assessment strategy to assess the likelihood of the hazard and the consequence should the hazardous situation occur. For high probability hazards that pose a potentially catastrophic consequence to the vehicle, the most effective strategy for reducing the risk is accomplished by engineering and implementing systems that actively mitigate the hazard. A hazards analysis is completed to determine the likelihood and severity of each hazard. These hazard analyses are informed using relevant empirical data and physics-based analytical models. Time-accurate Computational Fluid Dynamics models used to quantify and understand the risks posed to Artemis I due to expulsions of hazardous gas near the vehicle. Several sources of hazardous gas that posed a risk to Artemis I during nominal pre-flight operations are analyzed in this work. The results of the analyses were used to develop flight rationale and make risk acceptance decisions for the Artemis I launch.

Brian R. Richardson↗

Probability of failure and risk assessment of propulsion structural components

Because of the increasing need to account for the uncertainties in material properties, loading conditions, geometry, etc., a methodology was developed to determine structural reliability and to assess the associated risk. The methodology consists of a probabilistic structural analysis by a probabilistic finite element computer code, numerical evaluation of stochastic structures under stress (NESSUS), and a generic probabilistic material property model. The methodology is versatile and is equally applicable to structures operating at high and cryogenic temperature environments. Results obtained demonstrate that the issues of structural reliability and risk can be formally evaluated by using the methodology developed which is inclusive of the uncertainties in material properties, structural parameters, and loading conditions. The methodology is described in some detail with illustrative examples.

Shiao, Michael C.↗

Sensitivity Analysis of Median Lifetime on Radiation Risks Estimates for Cancer and Circulatory Disease amongst Never-Smokers

Radiation risks are estimated in a competing risk formalism where age or time after exposure estimates of increased risks for cancer and circulatory diseases are folded with a probability to survive to a given age. The survival function, also called the life-table, changes with calendar year, gender, smoking status and other demographic variables. An outstanding problem in risk estimation is the method of risk transfer between exposed populations and a second population where risks are to be estimated. Approaches used to transfer risks are based on: 1) Multiplicative risk transfer models -proportional to background disease rates. 2) Additive risk transfer model -risks independent of background rates. In addition, a Mixture model is often considered where the multiplicative and additive transfer assumptions are given weighted contributions. We studied the influence of the survival probability on the risk of exposure induced cancer and circulatory disease morbidity and mortality in the Multiplicative transfer model and the Mixture model. Risks for never-smokers (NS) compared to the average U.S. population are estimated to be reduced between 30% and 60% dependent on model assumptions. Lung cancer is the major contributor to the reduction for NS, with additional contributions from circulatory diseases and cancers of the stomach, liver, bladder, oral cavity, esophagus, colon, a portion of the solid cancer remainder, and leukemia. Greater improvements in risk estimates for NS s are possible, and would be dependent on improved understanding of risk transfer models, and elucidating the role of space radiation on the various stages of disease formation (e.g. initiation, promotion, and progression).

Chappell, Lori J.↗

Probability of Failure and Risk Assessment of Propulsion Structural Components

Due to increasing need to account for the uncertainties in material properties, loading conditions, or geometries, a methodology was developed to determine structural reliability and the assess the risk associated with it. The methodology consists of a probabilistic structural analysis by a probabilistic finite element computer code Nonlinear Evaluation of Stochastic Structures Under Stress (NESSUS) and a generic probabilistic material properties model. The methodology is versatile and is equally applicable to high and cryogenic temperature structures. Results obtained demonstrate that the whole issue of structural reliability and risk can be formally evaluated using the methodology developed which is inclusive of uncertainties in material properties, structural parameters and loading conditions. The methodology is described in some detail with illustrative examples.

Shiao, Michael C.↗

Probabilistic Risk Assessment: A Bibliography

Probabilistic risk analysis is an integration of failure modes and effects analysis (FMEA), fault tree analysis and other techniques to assess the potential for failure and to find ways to reduce risk. This bibliography references 160 documents in the NASA STI Database that contain the major concepts, probabilistic risk assessment, risk and probability theory, in the basic index or major subject terms, An abstract is included with most citations, followed by the applicable subject terms.

Source record↗

Reliability and Confidence Interval Analysis of a CMC Turbine Stator Vane

High temperature ceramic matrix composites (CMC) are being explored as viable candidate materials for hot section gas turbine components. These advanced composites can potentially lead to reduced weight, enable higher operating temperatures requiring less cooling and thus leading to increased engine efficiencies. However, these materials are brittle and show degradation with time at high operating temperatures due to creep as well as cyclic mechanical and thermal loads. In addition, these materials are heterogeneous in their make-up and various factors affect their properties in a specific design environment. Most of these advanced composites involve two- and three-dimensional fiber architectures and require a complex multi-step high temperature processing. Since there are uncertainties associated with each of these in addition to the variability in the constituent material properties, the observed behavior of composite materials exhibits scatter. Traditional material failure analyses employing a deterministic approach, where failure is assumed to occur when some allowable stress level or equivalent stress is exceeded, are not adequate for brittle material component design. Such phenomenological failure theories are reasonably successful when applied to ductile materials such as metals. Analysis of failure in structural components is governed by the observed scatter in strength, stiffness and loading conditions. In such situations, statistical design approaches must be used. Accounting for these phenomena requires a change in philosophy on the design engineer s part that leads to a reduced focus on the use of safety factors in favor of reliability analyses. The reliability approach demands that the design engineer must tolerate a finite risk of unacceptable performance. This risk of unacceptable performance is identified as a component's probability of failure (or alternatively, component reliability). The primary concern of the engineer is minimizing this risk in an economical manner. The methods to accurately determine the service life of an engine component with associated variability have become increasingly difficult. This results, in part, from the complex missions which are now routinely considered during the design process. These missions include large variations of multi-axial stresses and temperatures experienced by critical engine parts. There is a need for a convenient design tool that can accommodate various loading conditions induced by engine operating environments, and material data with their associated uncertainties to estimate the minimum predicted life of a structural component. A probabilistic composite micromechanics technique in combination with woven composite micromechanics, structural analysis and Fast Probability Integration (FPI) techniques has been used to evaluate the maximum stress and its probabilistic distribution in a CMC turbine stator vane. Furthermore, input variables causing scatter are identified and ranked based upon their sensitivity magnitude. Since the measured data for the ceramic matrix composite properties is very limited, obtaining a probabilistic distribution with their corresponding parameters is difficult. In case of limited data, confidence bounds are essential to quantify the uncertainty associated with the distribution. Usually 90 and 95% confidence intervals are computed for material properties. Failure properties are then computed with the confidence bounds. Best estimates and the confidence bounds on the best estimate of the cumulative probability function for R-S (strength - stress) are plotted. The methodologies and the results from these analyses will be discussed in the presentation.

Murthy, Pappu L. N.↗

Risk analysis and management

Present software development accomplishments are indicative of the emerging interest in and increasing efforts to provide risk assessment backbone tools in the manned spacecraft engineering community. There are indications that similar efforts are underway in the chemical processes industry and are probably being planned for other high risk ground base environments. It appears that complex flight systems intended for extended manned planetary exploration will drive this technology.

Smith, H. E.↗

Dynamic systems-engineering process - The application of concurrent engineering

A system engineering methodology is described which enables users, particulary NASA and DOD, to accommodate changing needs; incorporate emerging technologies; identify, quantify, and manage system risks; manage evolving functional requirements; track the changing environment; and reduce system life-cycle costs. The approach is a concurrent, dynamic one which starts by constructing a performance model defining the required system functions and the interrelationships. A detailed probabilistic risk assessment of the system elements and their interrelationships is performed, and quantitative analysis of the reliability and maintainability of an engineering system allows its different technical and process failure modes to be identified and their probabilities to be computed. Decision makers can choose technical solutions that maximize an objective function and minimize the probability of failure under resource constraints.

Wiskerchen, Michael J.↗

LOFTID Aeroshell Thermal Response Uncertainty Analysis Utilizing the End-to-End Monte Carlo Approach

A probabilistic thermal margin process has been performed to design the flexible thermal protection system (FTPS) and select entry trajectory constraints given an acceptable risk level for the Low-Earth Orbit Flight Test of and Inflatable Decelerator (LOFTID) project. Uncertainties exist in atmospheric entry aeroheating environments and the predicted thermal response of thermal protection system (TPS) material. Entry vehicle TPS is often over-sized to mitigate uncertainty by combining conservative bounding scenarios together. The probabilistic thermal margin process allows engineers to make informed aeroshell design, flight design, and FTPS performance risk trades while preventing excessive FTPS margin from being applied. This paper describes the uncertainty analysis methodology used to carry out a probabilistic thermal margin process used for LOFTID’s aeroshell and explains how the calculated probability of exceeding flight allowable temperatures is used to design the FTPS and establish nominal flight design constraints. This probabilistic thermal margin process had never been applied to entry, decent, and landing design for a flown entry vehicle and it is one of the LOFTID project’s goals to demonstrate its merits.

Steven Andrew Tobin↗

Risk analysis simulation of rover operations for Mars surface exploration

Risk management advocates have long sought to directly influence the early stages of the systems engineering process through a more effective role in system design trade studies. The principal obstacle to this has been the lack of credible ways to represent and quantify mission risk—that is, a combination of the probability of mission success (“system safety”) and science value—for the project manager and the rest of the design team. If it were possible to quantify mission risk, then the effects of proposed mission and system design changes could be calculated, and along with life-cycle costs, could be used to explore the design space more extensively and select better designs. JPL has been working to build the capability to quantify the probability of mission success using a federation of diverse simulations and models, each of which contributes some vital piece of the puzzle. The initial institutional focus has been on Mars surface operations. This ensemble computing framework enables the diverse models and simulations to work together seamlessly. Recent work at JPL has demonstrated the capability to exercise this ensemble from end-to-end using an Oracle-based database to automatically move results from one model/simulation to the next stage in the analysis.

Shishko, Robert↗

Risk and value analysis of SETI

The risks, values, and costs of the SETI project are evaluated and compared with those of the Viking project. Examination of the scientific values, side benefits, and costs of the two projects reveal that both projects provide equal benefits at equal costs. The probability of scientific and technical success is analyzed.

Billingham, J.↗

Probabilistic model for fracture mechanics service life analysis

The service longevity of complex propulsion systems, such as the Space Shuttle Main Engine (SSME), can be at risk from several competing failure modes. Conventional life assessment practice focuses upon the most severely life-limited feature of a given component, even though there may be other, less severe, potential failure locations. Primary, secondary, tertiary failure modes, as well as their associated probabilities, must also be considered. Futhermore, these probabilities are functions of accumulated service time. Thus a component may not always succumb to the most severe, or even the most probable failure mode. Propulsion system longevity must be assessed by considering simultaneously the actions of, and interactions among, life-limiting influences. These include, but are not limited to, high frequency fatigue (HFF), low cycle fatigue (LCF), and subsequent crack propagation, thermal and acoustic loadings, and the influence of less-than-ideal nondestructive evaluation (NDE). An outline is provided for a probabilistic model for service life analysis, and the progress towards its implementation is reported.

Annis, Charles↗

Predicting Close Satellite Encounters

Method for predicting probabilities of collisions between nominally geosynchronous satellites gives results without large computer resources. Realistically assesses possibility of collision between expired, drifting satellite and active, station-keeping satellite. Mathematical techniques in paper useful in analysis of such terrestrial risks as floods and nuclear accidents.

Mccormick, B. R.↗

Launch Vehicle Debris Models and Crew Vehicle Ascent Abort Risk

For manned space launch systems, a reliable abort system is required to reduce the risks associated with a launch vehicle failure during ascent. Understanding the risks associated with failure environments can be achieved through the use of physics-based models of these environments. Debris fields due to destruction of the launch vehicle is one such environment. To better analyze the risk posed by debris, a physics-based model for generating launch vehicle debris catalogs has been developed. The model predicts the mass distribution of the debris field based on formulae developed from analysis of explosions. Imparted velocity distributions are computed using a shock-physics code to model the explosions within the launch vehicle. A comparison of the debris catalog with an existing catalog for the Shuttle external tank show good comparison in the debris characteristics and the predicted debris strike probability. The model is used to analyze the effects of number of debris pieces and velocity distributions on the strike probability and risk.

Gee, Ken↗

Analysis of Launch Vehicle Liftoff Debris: Historical Perspective from Space Shuttle and Application to Artemis I

Human exploration-class launch vehicles are inherently prone to debris due to the extreme environments generated during pre-launch operations, liftoff, and flight. The use of cryogenic propellants often requires thermal protection system (TPS) coatings, typically foam, to maintain the propellant conditions in the tank and prevent an accumulation ice on the external surface of the vehicle. Some ice growth is to be expected at umbilical interfaces, vents, flanges, or brackets where it is difficult to apply TPS. This ice may come loose at any time due to wind on the launch pad, structural vibration and acoustics after rocket ignition, or aerodynamic forces during flight. This phenomena is especially apparent on vehicles with no TPS, such as the Saturn V rockets used in the Apollo Program, see Figure 1. During propellant tanking, the thermal contraction of the underlying substrate may generate cracks in the TPS (Figure 1). Chunks of TPS can release due to the expansion of ingested gas from cryopumping or from aerodynamic forces if the crack creates an offset surface. Most foams will also have a certain amount of “popcorning” where small pieces of foam will pop off during flight because of the differential between the static surface pressure and the pressure of the gas trapped in the foam cell structure. There are a number of other coating or closeout materials that may be shed from the vehicle and become debris. During pre-launch operations and liftoff, the vehicle may also be exposed to debris originating from the launch pad or ground support equipment. This debris is separate from foreign object debris, or FOD, which is not intended to be present and is strictly controlled through operations and maintenance procedures. In this case, debris is generated from hardware and materials that are necessary for launch and are subject to the intense vibration, acoustics, and direct plume impingement of the launch environment. Examples include ice from umbilicals, tape and tie wraps that protect cables, and rust or corrosion from the launch platform. While NASA has historically been aware of debris as a potential issue that could cause a failure resulting in loss of mission, loss of vehicle, or loss of crew, the likelihood and severity of that risk was not always well understood or given sufficient weight in program and flight decisions. After the Space Shuttle Columbia accident (STS-107), the investigation found that foam TPS debris shed from the external tank was the proximate cause of the damage to the orbiter wing. Six previous observations of debris released from the foam ramp that covered the bipod connecting the forward end of the orbiter to the external tank resulted in minor changes or were determined to be accepted flight risks. Two occurrences of bipod ramp foam loss were not identified until the STS-107 investigation. Despite the damage inflicted by these debris strikes, the Shuttle Program Requirements Control Board deemed the vehicle safe to fly. During the Return to Flight effort following the Columbia disaster, NASA Engineering developed a process for the assessment of debris transport, impact, and damage tolerance to support independent assessments of risk by NASA Safety and Mission Assurance (S&MA). Under this system, each element (vehicle or ground system) defines a catalog of all expected debris based on launch history, component testing, or analysis. Debris transport analysis (DTA) is conducted using the debris catalog characteristics and potential flow transport mechanisms (e.g., vehicle aerodynamics, gravity, wind, plume-driven). The predicted debris impact locations and velocities are provided to the hardware owners, who use available test data and analysis to determine whether each component can withstand the impacts. In cases where the element hardware may be severely damaged or fail, the options are to mitigate the debris source through some change in design or operation, or to work with S&MA to try to characterize the probability of the impact and damage for program risk acceptance. Because of the differences in debris characteristics and transport, the DTA has been divided between the Liftoff and Ascent regimes. The development and application of Liftoff DTA methodology from the Shuttle Program to the current Artemis Program is the subject of this paper. Liftoff DTA covers the time from the start of pre-launch operations at the launch pad, up until the vehicle clears the launch tower and there is no longer any interaction with ground systems. Debris transport during this period is broadly classified as either gravity, wind, and plume-entrained (GWPE) or plume driven (PD). GWPE debris is generally lower speed, travelling in a forward-to-aft direction. PD transport includes flow features from the rocket ignition transient, as well as plume impingement and recirculation that occur as the vehicle lifts off the launch platform. In these cases, the debris typically moves in an aft-to-forward direction at higher speeds. The applicable transport mechanisms must be considered for each piece of debris depending on the material, and release location and time. For example, rust or metallic debris from the tower could fall (GWPE) and impact the vehicle before landing on the launch platform deck where it could be also be transported by plume impingement (PD). However, falling ice (GWPE) from an umbilical is unlikely to survive impact with the vehicle or launch platform and be available for PD transport. Modeling of debris transport is accomplished using a set of DTA tools which simulate debris trajectories subject to a reference frame acceleration (i.e., gravity) and aerodynamic drag. Where the trajectory encounters a solid surface, the debris is allowed to rebound with a specified coefficient of restitution. The drag is calculated by interpolating the fluid state at each point in the debris trajectory from high-fidelity computational fluid dynamics (CFD) simulations of the launch vehicle and pad. The CFD data may either be static (steady state or time averaged), typically for GWPE transport, or dynamic (time-accurate) for PD flow features like the ignition transient. Examples of the CFD flow field solutions for the Space Launch System (SLS) rocket and launch pad are shown in Figure 2. Typical SLS debris trajectory predictions from DTA are illustrated in Figure 3. The final version of this paper will include a more detailed examination of the Liftoff DTA process developed during the Shuttle Program, and how it has been augmented and applied to the SLS rocket under the Artemis Program. Comparisons with debris observations from the Artemis I launch will demonstrate validation of the tools and methodology.

Debris↗