Search NASA⌕ Search

SEARCH · Search NASA

Results for “process and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

[Determine and Implement Updates to Be Made to MODEAR (Mission Operations Data Enterprise Architecture Repository)]

My main project was to determine and implement updates to be made to MODEAR (Mission Operations Data Enterprise Architecture Repository) process definitions to be used for CST-100 (Crew Space Transportation-100) related missions. Emphasis was placed on the scheduling aspect of the processes. In addition, I was to complete other tasks as given. Some of the additional tasks were: to create pass-through command look-up tables for the flight controllers, finish one of the MDT (Mission Operations Directorate Display Tool) displays, gather data on what is included in the CST-100 public data, develop a VBA (Visual Basic for Applications) script to create a csv (Comma-Separated Values) file with specific information from spreadsheets containing command data, create a command script for the November MCC-ASIL (Mission Control Center-Avionics System Integration Laboratory) testing, and take notes for one of the TCVB (Terminal Configured Vehicle B-737) meetings. In order to make progress in my main project I scheduled meetings with the appropriate subject matter experts, prepared material for the meetings, and assisted in the discussions in order to understand the process or processes at hand. After such discussions I made updates to various MODEAR processes and process graphics. These meetings have resulted in significant updates to the processes that were discussed. In addition, the discussions have helped the departments responsible for these processes better understand the work ahead and provided material to help document how their products are created. I completed my other tasks utilizing resources available to me and, when necessary, consulting with the subject matter experts. Outputs resulting from my other tasks were: two completed and one partially completed pass through command look-up tables for the fight controllers, significant updates to one of the MDT displays, a spreadsheet containing data on what is included in the CST-100 public data, a tool to create a csv file with specific information from spreadsheets containing command data, a command script for the November MCC-ASIL testing which resulted in a successful test day identifying several potential issues, and notes from one of the TCVB meetings that was used to keep the teams up to date on what was discussed and decided. I have learned a great deal working at NASA these last four months. I was able to meet and work with amazing individuals, further develop my technical knowledge, expand my knowledge base regarding human spaceflight, and contribute to the CST-100 missions. My work at NASA has strengthened my desire to continue my education in order to make further contributions to the field, and has given me the opportunity to see the advantages of a career at NASA.

Fanourakis, Sofia↗

Concurrent and vectorized mixed time, explicit nonlinear structural dynamics algorithms

A nonlinear structural dynamics program with an element library that exploits parallel processing is described. The aim is to exploit scheduling-allocation so that parallel processing and vectorization can effectively be treated in a general purpose program with explicit time integration and different time steps in different parts of the mesh. The program uses an element group scheme, which, as a by-product, also provides an automatic scheme for assigning different time steps to different parts of the mesh. The program has been tested on the Alliant FX/8; it shows a fivefold improvement in speed over compiler optimization.

Belytschko, Ted↗

Parallel processors and nonlinear structural dynamics algorithms and software

A nonlinear structural dynamics program with an element library that exploits parallel processing is under development. The aim is to exploit scheduling-allocation so that parallel processing and vectorization can effectively be treated in a general purpose program. As a byproduct an automatic scheme for assigning time steps was devised. A rudimentary form of the program is complete and has been tested; it shows substantial advantage can be taken of parallelism. In addition, a stability proof for the subcycling algorithm has been developed.

Belytschko, T.↗

Expert system for scheduling simulation lab sessions

Implementation and results of an expert system used for scheduling session requests for the Systems Engineering Simulator (SES) laboratory at the NASA Johnson Space Center (JSC) are discussed. Weekly session requests are received from astronaut crew trainers, procedures developers, engineering assessment personnel, software developers, and various others who wish to access the computers, scene generators, and other simulation equipment available to them in the SES lab. The expert system under discussion is comprised of a data acquisition portion - two Pascal programs run on a personal computer - and a CLIPS program installed on a minicomputer. A brief introduction to the SES lab and its scheduling background is given. A general overview of the system is provided, followed by a detailed description of the constraint-reduction process and of the scheduler itself. Results from a ten-week trial period using this approach are discussed. Finally, a summary of the expert system's strengths and shortcomings are provided.

Lund, Chet↗

Friction Stir Process Mapping Methodology

In FSW (friction stir welding), the weld process performance for a given weld joint configuration and tool setup is summarized on a 2-D plot of RPM vs. IPM. A process envelope is drawn within the map to identify the range of acceptable welds. The sweet spot is selected as the nominal weld schedule. The nominal weld schedule is characterized in the expected manufacturing environment. The nominal weld schedule in conjunction with process control ensures a consistent and predictable weld performance.

Kooney, Alex↗

Friction Stir Process Mapping Methodology

The weld process performance for a given weld joint configuration and tool setup is summarized on a 2-D plot of RPM vs. IPM. A process envelope is drawn within the map to identify the range of acceptable welds. The sweet spot is selected as the nominal weld schedule The nominal weld schedule is characterized in the expected manufacturing environment. The nominal weld schedule in conjunction with process control ensures a consistent and predictable weld performance.

Bjorkman, Gerry↗

Process development of two high strength tantalum base alloys (ASTAR-1211C and ASTAR-1511C)

Two tantalum base alloys, Ta-12W-1.0Re-0.7Hf-0.025C(ASTAR-1211C) and Ta-15W-1.0Re-0.7Hf-0.025C(ASTAR-1511C), were cast as 12.5 cm (5 inch) diameter ingots and processed to swaged rod, sheet, forged plate, and tubing. Swaged rod was evaluated with respect to low temperature ductility, elevated temperature tensile properties, and elevated temperature creep behavior. A standard swaging process and final annealing schedule were determined. Elevated temperature tensile properties, low temperature impact properties, low temperature DBTT behavior, and extended elevated temperature creep properties were determined. A process for producing ASTAR-1211C and ASTAR-1511C sheet were developed. The DBTT properties of GTA and EB weld sheet given post-weld anneal and thermal aging treatments were determined using bend and tensile specimens. High and low temperature mechanical properties of forging ASTAR-1211C and ASTAR-1511C plate were determined as well as elevated temperature creep properties. Attempts to produce ASTAR-1211C tubing were partially successful while attempts to make ASTAR-1511C tubing were completely unsuccessful.

Ammon, R. L.↗

Advanced technologies in the ASI MLRO towards a new generation laser ranging system

Matera Laser Ranging Observatory (MLRO) is a high performance, highly automated optical and astronomical observatory currently under design and development by AlliedSignal for the Italian Space Agency (ASI). It is projected to become operational at the Centro Geodesia Spaziale in Matera, Italy, in 1997. MLRO, based on a 1.5-meter astronomical quality telescope, will perform ranging to spacecraft in earthbound orbits, lunar reflectors, and specially equipped deep space missions. The primary emphasis during design is to incorporate state-of-the-art technologies to produce an intelligent, automated, high accuracy ranging system that will mimic the characteristic features of a fifth generation laser ranging system. The telescope has multiple ports and foci to support future experiments in the areas of laser communications, lidar, astrometry, etc. The key features providing state-of-the-art ranging performance include: a diode-pumped picosecond (50 ps) laser, high speed (3-5 GHz) optoelectronic detection and signal processing, and a high accuracy (6 ps) high resolution (less than 2 ps) time measurement capability. The above combination of technologies is expected to yield millimeter laser ranging precision and accuracy on targets up to 300,000 km, surpassing the best operational instrument performance to date by a factor of five or more. Distributed processing and control using a state-of-the-art computing environment provides the framework for efficient operation, system optimization, and diagnostics. A computationally intelligent environment permits optimal planning, scheduling, tracking, and data processing. It also supports remote access, monitor, and control for joint experiments with other observatories.

Varghese, Thomas↗

From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, the pace of this process was never intended to be continued indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5-day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

mission operations↗

Balancing Science Objectives and Operational Constraints: A Mission Planner's Challenge

The Air Force minute sensor technology integration (MSTI-3) satellite's primary mission is to characterize Earth's atmospheric background clutter. MSTI-3 will use three cameras for data collection, a mid-wave infrared imager, a short wave infrared imager, and a visible imaging spectrometer. Mission science objectives call for the collection of over 2 million images within the one year mission life. In addition, operational constraints limit camera usage to four operations of twenty minutes per day, with no more than 10,000 data and calibrating images collected per day. To balance the operational constraints and science objectives, the mission planning team has designed a planning process to e event schedules and sensor operation timelines. Each set of constraints, including spacecraft performance capabilities, the camera filters, the geographical regions, and the spacecraft-Sun-Earth geometries of interest, and remote tracking station deconflictions has been accounted for in this methodology. To aid in this process, the mission planning team is building a series of tools from commercial off-the-shelf software. These include the mission manifest which builds a daily schedule of events, and the MSTI Scene Simulator which helps build geometrically correct scans. These tools provide an efficient, responsive, and highly flexible architecture that maximizes data collection while minimizing mission planning time.

Weldy, Michelle↗

From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, there was never an intention of maintaining the pace of this process indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5- day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

Mars exploration↗

Flight Systems Integration & Test: Lessons Learned for Future Success

This paper offers a comprehensive view of flight system integration and test (I&T) lessons learned related to mishaps and close calls, focusing on what can be done to improve the I&T process to avoid recurrence. Specific areas within the realm of I&T that are covered in this paper include: I&T team communication and training; design of flight and ground systems for I&T; planning and scheduling; configuration management and process documentation; ground support equipment and tools; cleanrooms and contamination; mechanical integration, handling, and deployments; electrical integration and electrostatic discharge; functional testing and troubleshooting; environmental testing and facilities; and launch site operations. To illustrate "real-world" lessons learned for I&T, examples from throughout the history of the U.S. space program are presented. Also presented are some best practices for I&T that can help mitigate mishaps and close calls on the ground or during flight.

Integration & Test↗

SatNet: A Benchmark for Satellite Scheduling Optimization

Satellites provide essential services such as networking and weather tracking, and the number of near-earth and deep space satellites are expected to grow rapidly in the coming years. Communications with terrestrial ground stations is one of the critical functionalities of any space mission. Satellite scheduling is a problem that has been scientifically investigated since the 1970s. A central aspect of this problem is the need to consider resource contention and satellite visibility constraints as they require line of sight. Due to the combinatorial nature of the problem, prior solutions such as linear programs and evolutionary algorithms require extensive compute capabilities to output a feasible schedule for each scenario. Machine learning based scheduling can provide an alternative solution by training a model with historical data and generating a schedule quickly with model inference. We present SatNet, a benchmark for satellite scheduling optimization based on historical data from the NASA Deep Space Network. We propose formulation of the satellite scheduling problem as a Markov Decision Process and use reinforcement learning (RL) policies to generate schedules. The nature of constraints imposed by SatNet differ from other combinatorial optimization problems such as vehicle routing studied in prior literature. Our initial results indicate that RL is an alternative optimization approach that can generate candidate solutions of comparable quality to existing state-of-the-practice results. However, we also find that RL policies overfit to the training dataset and do not generalize well to new data, thereby necessitating continued research on reusable and generalizable agents.

Wilson, Brian↗

Processing and Properties of HfB2 Based Materials

Contents include the following: Modified hot pressing schedule has significantly improved UHTC billet processing: density and microstructure uniformity have improved. 2 in. dia. x 2 in. tall UHTC billets have been successfully hot pressed: scaled up billets have slightly higher density gradients axially than 1 in. billets. Hot press schedule has not been optimized for scaled up billets. Strengths and strength distributions are improving with experience: need to evaluate strength uniformity in the center of the billets. CTE or ARC materials compares favorably with heritage materials. Thermal conductivity of ARC materials considerably different than that of heritage materials.

Johnson, Sylvia M.↗

Strategies GeoCape Intelligent Observation Studies @ GSFC

This presentation provides information a summary of the tradeoff studies conducted for GeoCape by the GSFC team in terms of how to optimize GeoCape observation efficiency. Tradeoffs include total ground scheduling with simple priorities, ground scheduling with cloud forecast, ground scheduling with sub-area forecast, onboard scheduling with onboard cloud detection and smart onboard scheduling and onboard image processing. The tradeoffs considered optimzing cost, downlink bandwidth and total number of images acquired.

0000↗

Range Process Simulation Tool

Range Process Simulation Tool (RPST) is a computer program that assists managers in rapidly predicting and quantitatively assessing the operational effects of proposed technological additions to, and/or upgrades of, complex facilities and engineering systems such as the Eastern Test Range. Originally designed for application to space transportation systems, RPST is also suitable for assessing effects of proposed changes in industrial facilities and large organizations. RPST follows a model-based approach that includes finite-capacity schedule analysis and discrete-event process simulation. A component-based, scalable, open architecture makes RPST easily and rapidly tailorable for diverse applications. Specific RPST functions include: (1) definition of analysis objectives and performance metrics; (2) selection of process templates from a processtemplate library; (3) configuration of process models for detailed simulation and schedule analysis; (4) design of operations- analysis experiments; (5) schedule and simulation-based process analysis; and (6) optimization of performance by use of genetic algorithms and simulated annealing. The main benefits afforded by RPST are provision of information that can be used to reduce costs of operation and maintenance, and the capability for affordable, accurate, and reliable prediction and exploration of the consequences of many alternative proposed decisions.

Phillips, Dave↗

Reinforcement learning in scheduling

The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

Dietterich, Tom G.↗

MaROS: Information Management Service

This software is provided by the Mars Relay Operations Service (MaROS) task to a variety of Mars projects for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The Information Management Service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such, greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These relay sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This software component is an application process running as a Java virtual machine. The component provides all service interfaces via a Representational State Transfer (REST) protocol over https to external clients. There are two general interaction modes with the service: upload and download of data. For data upload, the service must execute logic specific to the upload data type and trigger any applicable calculations including pass delivery latencies and overflight conflicts. For data download, the software must retrieve and correlate requested information and deliver to the requesting client. The provision of this service enables several key advancements over legacy processes and systems. For one, this service represents the first time that end-to-end relay information is correlated into a single shared repository. The software also provides the first multimission latency calculator; previous latency calculations had been performed on a mission-by-mission basis.

Allard, Daniel A.↗