Search NASA⌕ Search

SEARCH · Search NASA

Results for “program administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Assessing cumulative impacts within state environmental review frameworks in the United States

Cumulative impact assessment (CIA) is the process of systematically assessing a proposed action's cumulative environmental effects in the context of past, present, and future actions, regardless of who undertakes such actions. Previous studies have examined CIA efforts at the federal level but little is known about how states assess the cumulative impacts of nonfederal projects. By examining state environmental review statutes, administrative rules, agency-prepared materials, and a national survey of the administrators of state environmental review programs, this study identifies the legal and administrative frameworks for CIA. It examines current CIA practice, discusses the relationship between CIA policy and its implementation, and explores the opportunities for improvement. The results of the study show that twenty-nine state environmental review programs across twenty-six states required the assessment of cumulative environmental impacts. More than half of these programs have adopted specific procedures for implementing their policies. Some programs assessed cumulative impacts using a standard review document, and others have created their own documentations incorporated into applications for state permits or funding. The majority of programs have adopted various scales, baselines, significance criteria, and coordination practices in their CIA processes. Mixed methods were generally used for data collection and analysis; qualitative methods were more prevalent than quantitative methods. The results also suggest that a program with comprehensive and consistent environmental review policies and procedures does not always imply extensive CIA requirements and practices. Finally, this study discusses the potential for improving existing CIA processes and promoting CIA efforts in states without established environmental review programs.

54 ENVIRONMENTAL SCIENCES↗

Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's unique energy needs while also addressing national goals such as energy security. Federal funding is based on a grant formula that takes into account population and energy consumption. The SEP emphasizes the state's role as the decision maker and administrator for the program. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP, authorizing $3.1 billion in grants. Based on existing grant formulas and after reviewing state-level plans, EERE made awards to states. The State of Florida's Energy Office (Florida) was allocated $126 million - a 90-fold increase over Florida's average annual SEP grant of $1.4 million. Per the Recovery Act, this funding must be obligated by September 30, 2010, and spent by April 30, 2012. As of March 10, 2010, Florida had expended $13.2 million of the SEP Recovery Act funds. Florida planned to use its grant funds to undertake activities that would preserve and create jobs; save energy; increase renewable energy sources; and, reduce greenhouse gas emissions. To accomplish Recovery Act objectives, states could either fund new or expand existing projects. As a condition of the awards, EERE required states to develop and implement sound internal controls over the use of Recovery Act funds. Based on the significant increase in funding from the Recovery Act, we initiated this review to determine whether Florida had internal controls in place to provide assurance that the goals of the SEP and Recovery Act will be met and accomplished efficiently and effectively. We identified weaknesses in the implementation of SEP Recovery Act projects that have adversely impacted Florida's ability to meet the goals of the SEP and the Recovery Act. Specifically: (1) Florida used about $8.3 million to pay for activities that did not meet the intent of the Recovery Act to create new or save existing jobs. With the approval of the Department, Florida used these funds to pay for rebates related to solar energy projects that had been completed prior to passage of the Recovery Act; (2) State officials did not meet Florida's program goals to obligate all Recovery Act funds by January 1, 2010, thus delaying projects and preventing them from achieving the desired stimulative economic impact. Obligations were delayed because Florida officials selected a number of projects that either required a lengthy review and approval process or were specifically prohibited. In June 2009, the Department notified Florida that a number of projects would not be approved; however, as of April 1, 2010, the State had not acted to name replacement projects or move funds to other projects; (3) Florida officials had not ensured that 7 of the 18 award requirements for Recovery Act funding promulgated by the Department had been passed down to sub-recipients of the award, as required; and, (4) Certain internal control weaknesses that could jeopardize the program and increase the risk of fraud, waste and abuse were identified in the Solar Energy System Incentives Program during our September 2009 visit to Florida. These included a lack of separation of duties related to the processing of rebates and deficiencies in the written procedures for grant managers to review and approve rebates. From a forward looking perspective, absent aggressive corrective action, these weaknesses threaten Florida's efforts to meet future Recovery Act goals. In response to our review, Florida took corrective action to incorporate the additional award requirements in sub-recipient documents. It also instituted additional controls to correct the internal control weaknesses we identified. More, however, needs to be done with respect to Department oversight. This report details the circumstances surrounding these program issues and outlines actions that, in our opinion, will help Florida achieve its SEP Recovery Act-funded goals.

14 SOLAR ENERGY↗

NASA's Marshall Space Flight Center Saves Water With High-Efficiency Toilet and Urinal Program

The National Aeronautics and Space Administration’s (NASA) Marshall Space Flight Center (MSFC) has a longstanding, successful sustainability program that focuses on energy and water efficiency as well as environmental protection. Because MSFC was built in the 1960s, most of the buildings house outdated, inefficient restroom fixtures. The facility engineering team at MSFC developed an innovative efficiency model for replacing these older toilets and urinals.

Best Management Practice Case Study #6↗

Advanced Simulation and Computing Business Plan

To maintain a credible nuclear weapons program, the National Nuclear Security Administration’s (NNSA’s) Office of Defense Programs (DP) needs to make certain that the capabilities, tools, and expert staff are in place and are able to deliver validated assessments. This requires a complete and robust simulation environment backed by an experimental program to test ASC Program models. This ASC Business Plan document encapsulates a complex set of elements, each of which is essential to the success of the simulation component of the Nuclear Security Enterprise. The ASC Business Plan addresses the hiring, mentoring, and retaining of programmatic technical staff responsible for building the simulation tools of the nuclear security complex. The ASC Business Plan describes how the ASC Program engages with industry partners—partners upon whom the ASC Program relies on for today’s and tomorrow’s high performance architectures. Each piece in this chain is essential to assure policymakers, who must make decisions based on the results of simulations, that they are receiving all the actionable information they need.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Waste Treatment of Acidic Solutions from the Dissolution of Irradiated LEU Targets for 99-Mo Production

One of the missions of the Reduced Enrichment for Research and Test Reactors (RERTR) program (and now the National Nuclear Security Administrations Material Management and Minimization program) is to facilitate the use of low enriched uranium (LEU) targets for 99 Mo production. The conversion from highly enriched uranium (HEU) to LEU targets will require five to six times more uranium to produce an equivalent amount of 99 Mo. The work discussed here addresses the technical challenges encountered in the treatment of uranyl nitrate hexahydrate (UNH)/nitric acid solutions remaining after the dissolution of LEU targets. Specifically, the focus of this work is the calcination of the uranium waste from 99 Mo production using LEU foil targets and the Modified Cintichem Process. Work with our calciner system showed that high furnace temperature, a large vent tube, and a mechanical shield are beneficial for calciner operation. One- and two-step direct calcination processes were evaluated. The high-temperature one-step process led to contamination of the calciner system. The two-step direct calcination process operated stably and resulted in a relatively large amount of material in the calciner cup. Chemically assisted calcination using peroxide was rejected for further work due to the difficulty in handling the products. Chemically assisted calcination using formic acid was rejected due to unstable operation. Chemically assisted calcination using oxalic acid was recommended, although a better understanding of its chemistry is needed. Overall, this work showed that the two-step direct calcination and the in-cup oxalic acid processes are the best approaches for the treatment of the UNH/nitric acid waste solutions remaining from dissolution of LEU targets for 99 Mo production.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview and Current Progress of the DOE/NNSA Nuclear Criticality Safety Program Training and Education Program

Since 2011, the US Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) has been providing a two-week nuclear criticality safety (NCS) practitioner course to support the training and qualification of new NCS staff. In 2013, an NCS Manager’s course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities, and, in 2017, an additional course was proposed for Criticality Safety Officers (CSOs). In addition to hands-on training, other NCSP-funded tasks include training on sensitivity/uncertainty methods, NCS resource pipeline tasks, development of NCS guides, maintenance and development of Nuclear Criticality Safety Education Training (NCSET) modules and designing of a new subcritical assembly for hands-on training purposes. This paper provides an overview of the NCSP training and education program. The status of the NCSP hands-on training program will also be provided.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

EPIC Calibration/Validation Experiment Field Campaign Report

A field exercise involving several different kinds of Unmanned Aerial Systems (UAS) and supporting instrumentation systems provided by DOE/ARM and NOAA/NSSL was conducted at the ARM SGP site in Lamont, Oklahoma on 29-30 October 2016. This campaign was part of a larger National Oceanic and Atmospheric Administration (NOAA) UAS Program Office program awarded to the National Severe Storms Laboratory (NSSL). named Environmental Profiling and Initiation of Convection (EPIC). The EPIC Field Campaign (Test and Calibration/Validation) proposed to ARM was a test or “dry-run” for a follow-up campaign to be requested for spring/summer 2017. The EPIC project addresses NOAA’s objective to “evaluate options for UAS profiling of the lower atmosphere with applications for severe weather.” The project goal is to demonstrate that fixed-wing and rotary-wing small UAS have the combined potential to provide a unique observing system capable of providing detailed profiles of temperature, moisture, and winds within the atmospheric boundary layer (ABL) to help determine the potential for severe weather development. Specific project objectives are: 1) to develop small UAS capable of acquiring needed wind and thermodynamic profiles and transects of the ABL using one fixed-wing UAS operating in tandem with two different fixed rotary-wing UAS pairs; 2) adapt and test miniaturized, high-precision, and fast-response atmospheric sensors with high accuracy in strong winds characteristic of the pre-convective ABL in Oklahoma; 3) conduct targeted short-duration experiments at the ARM Southern Great Plains site in northern Oklahoma concurrently with a second site to be chosen in “real-time” from the Oklahoma Mesonet in coordination with the (National Weather Service (NWS)-Norman Forecast Office; and 4) gain valuable experience in pursuit of NOAA’s goals for determining the value of airborne, mobile observing systems for monitoring rapidly evolving high-impact severe weather conditions not observed with current operational systems. OU operated three UAS at the Lamont SGP site – the OU CopterSonde, the OU Iris, and the Meteomatics Meteodrone – under a blanket Federal Aviation Administration (FAA) Certificate of Authorization (COA) allowing flights up to 400 feet above ground level (AGL). The mission for the rotary-wing UAS involved four aircraft, three from the ARM Lamont site and one from an Oklahoma Mesonet site located at Medford, involving a vertical ascent to an altitude of 400 ft (130 m) AGL at ~ 30 minute intervals for ~ 5 hours duration on each of the two experiment days. This operation was conducted in close coordination with NSSL-launched rawinsonde balloons at the two sites, and operation of a fixed-wing UAS from the University of Colorado called the TTwistor that flew mission flight legs between the Lamont site and Medford. The NSSL operation at Medford (outside of ARM) also involved use of their Collaborative Lower Atmosphere Mobile Profiling System (CLAMPS) ground-based remote-sensing system for measuring atmospheric profiles of temperature, moisture, and winds with atmospheric emitted radiance interferometer (AERI), microwave radiometer, and Doppler wind lidar systems. The ARM Facility supported the project by providing access to their instrumented tower data at Lamont (at three levels), as well as AERI and Doppler wind lidar data obtained from systems quite similar to those used by CLAMPS. These non-UAS data from both ARM and NSSL provided the observations used to validate the experimental UAS observations.

atmospheric boundary layer↗

Current Status of the DOE/NNSA Nuclear Criticality Safety Program Hands-on Criticality Safety Training Courses

In 2011, the US Department of Energy/National Nuclear Security Administration (DOE/NNSA) Nuclear Criticality Safety Program (NCSP) developed and piloted a 2-week nuclear criticality safety (NCS) practitioner course to support training and qualification of new NCS staff. The course was developed in accordance with the American National Standard Institute/American Nuclear Society (ANSI/ANS) standard for NCS training and qualifications (ANSI/ANS-8.26-2007). In 2013, an NCS manager’s course was developed for process supervisors, managers, regulators, and other professionals with NCS-related responsibilities. These courses consist of classroom education, facility training, and hands-on subcritical and critical experiments training. Each course is currently offered twice per year. The 2-week practitioner course offers a week of classroom training, with practical workshops and exercises focused on teaching students how to perform an NCS evaluation. The second week of training involves hands-on critical and subcritical experiments and measurements. The first week is offered in Las Vegas, Nevada, at the DOE Nevada Field Office or the National Atomic Testing Museum. Depending on the student’s clearance level, the second week is offered at Sandia National Laboratory (SNL) (uncleared and L-cleared students) or at the National Criticality Experiments Research Center (NCERC) (Q-cleared students). The 1-week manager’s course is offered at SNL or NCERC, depending on clearance or interest, and includes classroom and hands-on critical and subcritical experiments and measurements. This paper provides an overview and status report for the DOE/NNSA NCSP training courses in NCS and provides information about future course offerings.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Benchmark of the Kilowatt Reactor Using Stirling TechnologY (KRUSTY) Component Critical Configurations

Kilowatt Reactor Using Stirling TechnologY (KRUSTY) was a prototype for the U.S. National Aeronautics and Space Administration’s Kilopower Program. KRUSTY has a highly enriched uranium–molybdenum alloy (with 7.65 wt% molybdenum) annular core reflected by beryllium oxide with an outer stainless steel shield. Five configurations from the experimental campaign were chosen to be evaluated as benchmark cases. Uncertainties were evaluated in five categories: (1) criticality measurement, (2) mass and density, (3) dimensions, (4) material compositions, and (5) positioning. The largest contribution to the overall uncertainty in each case was from the radial alignment of the movable platen. A simplified model was created to increase computational efficiency, and an average bias of –16 pcm was calculated due to the simplifications. Sample calculations were completed for each case using MCNP6.2, COG, and MC21, all with ENDF/B-VIII.0 nuclear data. For MCNP6.2, the average difference (absolute value) between the calculated and experimental $k_{eff}$ for the five configurations was 14 pcm for both the detailed and the simplified models. The $k_{eff}$ results from all three codes are within 1σ of the benchmark values. KRUSTY’s value as a benchmark is due to its sensitivity to beryllium and molybdenum. For beryllium, KRUSTY adds an 18th benchmark with a total cross-section sensitivity greater than 0.05%/%/(unit lethargy). For molybdenum, KRUSTY adds a 9th benchmark with a total cross-section sensitivity greater than 0.004%/%/(unit lethargy).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Second Wind Forecast Improvement Project (WFIP2): Observational Field Campaign

The science of wind energy forecasting has taken a leap forward with the unique meteorological observations gathered in complex terrain during the Second Wind Forecast Improvement Project (WFIP2). The Second Wind Forecast Improvement Project (WFIP2) is a U.S. Department of Energy (DOE) and National Oceanic and Atmospheric Administration (NOAA) funded program, with private-sector and university partners, which aims to improve the accuracy of numerical weather prediction (NWP) model forecasts of wind speed in complex terrain for wind energy applications. A core component of WFIP2 was an 18-month field campaign which took place in the U.S. Pacific Northwest between October 2015 and March 2017. A large suite of instrumentation was deployed in a series of telescoping arrays, ranging from 500 km across to a densely instrumented 2 x 2 km area similar in size to a high-resolution NWP model grid cell. Observations from these instruments are being used to improve our understanding of the meteorological phenomena that affect wind energy production in complex terrain, and to evaluate and improve model physical parameterization schemes. We present several brief case studies using these observations to describe phenomena that are routinely difficult to forecast, including wintertime cold pools, diurnally driven gap flows, and mountain waves/wakes. Observing system and data product improvements developed during WFIP2 are also described.

17 WIND ENERGY↗

DOE/EM Criticality Safety Needs Assessment

The issue of nuclear criticality safety (NCS) in Department of Energy Environmental Management (DOE/EM) fissionable material operations presents challenges because of the large quantities of material present in the facilities and equipment that are committed to storage and/or material conditioning and dispositioning processes. Given the uncertainty associated with the material and conditions for many DOE/EM fissionable material operations, ensuring safety while maintaining operational efficiency requires the application of the most-effective criticality safety practices. In turn, more-efficient implementation of these practices can be achieved if the best NCS technologies are utilized. In 2002, DOE/EM-1 commissioned a survey of criticality safety technical needs at the major EM sites. These needs were documented in the report Analysis of Nuclear Criticality Safety Technology Supporting the Environmental Management Program, issued May 2002. Subsequent to this study, EM safety management personnel made a commitment to applying the best and latest criticality safety technology, as described by the DOE Nuclear Criticality Safety Program (NCSP). Over the past 7 years, this commitment has enabled the transfer of several new technologies to EM operations. In 2008, it was decided to broaden the basis of the EM NCS needs assessment to include not only current needs for technologies but also NCS operational areas with potential for improvements in controls, analysis, and regulations. A series of NCS workshops has been conducted over the past years, and needs have been identified and addressed by EM staff and contractor personnel. These workshops were organized and conducted by the EM Criticality Safety Program Manager with administrative and technical support by staff at Oak Ridge National Laboratory (ORNL). This report records the progress made in identifying the needs, determining the approaches for addressing these needs, and assimilating new NCS technologies into EM fissionable material operations. In addition, the report includes projections of future EM needs and associted recommendations.

Westfall, Robert Michael↗

Commercial Property Assessed Clean Energy (CPACE) for Tax-Exempt and Public Entities (“CivicPACE”)

This report summarizes the work of the CivicPACE team to open the market for property assessed clean energy financing for the nonprofit, tax exempt sector. Property Assessed Clean Energy (PACE) finances property improvements that are paid back through a line item on the property owner’s tax bill. Most states restrict such improvements to renewable energy and energy efficiency, although they may include water conservation and disaster related improvements such as hurricane or earthquake preparedness. When such projects are developed for commercial properties, it is referred to as commercial PACE or CPACE. When CPACE applies to tax exempt or nonprofit organizations, we refer to it as CivicPACE. CivicPACE also represents the name of this program. The purpose of the CivicPACE project was to help nonprofit tax-exempt organizations such as affordable housing, faith-based institutions, and schools gain greater access to financing for solar energy deployment through PACE. As such, the lessons learned and best practices from the CivicPACE team work is intended for state and municipal program designers, PACE administrators, solar installers, and nonprofit organizations. CPACE is experiencing rapid growth. Cumulative CPACE financing grew from 8.2 million in 2010 to 111 million in 2014 to 588 million in 2017. Renewable energy, mostly solar, represents about a quarter of the financing; the nonprofit sector represents about 10% of total financing. The Project Team was formed in early 2015 when solar financing options were limited for nonprofits (NPOs). Traditional bank financing was difficult for nonprofit organizations to secure since they are often viewed as a credit risk. Despite the growth of CPACE, few tax-exempt organizations were using the financing mechanism at the start of 2015. Nonetheless, CPACE financing appeared to have tremendous potential for solar development for tax-exempt organizations such as schools, churches, and multifamily affordable housing, because it addresses many of the traditional nonprofit financing roadblocks, such as credit risk. Given the benefits and the rapid growth of CPACE, the opportunity to expand CPACE financing for solar development on tax-exempt buildings was timely. The Project team was comprised of The Solar Foundation (TSF), Urban Ingenuity (UI), and Clean Energy Solutions, Inc. (CESI). The Solar Foundation was the Principal Investigator and overall team lead. The Solar Foundation is an independent 501(c)(3) nonprofit organization whose mission is to accelerate adoption of the world’s most abundant energy source. PACE financing specialist Urban Ingenuity was the lead for the team for the pilot projects. Clean Energy Solutions (CESI) was the lead on the market analysis, financial modeling, and HUD regulatory issues for PACE financed solar development on affordable housing. The CivicPACE team focused on four key activities to help open the market for CPACE financing of solar development for nonprofit entities: research, pilot projects, technical assistance, and information dissemination.

14 SOLAR ENERGY↗

Pit Realization Process Manufacturing Readiness Assessments

This document defines a manufacturing readiness assessment process within a Product Realization Process (PRP) for pit manufacturing at Los Alamos National Laboratory (LANL) having the following objectives. Meet National Nuclear Security Administration (NNSA) Defense Programs Business Process System (DPBPS) PRP requirements. Use language established within LANL’s pit manufacturing program. Enable a disciplined approach to evaluate pit manufacturing readiness. Provide effective tools and metrics to assess manufacturing system maturity.

42 ENGINEERING↗

Validation of the Public Radiation Exposure Calculation for the Incident at the National Institute of Standards and Technology Center for Neutron Research on February 3, 2021

The Department of Energy/National Nuclear Security Administration Consequence Management Program was contacted by the Health Physics Chief of the National Institute of Standards and Technology Center for Neutron Research (NCNR) to review public radiation exposure calculations for an event that occurred on its Gaithersburg, Maryland, campus on February 3, 2021. Subject matter experts from the Nuclear Emergency Support Team (NEST) assets, specifically the Consequence Management Home Team (CMHT) and the National Atmospheric Release Advisory Center (NARAC), were selected to provide support. CMHT used three separate modeling codes to validate the results the scientists at NCNR calculated using the HotSpot model. The analyses were performed using NARAC’s in-house Lagrangian dispersion codes known as LODI and Aeolus, as well as the Turbo FRMAC software from Sandia National Laboratories. The team used parameters provided by the NCNR scientists regarding the site, applicable observable meteorological data, and environmental survey and sampling data to estimate public exposure. Each model estimated public dose at much less than 0.5 mrem. CMHT concurs with the NCNR public radiation exposure calculations which state that members of the public at the 400-meter boundary would have received a radiological dose of less than 0.5 mrem.

61 RADIATION PROTECTION AND DOSIMETRY↗

Albeni Falls Wildlife Mitigation Project, 2008 Annual Report.

The Albeni Falls Interagency Work Group (AFIWG) was actively involved in implementing wildlife mitigation activities in late 2007, but due to internal conflicts, the AFIWG members has fractionated into a smaller group. Implementation of the monitoring and evaluation program continued across protected lands. As of 2008, The Albeni Falls Interagency Work Group (Work Group) is a coalition comprised of wildlife managers from three tribal entities (Kalispel Tribe, Kootenai Tribe, Coeur d Alene Tribe) and the US Army Corps of Engineers. The Work Group directs where wildlife mitigation implementation occurs in the Kootenai, Pend Oreille and Coeur d Alene subbasins. The Work Group is unique in the Columbia Basin. The Columbia Basin Fish and Wildlife Authority (CBFWA) wildlife managers in 1995, approved what was one of the first two project proposals to implement mitigation on a programmatic basis. The maintenance of this kind of approach through time has allowed the Work Group to implement an effective and responsive habitat protection program by reducing administrative costs associated with site-specific project proposals. The core mitigation entities maintain approximately 9,335 acres of wetland/riparian habitats in 2008.

13 HYDRO ENERGY↗

ADMINISTRATIVE AND ENGINEERING CONTROLS FOR THE OPERATION OF VENTILATION SYSTEMS FOR UNDERGROUND RADIOACTIVE WASTE STORAGE TANKS

Liquid radioactive wastes from the Savannah River Site are stored in large underground carbon steel tanks. The majority of the waste is confined in double shell tanks, which have a primary shell, where the waste is stored, and a secondary shell, which creates an annular region between the two shells, that provides secondary containment and leak detection capabilities should leakage from the primary shell occur. Each of the DST is equipped with a purge ventilation system for the interior of the primary shell and annulus ventilation system for the secondary containment. Administrative flammability controls require continuous ventilation to remove hydrogen gas and other vapors from the waste tanks while preventing the release of radionuclides to the atmosphere. Should a leak from the primary to the annulus occur, the annulus ventilation would also serve this purpose. The functionality of the annulus ventilation is necessary to preserve the structural integrity of the primary shell and the secondary. An administrative corrosion control program is in place to ensure integrity of the tank. Given the critical functions of the purge and annulus ventilation systems, engineering controls are also necessary to ensure that the systems remain robust. The system consists of components that are constructed of metal (e.g., steel, stainless steel, aluminum, copper, etc.) and/or polymeric (polypropylene, polyethylene, silicone, polyurethane, etc.) materials. The performance of these materials in anticipated service environments (e.g., normal waste storage, waste removal, etc.) was evaluated. The most aggressive vapor space environment occurs during chemical cleaning of the residual heels by utilizing oxalic acid. The presence of NO{sub x} and mercury in the vapors generated from the process could potentially accelerate the degradation of aluminum, carbon steel, and copper. Once identified, the most susceptible materials were either replaced and/or plans for discontinuing operations are executed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Jack Healy Remembers - Anecdotal Evidence for the Origin of the Approximate 24-hour Urine Sampling Protocol Used for Worker Bioassay Monitoring

The origin of the approximate 24-hour urine sampling protocol used at Hanford for routine bioassay is attributed to an informal study done in the mid-1940s. While the actual data were never published and have been lost, anecdotal recollections by staff involved in the initial bioassay program design and administration suggest that the sampling protocol had a solid scientific basis. Numerous alternate methods for normalizing partial day samples to represent a total 24-hour collection have since been proposed and used, but no one method is obviously preferred.

61 RADIATION PROTECTION AND DOSIMETRY↗

Recovering Radioactive Materials with ORSP Team

The National Nuclear Security Administration sponsors a program, executed by Los Alamos National Laboratory, to recover radioisotopes used by industry and academia and no longer needed. Called the "Offsite Source Recovery Program (OSRP), it has recovered more than 16,000 orphan sources as of 2008.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗