Search NASA⌕ Search

SEARCH · Search NASA

Results for “program costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Preliminary design of a high speed civil transport: The Opus 0-001

Based on research into the technology and issues surrounding the design, development, and operation of a second generation High Speed Civil Transport, HSCT, the Opus 0-001 team completed the preliminary design of a sixty passenger, three engine aircraft. The design of this aircraft was performed using a computer program which the team wrote. This program automatically computed the geometric, aerodynamic, and performance characteristic of an aircraft whose preliminary geometry was specified. The Opus 0-001 aircraft was designed for a cruise Mach number of 2.2, a range of 4,700 nautical miles and its design was based in current or very near term technology. Its small size was a consequence of an emphasis on a profitable, low cost program, capable of delivering tomorrow's passengers in style and comfort at prices that make it an attractive competitor to both current and future subsonic transport aircraft. Several hundred thousand cases of Cruise Mach number, aircraft size and cost breakdown were investigated to obtain costs and revenues for which profit was calculated. The projected unit flyaway cost was $92.0 million per aircraft.

Source record↗

A Review Towards the Design Optimization of High Performance Additively Manufactured Rotating Detonation Rocket Engine Injectors

Rotating Detonation Rocket Engines (RDRE) have been marketed primarily for their higher specific impulse potential over constant pressure (CP) liquid rocket engines. However, several other performance advantages exist with RDREs over CP engines such as heat transfer advantages for gas expander cycle, increased completeness of combustion at low chamber L*, compact engine design, reduced coolant channel pressure drop potential, and improved injector C* performance. NASA has paved the way for liquid engine system performance enhancement since the Apollo program and continues to do so with metal additive manufacturing (AM), super-alloy materials, and advanced propulsion concepts. A team of propulsion development engineers at NASA are in the process of developing high-performance 7K lbf class RDRE hardware for their potential use in lander, upper stage, and even launch vehicle applications. Clear advantages have been demonstrated with AM including program cost and schedule reductions of up to 50%. It is well known that injector performance is integrally linked to the global performance of a combustion device. This is especially the case for RDREs since detonation stability is heavily dependent on the mixedness of propellants. A major program goal is to rapidly produce ultra-high-performance AM injectors. This paper reviews the available literature on liquid rocket injector design optimization as well as the experimental work conducted to date on injectors tested in RDREs. Major lessons learned are document and suggestions given towards the design of high-performance liquid RDRE injectors. In addition, the integration of metal AM into the design of liquid RDRE injector schemes is discussed. Finally, several candidate AM RDRE injector elements were produced to obtain their diodicity and cold flow characteristics.

rotating detonation engine↗

Astrometric Telescope Facility preliminary systems definition study. Volume 1: Executive summary

The Astrometric Telescope Facility (ATF) is a spaceborne observatory proposed for use on the Space Station (SS) as an Initial Operating Capability (IOC) payload. The primary objective of the ATF will be the search for extrasolar planetary systems and a detailed investigation of any discovered systems. In addition, it will have the capability of conducting other astrophysics investigations; e.g., measuring precise distances and motions of stars within our galaxy. The purposes of the study were to: (1) define mission and system requirements; (2) define a strawman system concept for the facility at the Prephase A level; (3) define the need for additional trade studies or technology development; and (4) estimate program cost for the strawman concept. It has been assumed for the study that the ATF will be a SS payload, will use a SS-provided Coarse Pointing System (CPS), will meet SS constraints, and will make maximum use of existing flight qualified designs or designs to be qualified by the SS program for general SS use.

Sobeck, Charlie↗

Computer program to perform cost and weight analysis of transport aircraft. Volume 1: Summary

A digital computer program for evaluating the weight and costs of advanced transport designs was developed. The resultant program, intended for use at the preliminary design level, incorporates both batch mode and interactive graphics run capability. The basis of the weight and cost estimation method developed is a unique way of predicting the physical design of each detail part of a vehicle structure at a time when only configuration concept drawings are available. In addition, the technique relies on methods to predict the precise manufacturing processes and the associated material required to produce each detail part. Weight data are generated in four areas of the program. Overall vehicle system weights are derived on a statistical basis as part of the vehicle sizing process. Theoretical weights, actual weights, and the weight of the raw material to be purchased are derived as part of the structural synthesis and part definition processes based on the computed part geometry.

Source record↗

NASA Engineering and Safety Center Lunar Rover Design Concepts Assessments

Mass is a significant risk to programs and projects as they transition from formulation to implementation, especially in larger human space systems where delivery mass or volume can be a constrained commodity. • Concepts developed without an adequate systems-engineering basis, including design and operations experience, may miss significant functionality and subsequent mass required for integration or operations. • Further uncertainty can be associated with not fully understanding design best practices and standards that drive mass, such as design for minimum risk or fault tolerance.1 • Finally, the appropriate systems engineering mass properties management rigor and technical discipline insight are required to set the mass baseline, including appropriate mass growth allowance (MGA) to ensure program success. Mass is a key quantity that should be constantly monitored by the systems engineer and the program/project management stakeholder to ensure mission compatibility throughout the project life cycle. In addition, mass is a key programmatic performance metric monitored by the NASA Chief Financial Officer for current and future program cost estimating. NASA Exploration Systems sought an assessment of reasonableness with respect to different potential rover concepts that balances mass needs and human-class cargo lander capabilities. Appropriate systems engineering mass properties management rigor and technical discipline insight were used, and are required to set the mass baseline, including appropriate MGA to ensure program success. Two independent Lunar rover concepts were evaluated, with a goal to understand concept credibility and the Lunar rover designs potential extensibility for Mars surface operations. A notional generic rover concept is shown in Figure 1.

Systems Engineering↗

Enhancing the Human Factors Engineering Role in an Austere Fiscal Environment

An austere fiscal environment in the aerospace community creates pressures to reduce program costs, often minimizing or sometimes even deleting the human interface requirements from the design process. With an assumption that the flight crew can recover real time from a poorly human factored space vehicle design, the classical crew interface requirements have been either not included in the design or not properly funded, though carried as requirements. Cost cuts have also affected quality of retained human factors engineering personnel. In response to this concern, planning is ongoing to correct the acting issues. Herein are techniques for ensuring that human interface requirements are integrated into a flight design, from proposal through verification and launch activation. This includes human factors requirements refinement and consolidation across flight programs; keyword phrases in the proposals; closer ties with systems engineering and other classical disciplines; early planning for crew-interface verification; and an Agency integrated human factors verification program, under the One NASA theme. Importance is given to communication within the aerospace human factors discipline, and utilizing the strengths of all government, industry, and academic human factors organizations in an unified research and engineering approach. A list of recommendations and concerns are provided in closing.

Stokes, Jack W.↗

The common engine concept for ALS application - A cost reduction approach

Future launch systems require the application of propulsion systems which have been designed and developed to meet mission model needs while providing high degrees of reliability and cost effectiveness. Vehicle configurations which utilize different propellant combinations for booster and core stages can benefit from a common engine approach where a single engine design can be configured to operate on either set of propellants and thus serve as either a booster or core engine. Engine design concepts and mission application for a vehicle employing a common engine are discussed. Engine program cost estimates were made and cost savings, over the design and development of two unique engines, estimated.

Bair, E. K.↗

Space shuttle phase B extension, volume 1

In order to define a system which would significantly reduce payload delivery costs, activities were extended to modifications of the reusable space shuttle design concept. Considered were systems using orbiters with external propellant tanks and an interim expendable booster which allowed phased development of the usable orbiter and booster. Analyzed were: Merits of internal and external propellant tanks and the impact of external LH2 compared to L02 and LH2; impact of cargo bay size; impact abort; merit of expendable booster options; and merit of a phased development program. Studies showed that external L02/LH2 and the continued use of the J-2S engine on the orbiter reduced program cost and risk.

Source record↗

Concept report: Experimental vector magnetograph (EXVM) operational configuration balloon flight assembly

The observational limitations of earth bound solar studies has prompted a great deal of interest in recent months in being able to gain new scientific perspectives through, what should prove to be, relatively low cost flight of the magnetograph system. The ground work done by TBE for the solar balloon missions (originally planned for SOUP and GRID) as well as the rather advanced state of assembly of the EXVM has allowed the quick formulation of a mission concept for the 30 cm system currently being assembled. The flight system operational configuration will be discussed as it is proposed for short duration flight (on the order of one day) over the continental United States. Balloon hardware design requirements used in formulation of the concept are those set by the National Science Balloon Facility (NSBF), the support agency under NASA contract for flight services. The concept assumes that the flight hardware assembly would come together from three development sources: the scientific investigator package, the integration contractor package, and the NSBF support system. The majority of these three separate packages can be independently developed; however, the computer control interfaces and telemetry links would require extensive preplanning and coordination. A special section of this study deals with definition of a dedicated telemetry link to be provided by the integration contractor for video image data for pointing system performance verification. In this study the approach has been to capitalize to the maximum extent possible on existing hardware and system design. This is the most prudent step that can be taken to reduce eventual program cost for long duration flights. By fielding the existing EXVM as quickly as possible, experience could be gained from several short duration flight tests before it became necessary to commit to major upgrades for long duration flights of this system or of the larger 60 cm version being considered for eventual development.

Source record↗

Shuttle systems evaluation and selection. Volume 1: Executive summary

The major issues affecting the selection of a space shuttle system were considered. These included the HO orbiter/ballistic recoverable booster series-burn configuration; the HO orbiter/ballistic recoverable booster parallel-burn (rocket-assisted orbiter-RAO) configuration; and the HO orbiter/flyback LOX/RP booster configuration. The booster studies emphasized the series-burn ballistic design, but the differences required for RAO application were identified and evaluated. Definition of the RAO configuration parameters and technical problem areas, establishing approaches to possible solutions, and developing program costs are discussed.

Source record↗

Study of solid rocket motor for a space shuttle booster

The study of solid rocket motors for a space shuttle booster was directed toward definition of a parallel-burn shuttle booster using two 156-in.-dia solid rocket motors. The study effort was organized into the following major task areas: system studies, preliminary design, program planning, and program costing.

Source record↗

Multi-EVA communications system analysis

A communications concept is analyzed to establish requirements of a confident candidate system for space shuttle. Conceptual baseline configurations, EVA's-to-spacecraft via PCM/FDM and spacecraft-to-EVA via PAM/FM, and respective functional performance requirements are discussed. The baseline system is analyzed to determine link characteristics, EMI levels at various frequency bands, and determination of desirable spectrum. Selected L- and S-Band links are analyzed to ascertain signal design parameters. A trade-off is performed, which establishes L-Band frequency as the best compromise. The results of the analysis along with the reliability/safety aspects and physical characteristics of the candidate system, indicate that the initial baseline concept meets functional requirements, but is poor from standpoint of overall space shuttle program cost.

Source record↗

The solar electric propulsion stage concept for high energy missions.

Definition of multimission and engine performance requirements for candidate solar electric propulsion stage configurations, considering launch vehicle compatibility, electric propulsion integration, payload requirements, and the effects of environmental extremes. Electric propulsion power options include two solar array power levels (15/22 kW), up to twelve electric thrustors of 30 cm diameter and 2.7 kW each, five to eight power conditioning units, and a maximum mercury propellant capacity of 1530 kg. In performance, the stage with a dry weight of 700 to 900 kg can deliver a net mass of 756 kg into Saturn orbit, 329 kg into a tight Mercury orbit, and 334 kg within 0.1 AU of the sun. The stage can also deliver a round trip payload of 3350 kg to geosynchronous orbit and return from an intermediate elliptical orbit using the Shuttle/Tug. Thus, a versatile stage is developed which competes effectively in performance with existing integrated spacecraft and promises considerable savings in total program costs.

Guttman, C. H.↗

HEUS-RS applications study, volume 2

The final report of a High Energy Upper Stage Restartable Solid (HEUS-RS) Applications Study is presented. The material deals with launch program cost comparisons associated with meeting NASA mission model requirements with several different launch vehicle approaches.

Source record↗

Space tug economic analysis study. Volume 2: Tug concepts analysis. Part 1: Overall approach and data generation

An economic analysis of space tug operations is presented. The subjects discussed are: (1) data base for orbit injection stages, (2) data base for reusable space tug, (3) performance equations, (4) data integration and interpretation, (5) tug performance and mission model accomodation, (6) total program cost, (7) payload analysis, (8) computer software, and (9) comparison of tug concepts.

Source record↗

Study of an evolutionary interim earth orbit program

An evolutionary, gradual, and step-wise spacecraft systems technology development from those used on the Apollos and Skylab 1 to that required for the space station was considered. The four mission spacecraft were dry workshop versions of the Saturn 4-B stage, and each individually configured, outfitted and launched by INT-21 vehicles. These spacecraft were evaluated for crews of three, six and nine men and for mission lifetimes of one year. Two versions of the Apollo CSM, a three man and a four man crew, were considered as the logistic vehicle. The solar cell electrical power system of the first mission evolves into a light weight panel system supplemented by an operating isotope-Brayton system on the later missions. The open life support system of the first mission evolves to a system which recovers both water and oxygen on the last mission. The data handling, communications, radiation shielding, micrometeoroid protection, and orbit keeping systems were determined. The program costs were estimated and, excluding operational costs, the cost for each mission would average about $2 billion of which one-sixth would be for development, one-fourth for experiments, and the balance for vehicle acquisition.

Anderson, J. L.↗