Search NASA⌕ Search

SEARCH · Search NASA

Results for “programmatic requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Qualification Progress and Mission-Enabling Capabilities of the 12-kW Hall-Effect, Advanced Electric Propulsion System (AEPS) Thruster

An update of the 12 kW Advanced Electric Propulsion System (AEPS) qualification and flight thruster status is provided. Three flight thrusters completed acceptance testing in 2025 and have been delivered to NASA. Environmental qualification is complete and preparations are under way for long-duration life-demonstration testing. Programmatic lessons learned associated with risk management, contract oversight, and requirement definition during the fabrication and assembly are discussed. In addition, the extensibility of the AEPS thruster to enable a variety of NASA missions is presented.

Electric Propulsion↗

Qualification Progress and Mission-Enabling Capabilities of the 12-kW Hall-Effect, Advanced Electric Propulsion System (AEPS) Thruster

An update of the 12 kW Advanced Electric Propulsion System (AEPS) qualification and flight thruster status is provided. Three flight thrusters completed acceptance testing in 2025 and have been delivered to NASA. Environmental qualification is complete and preparations are under way for long-duration life-demonstration testing. A brief overview of three of SEP’s programmatic lessons learned are discussed: risk management, contract oversight, and requirement definition. In addition, the extensibility of the AEPS thruster to enable a variety of NASA missions is presented.

Mars Exploration↗

Space transfer vehicle concepts and requirements study. Volume 1: Executive summary

A description of the study in terms of background, objectives, and issues is provided. NASA is currently studying new initiatives of space exploration involving both piloted and unpiloted missions to destinations throughout the solar system. Many of these missions require substantial improvements in launch vehicle and upper stage capabilities. This study provides a focused examination of the Space Transfer Vehicles (STV) required to perform these missions using the emerging national launch vehicle definition, the Space Station Freedom (SSF) definition, and the latest mission scenario requirements. The study objectives are to define preferred STV concepts capable of accommodating future exploration missions in a cost-effective manner, determine the technology development (if any) required to perform these missions, and develop a decision database of various programmatic approaches for the development of the STV family of vehicles. Special emphasis was given to examining space basing (stationing reusable vehicles at a space station), examining the piloted lunar mission as a primary design mission, and restricting trade studies to the high-performance, near-term cryogenics (LO2/LH2) as vehicle propellant. The study progressed through three distinct 6-month phases. The first phase concentrated on supporting a NASA 3 month definition of exploration requirements (the '90-day study') and during this phase developed and optimized the space-based point-of-departure (POD) 2.5-stage lunar vehicle. The second phase developed a broad decision database of 95 different vehicle options and transportation architectures. The final phase chose the three most cost-effective architectures and developed point designs to carry to the end of the study. These reference vehicle designs are mutually exclusive and correspond to different national choices about launch vehicles and in-space reusability. There is, however, potential for evolution between concepts.

Weber, Gary A.↗

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! Specifically, the standard practice for doing so is the Large Area Pulsed Solar Simulation (LAPSS). A LAPSS test can characterize a photovoltaic system's efficiency via its response to rapidly applied impulses of simulated sunlight. However, a Class D program on a constrained budget and schedule may not have the resources to ship an entire satellite for a LAPSS test alone. Such was the case with the Lunar Atmospheric and Dust Environment Explorer (LADEE) program, which was also averse to the risk of hardware damage during shipment. When the Electrical Power System (EPS) team was denied a spacecraft-level LAPSS test, the lack of an end-to-end power generation test elevated to a project-level technical risk. The team pulled together very limited resources to not only eliminate the risk, but build a process to monitor the health of the system through mission operations. We discuss a process for performing a low-cost, end-to-end test of the LADEE photovoltaic system. The approach combines system-level functional test, panel-level performance results, and periodic inspection (and repair) up until launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of data. The process starts in manufacturing at the subcontractor. The panel manufacturer provides functional test and LAPSS data on each individual panel. We apply an initial assumption that the per-panel performance is sufficient to meet the power generation requirements. The manufacturer's data is also carried as the performance allocation for each panel during EPS system modeling and initial mission operations. During integration and test, a high-power, professional theater lamp system provides simulated sunlight to each panel on the spacecraft, thereby permitting a true end-to-end system test. A passing test results in a step response to nearly full-rated current at the appropriate solar array switch in the power system. A metal-halide bulb, infrared imagers, and onboard spacecraft measurements are utilized to minimize risk of thermal damage during test. Data is provided to support test results for both passing and marginal panels. Prior to encapsulation in the launch vehicle, each panel is inspected for damage by the panel manufacturer. Cracked cells or other damage is amended on-site. Because the photovoltaic test system is inexpensive and portable, each repaired panel can be re-verified immediately. Post-launch, the photovoltaic system is again characterized for per-panel deviations from the manufacturer's performance test. This proved especially tricky as the LADEE spacecraft performs only one current measurement on the entire array. The algorithm for Matlab tools to assess panel performance based on spacecraft attitude is discussed. While not as precise and comprehensive as LAPSS, the LADEE approach leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a spacecraft level performance test versus the programmatic risk of shipping the spacecraft to another facility. The resources required are a fraction of that for a LAPSS test, and is easy to repeat. Further, the test equipment can be handed down to future projects without building an on-site facility.

photovoltaic↗

Use of STS subsystems and components for MMSE, volume 1

Multiuse mission support equipment (MMSE) is flight/ground equipment for the shuttle era which is used in conjunction with more than one mission payload. Initial verification of STS subsystem's applicability to MMSE is provided along with the cost savings potential and programmatic data needed for further program planning decisions. Some 70 MMSE requirements were found to be potentially satisfied by STS equipment, and and 6 items of particular interest were chosen for special emphasis. All were found to be feasible and beneficial. Program cost savings through their use are estimated to be substantial. Further study is recommended to identify additional MMSE requirements and hardware.

Source record↗

Spacelab programme overview

The current activity status of Spacelab, objectives of which are to provide a laboratory and observation facility in space, is surveyed. Program requirements are given, and the basic Spacelab concept is described. The programmatic aspects of the program and some considerations concerning payload integration and payload operations are outlined.

Lord, D. R.↗

Testing in Support of Space Fission System Development and Qualification

Extensive data would be required for the qualification of a fission surface power (FSP) system. The strategy for qualifying a FSP system could have a significant programmatic impact. This paper explores potential options that could be used for qualifying FSP systems, including cost-effective means for obtaining required data. three methods for obtaining qualification data are analysis, non-nuclear testing, and nuclear testing. It has been over 40 years since the US qualified a space reactor for launch. During that time, advances have been made related to all three methods. Perhaps the greatest advancement has occurred in the area of computational tools for design and analysis. Tools that have been developed, coupled with modem computers, would have a significant impact on a FSP qualification. This would be especially true for systems with materials and fuels operating well within temperature, irradiation damage, and burnup limits. The ability to perform highly realistic non-nuclear testing has also advanced throughout the past four decades. Instrumented thermal simulators were developed during the 1970s and 1980s to assist in the development, operation, and assessment of terrestrial fission systems. Instrumented thermal simulators optimized for assisting in the development, operation, and assessment of modem FSP systems have been under development (and utilized) since 1998. These thermal simulators enable heat from fission to be closely mimicked (axial power profile, radial power profile, temperature, heat flux, etc.} and extensive data to be taken from the core region. Both steady-state and transient operation can be tested. For transient testing, reactivity feedback is calculated (or measured in cold/warm criticals) based on reactor temperature and/or dimensional changes. Pin power during a transient is then calculated based on the reactivity feedback that would occur given measured values of temperature and/or dimensional change. In this way nonnuclear testing can be used to provide very realistic information related to nuclear operation. Non-nuclear testing can be used at all levels, including component, subsystem, and integrated system testing. Realistic non-nuclear testing is most useful for systems operating within known temperature, irradiation damage, and burnup capabilities.

Houts, Mike↗

Management Approach for NASA's Earth Venture-1 (EV-1) Airborne Science Investigations

The Earth System Science Pathfinder (ESSP) Program Office (PO) is responsible for programmatic management of National Aeronautics and Space Administration's (NASA) Science Mission Directorate's (SMD) Earth Venture (EV) missions. EV is composed of both orbital and suborbital Earth science missions. The first of the Earth Venture missions is EV-1, which are Principal Investigator-led, temporally-sustained, suborbital (airborne) science investigations costcapped at $30M each over five years. Traditional orbital procedures, processes and standards used to manage previous ESSP missions, while effective, are disproportionally comprehensive for suborbital missions. Conversely, existing airborne practices are primarily intended for smaller, temporally shorter investigations, and traditionally managed directly by a program scientist as opposed to a program office such as ESSP. In 2010, ESSP crafted a management approach for the successful implementation of the EV-1 missions within the constructs of current governance models. NASA Research and Technology Program and Project Management Requirements form the foundation of the approach for EV-1. Additionally, requirements from other existing NASA Procedural Requirements (NPRs), systems engineering guidance and management handbooks were adapted to manage programmatic, technical, schedule, cost elements and risk. As the EV-1 missions are nearly at the end of their successful execution and project lifecycle and the submission deadline of the next mission proposals near, the ESSP PO is taking the lessons learned and updated the programmatic management approach for all future Earth Venture Suborbital (EVS) missions for an even more flexible and streamlined management approach.

Guillory, Anthony R.↗

Concepts, requirements, and design approaches for building successful planning and scheduling systems

Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.

Hornstein, Rhoda Shaller↗

An Overview of NASA’s Catalog of Archived Suborbital Earth Science Investigations (CASEI): Supporting FAIR and Open Access to Airborne and Field Data

Since 2019, NASA’s Airborne Data Management Group (ADMG) within the Interagency Implementation and Advanced Concepts Team (IMPACT) has worked to promote and ensure the discoverability and accessibility of the agency’s non-satellite Earth science observations. A primary component of this effort is the development of NASA’s Catalog of Archived Suborbital Earth Science Investigations (CASEI) and the vetting of key contextual details required to sustain this unique inventory of airborne and field metadata. CASEI provides information on the science objectives motivating data collection, key events/time periods in the observational record aligned with the science objectives, complementary simultaneous observations, programmatic details, and much more. The diverse set of data formats and disciplines served by CASEI have required the implementation of a common data model to organize suborbital observation metadata and efficiently connect appropriate campaigns, platforms, and instruments. The CASEI inventory provides a single entry point for users to search and browse NASA’s airborne and field data archives, regardless of which repository is responsible for their stewardship. This presentation will provide a summary of the motivations for and the development of the CASEI system. Particular attention will be granted to how CASEI facilitates discovery and reuse of these lesser-known NASA data, supporting the Open Science vision and enhancing the return on investments made to collect these unique and varied observations. An up-to-date summary of CASEI inventory content and initial metrics will be provided. Current and future avenues ADMG is pursuing to enhance both CASEI and specific components of suborbital data stewardship at various stages of the data life cycle will also be discussed.

Stephanie M. Wingo↗

Manned Space-laboratories Control Center (MSCC) operations concept

The initiation of the (German-) nationally funded control center for manned spaceflight operations triggered by the invitation of President Reagan to ESA, Japan, and Canada in 1984 to join the International Space Station Freedom Program is recalled. The requirements for a Manned Space-Laboratories Control Center (MSCC) as defined at the beginning of the planning and construction process in 1987 and the resulting modifications during the various programmatic scenario changes on NASA and ESA side between 1987 and now are presented. The validity of the original requirements with respect to the current scenario, which asks for a logical evolution from the execution of the D-2 mission in January 1993 via the European Columbus Precursor flights (in particular the E-1 mission) towards Columbus Attached Laboratory (APM)-operations by the end of this century are discussed. The resulting tasks of the MSCC for the various missions, the current configuration, and the ensuing operations concept leading from a more centralized concept for D-2 towards a decentralized payload operations concept for the APM and the implications with respect to European and International interfaces are presented. The planned Columbus MSCC facility architecture and its expected modifications introduced by the ESA Ministerial Conference in Munich (Nov. 1991) and follow-on discussions are briefly addressed. The last chapter outlines the planned services to be provided by the MSCC to the decentralized User (experimenter) community. Issues like decentralized mission planning on executional level, command validation, data flow coordination, archiving services, and telescience capabilities are highlighted from a MSCC point of view.

Kehr, Joachim↗

An Assessment of Alternate Thermal Protection Systems for the Space Shuttle Orbiter: Executive Summary - Volume 1

Alternate thermal protection system (TPS) concepts to the Space Shuttle Orbiter were assessed. Metallic, ablator, and carbon-carbon concepts which are the result of some previous design, manufacturing and testing effort were considered. Emphasis was placed on improved TPS durability, which could potentially reduce life cycle costs and improve Orbiter operational characteristics. Integrated concept/orbiter point designs were generated and analyzed on the basis of Shuttle design environments and criteria. A merit function evaluation methodology based on mission impact, life cycle costs, and risk was developed to compare the candidate concepts and to identify the best alternate. Voids and deficiencies in the technology were identified, along with recommended activities to overcome them. Finally, programmatic plans, including ROM costs and schedules, were developed for all activities required to bring the selected alternate system up to operational readiness.

Hays, D.↗

Romans to Mars

The key role played by technology advancement with respect to the anticipated era of discovery and exploration (in space) is illustrated: how bold new initiatives may or may not be enabled. A truly enabling technology not only renders the proposed missions technically feasible, but also makes them viable economically; that is, low enough in cost (relative to the economy supporting them) that urgent national need is not required for justification, low enough in cost that high risk can be programmatically tolerated. A fictional parallel is drawn to the Roman Empire of the second century A.D., shown to have possessed by that time the necessary knowledge, motivation, means, and technical capability of mounting, through the use of innovative mission planning, an initiative similar to Columbus' voyage. They failed to do so because they lacked the advanced technology necessary to make it an acceptable proposition economically. Speculation, based on the historical perspective, is made on the outcome of contemporary plans for future exploration showing how they will be subjected to the same historical forces, within limits imposed by the state of technology development, that shaped the timing of that previous era of discovery and exploration.

Bents, D. J.↗

Options for a lunar base surface architecture

The Planet Surface Systems Office at the NASA Johnson Space Center has participated in an analysis of the Space Exploration Initiative architectures described in the Synthesis Group report. This effort involves a Systems Engineering and Integration effort to define point designs for evolving lunar and Mars bases that support substantial science, exploration, and resource production objectives. The analysis addresses systems-level designs; element requirements and conceptual designs; assessments of precursor and technology needs; and overall programmatics and schedules. This paper focuses on the results of the study of the Space Resource Utilization Architecture. This architecture develops the capability to extract useful materials from the indigenous resources of the Moon and Mars. On the Moon, a substantial infrastructure is emplaced which can support a crew of up to twelve. Two major process lines are developed: one produces oxygen, ceramics, and metals; the other produces hydrogen, helium, and other volatiles. The Moon is also used for a simulation of a Mars mission. Significant science capabilities are established in conjunction with resource development. Exploration includes remote global surveys and piloted sorties of local and regional areas. Science accommodations include planetary science, astronomy, and biomedical research. Greenhouses are established to provide a substantial amount of food needs.

Roberts, Barney B.↗

The Idyllic Workplace

How many of us have worked in organizations where the discipline was so rigid and unyielding that it would send even a Marine Corps Drill Instructor screaming into the night? How many of us have worked in organizations where sightings of senior management were sporadic and rare, and any other interactions were by appointment only? Or, how many of us have worked in organizations where your role, absent specific direction, was to be seldom seen and rarely heard? And how many of us have worked in organizations where seemingly light itself was not permitted to escape without the acquiescence and approval of the director? Sadly, there are organizations that embody some of these conditions, and the resultant adverse effects on employee productivity, creativity and morale are profound. But what if you could work in an organization in which there was little hierarchy, where rank and seniority played no part, where there were no closed meetings or doors, where everyone knows what was expected of them, and where creativity was not only tolerated but encouraged and celebrated? Was there ever such a place? There was, and it was known as NASA's Space Station Task Force. I was fortunate enough to work there for a time, and I would like to tell you how this organization with few apparent rules led to incredibly high levels of employee satisfaction and fulfillment, and yielded work products of enduring quality. On May 20, 1982, NASA Administrator James M. Beggs established the Space Station Task Force under the direction of John D. Hodge. The Task Force was charged with the responsibility for "the development of the programmatic aspects of a Space Station as they evolve, including mission analysis, requirements definition and program management," and was authorized to draw on Space Station activities at the NASA Program Offices and Field Centers. No additional conditions or directions were provided. Hodge knew that in order to accomplish the job he had been given, he was going to have to obtain the services of the "best and the brightest" and facilitate the unleashing of the full force of their creative capabilities. In order to avoid the stultifying effects of a typical hierarchical organization, he set up a loosely structured, horizontal organization with only one supervisor of record - himself. He populated this organization with detailees from Headquarters, the field Centers and the Jet Propulsion Lab, thereby assuring himself of the political and technical expertise with which to deal with Congress and the bureaucracy, and conduct the required engineering studies and analyses.

Schoenfelder, Tony E.↗

A manned Mars artificial gravity vehicle

Data are presented on an artificial-gravity vehicle that is being designed for a manned Mars mission, using a 'split-mission' concept, in which an unmanned cargo vehicle is sent earlier and stored in a Mars orbit for a rendezvous with a manned vehicle about 1.5 years later. Special attention is given to the vehicle trajectory and configuration, the tether design, and the vehicle weight and launch requirements. It is shown that an artificial-G vehicle for a manned Mars missions is feasible technically and programmatically. Using an artificial-G vehicle instead of a zero-G vehicle for the piloted portion of a split mission provides physiological and human-factor-related benefits, does not eliminate requirements for zero-G countermeasures research (since zero-G is an abort mode), and could possibly reduce some life science activities. Diagrams are included.

Schultz, David N.↗