Search NASA⌕ Search

SEARCH · Search NASA

Results for “rover operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Mars Science Laboratory Rover System Thermal Test

On November 26, 2011, NASA launched a large (900 kg) rover as part of the Mars Science Laboratory (MSL) mission to Mars. The MSL rover is scheduled to land on Mars on August 5, 2012. Prior to launch, the Rover was successfully operated in simulated mission extreme environments during a 16-day long Rover System Thermal Test (STT). This paper describes the MSL Rover STT, test planning, test execution, test results, thermal model correlation and flight predictions. The rover was tested in the JPL 25-Foot Diameter Space Simulator Facility at the Jet Propulsion Laboratory (JPL). The Rover operated in simulated Cruise (vacuum) and Mars Surface environments (8 Torr nitrogen gas) with mission extreme hot and cold boundary conditions. A Xenon lamp solar simulator was used to impose simulated solar loads on the rover during a bounding hot case and during a simulated Mars diurnal test case. All thermal hardware was exercised and performed nominally. The Rover Heat Rejection System, a liquid-phase fluid loop used to transport heat in and out of the electronics boxes inside the rover chassis, performed better than predicted. Steady state and transient data were collected to allow correlation of analytical thermal models. These thermal models were subsequently used to predict rover thermal performance for the MSL Gale Crater landing site. Models predict that critical hardware temperatures will be maintained within allowable flight limits over the entire 669 Sol surface mission.

Novak, Keith S.↗

Operations Strategies for the Mars Exploration Rovers During the 2007 Martian Global Dust Storm

In June and July 2007 Mars experienced a dust storm that grew to envelop all but the polar latitudes of the planet. This dust storm was the first global dust storm to occur while the twin Mars Exploration Rovers (MER) began surface operations. It is estimated that the dust in the atmosphere prevented over 99.6% of direct sunlight from reaching the surface at the peak of the storm. Data collected indicated that solar array energy output was reduced to approximately 15% of maximum. The reduction in insolation and energy output posed the greatest risk of ending the mission for both rovers at that time.

Seibert, Michael↗

Lunar surface operations. Volume 4: Lunar rover trailer

The purpose of the project was to design a lunar rover trailer for exploration missions. The trailer was designed to carry cargo such as lunar geological samples, mining equipment and personnel. It is designed to operate in both day and night lunar environments. It is also designed to operate with a maximum load of 7000 kilograms. The trailer has a ground clearance of 1.0 meters and can travel over obstacles 0.75 meters high at an incline of 45 degrees. It can be transported to the moon fully assembled using any heavy lift vehicle with a storage compartment diameter of 5.0 meters. The trailer has been designed to meet or exceed the performance of any perceivable lunar vehicle.

Shields, William↗

Power Operations of the Mars Exploration Rovers

The rovers of the National Aeronautics and Space Administration’s (NASA) Mars Exploration Rovers (MER) project, Spirit (MER-A) and Opportunity (MER-B), safely landed on the surface of Mars three weeks apart during January 2004. Spirit and Opportunity were built and operated by the Jet Propulsion Laboratory (JPL), which is managed by the California Institute of Technology (Caltech) for NASA. Spirit landed at Gusev Crater, 14.8 degrees south of the equator, and operated continuously on the surface of Mars from January 4, 2004 until last contact from Spirit on March 22, 2010. Opportunity landed at Meridiani Planum, a location 2.5 degrees south of the Martian equator. Opportunity operated continuously on the Martian surface from January 25, 2004 until the last received transmission from Opportunity on June 10, 2018. The goal of the MER project was to determine if Mars ever had a habitable environment, in particular, if it ever had water. During their missions, both Spirit and Opportunity found evidence that liquid water once flowed on the surface of Mars. Both Spirit and Opportunity used a 1.33 m2 triple-junction solar array as their power sources. Based on observations of the original Mars rover, the Sojourner rover of the Mars Pathfinder mission that landed on Mars on July 4, 1997, the expectation was that the Martian dust would rapidly accumulate on the solar arrays of Spirit and Opportunity, and that the rovers would not have enough energy to continue operations after 90 Martian days (sols). Instead, due in part to lower dust accumulation rates than expected and numerous dust cleaning events, the Spirit and Opportunity rovers continued to operate on the Martian surface for over 2000 sols (MER-A) and 5000 sols (MER-B), respectively. During this time, the rovers experienced multiple Martian winters and several dust storms. Because the sources of solar array energy loss were known, the solar array energy output offered a method to scientifically estimate the loading and aeolian removal of dust from the solar arrays each sol. The MER Power operations team called this value that they calculated the solar array Dust Factor (DF). Dust Factor was defined as the fraction of sunlight that penetrates the accumulated dust on the surface of the solar array. A Dust Factor of 1.0 would indicate that the solar array was perfectly clean. A Dust Factor of 0.6 would indicate that only 60% of the available sunlight was able to penetrate the accumulated dust on the solar arrays. The MER Power subsystem operations team used the Multi-Mission Power Analysis Tool (MMPAT) to perform these Dust Factor calculations. The MMPAT software tool modeled the behavior of the solar arrays and the batteries as they interacted with the spacecraft power loads over the mission timeline. MMPAT also had knowledge (through telemetry and user inputs) of telemetered Power subsystem voltages and currents, atmospheric opacity (Tau), rover surface location, rover attitude, the planetary tilt and distance of Mars from the sun based on day of year, the instantaneous elevation of the sun based on time of day, temperatures (internal and external), terrain masking, and shadowing (due to the camera mast and antennas). Once all of the known sources of array energy loss are accounted, the remaining difference between the expected array energy and the actual array energy determines the solar array Dust Factor. The assumptions made while determining the Dust Factor are 1) that the single measured atmospheric opacity value (Tau) is constant over the course of the entire sol, 2) there is no measurable solar cell degradation, 3) there are no shorted strings and therefore, 4) all unexpected solar array energy losses are due to accumulated dust on the solar array. Although it cannot provide an absolute measure of dust loading, the determination of solar array Dust Factor provides a useful way of tracking dust accumulation and aeolian dust removal trends on Martian spacecraft. Any spacecraft on the Martian surface is vulnerable to dust, especially solar-powered spacecraft. The Spirit and Opportunity rovers were operational on the Martian surface for much longer than expected due in part to aeolian removal of dust from their solar arrays. The first few dust removal events were a pleasant surprise to the MER operations teams; however, over time a pattern began to arise. In over three Mars Years on the surface, the Power operations team tracked the solar array Dust Factor at Gusev Crater (location of MER-A) and observed that there were several significant dust removal and deposition events in Mars Year (MY) 27, even in the absence of a large dust storm. In MY 28 at Gusev Crater, the large atmospheric opacity (Tau) increase lagged significant dust removal events. Overall at Gusev Crater, there was a pattern of steady dust accumulation on the solar arrays, with a small number of significant dust cleaning events. At Meridiani Planum, where Opportunity rover operated for over seven Mars Years (late MY 26 to mid MY 34), a clear and consistent pattern of dust movement emerged. Meridiani Planum had a predictable, seasonally dependent pattern of gradual and continuous dust accumulation and removal. In summary, this paper explains the reasons for the development of the solar array Dust Factor and how it was used in mission operations. In particular, this paper describes the MMPAT software package, how it models array energy, including the important assumptions, model inputs and sources of error. And finally, this paper will show how the calculated solar array Dust Factor was used at Gusev Crater and Meridiani Planum to predict dust accumulation rates and weather patterns, and the importance of this generated data set for current and future solar- powered missions to Mars, such as the InSight lander and the planned Mars Sample Return rover.

Chin, Keith B.↗

MAPGEN: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission

This document describes the Mixed initiative Activity Plan Generation system MAPGEN. This system is one of the critical tools in the Mars Exploration Rover mission surface operations, where it is used to build activity plans for each of the rovers, each Martian day. The MAPGEN system combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The constraint-based planning component provides active constraint and rule enforcement, automated planning capabilities, and a variety of tools and functions that are useful for building activity plans in an interactive fashion. In this demonstration, we will show the capabilities of the system and demonstrate how the system has been used in actual Mars rover operations. In contrast to the demonstration given at ICAPS 03, significant improvement have been made to the system. These include various additional capabilities that are based on automated reasoning and planning techniques, as well as a new Constraint Editor support tool. The Constraint Editor (CE) as part of the process for generating these command loads, the MAPGEN tool provides engineers and scientists an intelligent activity planning tool that allows them to more effectively generate complex plans that maximize the science return each day. The key to the effectiveness of the MAPGEN tool is an underlying constraint-based planning and reasoning engine.

Ai-Chang, Mitchell↗

CIP Training Manual: Collaborative Information Portal Advance Training Information for Field Test Participants

The Collaborative Information Portal (CIP) is a web-based information management and retrieval system. Its purpose is to provide users at MER (Mars Exploration Rover) mission operations with easy access to a broad range of mission data and products and contextual information such as the current operations schedule. The CIP web-server provides this content in a user customizable web-portal environment. Since CIP is still under development, only a subset of the full feature set will be available for the EDO field test. The CIP web-portal will be accessed through a standard web browser. CIP is intended to be intuitive and simple to use, however, at the training session, users will receive a one to two page reference guide, which should aid them in using CIP. Users must provide their own computers for accessing CIP during the field test. These computers should be configured with Java 1.3 and a Java 2 enabled browser. Macintosh computers should be running OS 10.1.3 or later. Classic Mac OS (OS 9) is not supported. For more information please read section 7.3 in the FIASCO Rover Science Operations Test Mission Plan. Several screen shots of the Beta Release of CIP are shown on the following pages.

Schreiner, John↗

Mobility Sub-System for the Exploration Technology Rover

A new six-wheeled robotic roving vehicle was developed for NASA's Exploration Technology (ET) program. The rover which is called the Field, Integrated, Design, and Operations (FIDO) rover is being used for advanced technology development. In addition, copies of FIDO's Mobility Sub-System (MSS) are being used for software development in several NASA projects, including the prototype for the flight Athena Rover of the Mars Sample Return (MSR) 2003 mission. The focus of this paper is the work done on the MSS, specifically the development and test of the wheel drive actuators, which are fundamental to vehicle mobility.

Lindemann, Randel↗

Design of a Radioisotope Heat Exchanger Rocket

The state of planetary exploration vehicle technology has become increasingly more advanced over its long history. Better technologies enable more detailed scientific research to be conducted during the vehicle’s life, while advanced manufacturing strategies allow the vehicles to operate for greater lengths of time. However, one aspect of these vehicles has remained constant: the means of exploration. Previous vehicles have all relied on wheels to traverse the surface of the explored planet, limiting their range. The Mars Opportunity Rover, the longest operating rover, only traveled 45.15 km over its life. The radioisotope heat exchanger rocket is a new vehicle concept, designed to use heated gas as a means of propellant. The vehicle collects gas from the surface of a body, stores it in a heated tank, and passes it through a heat exchanger. This process significantly increases the temperature of the collected gas, allowing it to exit through a nozzle with high velocity and efficiency. This process will enable the vehicle to hop across the surface of the body and repeatedly refuel, with the potential of travelling thousands of kilometers during its lifetime. A computer model was constructed to simulate the heat exchanger and nozzle of this proposed system. This simulation allowed the heat exchanger and propellant tank properties to be optimized for the current mission parameters: the exploration of Triton. The nitrogen flows through a 25 kg lithium heat exchanger, consisting of 540, 1.5-mm diameter, 40-cm long Titanium Zirconium Molybdenum pipes, to three operating nozzles. Once landed, the vehicle will conduct science and refueling operations for six days before hopping again. With the optimized design determined from the simulations conducted in this paper, 235.26 kg of nitrogen is collected and stored in a 300 K, 3000 psia tank. With these parameters, a potential hop distance of 39 km with an average specific impulse of 127.5 s is attained. A previous iteration of this vehicle did not include a heat exchanger, instead heating 100 kg of nitrogen to 300 K, only allowing the vehicle to hop 5 km and with a low specific impulse of 60 s. Thus, the addition of the heat exchanger component of the vehicle is shown to potentially double the specific impulse and quadruple the hop distance compared to the previous design.

Thomas E. O'Brien↗

Assemby, test, and launch operations for the Mars Exploration Rovers

In January of 2004, NASA's twin Mars rovers, Spirit and Opportunity, successfully landed on opposite sides of the Red Planet after a seven month Earth to Mars cruise period. Both vehicles have operated well beyond their 90 day primary mission design life requirements. The Assembly, Test, and Launch Operations (ATLO) program for these missions presented unique technical and schedule challenges to the team at the Jet Propulsion Laboratory (JPL). Among these challenges were a highly compressed schedule and late deliveries leading to extended double shift staffing, dual spacecraft operations requiring test program diversification and resource arbitration, multiple atypical test configurations for airbag/rocket landings and surface mobility testing, and verification of an exceptionally large number of separations, deployments, and mechanisms. This paper discusses the flight system test philosophies and approach, and presents lessons learned.

Assembly, Test, and Launch Operations (ATLO)↗

Mars Technology Rover with Arm-Mounted Percussive Coring Tool, Microimager, and Sample-Handling Encapsulation Containerization Subsystem

A report describes the PLuto (programmable logic) Mars Technology Rover, a mid-sized FIDO (field integrated design and operations) class rover with six fully drivable and steerable cleated wheels, a rocker-bogey suspension, a pan-tilt mast with panorama and navigation stereo camera pairs, forward and rear stereo hazcam pairs, internal avionics with motor drivers and CPU, and a 5-degrees-of-freedom robotic arm. The technology rover was integrated with an arm-mounted percussive coring tool, microimager, and sample handling encapsulation containerization subsystem (SHEC). The turret of the arm contains a percussive coring drill and microimager. The SHEC sample caching system mounted to the rover body contains coring bits, sample tubes, and sample plugs. The coring activities performed in the field provide valuable data on drilling conditions for NASA tasks developing and studying coring technology. Caching of samples using the SHEC system provide insight to NASA tasks investigating techniques to store core samples in the future.

Younse, Paulo J.↗

Distributed Operations for the Mars Exploration Rover Mission with the Science Activity Planner

Due to the length of the Mars Exploration Rover Mission, most scientists were unable to stay at the central operations facility at the Jet Propulsion Laboratory. This created a need for distributed operations software, in the form of the Distributed Science Activity Planner. The distributed architecture saved a considerable amount of money and increased the number of individuals who could be actively involved in the mission, contributing to its success.

collaboration↗

A Curious Year on Mars - Long-Term Thermal Trends for Mars Science Laboratory Rover's First Martian Year

By the time of this writing, Curiosity, the Mars Science Laboratory (MSL) Rover, has weathered four seasons in Gale Crater, just south of and approaching the foothills of the 5-km high Aeolis Mons, known as "Mount Sharp," at 4.59 deg south latitude. The mission design included a much broader latitude range of 30 deg north to 30 deg south constraining some of the Rover environmental requirements and operations. To date, Curiosity has relayed over 150 MB of thermal telemetry. Curiosity has relayed over 150 MB of thermal telemetry through four seasons. The trends and idiosyncrasies revealed through four seasons of telemetry from Mars are discussed. The better-characterized thermal environment allows for less conservatism in operational models and increases the amount of science data collection. Examples include: the elimination of overheating concerns for some cameras and the use of the previous sol's temperature telemetry along with the conservative soak temperature curve from the winter thermal model, to produce a custom heating prescription for the upcoming weeks thus increasing operation time and reducing heating times. This paper discusses the lessons learned for Rover operation as well as general idiosyncrasies discovered about the local environment-such as the effect of orientation on subsystem temperature variation, a regular morning and afternoon wind, ground and air microclimates with distinct temperature differences from other terrain, and how the Rover affects the local environment. This paper further documents and explains some of the interesting highs and lows of the temperature telemetry data as well as offers explanations for sudden temperature changes on board the Rover.

HRS↗

SafeMAP: Safe Multi-Agent Planning Framework Based on Dynamic Probabilistic Risk Assessment

This paper proposes a risk-aware framework for Safe Multi-Agent Planning (SafeMAP) that unifies disparate models for multi-agent systems in a Markovian process that allows for simultaneous system health monitoring, decision making under uncertainty, and multi-agent system collaboration. As operations beyond low earth orbit mature, there is an increased need for autonomous cyber-physical systems with onboard decision making capabilities. Multi-agent cyber-physical systems in particular offer the potential of increased efficiency, resiliency, and mission capabilities for future applications such as multi-rover terrain operations, distributed satellite operations, and management of smart lunar habitats. SafeMAP utilizes physics-based models of each agent and the relevant components, probability models of the environment and component operational states, and reward models for mission-specific objectives such as scientific task completion or resource consumption. The output of SafeMAP is a set of mission plans that satisfy the mission objective under specified risk/reward constraints. A readable interpretation of each of these generated mission plans is provided as an additional output. SafeMAP has been demonstrated on a simulated case study involving a four-rover system performing surface mapping operations and science tasks. Results of this paper demonstrate SafeMAP’s ability to generate explainable mission plans that satisfy the mission objective while minimizing risk under nominal and off-nominal conditions.

Mohammad Hejase↗