Search NASA⌕ Search

SEARCH · Search NASA

Results for “segmental dynamics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Ares I-X Launch Vehicle Modal Test Measurements and Data Quality Assessments

The Ares I-X modal test program consisted of three modal tests conducted at the Vehicle Assembly Building at NASA s Kennedy Space Center. The first test was performed on the 71-foot 53,000-pound top segment of the Ares I-X launch vehicle known as Super Stack 5 and the second test was performed on the 66-foot 146,000- pound middle segment known as Super Stack 1. For these tests, two 250 lb-peak electro-dynamic shakers were used to excite bending and shell modes with the test articles resting on the floor. The third modal test was performed on the 327-foot 1,800,000-pound Ares I-X launch vehicle mounted to the Mobile Launcher Platform. The excitation for this test consisted of four 1000+ lb-peak hydraulic shakers arranged to excite the vehicle s cantilevered bending modes. Because the frequencies of interest for these modal tests ranged from 0.02 to 30 Hz, high sensitivity capacitive accelerometers were used. Excitation techniques included impact, burst random, pure random, and force controlled sine sweep. This paper provides the test details for the companion papers covering the Ares I-X finite element model calibration process. Topics to be discussed include test setups, procedures, measurements, data quality assessments, and consistency of modal parameter estimates.

Templeton, Justin D.↗

ISS Microgravity Environment

The Microgravity performance assessment of the International Space Station (ISS) is comprised of a quasi-steady, structural dynamic and a vibro-acoustic analysis of the ISS assembly-complete vehicle configuration. The Boeing Houston (BHOU) Loads and Dynamics Team is responsible to verify compliance with the ISS System Specification (SSP 41000) and USOS Segment (SSP 41162) microgravity requirements. To verify the ISS environment, a series of accelerometers are on-board to monitor the current environment. This paper summarizes the results of the analysis that was performed for the Verification Analysis Cycle (VAC)-Assembly Complete (AC) and compares it to on-orbit acceleration values currently being reported. The analysis will include the predicted maximum and average environment on-board ISS during multiple activity scenarios

Laible, Michael R.↗

Evaluation of Multiple Flow Constrained Area Capacity Setting Methods for Collaborative Trajectory Options Program

The purpose of this study was to compare flow constrained area (FCA) capacity setting methods for Collaborative Trajectory Options Program (CTOP) as they pertain to the Integrated Demand Management (IDM) concept. IDM uses flow balancing to manage air traffic across multiple FCAs with a common downstream constraint, as well as constraints at the respective FCA locations. FCA capacity rates can be set manually, but generating capacities for multiple, interdependent FCAs could potentially over-burden a user. A new enhancement to CTOP called the FCA Balance Algorithm (FBA) was developed at NASA Ames Research Center to improve the process of allocating capacity across multiple flow constrained segments in the airspace. The FBA evaluates the predicted demand and capacity across multiple FCAs and dynamically generates capacity settings for the FCAs that best meet capacity limits for all identified constraints. In a human-in-the-loop simulation study, both manual and automated capacity setting methods were evaluated in terms of their overall feasibility using measures of system performance, human performance, and qualitative feedback. Subject matter experts were asked to use three different methods to allocate capacity to three FCAs, either (1) by manually setting capacity for every 60-minute time window, (2) by manually setting capacity for every 15-minute time window, or (3) by using the FBA capability to automatically generate capacity settings. Results showed no significant differences in terms of overall system performance, indicated by similar ground delay and airport throughput numbers between methods. However, differences in individual strategies afforded by the manual methods allowed some participants to achieve system-wide delay that was much lower than the average. The FBA was the fastest method of capacity setting, and it received the lowest subjective rating scores on physical task load, mental task load, task difficulty and task complexity out of the three methods. Finally, participants explained through qualitative feedback that there were many benefits to using the FBA, such as ease of use, accuracy, and low risk of human input error. Participants did not experience the same limitations with the FBA that they did with the manual methods, such as reduced accuracy in the 60-minute manual condition, or high complexity in the 15-minute/manual condition. These results suggest that the FBA automation enhancement to CTOP maintains system performance while improving human performance. Therefore, the FBA could be introduced as a way to mitigate operator workload while planning a CTOP.

NextGen↗

Evaluation of Multiple Flow Constrained Area Capacity Setting Methods for Collaborative Trajectory Options Program

The purpose of this study was to compare flow constrained area (FCA) capacity setting methods for Collaborative Trajectory Options Program (CTOP) as they pertain to the Integrated Demand Management (IDM) concept. IDM uses flow balancing to manage air traffic across multiple FCAs with a common downstream constraint, as well as constraints at the respective FCA locations. FCA capacity rates can be set manually, but generating capacities for multiple, interdependent FCAs could potentially over-burden a user. A new enhancement to CTOP called the FCA Balance Algorithm (FBA) was developed at NASA Ames Research Center to improve the process of allocating capacity across multiple flow constrained segments in the airspace. The FBA evaluates the predicted demand and capacity across multiple FCAs and dynamically generates capacity settings for the FCAs that best meet capacity limits for all identified constraints. In a human-in-the-loop simulation study, both manual and automated capacity setting methods were evaluated in terms of their overall feasibility using measures of system performance, human performance, and qualitative feedback. Subject matter experts were asked to use three different methods to allocate capacity to three FCAs, either (1) by manually setting capacity for every 60-minute time window, (2) by manually setting capacity for every 15-minute time window, or (3) by using the FBA capability to automatically generate capacity settings. Results showed no significant differences in terms of overall system performance, indicated by similar ground delay and airport throughput numbers between methods. However, differences in individual strategies afforded by the manual methods allowed some participants to achieve system-wide delay that was much lower than the average. The FBA was the fastest method of capacity setting, and it received the lowest subjective rating scores on physical task load, mental task load, task difficulty and task complexity out of the three methods. Finally, participants explained through qualitative feedback that there were many benefits to using the FBA, such as ease of use, accuracy, and low risk of human input error. Participants did not experience the same limitations with the FBA that they did with the manual methods, such as reduced accuracy in the 60-minute manual condition, or high complexity in the 15-minute/manual condition. These results suggest that the FBA automation enhancement to CTOP maintains system performance while improving human performance. Therefore, the FBA could be introduced as a way to mitigate operator workload while planning a CTOP.

NextGen↗

A Flight Replanning Tool for Terminal Area Urban Air Mobility Operations

In this presentation we describe and evaluate a flight replanning tool, called the trial planner, for terminal area air transport applications. The trial planner employs predefined airspace structures to generate rerouting options between vertiports. In a simplified definition, vertiports are facilities that provide services for managing the take-off and landing of autonomous or manned electric vertical take-off or landing (eVTOL) aircraft. The airspace structures involved in our test cases are arrival routes that consist of predefined entry points to which a transitional path is computed dynamically from the current position of the aircraft. Rerouting options include the transitional path and approach segment along the arrival route; these rerouting options are not vetted for potential conflicts with other operations until a human operator commits to a choice and forwards the flight plan modification for approval from an automated airspace management service. A selected rerouting option is executed by loading a flight plan file to the aircraft ground control station. We conducted a qualitative evaluation of the trial planner using ratings provided by flight crews and air transportation human factors experts with relevant experience from air traffic control. Evaluation criteria included trust in the route recommendations and adequate explanation for the route options. We detail the logic and implementation of the trial planner, as well as report the results of the evaluation of the implementation herein.

Trial planning↗

A comparison of neural network and fuzzy clustering techniques in segmenting magnetic resonance images of the brain

Magnetic resonance (MR) brain section images are segmented and then synthetically colored to give visual representations of the original data with three approaches: the literal and approximate fuzzy c-means unsupervised clustering algorithms and a supervised computational neural network, a dynamic multilayered perception trained with the cascade correlation learning algorithm. Initial clinical results are presented on both normal volunteers and selected patients with brain tumors surrounded by edema. Supervised and unsupervised segmentation techniques provide broadly similar results. Unsupervised fuzzy algorithms were visually observed to show better segmentation when compared with raw image data for volunteer studies. However, for a more complex segmentation problem with tumor/edema or cerebrospinal fluid boundary, where the tissues have similar MR relaxation behavior, inconsistency in rating among experts was observed.

Hall, Lawrence O.↗

Studies of aircraft differential maneuvering. Report 75-27: Calculating of differential-turning barrier surfaces. Report 75-26: A user's guide to the aircraft energy-turn and tandem-motion computer programs. Report 75-7: A user's guide to the aircraft energy-turn hodograph program

The numerical analysis of composite differential-turn trajectory pairs was studied for 'fast-evader' and 'neutral-evader' attitude dynamics idealization for attack aircraft. Transversality and generalized corner conditions are examined and the joining of trajectory segments discussed. A criterion is given for the screening of 'tandem-motion' trajectory segments. Main focus is upon the computation of barrier surfaces. Fortunately, from a computational viewpoint, the trajectory pairs defining these surfaces need not be calculated completely, the final subarc of multiple-subarc pairs not being required. Some calculations for pairs of example aircraft are presented. A computer program used to perform the calculations is included.

Kelley, H. J.↗

Development of a large space robot - A multi-segment approach. I

A concept of multisegment robot (of a class of large space cranes) is developed for use in space-based construction operations. The robot consists of a collection of segments, which are pinned together to form a snakelike configuration, with a single degree of freedom representing rotation being retained at each pinned connection and with reaction flywheels suspended within each segment for the control necessary to position each body segment. Algorithms are developed for positioning this serpentine robot to a prescribed location and orientation. A multibody dynamics simulation is used to investigate the behavior and interactions of the robot, demonstrating its viability.

Spanos, P. D.↗

Ares I-X Flight Test Vehicle: Stack 5 Modal Test

Ares I-X was the first flight test vehicle used in the development of NASA's Ares I crew launch vehicle. The Ares I-X used a 4-segment reusable solid rocket booster from the Space Shuttle heritage with mass simulators for the 5th segment, upper stage, crew module and launch abort system. Three modal tests were defined to verify the dynamic finite element model of the Ares I-X flight test vehicle. Test configurations included two partial stacks and the full Ares I-X flight test vehicle on the Mobile Launcher Platform. This report focuses on the first modal test that was performed on the top section of the vehicle referred to as Stack 5, which consisted of the spacecraft adapter, service module, crew module and launch abort system simulators. This report describes the test requirements, constraints, pre-test analysis, test operations and data analysis for the Ares I-X Stack 5 modal test.

Buehrle, Ralph D.↗

Adaptive structures for precision segmented optical systems

An adaptive structures approach for a large segmented optical system with a 20-meter primary reflector made of lightweight hexagonal composite panels is considered. This approach makes it possible to vary the static and dynamic characteristics of a structural system through actuators and sensors integrated within the structure. Topics discussed include quasi-static shape adjustment and active damping augmentation of the primary backup truss structure, deformable panels for long spatial wavelength quasi-static figure correction, and an on-orbit identification system for large segmented optical systems.

Chen, G.-S.↗

Overcoming Dynamic Disturbances in Imaging Systems

We develop and discuss a methodology with the potential to yield a significant reduction in complexity, cost, and risk of space-borne optical systems in the presence of dynamic disturbances. More robust systems almost certainly will be a result as well. Many future space-based and ground-based optical systems will employ optical control systems to enhance imaging performance. The goal of the optical control subsystem is to determine the wavefront aberrations and remove them. Ideally reducing an aberrated image of the object under investigation to a sufficiently clear (usually diffraction-limited) image. Control will likely be distributed over several elements. These elements may include telescope primary segments, telescope secondary, telescope tertiary, deformable mirror(s), fine steering mirror(s), etc. The last two elements, in particular, may have to provide dynamic control. These control subsystems may become elaborate indeed. But robust system performance will require evaluation of the image quality over a substantial range and in a dynamic environment. Candidate systems for improvement in the Earth Sciences Enterprise could include next generation Landsat systems or atmospheric sensors for dynamic imaging of individual, severe storms. The technology developed here could have a substantial impact on the development of new systems in the Space Science Enterprise; such as the Next Generation Space Telescope(NGST) and its follow-on the Next NGST. Large Interferometric Systems of non-zero field, such as Planet Finder and Submillimeter Probe of the Evolution of Cosmic Structure, could benefit. These systems most likely will contain large, flexible optomechanical structures subject to dynamic disturbance. Furthermore, large systems for high resolution imaging of planets or the sun from space may also benefit. Tactical and Strategic Defense systems will need to image very small targets as well and could benefit from the technology developed here. We discuss a novel speckle imaging technique with the potential to separate dynamic aberrations from static aberrations. Post-processing of a set of image data, using an algorithm based on this technique, should work for all but the lowest light levels and highest frequency dynamic environments. This technique may serve to reduce the complexity of the control system and provide for robust, fault-tolerant, reduced risk operation. For a given object, a short exposure image is "frozen" on the focal plane in the presence of the environmental disturbance (turbulence, jitter, etc.). A key factor is that this imaging data exhibits frame-to-frame linear shift invariance. Therefore, although the Point Spread Function is varying from frame to frame, the source is fixed; and each short exposure contains object spectrum data out to the diffraction limit of the imaging system. This novel speckle imaging technique uses the Knox-Thompson method. The magnitude of the complex object spectrum is straightforward to determine by well-established approaches. The phase of the complex object spectrum is decomposed into two parts. One is a single-valued function determined by the divergence of the optical phase gradient. The other is a multi-valued function determined by the circulation of the optical phase gradient-"hidden phase." Finite difference equations are developed for the phase. The novelty of this approach is captured in the inclusion of this "hidden phase." This technique allows the diffraction-limited reconstruction of the object from the ensemble of short exposure frames while simultaneously estimating the phase as a function of time from a set of exposures.

Young, Eric W.↗

Overcoming Dynamic Disturbances in Imaging Systems

We develop and discuss a methodology with the potential to yield a significant reduction in complexity, cost, and risk of space-borne optical systems in the presence of dynamic disturbances. More robust systems almost certainly will be a result as well. Many future space-based and ground-based optical systems will employ optical control systems to enhance imaging performance. The goal of the optical control subsystem is to determine the wavefront aberrations and remove them. Ideally reducing an aberrated image of the object under investigation to a sufficiently clear (usually diffraction-limited) image. Control will likely be distributed over several elements. These elements may include telescope primary segments, telescope secondary, telescope tertiary, deformable mirror(s), fine steering mirror(s), etc. The last two elements, in particular, may have to provide dynamic control. These control subsystems may become elaborate indeed. But robust system performance will require evaluation of the image quality over a substantial range and in a dynamic environment. Candidate systems for improvement in the Earth Sciences Enterprise could include next generation Landsat systems or atmospheric sensors for dynamic imaging of individual, severe storms. The technology developed here could have a substantial impact on the development of new systems in the Space Science Enterprise; such as the Next Generation Space Telescope(NGST) and its follow-on the Next NGST. Large Interferometric Systems of non-zero field, such as Planet Finder and Submillimeter Probe of the Evolution of Cosmic Structure, could benefit. These systems most likely will contain large, flexible optormechanical structures subject to dynamic disturbance. Furthermore, large systems for high resolution imaging of planets or the sun from space may also benefit. Tactical and Strategic Defense systems will need to image very small targets as well and could benefit from the technology developed here. We discuss a novel speckle imaging technique with the potential to separate dynamic aberrations from static aberrations. Post-processing of a set of image data, using an algorithm based on this technique, should work for all but the lowest light levels and highest frequency dynamic environments. This technique may serve to reduce the complexity of the control system and provide for robust, fault-tolerant, reduced risk operation. For a given object, a short exposure image is "frozen" on the focal plane in the presence of the environmental disturbance (turbulence, jitter, etc.). A key factor is that this imaging data exhibits frame-to-frame linear shift invariance. Therefore, although the Point Spread Function is varying from frame to frame, the source is fixed; and each short exposure contains object spectrum data out to the diffraction limit of the imaging system. This novel speckle imaging technique uses the Knox-Thompson method. The magnitude of the complex object spectrum is straightforward to determine by well-established approaches. The phase of the complex object spectrum is decomposed into two parts. One is a single-valued function determined by the divergence of the optical phase gradient. The other is a multi-valued function determined by, the circulation of the optical phase gradient-"hidden phase." Finite difference equations are developed for the phase. The novelty of this approach is captured in the inclusion of this "hidden phase." This technique allows the diffraction-limited reconstruction of the object from the ensemble of short exposure frames while simultaneously estimating the phase as a function of time from a set of exposures.

Young, Eric W.↗

Figure control concepts for segmented reflector telescopes

Control analysis activities related to the development of figure control technologies for large space telescopes with precision segmented actively controlled primary reflectors are reviewed. The Precision Segmented Reflector (PSR) configuration is described along with the development and use of the PSR models. Geometric and dynamic models, characterization of figure estimation errors and optimal sensor placement, and the development of quasi-static and dynamic control concepts are outlined. The structure of a quasi-static controller is presented, that utilizes edge sensor measurements to estimate displacement errors at the actuator level and generates figure correction commands. The second approach considers decentralization of the reflector system at the panel level, while the third considers decentralization at the actuator level.

Boussalis, D.↗

Cabin Air Quality Dynamics On Board the International Space Station

Spacecraft cabin air quality is influenced by a variety of factors. Beyond normal equipment offgassing and crew metabolic loads, the vehicle s operational configuration contributes significantly to overall air quality. Leaks from system equipment and payload facilities, operational status of the atmospheric scrubbing systems, and the introduction of new equipment and modules to the vehicle all influence air quality. The dynamics associated with changes in the International Space Station's (ISS) configuration since the launch of the U.S. Segment s laboratory module, Destiny, is summarized. Key classes of trace chemical contaminants that are important to crew health and equipment performance are emphasized. The temporary effects associated with attaching each multi-purpose logistics module (MPLM) to the ISS and influence of in-flight air quality on the post-flight ground processing of the MPLM are explored.

Perry, J. L.↗

Tracking capability for entry, descent and landing and its support to NASA Mars Exploration Rovers

This paper described a new capability recently deployed in the NASA Deep Space Network to support the entry, descent and landing of the two Mars Exploration Rovers - Spirit and Opportunity. This final segment of a 7-month journey was critical step in enabling successful mission operation. The EDL Data Analysis (EDA) equipment processed the open loop recording samples from the existing radio science receivers, extracted the MFSK-modulated tones, and provided information on the occurrence of associated events happened onboard spacecraft. The EDA software supported real-time as well as post pass processing. The design flexibility allowed the track to be divided into different segments, each could be processed with a configuration optimized for its signal conditions and uncertainties. The use of dynamic lock state concept enabled signal detection be done with minimum required computing power - less was spent when signal was steadily detected and more when signal fluctuated. With the server-client design, the EDA supported connections to different remote operation centers for monitor purpose. The paper also presented the field results from both Spirit and Opportunity landings. The detection were much better than anticipated. All critical event tones were seen in real time. Surprising detection of LCP signal was found with Spirit landing, resulted in a reconfiguration for Opportunity landing to maximize signal detection.

tracking↗

Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

Reduced gravity multibody dynamics testing

The Final Report on reduced gravity multibody dynamics testing is presented. Tests were conducted on board the NASA KC-135 RGA in Houston, Texas. The objective was to analyze the effects of large angle rotations on flexible, multi-segmented structures. The flight experiment was conducted to provide data which will be compared to the data gathered from ground tests of the same configurations. The flight and ground tested data will be used to validate the TREETOPS software, software which models dynamic multibody systems, and other multibody codes. The flight experiment consisted of seven complete flights on board the KC-135 RGA during two one-week periods. The first period of testing was 4-9 Apr. 1993. The second period of testing was 13-18 Jun. 1993.

Sillanpaa, Meija↗