Search NASA⌕ Search

SEARCH · Search NASA

Results for “simulation facilities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Man-Vehicle Systems Research Facility - Design and operating characteristics

This paper describes the full-mission flight simulation facility at the NASA Ames Research Center. The Man-Vehicle Systems Research Facility (MVSRF) supports aeronautical human factors research and consists of two full-mission flight simulators and an air-traffic-control simulator. The facility is used for a broad range of human factors research in both conventional and advanced aviation systems. The objectives of the research are to improve the understanding of the causes and effects of human errors in aviation operations, and to limit their occurrence. The facility is used to: (1) develop fundamental analytical expressions of the functional performance characteristics of aircraft flight crews; (2) formulate principles and design criteria for aviation environments; (3) evaluate the integration of subsystems in contemporary flight and air traffic control scenarios; and (4) develop training and simulation technologies.

Shiner, Robert J.↗

Effects of helicopter noise and vibration on pilot performance (as measured in a fixed-base flight simulator)

The effects of noise and vibration on pilot performance are described. Pilot subjects were required to fly VTOL commercial IFR schedules using the computer simulation facilities. The routes flown simulated closely metropolitan routes flown currently by a helicopter airline. The duration of simulator flights ranged from 3 to 8 hours. Subjects were exposed to noise sound pressure levels ranging from 74dB (ambient) to 100dB and 17 Hz vibration stimuli ranging from .1 g to .3 g measured at the floor directly beneath the pilot's seat. Despite subject reports of extreme fatigue in these long flights, performance did not degrade. A curve of performance shows a slow improvement for the first three hours of exposure and a slight loss in performance during the remainder of the flight. As environmental stress conditions (noise, vibration, and time in the simulator) increased, subject performance improved. Within the limits of this study, the higher the stress the better the performance.

Stave, A. M.↗

The NASA Langley building solar project and the supporting Lewis solar technology program

A solar energy technology program is described that includes solar collector testing in an indoor solar simulator facility and in an outdoor test facility, property measurements of solar panel coatings, and operation of a laboratory-scale solar model system test facility. Early results from simulator tests indicate that non-selective coatings behave more nearly in accord with predicted performance than do selective coatings. Initial experiments on the decay rate of thermally stratified hot water in a storage tank have been run. Results suggest that where high temperature water is required, excess solar energy collected by a building solar system should be stored overnight in the form of chilled water rather than hot water.

Ragsdale, R. G.↗

The SCEPTRE facility: Improved simulation of the space environment through the application of advanced technology

SCEPTRE (Space Combined Effects Primary Test Research Equipment) is the Air Force Materials Laboratory's primary device for performance testing of spacecraft thermal control materials. It has been undergoing a major upgrade in the last two years aimed at making it capable of simulating the synergistic effects of vacuum, ultraviolet radiation, and electron radiation. In the course of this work, a number of advances have been made in the areas of computer data processing, solar simulation, and the analysis of test results.

Ruley, J. D.↗

Real-time simulation for Space Station

Development of a new Space Station simulation designed to provide long-term support to the Space Station Program is well under way. A description of the two Engineering Directorate simulation facilities, the Systems Engineering Simulator and the Shuttle Avionics Integration Laboratory, is presented. The function of each in support of the Space Shuttle Program is discussed, with emphasis on functions applicable to Space Station. The function of the Systems Engineering Simulator in Space Station development is described. Finally, a comprehensive and detailed description of the new Space Station simulation under development on the System Engineering Simulator is presented.

St. John, Robert H.↗

Life sciences utilization of Space Station Freedom

Space Station Freedom will provide the United States' first permanently manned laboratory in space. It will allow, for the first time, long term systematic life sciences investigations in microgravity. This presentation provides a top-level overview of the planned utilization of Space Station Freedom by NASA's Life Sciences Division. The historical drivers for conducting life sciences research on a permanently manned laboratory in space as well as the advantages that a space station platform provides for life sciences research are discussed. This background information leads into a description of NASA's strategy for having a fully operational International Life Sciences Research Facility by the year 2000. Achieving this capability requires the development of the five discipline focused 'common core' facilities. Once developed, these facilities will be brought to the space station during the Man-Tended Capability phase, checked out and brought into operation. Their delivery must be integrated with the Space Station Freedom manifest. At the beginning of Permanent Manned Capability, the infrastructure is expected to be completed and the Life Sciences Division's SSF Program will become fully operational. A brief facility description, anticipated launch date and a focused objective is provided for each of the life sciences facilities, including the Biomedical Monitoring and Countermeasures (BMAC) Facility, Gravitational Biology Facility (GBF), Gas Grain Simulation Facility (GGSF), Centrifuge Facility (CF), and Controlled Ecological Life Support System (CELSS) Test Facility. In addition, hardware developed by other NASA organizations and the SSF International Partners for an International Life Sciences Research Facility is also discussed.

Chambers, Lawrence P.↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed– A Robotic Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, a 3-axis robotic positioning system, and a regolith bin. For the REACT project, a pellet extruder and feed hopper have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

Moon↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed – A Robotic Excavation and Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior to surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, 3-axis robotic positioning system, and regolith bin. For the REACT project, a pellet extruder, feed hopper, and heated 600mm x 600mm (23.6x23.6in) build plate have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

regolith↗

Development of the Advanced Regolith Ground Operations (ARGO) Test Bed: A Robotic Excavation and Construction Test Facility with Simulated Lunar Environments

NASA’s Artemis Program is working towards developing a sustained presence on the Moon and eventually Mars. To achieve this goal, robotic excavation, site preparation and construction technologies are under development to establish the capability to construct infrastructure such as launch/landing pads and radiation protection shelters. Technologies must be proven in simulated Lunar conditions prior to surface demonstration missions. To that end, the Relevant Additive Construction Technology (REACT) Announcement of Collaboration Opportunities (ACO) project with AI Space Factory and the NASA Kennedy Space Center’s (KSC) Granular Mechanics and Regolith Operations Laboratory (a.k.a. Swamp Works) has developed the Advanced Regolith Ground Operations (ARGO) Test Bed. ARGO includes a ~1.5m x 1.5m x 1.2m (~5x5x4ft) vacuum chamber, cryogenically cooled thermal shroud, 3-axis robotic positioning system, and regolith bin. For the REACT project, a pellet extruder, feed hopper, and heated 600mm x 600mm (23.6x23.6in) build plate have been installed on ARGO to advance the Technology Readiness Level (TRL) of regolith-polymer composite Fused Deposition Modeling (FDM) additive construction systems, processes, and materials. This paper will focus on the design and operational characteristics of the ARGO Test Bed with pellet extruder.

regolith↗

2011 Highlights: Advanced Simulation Research at NASA Ames

The Simulation Laboratories (SimLabs) at NASA Ames support a wide range of research in aerospace vehicles, aerospace systems and operations, human factors, and aviation safety. Our state-of-the-art simulation facilities are available to develop your future concepts and technologies.

simulation research↗

Global crop production forecasting - A simulation analysis of the data system problems and their solutions

Alternative data systems for a global crop production forecasting system were studied with the aid of a unique simulation facility called the Data System Dynamic Simulator (DSDS). Information system requirements were determined and compared with existing and planned data systems, and deficiencies were identified and analyzed. A first step was to determine the data load for an operational global crop production forecasting system as a function of data frequency, crop types, biophases, cloud coverage, and number of satellites. The DSDS was used to correlate the interrelated influence of orbital parameters, crop calendars, and cloud conditions to generate global data loading profiles. Some of the more important conclusions and the main features of the simulation system are presented.

Golden, H.↗

Conceptual design study for an advanced cab and visual system, volume 2

The performance, design, construction and testing requirements are defined for developing an advanced cab and visual system. The rotorcraft system integration simulator is composed of the advanced cab and visual system and the rotorcraft system motion generator, and is part of an existing simulation facility. User's applications for the simulator include rotorcraft design development, product improvement, threat assessment, and accident investigation.

Rue, R. J.↗

Simulation for STS flight crew training

Training activities for flights of the Space Shuttle Orbiter are performed in the most complicated flight simulation facility yet assembled. The Shuttle Mission Simulator (SMS) provides training for the entire mission from prelaunch to postlanding. An extensive pilot-cues environment is provided in which visual, aural, and motion cues are presented. The planning and execution of training on the simulator must take into account the complexity of the Shuttle systems, the complexity of the procedures and crew interface on the Shuttle, and the complexity of the mission, itself. The major points of this training program are highlighted.

Hughes, F. E.↗

SIMULATION AND TRAINING FACILITIES

As we move toward future manned spaceflight programs, there will be brought into playa broad range of training and simulation facilities in NASA, other government agencies, and private industry. We use the term "facility" in the broadest sense-from an airplane pressed into use for zero-gravity familiarization to a large moving-base simulator housed in its own permanent building.

SIMULATION↗

Investigation of the effects of bandwidth and time delay on helicopter roll-axis handling qualities

Several years of cooperative research conducted under the U.S./German Memorandum of Understanding (MOU) in helicopter flight control has recently resulted in a successful handling qualities study. The focus of this cooperative research has been the effects on handling qualities due to time delays in combination with a high bandwidth vehicle. The jointly performed study included the use of U.S. ground-based simulation and German in-flight simulation facilities. The NASA-Ames Vertical Motion Simulator (VMS) was used to develop a high bandwidth slalom tracking task which took into consideration the constraints of the facilities. The VMS was also used to define a range of the test parameters and to perform initial handling qualities evaluations. The flight tests were conducted using DLR's variable-stability BO 105 S3 Advanced Technology Testing Helicopter System (ATTHeS). Configurations included a rate command and an attitude command response system with added time delays up to 160 milliseconds over the baseline and bandwidth values between 1.5 and 4.5 rad/sec. Sixty-six evaluations were performed in about 25 hours of flight time during ten days of testing. The results indicate a need to more tightly constrain the allowable roll axis phase delay for the Level 1 and Level 2 requirements in the U.S. Army's specification for helicopter handling qualities, ADS-33C.

Pausder, Heinz-Juergen↗

Investigation of the effects of bandwidth and time delay on helicopter roll-axis handling qualities

Several years of cooperative research conducted under the U.S./German Memorandum of Understanding (MOU) in helicopter flight control has recently resulted in a successful handling qualities study. The focus of this cooperative research has been the effects on handling qualities due to time delays in combination with a high bandwidth vehicle. The jointly performed study included the use of U.S. ground-based simulation and German in-flight simulation facilities. The NASA-Ames Vertical Motion Simulator (VMS) was used to develop a high bandwidth slalom tracking task which took into consideration the constraints of the facilities. The VMS was also used to define a range of the test parameters and to perform initial handling qualities evaluations. The flight tests were conducted using DLR's variable-stability BO 105 S3 Advanced Technology Testing Helicopter System (ATTHeS). Configurations included a rate command and an attitude command response system with added time delays up to 160 milliseconds over the baseline and bandwidth values between 1.5 and 4.5 rad/sec. Sixty-six evaluations were performed in about 25 hr of flight time during 10 days of testing. The results indicate a need to more tightly constrain the allowable roll axis phase delay for the Level 1 and Level 2 requirements in the U.S. Army's specification for helicopter handling qualities, ADS-33C.

Pausder, Heinz-Juergen↗