Development of Design for the STS Extraction Magnet System

The Oak Ridge National Laboratory STS Project will enhance the Spallation Neutron Source by adding a new neutron source. The upgrade includes a 30% increase in beam energy and a 50% boost in beam current, doubling the accelerator's power capability to 2.8 MW. The Ring-to-Second-Target Beam Transport (RTST) system is vital in directing high-energy proton beams to the new second target station. New magnets have to fit into a restricted space within the existing beamline to add the new extraction line. New, fast kicker magnets (Pulsed Dipole), a focusing quad with an aperture for both beamlines (Large Quad) and the replacement of existing 21Q40 Quads with 'Narrow Quads' having identical fields as the existing design are Fermilab's responsibility. The design of these magnets poses unique challenges, as in addition to the high requirements on the quality of magnetic fields, they are subject to major restrictions related to their dimensions.

Chernenok, V. [Fermilab] (ORCID:0009000778148215)↗

Slow control and monitoring system at the JSNS 2

The Sterile Neutrino Search at the J-PARC Spallation Neutron Source (JSNS$^2$) experiment aims to search for sterile neutrino oscillations using a neutrino beam from muon decays at rest. The JSNS$^2$ detector contains 17 tons of 0.1$\%$ gadolinium (Gd) loaded liquid scintillator (LS) as a neutrino target. Detector construction was completed in the spring of 2020. A slow control and monitoring system (SCMS) was implemented for reliable control and quick monitoring of the detector operational status and environmental conditions. It issues an alarm if any of the monitored parameters exceed a preset acceptable range. The SCMS monitors the high voltage of the photomultiplier tubes, the LS level in the detector, possible LS overflow and leakage, the temperature and air pressure in the detector, the humidity of the experimental hall, and the LS flow rate during filling and extraction. An initial 10 days of data-taking with a neutrino beam was done following a successful commissioning of the detector and SCMS in 2020 June. In this paper, we present a description of the assembly and installation of the SCMS and its performance.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

A Compact Gas Liquid Separator for the Spallation Neutron Source Mercury Process Loop

Upgrades at the spallation neutron source (SNS) accelerator at Oak Ridge National Laboratory are underway to double its proton beam power from 1.4 to 2.8 MW. About 2 MW will go to the current first station while the rest will go to the future Second Target Station. The increase of beam power to the first target station is especially challenging for its mercury target. When the short proton beam hits the target, strong pressure waves are generated, causing cavitation erosion and challenging stresses for the target's weld regions. SNS has successfully operated reliably at 1.4 MW by mitigating the pressure wave with the injection of small Helium bubbles into the mercury. To operate reliably at 2 MW, more gas will be injected into mercury to mitigate the pressure wave further. However, the mercury process loop was not originally designed for gas injection, and the accumulation of gas in the pipes is a concern. Due to space constraints, a custom gas liquid separator (GLS) was designed to fit a 90-deg horizontal elbow space in the SNS mercury loop. Simulations and experiments were performed, and a successful design was developed that has the desired efficiency while keeping the pressure losses acceptable.

42 ENGINEERING↗

Comparison of the Neutronic Performance of IRP-1 and IRP-2 at SNS

The Spallation Neutron Source (SNS) operated from start-up, in May 2006, through December, 2017 before replacing the Inner Reflector Plug (IRP). This component is the most costly and time-consuming “regular maintenance” replacement foreseen in the operation of the First Target Station (FTS). The IRP includes beryllium reflector blocks, steel and aluminum support structures, aluminum moderator vessels (which in turn include gadolinium and cadmium neutron poisons) and water coolant systems. The lifetime of this multi-million dollar component is driven by poison and decoupler burnup in moderator vessels. The moderators include these neutron poisons to best match neutron beam performance with scattering instrument needs. The burnup that comes with use changes the performance of the moderators until they no longer server their intended purpose. The reasonable desire to maximize the IRP lifetime means that the moderator performance at the Beginning Of Life (BOL) is significantly “over poisoned” and different from the performance at moderator End Of Life (EOL). Upon installation of the second IRP article, IRP-2, the SNS Neutronics team characterized the performance of the neutron beamlines in order to assess the differences between them, primarily by comparing the EOL performance of IRP-1 to the BOL performance of IRP-2. While IRP-2 was largely similar to IRP-1 in its conceptual design, there were some differences in the specific design of IRP-2 to support enhanced manufacturability, and the change from IPR-1 to IRP-2 coincided with the replacement of the light water in the IRP cooling loop with heavy water, as had been intended in the SNS design but not implemented during construction because of heavy water availability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Control System Plans for SNS Upgrade Projects

The Spallation Neutron Source at Oak Ridge National Laboratory is planning two major upgrades to the facility. The Proton Power Upgrade project, currently underway, will double the machine power from 1.4 to 2.8 MW by adding seven additional cryomodules and associated equipment. The Second Target Station project, currently in conceptual design, will construct a new target station effectively doubling the potential scientific output of the facility. This paper discusses the control system upgrades required to integrate these projects into the existing EPICS based control systems used for the machine and neutron instrument beamlines. While much of the control system can be replicated from existing solutions, some systems require new hardware and software. Operating two target stations simultaneously will require a new run permit system to safely manage beam delivery.

Hartman, Steven↗

An Operationally Integrated Approach to the SNS 2.8 MW Power Upgrade

The SNS accelerator consist of a 1 GeV H⁻ linac and an accumulator ring producing a 1.4 MW pulsed proton beam which drives a spallation neutron source. The Proton Power Upgrade project will double the power capability from 1.4 to 2.8 MW by increasing the linac energy 30% and the beam current about 50%. Equipment upgrades include new superconducting RF cryomodules and supporting RF equipment, upgraded ring equipment, and upgraded high power target systems. An important aspect of the upgrade is a gradual power ramp-up starting in 2022 in which new equipment is installed during maintenance outages as it arrives.

Galambos, John D↗

Monitoring the SNS basement neutron background with the MARS detector

Here, we present the analysis and results of the first dataset collected with the MARS neutron detector deployed at the Oak Ridge National Laboratory Spallation Neutron Source (SNS) for the purpose of monitoring and characterizing the beam-related neutron (BRN) background for the COHERENT collaboration. MARS was positioned next to the COH-CsI coherent elastic neutrino-nucleus scattering detector in the SNS basement corridor. This is the basement location of closest proximity to the SNS target and thus, of highest neutrino flux, but it is also well shielded from the BRN flux by infill concrete and gravel. Furthermore, these data show the detector registered roughly one BRN per day. Using MARS' measured detection efficiency, the incoming BRN flux is estimated to be 1.20 ± 0.56 neutrons/m 2 /MWh for neutron energies above ~3.5 MeV and up to a few tens of MeV. We compare our results with previous BRN measurements in the SNS basement corridor reported by other neutron detectors.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Integrated edge-to-exascale workflow for real-time steering in neutron scattering experiments

We introduce a computational framework that integrates artificial intelligence (AI), machine learning, and high-performance computing to enable real-time steering of neutron scattering experiments using an edge-to-exascale workflow. Focusing on time-of-flight neutron event data at the Spallation Neutron Source, our approach combines temporal processing of four-dimensional neutron event data with predictive modeling for multidimensional crystallography. At the core of this workflow is the Temporal Fusion Transformer model, which provides voxel-level precision in predicting 3D neutron scattering patterns. The system incorporates edge computing for rapid data preprocessing and exascale computing via the Frontier supercomputer for large-scale AI model training, enabling adaptive, data-driven decisions during experiments. This framework optimizes neutron beam time, improves experimental accuracy, and lays the foundation for automation in neutron scattering. Although real-time experiment steering is still in the proof-of-concept stage, the demonstrated potential of this system offers a substantial reduction in data processing time from hours to minutes via distributed training, and significant improvements in model accuracy, setting the stage for widespread adoption across neutron scattering facilities and more efficient exploration of complex material systems.

97 MATHEMATICS AND COMPUTING↗

Multi-scale structural analysis of swift heavy ion-irradiated ZrO 2 and HfO 2

The radiation-induced monoclinic-to-tetragonal phase transition in ZrO 2 and HfO 2 has been the subject of many investigations, but the transformation pathways and underlying structural mechanisms are still not well understood. In this study, microcrystalline powder samples of ZrO 2 and HfO 2 were irradiated with 946 MeV and 1470 MeV Au ions to a wide fluence range up to 3 × 10 13 ions/cm 2 . To characterize beam-induced structural modifications across all spatial length scales, complementary experimental techniques such as synchrotron X-ray diffraction and spallation neutron total scattering were used. The phase evolution of the tetragonal polymorph with increasing ion fluence is accurately described by a heterogeneous track-overlap model that incorporates both direct- and double-impact processes. These damage accumulation processes are an expression of a core-shell ion track morphology that depends on irradiation conditions and target material. Neutron pair distribution function analysis revealed that ion-beam-induced tetragonal ZrO 2 is merely a configurational average of short-range orthorhombic (Pbcn) domains stabilized by a dense network of domain walls. Furthermore, this knowledge is critical for a better understanding of how crystalline-to-crystalline phase transformations proceed at the atomic scale under extreme conditions.

Monoclinic-to-tetragonal phase transformation↗

Modeling the Interaction of Laser-Produced Proton Beams with Matter

A major goal of this project is to significantly increase our understanding of isochoric heating of matter using laser produced proton beams, and the associated high energy density (HED) and warm dense matter (WDM) regimes generated. This will benefit research fields such as planetary science, fusion energy, plasma physics, and material science. For example, it will enhance our understanding of WDM properties of iron and silica under conditions encountered in planetary interiors and diagnostic components in fusion devices exposed to high fluxes of energetic plasma ions. The project is motivated by recent experiments that irradiated Si targets with proton beams generated by the 20 TW-laser at the SLAC MEC end-station. The HED/WDM states are probed using the 50 fs hard X-rays available in the 3rd harmonic of the LCLS. As part of this project, results from the phase contrast X-ray imaging, which shows the generation of compression waves that produces rear surface spallation, are compared with results from the 3D multi-physics multi- material code, PISALE, that combines Arbitrary Lagrangian-Eulerian (ALE) hydrodynamics with Adaptive Mesh Refinement (AMR). This comparison required modifications to several physics models in the PISALE (Pacific Island Structured-AMR with ALE) code. An important aspect of this project is the continued training of graduate students in HED physics and in conducting complex multiphysics simulations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Helium Degassing Filter for Mercury Process Gas Liquid Separator

Testing was conducted to find a suitable filter to help separate helium gas from the Spallation Neutron Source’s mercury process loop. This filter is proposed for installation on the gas-liquid separator (GLS) vent line to prevent a column of liquid mercury from flowing outside of the process loop shielding in the service bay. The filter’s desired properties are to prevent the passage of liquid mercury, provide minimal resistance to helium flow, resist radiation, operate for the lifetime of the target, be replaceable, and have a reliable construction. Testing concluded that the Mott Corporation POU-10-S series of filters provided the best performance available. The filters could stop most liquid mercury passage while allowing helium passage at nominal pressures above the GLS in standard conditions. This result has several implications for the design of the GLS vent system.

Weinmeister, Justin↗

Python-EPICS RF Conditioning Automatic Control System at the Spallation Neutron Source

The RF Test Facility (RFTF) at the Spallation Neutron Source (SNS) is used for the conditioning of RF compo-nents such as ceramic vacuum windows and power cou-plers prior to their installation in the H- ion linear accel-erator. This process exposes components to high-power RF fields and thermal cycling to improve performance and remove surface impurities. To automate and optimize this process, a Python-based EPICS control system was developed alongside targeted hardware upgrades. The system enables real-time monitoring and control of RF power levels, temperature, and vacuum pressure. A user-friendly graphical interface was implemented using CS-Studio (Phoebus), allowing operators to adjust parameters and collect data efficiently. The system integrates a High-Power Protection Module (HPM) for interlocks based on vacuum and arc detection, ensuring safe operation. These upgrades have significantly improved the efficiency, accuracy, and safety of RF conditioning at the SNS RFTF. This paper describes the updated RF conditioning sys-tem, highlighting the software and hardware develop-ments and their application in support of the Proton Pow-er Upgrade (PPU) project.

Lee, Sung-Woo [ORNL] (ORCID:000000030915835X)↗

Coupled beam-target-moderator optimization for the Second Target Station

To support the design of the Second Target Station, that aims to provide the world’s highest peak brightness of cold neutrons, studies that optimize the dimensions of the target and moderators are invaluable. In this work, we investigate the influence of the target dimensions and beam profile on the performance and optimal size of the moderators. We perform optimization runs with detailed MCNP6.2 simulations using high-fidelity unstructured mesh geometries generated from parametrized CAD models. We demonstrate that small changes in target height do not influence the moderator performance if the beam dimensions are chosen adequately. We quantify the effect of beam footprint and target width on the moderator performance and show that the optimal moderator dimensions are insensitive to limited changes in target and beam profile.

Dakota↗

Rapid dissolution without elemental fractionation by laser driven hydrothermal processing

Traditional dissolution of geologic samples often requires a significant time investment. Here, we present an alternative method for the dissolution of geologic materials using laser-driven hydrothermal processing (LDHP). LDHP uses laser energy directed onto a submerged sample, which increases the temperature and pressure at the liquid–sample interface and drives the hydrothermal dissolution coupled with photomechanical spallation, an ablative process. This uses focused 527 nm laser energy at 40 W average power, 1 kHz pulse repetition rate, and 115 ns pulse duration. Importantly, when LDHP is performed on basalt geostandards (BCR-2 and BHVO-2) using the conditions outlined, we show that LDHP does not produce significant elemental fractionation and, thus, can be considered an alternative processing method to traditional mechanical crushing and acid digestion. Additionally, it is possible using LDHP to utilize the spatially confined beam to target and selectively isolate individual phases in a rock, potentially alleviating the need for mechanical separation of inclusions that are difficult to physically isolate. Furthermore, using this outlined method of LDHP, we demonstrate full dissolution of 120 mg of obsidian in 85 minu, meaning that LDHP is a potentially very useful method when sample processing is time sensitive.

58 GEOSCIENCES↗