Search NASA⌕ Search

SEARCH · Search NASA

Results for “system adequacy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

161 records · Page 9

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada, (Rev.0, with ROTC 1)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site (formerly, the Nevada Test Site): 25-41-03, EMAD Facility; 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV); and 25-33-05, Building 3901, Engine Transport System Maintenance Building. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the SAFER Plan, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report will be prepared and submitted to NDEP for review and approval. The schedule for completion of the closure report will be established at the FFACO annual meeting.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: • 25-41-03, EMAD Facility (Building 3900) • 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV) • 25-33-05, Building 3901, Engine Transport System Maintenance Building (Train Shed) This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the conceptual site model, such as an unanticipated release, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report (CR) will be prepared and submitted to NDEP for review and approval. The schedule for completion of the CR will be established in consultation with NDEP.

54 ENVIRONMENTAL SCIENCES↗

Planning and Operations in Electricity Markets Under System Tansformation: Key Findings

This report summarizes a set of key findings that have been developed through a set of interconnected research activities performed by five institutions between January 2020 and December 2023. The project team, comprising Argonne National Laboratory, the National Renewable Energy Laboratory, Lawrence Berkeley National Laboratory, the Electric Power Research Institute, and Johns Hopkins University, collective engaged with the North American Independent System Operators and Regional Transmission Operators (ISO/RTOs) to identify the key challenges they are facing and opportunities for the project team to provide technical assistance in several prioritized challenge areas.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PR100 One-Year Progress Summary Report: Preliminary Modeling Results and High-Resolution Solar and Wind Data Sets

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a 2-year study by the U.S. Department of Energy's (DOE's) Grid Deployment Office and six national laboratories to comprehensively analyze stakeholder-driven pathways to Puerto Rico's clean energy future. In Year 1 of the study, the PR100 team rigorously modeled and analyzed scenarios that meet Puerto Rico's renewable energy targets and achieve short-term recovery goals and long-term energy resilience. This report, which summarizes PR100 progress in Year 1, provides considerations that can inform potential funding and implementation decisions by key federal and local agencies and stakeholders. The summary report follows the publication in July 2022 of a PR100 Six-Month Progress Update (in English and Spanish), as well as public webinars in February 2022 to kick off the study and in July 2022 to present the 6-month update. A final written report and web-based visuals will be published in late 2023. All publications and public events associated with the study will be available in Spanish and English. This report is also available in Spanish https://www.nrel.gov/docs/fy23osti/85144.pdf.

100%↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Respirator Cartridge Performance on Mixed Vapors from Hanford Tank Headspaces and Exhausters - 20427

Between 2016 and 2018, the Hanford Tank Operations Contractor - Washington River Protection Solutions (WRPS) - conducted a series of tests of air-purifying respirator (APR) chemical cartridges commonly used at Hanford tank farms to determine the period of time for which the cartridges would provide adequate performance when used in APRs and powered-air-purifying respirators (PAPRs) to protect workers when exposed to a mixture of vapors exiting tank headspaces. Although cartridge manufacturers provide service life estimating tools for individual chemical compounds, the projected performance of these cartridges on complex vapor mixtures is not available, and the adequacy of APRs for tank farm applications represents an important workforce concern. The Occupational Safety and Health Administration identifies cartridge testing as a valid approach for establishing cartridge service life. The primary function of the WRPS Cartridge Test Program was to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford tank farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis of and recommendations based on respirator cartridge performance. A total of 28 APR and 10 PAPR cartridge tests were conducted between 2016 and 2018 on 12 different tank headspaces and tank farm exhauster slipstreams. Two APR cartridges from SCOTT (now 3M) and two PAPR cartridges from MSA Safety, Inc. and 3M were evaluated using a cartridge testing system specifically designed to measure and monitor test conditions and sample cartridge inlet and outlet vapor streams for important chemical compounds. Testing focused on analysis of approximately 61 tank vapor chemicals of potential concern (COPCs) that have been previously detected in tank vapors at levels above 10% of their occupational exposure limits (OELs). Each test was conducted over 16 hours of run time. Evidence of chemical breakthrough was assessed by comparing inlet and outlet COPC concentrations over the duration of each test. The breakthrough threshold was normally defined as exceeding 10% of the compounds OEL at the cartridge outlet. Ammonia breakthrough was observed in a majority of the cartridge tests and occurred earlier than breakthrough of any other chemical compound. Several other COPCs did exhibit breakthrough behavior, including mercury, 1,3-butadiene, furan, 2,5 dihydrofuran, and N-nitrosodimethylamine (NDMA), but only in a very limited number of cartridge tests and only after ammonia breakthrough had occurred. In addition, tests results suggest that breakthrough of some of these COPCs may have been affected by competition with and breakthrough of other non-COPC organics, such as ethanol and acetone, with substantially lower toxicological hazard. Comparison of cartridge manufacturers' service life estimates with the experimentally derived breakthrough times indicates that manufacturers' estimates are generally conservative, even in the presence of the complex mixed vapor streams experienced in these tests. With consideration of appropriate safety margins, these results provide valuable insights on cartridge performance to inform industrial hygiene professionals in establishing appropriate cartridge change-out schedules for APR and PAPR use in the Hanford tank farms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Metal-to-Ligand Charge-Transfer Spectrum of a Ru-Bipyridine-Sensitized TiO 2 Cluster from Embedded Multiconfigurational Excited-State Theory

Understanding optical properties of the dye molecule in dye-sensitized solar cells (DSSCs) from first-principles quantum mechanics can contribute to improving the efficiency of such devices. While density functional theory (DFT) and time-dependent DFT have been pivotal in simulating optoelectronic properties of photoanodes used in DSSCs at the atomic scale, questions remain regarding DFT’s adequacy and accuracy to furnish critical information needed to understand the various excited-state processes involved. In this work, we simulate the absorption spectra of a dye-sensitized solar cell analogue, comprised of a Ru-bipyridine (Ru-bpy) dye molecule and a small TiO2 cluster via DFT and via an accurate embedded correlated wavefunction (CW) theory. We generated CW spectra for the adsorbed Ru-bpy dye via a recently introduced capped density functional embedding theory or capped-DFET (to generate the embedding potential that accounts for the interaction of the molecule and the TiO 2 cluster). We then combined capped-DFET with the accurate but expensive multiconfigurational complete active space second-order perturbation theory (CASPT2)—embedded CASPT2. Because the CW theory is conducted on only a portion of the total system in the presence of an embedding potential that describes that portion’s interaction with its environment, we efficiently obtain CW-quality predictions that reflect local properties of the entire system. Specifically, for example, with capped-DFET and embedded CW theory, we can simulate accurately a plethora of metal-to-ligand charge-transfer excited properties at a manageable computational cost. Here, we predict detailed electronic spectra within the visible region, featuring the lowest three singlet and triplet excited states, along with predictions of the singlets’ lifetimes. We illustrated these results using a Jablonski diagram that show the relative energy position of the singlet and longer-lived triplet excited states and analyzed and proposed relaxation paths for the excited state corresponding to the most intense but short-lived absorption (interconversion, intersystem crossing, fluorescence, and phosphorescence) that may lead to longer-lived excited states necessary for efficient charge separation required to generate current in solar cells.

14 SOLAR ENERGY↗

An evaluation of the demand response potential of integrated dynamic window and HVAC systems

Demand response (DR) increases the flexibility and reliability of the electricity grid as use of intermittent renewable energy sources increases. HVAC and envelope DR measures present the largest aggregate energy and peak demand savings potential of all commercial building end uses because their net demand savings occur during critical peak demand periods. Controllable envelope measures include switchable electrochromic windows, operable window attachments such as outdoor louvers, roller shades, and awnings, as well as other innovative facade technologies that can modulate both solar heat gain and daylight admission over a broad solar-optical range. This study evaluated the technical potential of DR-enabled dynamic windows to reduce critical peak demand for a prototypical medium office building situated in all 16 U.S. climates. Model predictive control (MPC) algorithms were designed to minimize electricity cost in daylit perimeter office zones through control of an electrochromic window with and without HVAC thermostat setpoint control. Conventional and time-of-use rates were used to shape the degree of DR. Median annual peak demand savings with window and thermostat control across all climate zones were 24.3 kW (4.4 W/m 2 ) per building or 15.9 W/m 2 for non-north perimeter zones. Resource adequacy at the whole building level was estimated to be 13.1 to 43.4 $/kW per year over the 30-year life of the installation. Co-benefits were increased energy efficiency, and reduced electricity cost and emissions. Visual and thermal comfort requirements were met at all times. Dynamic facades controlled by MPC have substantial technical potential for DR across all U.S. climates and warrant serious consideration for inclusion in DR portfolios.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bias Correcting NOAA's High-Resolution Rapid Refresh (HRRR) Wind Resource Data for Grid Integration Applications [Slides]

Many weather years of high-quality wind data are widely accepted in the grid integration community to be important for studying wind energy technical potential, energy system operations, and grid resilience. NREL makes high-quality wind and solar resource data available. NREL's Grid-Atmosphere workshop (March 2024) identified NREL National Solar Radiation Database as widely used in grid integration modeling, but there is less agreement on commonly used wind datasets. One important factor identified by ESIG's 2023 report 'Weather Dataset Needs for Planning and Analyzing Modern Power Systems' for gold standard wind data is regular updates. To address the need for regular updates, NREL's team can now process all currently available and regularly updated High-Resolution Rapid Refresh (HRRR) outputs. HRRR is an hourly-updated operational forecast product produced by the National Oceanic and Atmospheric Administration (NOAA) (Dowell et al., 2022). One barrier to NREL using HRRR is systematic bias and consistency with NREL's existing wind datasets (e.g. WIND Toolkit, 'WTK') across weather years. To address this barrier, we show that the HRRR can be interpolated and bias-corrected to be consistent with NRE's existing datasets. We call the new dataset BC-HRRR (bias-corrected HRRR). As with historical datasets like the WTK, BC-HRRR is intended for use in grid integration modeling (e.g., capacity expansion, production cost, and resource adequacy modeling). BC-HRRR's (2015-present) consistency with WTK (2007-2013) allows NREL to extend internal grid integration tooling with 15+ weather years of wind data with low-overhead extensibility to future years as they are made available by NOAA. The rest of this slide deck documents the BC-HRRR processing methods, validation, and its implications for intended use.

17 WIND ENERGY↗

Bounding Pressure and Flammability Evaluations for a Department of Energy Standard Canister Loaded with Aluminum-Clad Spent Fuel

This report presents bounding pressurization and flammability evaluations from the radiolytic gas generation expected during extended (>50 years) dry storage of aluminum-clad spent nuclear fuel (ASNF) elements in a sealed Department of Energy (DOE) Standard Canister. The primary questions involving extended ASNF dry storage center around the adequacy of dry storage conditioning processes (i.e., drying) and the behavior of residual hydrated aluminum oxides on the cladding—specifically, the radiolytic breakdown of chemically bound water in these corrosion products. The objectives of the presented work include providing a bounding assessment of the pressure with respect to the DOE Standard Canister’s structural integrity limits and identifying the potential for forming flammable or explosive gas mixtures (i.e., exceedance of the lower flammability limit of the molecular hydrogen [H2] and oxygen [O2] concentrations). The evaluation results confirm the findings of previous, more complex M&S work. That is, the structural integrity of the canister remains unchallenged by a wide margin. Nevertheless, it is important to recognize that the presented pressure calculations consider a full breakdown of the chemisorbed water, including a consequent release of all available H2. In reality, the breakdown of water in these systems will likely remain incomplete, due to competing chemical and radiolytic reactions, thereby attaining an equilibrium in the storage environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Explained: Causes of Three Recent Major Blackouts and What Is Being Done in Response

While the power grid is designed to have an adequate supply of electricity generating capacity under hot and cold conditions well above or below average, weather in recent years has approached the bounds of anticipated conditions, in both magnitude and duration. Extreme weather can result in unanticipated levels of electricity demand and correlated power plant outages driven by extreme temperatures. How power system planners account for the changing role of wind and solar also plays an important role in the power grid's ability to supply enough electricity during extreme weather. In response to recent significant outages, power system planners have been focusing on ensuring methods to evaluate reliability during periods of "net peak demand" consider availability of renewable resources and capture the impact of extreme weather on power plants of all types. In particular, there is significant emphasis on the ability of natural gas-fueled power plants to operate during periods of extreme cold temperatures. The impact of extreme weather on the need to change planning processes is demonstrated in this fact sheet that discusses three significant outages that occurred in recent years.

power grid↗

Research Priorities and Opportunities in United States Wholesale Electricity Markets

The power system is currently undergoing a number of changes, including a rapidly evolving resource mix, growth of distributed energy resources (DERs), more active consumer participation, increased deployment of energy storage and hybrid resources, and more advanced communication and control requirements. These changes in the power system present numerous technical, economic, implementation, and policy challenges and research opportunities for power system operators. To help address these challenges, a collaboration among five research institutions—Argonne National Laboratory, the National Renewable Energy Laboratory, Lawrence Berkeley National Laboratory, the Electric Power Research Institute, and Johns Hopkins University—has been established to provide technical assistance to the seven U.S. Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs). The 3-year project aims to leverage the advanced methods, tools, datasets, and resources of the collaborators to provide robust analytical support to address the high-priority market challenges that will be faced in the 2- to 10-year time horizon.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SAM Code Development for Transient Safety Analyses of Fluoride-salt-cooled High-temperature Reactors

The System Analysis Module (SAM) is under development at Argonne National Laboratory as a modern system-level modeling and simulation tool for advanced non-light water reactor safety analyses. It utilizes the object-oriented application framework MOOSE to leverage the modern software environment and advanced numerical methods. The capabilities of SAM are being extended to enable the transient modeling, analysis, and design of various advanced nuclear reactor systems. The molten-salt-cooled pebble-bed reactor, or pebble-bed FHR (PB-FHR) is a promising candidate among advanced nuclear reactor concepts with its improved passive safety characteristics and high thermal efficiency. To support the development and utilization of the SAM code for PB-FHR safety analysis, activities on SAM code enhancements, reference plant model developments, and code validations have been performed in the past a few years to support near-term industry and NRC needs. This report summarizes recent progress under DOE-NE’s Nuclear Energy Advanced Modeling and Simulation program in SAM code development and demonstration for transient safety analysis of Fluoride-salt-cooled High-temperature Reactors. SAM capabilities has been significantly enhanced over the years to add FHR specific modeling features, including salt freezing and thawing, spherical core channel and pebble bed core modeling, solid-fluid thermal radiation, tritium transport and general species transport in fluids and solids, and the general code enhancements on solver schemes of point kinetics module and reactivity feedback models. A reference PB-FHR model is developed, based on publicly available information from Kairos Power’s generic FHR design and the University of California, Berkeley (UCB) Mk1 design. A reference reactor model is foundational to the methodologies employed by NRC to verify the adequacy of computer codes and evaluation models. The reference FHR model was utilized for a number of selected FHR design basis accidents, including station blackout, loss of heat sink, loss of flow, transient overpower, and overcooling events.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Facets of hydro power and future trends in a Nordic Context

Hydropower technologies bolster high penetration of variable renewable energies (VREs) in the net zero emissions scenarios. Nevertheless, there are various challenges to meeting the ambitious goal, such as stability, reliability, resiliency, security, lack of reactive power, voltage support and inertia, large-scale storage deployment and coordination, interconnectedness, demand-side response, higher thermal cycles with increased start/stops, and inadequate Levelized Cost of Energy (LCOE) for system-wise VRE integration and profitability. This survey conducts a bottom-up analysis to unveil the opportunities to utilize hydropower facilities and disentangle the nested problem for intertwining design features, control algorithms, operation, optimization approaches, incentives, services, and market mechanisms using a three-pillar framework perspective: grid owners, power producers, and machine designers. The survey identified emerging trends in real-time and capacity markets, flexible power systems, and enhanced grid capabilities, including advanced voltage support and updated grid codes. These developments present significant opportunities for hydropower, such as achieving super-flexibility through hybridization, expanded reactive power capabilities, and advanced operational modes like a synchronous condenser and power adequator functionalities. These opportunities require novel design philosophies — including new winding, stator, and rotor configurations, optimized ventilation, and active cooling systems — to enhance performance under stressed grid and climate conditions. Finally, integrating climate and energy models for multi-basin optimization with finer spatial and temporal granularity enhances the planning accuracy for water management of hydropower while addressing environmental challenges. The review delivers helpful prospective suggestions and tools that would serve researchers, power engineers, and stakeholders in making decisions about hydropower technologies and services in 2050 and beyond.

13 HYDRO ENERGY↗

Calibration and Uncertainty Estimation Using the Ensemble Kalman Filter with a Large Subsurface Flow and Transport Model - 20321

At routinely monitored groundwater contamination sites, periodically measured environmental conditions such as groundwater levels and contaminant concentrations are used to inform and confirm a conceptual site model (CSM) and guide the development and calibration of a numerical groundwater flow and transport model. The calibration of groundwater flow and transport models after each measurement (sampling) event can illuminate deficiencies in a CSM, identify areas where additional monitoring is warranted, and predict the behavior of the system to guide decision making. However, manual and automated (e.g. PEST) model calibration tools can be time-consuming and computationally expensive to implement after each sampling event. Perhaps as a result, such calibration tools generally utilize all available monitoring data simultaneously rather than sequentially assimilating monitoring data one sampling event at a time as the results from sampling become available. A more real-time data assimilation approach may reduce parameter uncertainty, quantify the value of additional monitoring data, and produce a usable model more quickly and with less effort. To mitigate the potential time-consuming aspects of manual and widely applied automated calibration techniques, a data assimilation algorithm called the ensemble Kalman filter (EnKF) was evaluated as a relatively efficient method of model calibration and uncertainty assessment via the sequential integration of monitoring data into a model. The EnKF was able to successfully and efficiently assimilate monitoring and modeling data to calibrate a complex flow and transport model at a real-world site with significant subsurface heterogeneity, uncertainty, and 12 years of monitoring data (over 4,000 individual measurements of groundwater levels and over 2,500 measurements of contaminant concentrations). Starting with an uncalibrated model data from annual sampling events were sequentially assimilated, and the resultant predication errors and estimated parameter uncertainties were tracked. After all monitoring data were assimilated, both flow and transport residuals at the end of the EnKF process were comparable to those produced via a concurrent PEST calibration effort but required fewer model simulations. Both uncertainty and prediction errors decreased over time. In a real-time application, the adequacy of the model could be assessed after each sampling event. The benefits of such a real-time approach to utilizing monitoring data include reduced costs (in the form of model updates or site characterization efforts), early flagging of possible errors in the CSM, and a reduced risk of overfitting and corresponding increased confidence in model predictions. This tool may be particularly useful compared to other calibration techniques (e.g. manual, PEST) when model runtimes are long, calibration parameters are many, or parameter uncertainty is large. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distribution Development for Residual Inventory at the New York West Valley Site - 20400

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351 ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Operations led to contamination in a number of facilities and locations. Some of that contamination has migrated from waste disposal zones to other layers, formations, and features on and off the WNYNSC. Phase I decommissioning activities are ongoing and involve the removal of a number of areas and structures that have been associated with contamination. The purpose of this work is to outline the approach for characterizing contamination not associated with disposed wastes, contaminated structures, or specific releases. In this work, the term, residual radiological activity, is used to describe environmental contamination that exists subsequent to the completion of Phase I decommissioning activities, that is not associated with disposed wastes, contaminated structures, or specific releases. Contamination from the Site was quantified relative to data that characterize the concentrations of radionuclides that exist in background. Background concentrations are those present in the area but having no influence from Site related activities. The existence of residual radiological activity that is elevated relative to background has the potential to contribute to future risks to human health and the environment. As a consequence, the residual inventory information is used to inform the West Valley Probabilistic Performance Assessment (PPA) model to characterize potential future risks to human health and the environment. The centralized West Valley Data Management System (DMS) was the source of information for the data assembled in this analysis. The DMS is a fairly large compilation consisting of thousands of records from investigation studies, with sample dates ranging from 1990 to present. Samples from monitoring wells, boreholes, geoprobe studies, surface water, surface soils, storm water outfalls, ventilation stack filters, plant and animal tissues, and more are included in the DMS. Results are typically reported in units of activity per unit volume. For the purpose of the analyses presented here, all results were converted into consistent units of pCi per unit volume. Since 1990, data have been collected from various locations across the WNYNSC at different times with varying frequency over the course of several decades. As a consequence, a number of potential issues can arise with respect to the assembly of a dataset that is deemed adequate for the characterization of residual radiological activity. These issues were assessed and resolved to the extent possible through careful consideration of the properties of the distributions. The intent was to use data which characterize the current state of the Site. Radionuclides can be designated to one of several groups depending on their origin. In this work the groups considered were 1) Naturally Occurring Radioactive Material (NORM), 2) fallout, and 3) Other (including power plant, medical research, etc). This grouping is a useful construct with respect to the interpretation of fixed laboratory results. For example, NORM radionuclides that exist within a decay chain should have approximately equivalent distributions of concentrations if they are representative of background conditions. Insights such as these can be used as a check to identify sample results that need to be further investigated or omitted due to issues associated with reported results from fixed laboratory analyses. This type of analysis provided a foundation for the assessment of the adequacy of sample results for use in subsequent components of an assessment. The general process for the assessment of residual radiological contamination at the Site consists of a sequence of several steps. First, for each analyte, several statistical tests were performed to assess the weight of evidence against the null hypothesis that the mean of the distribution of concentrations was equal to zero. If the mean of the distribution of concentrations for a given radionuclide was not found to be greater than zero, then it was removed from consideration as a component of the residual radiological contamination. If there was significant evidence to reject the hypothesis of the mean being equal to zero, the second step was to compare the distribution of the data from the Site to that of the corresponding background. A suite of tests was used to compare the distributions of the site and background data. The results of these tests were collectively used to determine if site data are elevated relative to background. The third step was to develop distributions using a Bayesian framework to characterize the distribution of mean of the increment present above background for each of the radionuclides. The Bayesian model implemented allowed for the comparison of site-specific records to background concentrations to better approximate contamination attributed to the Site. A final screening step was employed for radionuclides that exceed background. This screening step compared 95% upper confidence limits (UCLs) from the increment distribution developed in the previous step to the risk screening levels. This approach yields a list of analytes that were determined to be elevated relative to background.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose and Saturated Zone Flow and Transport Model Package Report for the Active Trenches of the Low-Level Burial Grounds, Hanford Site, Washington

This model package report (MPR) documents the development of the integrated vadose and saturated zone flow and transport model developed for the performance assessment of Trenches 31 and 34 in the low-level burial grounds (LLBGs). This modeling capability is intended for use in addressing the analysis requirements outlined in DOE O 435.1, Chg 1, Radioactive Waste Management1. The overall objective of the modeling effort is to provide a basis for making informed disposal decisions pertinent to Trenches 31 and 34. The purpose of the MPR is to document the development of the three-dimensional numerical vadose zone and saturated flow and transport model test case and evaluate its adequacy to support the LLBG performance assessment. The purpose is not to present results for DOE 435.1 decision making. The use of the model to perform base case and sensitivity analysis for the LLBG performance assessment, including inputs and results, is documented separately in subsequent environmental calculation files. This report discusses the development and translation of the conceptual model for flow and contaminant transport into the LLBG performance assessment three-dimensional numerical flow and transport model evaluated using the Subsurface Transport Over Multiple Phases (STOMP©) simulator. The development of representative geologic framework is described along with the implementation of waste release models used to represent contaminant release from waste disposed in the trenches. The report also provides the technical basis for specific model parameters and boundary conditions, along with description of modeling assumptions. This MPR includes certain calculations that are necessary to demonstrate the soundness of the model. Results provided by the model include vadose zone and saturated zone flow fields, and estimates of the possible future concentration in groundwater of technetium-99 and iodine-129 as example test cases. As an evaluation of the test cases, the model estimates of current vadose conditions are compared to available and analogous field and laboratory data, and compared to the results from the original performance assessment model (WHC-EP-0645, Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds 2 ). The features, events, and processes applicable to vadose zone and saturated zone flow and transport model are identified, and representative initial estimates for various parameters are documented. Note that the parameter estimates presented in this MPR are for illustration purposes, and may or may not reflect values selected for eventual performance assessment. Several key topical discussions (i.e., basis for recharge estimates, basis for vadose zone modeling, basis for saturated zone model development, and calibration) are included, which serve as the groundwork for confidence building for the groundwater pathway modeling and results. Numerical simulation results based on an example test case are included to illustrate the use of the combined saturated-unsaturated model in performance assessment calculations. Sensitivity and uncertainty results are not included in this MPR. Those results will be included in future environmental calculation files. The inclusion of the trapezoidal trench geometry and construction details in the finite difference grid introduces some gross simplifications regarding the trench and liner systems. The model test case presented in this MPR includes the assumption that the trench liner system does not affect flow through or around the trenches after the liner system is assumed to fail. This MPR also includes results of other test cases that involve alternate assumptions about how to incorporate the hydraulic effects of the trenches into the vadose zone of the model. These alternate cases do not attempt to account for the presence of the liner system after its assumed failure either. None of these cases is considered to be the base case at this time. Analysis and alternate cases that attempt to account for the presence of the liner system in greater detail, and its effect on flow through and around it, are to be documented in subsequent environmental calculation files. Depending on the results of those analyses and alternate cases, the eventual base case may involve more detailed inclusion of the effects of the liner system hydraulics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗