Probabilistic Approach to Assessing Capture System Performance Margin in Mars Sample Return's Capture, Containment, and Return System
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
The solar energy system, Elcam San Diego, was designed to supply domestic hot water heating for a single family residence located in Encinitas, California. System description, performance assessment, operating energy, energy savings, maintenance, and conclusions are presented. The system is a 'Sunspot' two tank cascade type, where solar energy is supplied to either a 66 gallon preheat tank (solar storage) or a 40 gallon domestic hot water tank. Water is pumped directly from one of the two tanks, through the 65 square feet collector array and back into the same tank. Freeze protection is provided by automatically circulating hot water from the hot water tank through the collectors and exposed plumbing when freezing conditions exist. Auxiliary energy is supplied by natural gas. Analysis is based on instrumented system data monitored and collected for one full season of operation.
The thermal control surfaces experiment (TCSE) was the most complex hardware system aboard the Long Duration Exposure Facility (LDEF). The TCSE system consists of a scanning spectroreflectometer that measured test samples mounted on a rotatable carousel assembly. A microprocessor based data system controlled all aspects of TCSE system operation. Power was provided by four primary batteries. Flight measurement and housekeeping data were stored on a tape recorder for postflight analysis. The TCSE is a microcosm of complex electro-optical payloads being developed by NASA, DoD, and the aerospace community. The TCSE provides valuable data on the performance of these systems in space. The TCSE flight system and its excellent performance on the LDEF mission are described. A few operational anomalies were encountered and are discussed. Initial post-flight tests show that the TCSE system remains functional although some degradation in the optical measurements were observed. The results of these tests are also presented.
NASA is participating in the International Committee on Global Navigation Satellite Systems (GNSS) (ICG)'s efforts towards demonstrating the benefits to the space user in the Space Service Volume (SSV) when a multi-GNSS solution space approach is utilized. The ICG Working Group: Enhancement of GNSS Performance, New Services and Capabilities has started a three phase analysis initiative as an outcome of recommendations at the ICG-10 meeting, in preparation for the ICG-11 meeting. The first phase of that increasing complexity and fidelity analysis initiative is based on a pure geometrically-derived access technique. The first phase of analysis has been completed, and the results are documented in this paper.
To maintain Crew Health and Performance (CHP) during an Artemis mission, the NASA Human Research Program (HRP) and Exploration Medical Capabilities (ExMC) element recognize the challenge that many different vehicles, habitats, and operational groups must come together to develop and implement cross program capabilities. To address this challenge, the ExMC team created the prototype 2023 Artemis CHP System Model to analyze how human system requirements are implemented throughout an Artemis mission and help understand the effects of changing an individual vehicle or habitat requirement on a full mission. Since presenting this work at the 2024 HRP Investigators’ Workshop, ExMC has continued this effort, now called the Artemis III and IV CHP System Model, to better support its operational end users within the NASA Human Health and Performance Directorate (HHPD) workforce. In this presentation, we will recapitulate how visualizing requirements and their relationships using a Model-Based Systems Engineering approach (MBSE) serves to improve understanding of an Artemis mission’s CHP capabilities along with discussion on updates made to the model to increase accessibility for users within HHPD so that it may be used in the development of cross program CHP capabilities at NASA.
The Orion Launch Abort System Office is taking part in flight testing to enable certification that the system is capable of delivering the astronauts aboard the Orion Crew Module to a safe environment during both nominal and abort conditions. Orion is a NASA program, Exploration Flight Test 1 is managed and led by the Orion prime contractor, Lockheed Martin, and launched on a United Launch Alliance Delta IV Heavy rocket. Although the Launch Abort System Office has tested the critical systems to the Launch Abort System jettison event on the ground, the launch environment cannot be replicated completely on Earth. During Exploration Flight Test 1, the Launch Abort System was to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. Exploration Flight Test 1 was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. This was the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. Exploration Flight Test 1 provides critical data that enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The Exploration Flight Test 1 separation event occurred at six minutes and twenty seconds after liftoff. The separation of the Launch Abort System jettison occurs once Orion is safely through the most dynamic portion of the launch. This paper will present a brief overview of the objectives of the Launch Abort System during a nominal Orion flight. Secondly, the paper will present the performance of the Launch Abort System at it fulfilled those objectives. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.
A solar power satellite transmission system which incorporates automatic beam forming, steering, and phase control is discussed. The phase control concept centers around the notation of an active retrodirective phased array as a means of pointing the beam to the appropriate spot on Earth. The transmitting antenna (spacetenna) directs the high power beam so that it focuses on the ground-based receiving antenna (rectenna). A combination of analysis and computerized simulation was conducted to determine the far field performance of the reference distribution system, and the beam forming and microwave power generating systems.
The system's operational performance from May 1979 through April 1980 is described. Solar energy satisfied 23 percent of the total performance load, which was significantly below the design value of 56 percent. A fossil savings of 80.89 million Btu's or 578 gallons of fuel oil is estimated. If uncontrolled losses could have been reduced to an inconsequential level, the system's efficiency would have been improved considerably.
The operation and technical performance of the solar operational test site (OTS 44) are described, based on data collected between April, 1981 and August, 1981. The following topics are discussed: system description, performance assessment, operating energy, energy savings, system maintenance, and conclusions. The solar energy system at OTS 44 is a hydronic heating and cooling system consisting of 5040 square feet of liquid cooled flat plate collectors; a 4000 gallon thermal storage tank; one 25 ton capacity organic Rankine cycle engine assisted water chillers; a forced draft cooling tower; and associated piping, pumps, valves, controls and heat rejection equipment. The solar system has eight basic modes of operation and several combination modes for providing space conditioning and hot water to the building. Data monitored during the 4 months of the operational test period found that the solar system collected 285 MMBtu of thermal energy of the total incident solar energy of 1040 MMBtu and provided 210 MMBtu for cooling and 10 MMBtu for heating and hot water. The net electrical energy saving due to the solar system was approximately 2600 kWh(e), and fossil energy saving was about 20 million Btu (MMBtu).
Sunflower solar power system using mercury- Rankine cycle
The design of the microwave system for the solar power satellite is described. Design modifications recommended include changes in phase control to the power module level, a reduction in allowable amplitude jitter, the use of metal matrix waveguides, and sequences for startup/shutdown procedures. Investigations into reshaping the beam pattern to improve overall rectenna collection efficiency and improve sidelobe control are surveyed.
NASA’s Low-Density Supersonic Decelerators project (LDSD) has developed and tested four new aerodynamic decelerator technologies for future Mars missions: two attached toroidal inflatable decelerators, a ballute, and a large supersonic parachute. On June 8, 2015, the project conducted a high-altitude, supersonic flight test of a 30.5-meter supersonic Ringsail (SSRS) canopy at the US Navy’s Pacific Missile Range Facility (PMRF) on Kauai, HI. This test, the second in a series of Supersonic Flight Dynamics Tests (SFDT-2), allowed the LDSD project to test the deployment and performance of its parachute decelerator system in the wake of a representative test vehicle (a 4.7-meter aeroshell and 6-meter toroidal inflatable aerodynamic decelerator) at conditions relevant to Mars entry for the second time. The parachute decelerator system consisted of the SSRS main parachute and a 4.4-meter ballute (called the parachute deployment device, or PDD) for its extraction. The ballute was mortar-deployed at a Mach number of 2.78 and a dynamic pressure of 493 Pa, and inflated with the aid of a water-methanol based gas generator. After flying in the wake of the test vehicle for ten seconds, the PDD was released and allowed to extract the main parachute pack. The SSRS reached line-stretch at a Mach number of 2.37 and dynamic pressure of 602 Pa. Following full inflation, the propagation of a tear in the canopy led to the failure of the parachute skirt band and to the subsequent failure of the vent band. The test vehicle was instrumented with load sensors, inertial sensors, and high-speed and high resolution cameras that provided data on the performance of the PDD and SSRS through deployment, inflation, and flight. This paper describes the resulting reconstructed behavior of the PDD and SSRS during deployment and inflation, their aerodynamic performance on SFDT-2, the failure of the SSRS shortly after full inflation, and the LDSD project’s investigation into its underlying causes.
Automatic, parameter-tracking, model-matching technique compares the responses of a human operator with those of an analog computer model of a human operator to predict and analyze the performance of mechanical or electromechanical systems prior to construction. Transfer functions represent the input-output relation of an operator controlling a closed-loop system.
This paper discusses the performance analysis effort being carried out in the NASA Deep Space Network. The activity involves root cause analysis of failures and assessment of key performance metrics. The root cause analysis helps pinpoint the true cause of observed problems so that proper correction can be effected. The assessment currently focuses on three aspects: (1) data delivery metrics such as Quantity, Quality, Continuity, and Latency; (2) link-performance metrics such as antenna pointing, system noise temperature, Doppler noise, frequency and time synchronization, wide-area-network loading, link-configuration setup time; and (3) reliability, maintainability, availability metrics. The analysis establishes whether the current system is meeting its specifications and if so, how much margin is available. The findings help identify the weak points in the system and direct attention of programmatic investment for performance improvement.
Propulsion system specific results are presented from the application of the Integrated Methodology for Propulsion and Airframe Control (IMPAC) design approach to Integrated Flight/Propulsion Control design for a STOVL aircraft in transition flight. The IMPAC method is briefly discussed and the propulsion system specifications for the integrated control design are examined. The structure of a linear engine controller that results from partitioning a linear centralized controller is discussed. The details of a nonlinear propulsion control system are presented, including a scheme to protect the engine operational limits: the fan surge margin and the acceleration/deceleration schedule which limits the fuel flow. Also, a simple but effective multivariable integrator windup protection scheme is investigated. Nonlinear closed-loop simulation results are presented for two typical pilot commands for transition flight: acceleration while maintaining flight path angle and a change in flight path angle while maintaining airspeed. The simulation nonlinearities include the airframe/engine coupling, the actuator and sensor dynamics and limits, the protection scheme for the engine operational limits, and the integrator windup protection. Satisfactory performance of the total airframe plus engine system for transition flight, as defined by the specifications, is maintained during the limit operation of the closed-loop engine subsystem.
The Neutral Buoyancy Portable Life Support System (NBPSS) has been designed to support astronaut underwater training activities associated with EVA operations. The performance of competing NBPSS configurations has been analyzed on the basis of a modified 'Metabolic Man' program. NBPSS success is dependent on the development of novel cryogen supply tank and liquid-cooling garment vaporizer. Attention is given to mass and thermal balances and the evaluation results for the vent-loop ejector and heat-exchanger designs.
This paper will present an overview of the flight test objectives and performance of the Orion Launch Abort System during Exploration Flight Test-1. Exploration Flight Test-1, the first flight test of the Orion spacecraft, was managed and led by the Orion prime contractor, Lockheed Martin, and launched atop a United Launch Alliance Delta IV Heavy rocket. This flight test was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety. This test included the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. NASA is currently designing and testing the Orion Multi-Purpose Crew Vehicle (MPCV). Orion will serve as NASA's new exploration vehicle to carry astronauts to deep space destinations and safely return them to earth. The Orion spacecraft is composed of four main elements: the Launch Abort System, the Crew Module, the Service Module, and the Spacecraft Adapter (Fig. 1). The Launch Abort System (LAS) provides two functions; during nominal launches, the LAS provides protection for the Crew Module from atmospheric loads and heating during first stage flight and during emergencies provides a reliable abort capability for aborts that occur within the atmosphere. The Orion Launch Abort System (LAS) consists of an Abort Motor to provide the abort separation from the Launch Vehicle, an Attitude Control Motor to provide attitude and rate control, and a Jettison Motor for crew module to LAS separation (Fig. 2). The jettison motor is used during a nominal launch to separate the LAS from the Launch Vehicle (LV) early in the flight of the second stage when it is no longer needed for aborts and at the end of an LAS abort sequence to enable deployment of the crew module's Landing Recovery System. The LAS also provides a Boost Protective Cover fairing that shields the crew module from debris and the aero-thermal environment during ascent. Although the Orion Program has tested a number of the critical systems of the Orion spacecraft on the ground, the launch environment cannot be replicated completely on Earth. A number of flight tests have been conducted and are planned to demonstrate the performance and enable certification of the Orion Spacecraft. Exploration Flight Test 1, the first flight test of the Orion spacecraft, was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. Orion's first flight was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety, such as heat shield performance, separation events, avionics and software performance, attitude control and guidance, parachute deployment and recovery operations. One of the key separation events tested during this flight was the nominal jettison of the LAS. Data from this flight will be used to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. The LAS nominal jettison event on Exploration Flight Test 1 occurred at six minutes and twenty seconds after liftoff (See Fig. 3). The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. A suite of developmental flight instrumentation was included on the flight test to provide data on spacecraft subsystems and separation events. This paper will focus on the flight test objectives and performance of the LAS during ascent and nominal jettison. Selected LAS subsystem flight test data will be presented and discussed in the paper. Exploration Flight Test -1 will provide critical data that will enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.
The Wormser Solar Energy System's operational performance from April 1979 through March 1980 was evaluated. The space heating subsystem met 42 percent of the measured space heating load and the hot water subsystem met 23 percent of the measured hot water demand. Net electrical energy savings were 4.36 million Btu's or 1277 kwh. Fossil energy savings will increase considerably if the uncontrolled solar energy input to the building is considered.