Search NASA⌕ Search

SEARCH · Search NASA

Results for “technology procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Long life monopropellant hydrazine thruster evaluation for Space Station Freedom application

In support of propulsion system thruster development activity for Space Station Freedom (SSF), NASA Johnson Space Center (JSC) is conducting a hydrazine thruster technology demonstration program. The goal of this program is to identify impulse life capability of state-of-the-art long life hydrazine thrusters nominally rated for 50 pounds thrust at 300 psia supply pressure. The SSF propulsion system requirement for impulse life of this thruster class is 1.5 million pound-seconds, corresponding to a throughput of approximately 6400 pounds of propellant, with a high performance (234 pound-seconds per propellant pound). Long life thrusters were procured from Hamilton Standard, The Marquardt Company, and Rocket Research Company. Testing has initiated on the thruster designs to identify life while simulating expected thruster firing duty cycles and durations for SSF using monopropellant grade hydrazine. This paper presents a review of the SSF propulsion system and requirements as applicable to hydrazine thrusters, the three long life thruster designs procured by JSC and the resultant acceptance test data for each thruster, and the JSC test plan and facility.

Popp, Christopher G.↗

The MSAT spacecraft of Telesat Mobile Inc.

The MSAT spacecraft of the Canadian mobile satellite operator, Telesat Mobile Inc. (TMI) is described. When launched in 1994, the large geostationary MSAT spacecraft which is currently under construction by Hughes Aircraft Co. and Spar Aerospace Ltd. will enable TMI to provide mobile and transportable communications services to its customers even in the most remote parts of the North American continent. The main elements of TMI's mobile satellite system (described in a companion paper) are the space segment and the ground segment. TMI's space segment will employ one of two nearly identical satellites, one of which will be owned and operated by TMI, the other by the U.S. mobile satellite operator, American Mobile Satellite Corporation (AMSC). The two companies are participating in a joint spacecraft procurement in order to reduce the nonrecurring costs and to ensure system compatibility between the two systems; and they have also agreed to provide in-orbit backup to each other in the event of a catastrophic satellite failure. The program status, performance requirements, main parameters, and configuration of the MSAT spacecraft are reviewed. The major features of the communications subsystem are discussed in some detail, and a brief summary is presented of the spacecraft service module. Key technology items include the L-band RF power amplifier, which must operate with a high DC to RF power efficiency and generate low intermodulation when loaded with multi-carrier signals; and the large diameter deployable L-band antenna. The development status and expected performance of these spacecraft components is examined.

Bertenyi, E.↗

Reliable Ignition of LOX-LCH4 Propellants

No cryogenic Reaction Control System (RCS) has ever flown in space. Cryogenic propellants are baselined by HLS and CLPS partners and are the key use case for future ISRU manufactured propellants. A reliable LOX/LCH 4 RCS is an enabling technology for human Lunar and Mars exploration. In previous thermal vacuum (<275 F, <10 torr) testing at NASA GRC Plum Brook, the team uncovered anomalous LOX/LCH4 engine ignition phenomena where flame kernels quenched at these ultra cold hardware temperatures, leading to many pulses where the engines would not light. In 2022, the project was able to recreate the no light condition with an upgraded Frost-Mint test stand at JSC. This project implemented test stand improvements and procured propellants and follow on engine components for a hot fire campaign beginning in November 2024 which will attempt to ignite the RCS engine at ultra cold vacuum conditions by modifying the engine mixture ratio. New modeling techniques were implemented to account for past no lights and are an enabling method to make lunar surface go no go predictions based on hardware conditions. This was enabled by significant improvements to the Frost Mint system, which reduced moisture build up and leaks, increased propellant availability, leading to more attempts at thermal vacuum hot-fires.

Propulsion↗

X-traktor: A Rookie Robot, Simple, Yet Complex, Impeccably Designed, a Very Innovative Multidisciplinary Engineering Masterpiece

FIRST is the acronym of For Inspiration and Recognition of Science and Technology. FIRST is a 501.C.3 non-profit organization whose mission is to generate an interest in science and engineering among today's young adults and youth. This mission is accomplished through a robot competition held annually in the spring of each year. NASAs Marshall Space Flight Center, Education Programs Department, awarded a grant to Lee High School, the sole engineering magnet school in Huntsville, Alabama. MSFC awarded the grant in hopes of fulfilling its goal of giving back invaluable resources to its community and engineers, as well as educating tomorrow's work force in the high-tech area of science and technology. Marshall engineers, Lee High School students and teachers, and a host of other volunteers and parents officially initiated this robot design process and competitive strategic game plan. The FIRST Robotics Competition is a national engineering contest, which immerses high school students in the exciting world of science and engineering. Teaming with engineers from government agencies, businesses, and universities enables the students to learn about the engineering profession. The students and engineers have six weeks to work together to brainstorm, design, procure, construct, and test their robot. The team then competes in a spirited, 'no-holds barred' tournament, complete with referees, other FIRST-designed robots, cheerleaders, and time clocks. The partnerships developed between schools, government agencies, businesses, and universities provide an exchange of resources and talent that build cooperation and expose students to new and rewarding career options. The result is a fun, exciting, and stimulating environment in which all participants discover the important connections between classroom experiences and real-world applications. This paper will highlight the story, engineering development, and evolutionary design of Xtraktor, the rookie robot, a manufacturing marvel and engineering achievement.

Henderson, A. J., Jr.↗

Industry survey of space system cost benefits from New Ways Of Doing Business

The cost of designing, building and operating space system hardware has always been expensive. Small quantities of specialty parts escalate engineering design, production and operations cost. Funding cutbacks and shrinking revenues dictate aggressive cost saving programs. NASA's highest priority is providing economical transportation to and from space. Over the past three decades NASA has seen technological advances that provide grater efficiencies in designing, building, and operating of space system hardware. As future programs such as NLS, LUTE and SEI begin, these greater efficiencies and cost savings should be reflected in the cost models. There are several New Ways Of Doing Business (NWODB) which, when fully implemented will reduce space system costs. These philosophies and/or culture changes are integrated in five areas: (1) More Extensive Pre-Phase C/D & E, (2) Multi Year Funding Stability, (3) Improved Quality, Management and Procurement Processes, (4) Advanced Design Methods, and (5) Advanced Production Methods. Following is an overview of NWODB and the Cost Quantification Analysis results using an industry survey, one of the four quantification techniques used in the study. The NWODB Cost Quantification Analysis is a study performed at Marshall Space Flight Center by the Engineering Cost Group, Applied Research Incorporated and Pittsburg State University. This study took place over a period of four months in mid 1992. The purpose of the study was to identify potential NWODB which could lead to improved cost effectiveness within NASA and to quantify potential cost benefits that might accrue if these NWODB were implemented.

Rosmait, Russell L.↗

Open system environment procurement

Relationships between the request for procurement (RFP) process and open system environment (OSE) standards are described. A guide was prepared to help Federal agency personnel overcome problems in writing an adequate statement of work and developing realistic evaluation criteria when transitioning to an OSE. The guide contains appropriate decision points and transition strategies for developing applications that are affordable, scalable and interoperable across a broad range of computing environments. While useful, the guide does not eliminate the requirement that agencies posses in-depth expertise in software development, communications, and database technology in order to evaluate open systems.

Fisher, Gary↗

Investigating Laser Beam Welding as an In-Space Joining Technique via Thermal Vacuum and Microgravity and Vacuum Experiments

In-space joining technologies are crucial for stimulating an in-space economy and for enabling sustained space exploration by in-space manufacturing and repair of metallic structures. Compared to brazing or soldering, in-space welding (ISW) can provide highly hermetic, strong, and complex joints, potentially without introducing additional material. However, the influence of extreme temperatures, reduced pressure, and reduced gravity on ISW is not yet fully elucidated. Several efforts at NASA are investigating laser beam welding (LBW) as a joining and repair method in both thermal vacuum (TVAC) and combined vacuum & reduced gravity environments. NASA Marshall Space Flight Center (MSFC) shepherded several ISW projects in its past, including the 1973 electron beam welding on Skylab, the 1989 low-power LBW on parabolic flights, and the unflown 1990s-era In-Space Welding Experiment. Recent parabolic flights and 3 degree-of-freedom ground testing build upon this heritage. A collaboration with the Ohio State University using NASA Langley Research Center (LaRC) hardware retrofitted for LBW achieved the first high-powered laser welds under vacuum and low gravity and developed a workforce capable developing such experimental hardware. A ground testing campaign at the MSFC Flat Floor simulated fit-up and welding representative of ISW in 3 degrees of freedom to emulate microgravity effects on inertial systems. One ongoing effort is a NASA Early Career Initiative project – Lunar Assembly and Servicing by Autonomous Robotics (LASAR). Ruggedized LBW components were developed by an external partner for use in TVAC. A TVAC-rated robotic arm was procured by MSFC and used in the first known robotic laser weld where all components save the laser generator were under vacuum. NASA Johnson Space Center (JSC) is advancing supervised autonomy of ISW. NASA LaRC continues to adapt their unique snowflake joint geometry, suitable for connecting segments in trusses and other structures, to LBW. Upcoming TVAC campaigns will focus on testing extreme temperatures, proving out autonomous operations, and demonstrating weld repair. Weld inspection will occur via a non-contact nondestructive evaluation (NDE) technique – electromagnetic acoustic transduction (EMAT). Another ongoing effort based at MSFC is the DISCMAN -- DIsk-Shaped Configurable and Modular vAcuum uNit – which seeks to development a compact, modular payload that can provide a vacuum environment while in a reduced gravity condition. This payload could support multiple in-space manufacturing developmental efforts, with the first demonstration technology being LBW. Currently, the design is targeting operations in the pressurized volume of a space station, but the payload could readily be adapted to other flight platforms such as parabolic or even suborbital vehicles. LASAR elucidates the effects of temperature and vacuum on LBW while DISCMAN probes those of vacuum and gravity. Through these complementary efforts, NASA is addressing the primary challenges of ISW across the space environment while simultaneously developing and maturing technologies including robotic systems and inspection methodologies for future practical implementation on the Moon and beyond. This approach is timely, as upcoming missions requiring sustained human presence in space will depend on reliable ISW capabilities to create robust metallic joints currently unproven in the space environment and to perform repairs in situ .

hypogravity↗

Development of a Ground Multi-Mission Low-Cost Optical Terminal (LCOT) for Free-Space Optical Communications

Once confined to the realm of laboratory experiments and theoretical papers, space-based laser communications (lasercomm) are on the verge of achieving mainstream status. Organizations from Facebook to NASA, and missions from cubesats to Orion are employing lasercomm to achieve gigabit communication speeds at mass and power requirements lower than that of traditional radio frequency (RF) methods. Since first demonstrating free-space optical communications services with Lunar Laser Communications Demonstration (LLCD) in 2013, NASA has invested in developing optical communications technologies and capabilities to enhancing its space communications networks. Along with evolving optical space terminals, NASA is also developing lasercomm grounds stations capable of meeting the rapidly increasing data volume demands of upcoming missions, from low-earth to lunar orbits and beyond and integrating these advanced capabilities into its Near-Space and Deep Space Networks. To meet this emerging need, the Low-Cost Optical Terminal (LCOT) project at NASA’s Goddard Space Flight Center (GSFC) is designing, building and validating a prototype for a flexible, multi-mission, and economical optical ground terminal that could be used as a blueprint for a global network of optical ground stations, capable of supporting a wide variety of missions. To date a major impediment to widespread adoption of laser communication has been the lack of an existing ground network infrastructure. A mission that wishes to take advantage of laser communication not only needs to invest in an optical space terminal, but it must also finance the creation of ground terminals to receive the downlink signal. This adds significant additional cost. Missions that do decide to incur the cost of financing a network of ground terminals end up building highly specialized optical receivers that are operable as receivers for that specific mission only. Significant Non-Recurring Engineering (NRE) cost is invested to build highly specialized one-of-a-kind ground terminals that go into storage after that particular mission is over. This is not an economical approach and does nothing to grow the number of optical ground stations available to future missions. In essence each mission that wants to take advantage of the benefits of lasercom has to start from scratch to provide a ground terminal network to support it. As long as this is the case, the cost for using laser communications will be too high for most missions to consider. LCOT intends to close this gap in technology by designing and developing a standard optical ground terminal design that is flexible enough to serve as a receiver for a wide range of future missions – a ground terminal that can be quickly reconfigured to receive downlinks at different wavelengths using different signal formats. Not only does LCOT have the industry-building objectives of utilizing commercial-off-the-shelf (COTS) components to the maximum extent possible, but also spurs the commercial development of other necessary lasercomm components not currently offered by industry. Finally, LCOT will give NASA scientists and engineers a facility where they can gain real-world experience with optical communications. It will give engineers a cost-effective way to try out new concepts and processes by providing the infrastructure for such testing. In this way it is hoped LCOT will serve as a stimulus for innovation in optical communications and speed its widespread adoption by future missions. The LCOT is comprised of five subsystems: Free-Space Optical, Transceiver, Amplifier, Monitor and Control, and Observatory Infrastructure. In August 2021, the LCOT team installed a 70 cm telescope, developed by Planewave Instruments that was optimized for optical communications. Free-Space Optical subsystem comprises of the telescope and its associated hardware, including a transmitter optical assembly, wide field cameras, two optical benches, and an adaptive optics subsystem. The transmit optical assembly, a unique concept design, is a cluster of four functionally independent transmit subassemblies located on the receive telescope. In addition to receiving optical signals and directing the expanded beam with high precision to the space terminal, it also performs tracking functions. The transmit optical assembly will support operations from Low Earth Orbit (LEO) through lunar and will be used as a template for industry manufacturing. The Optical Infrastructure subsystem is responsible for providing environmentally controlled shelters for LCOT equipment and various other systems. To maintain the safety and proper functionality of the telescope, a 16 ft Astrohaven clamshell dome procured which provides all-sky coverage without the need to rotate the dome. Additionally, Atmospheric Monitoring Assembly (AMA) will be part of optical infrastructure subsystem to ensure accurate performance of the LCOT. Like existing optical ground stations, LCOT will measure standard weather station parameters, infrared all sky image of cloud cover, and cloud height. LCOT, however, adds requirements for measuring night time seeing and, in the future, daytime seeing. Unlike other optical ground terminals, the LCOT is transceiver agnostic; user transceivers may be duplex transceivers, standalone receivers, or standalone transmitters with or without acquisition beacon functionality. As such, the LCOT project accommodates testing with external customer transceivers in a flexible manor, further complimenting its intended multi-mission goals. Another unique component of LCOT is the use of a new amplifier technology – the Very Large Mode Area (VLMA) amplifiers. This new technology allows LCOT to avoid the issues faced by previous laser communications ground terminals, gives users more flexibility and modular capability, and is capable of reaching an order of magnitude higher peak power than traditional High Power Optical Amplifiers (HPOA). One drawback of the VLMA HPOA approach is that the amplified light is output into free-space. The solution developed by LCOT is an optics train that couples the output of the VLMA amplifier into a short fiber for transport to the transmit telescopes with high efficiency. Like many of the LCOT components, a set of detailed manufacturing drawings have been created for the optics train to allow any machine shop with a multi-axis Computer Numerical Control (CNC) machine to fabricate the piece parts from commonly available materials. In line with the goals of LCOT, the monitor and control functions are developed as a modular and flexible system with the ability to support future hardware or algorithm changes, minimizing disruptions. A main priority of development in the Monitor and Control Subsystem (MCS) is the safety monitor system.

laser communication↗

Development of a Ground Multi-mission Low Cost Optical Terminal(LCOT) for Free-Space Optical Communication

Once confined to the realm of laboratory experiments and theoretical papers, space-based laser communications (lasercomm) are on the verge of achieving mainstream status. Organizations from Facebook to NASA, and missions from cubesats to Orion are employing lasercomm to achieve gigabit communication speeds at mass and power requirements lower than that of traditional radio frequency (RF) methods. Since first demonstrating free-space optical communications services with Lunar Laser Communications Demonstration (LLCD) in 2013, NASA has invested in developing optical communications technologies and capabilities to enhancing its space communications networks. Along with evolving optical space terminals, NASA is also developing lasercomm grounds stations capable of meeting the rapidly increasing data volume demands of upcoming missions, from low-earth to lunar orbits and beyond and integrating these advanced capabilities into its Near-Space and Deep Space Networks. To meet this emerging need, the Low-Cost Optical Terminal (LCOT) project at NASA’s Goddard Space Flight Center (GSFC) is designing, building and validating a prototype for a flexible, multi-mission, and economical optical ground terminal that could be used as a blueprint for a global network of optical ground stations, capable of supporting a wide variety of missions. To date a major impediment to widespread adoption of laser communication has been the lack of an existing ground network infrastructure. A mission that wishes to take advantage of laser communication not only needs to invest in an optical space terminal, but it must also finance the creation of ground terminals to receive the downlink signal. This adds significant additional cost. Missions that do decide to incur the cost of financing a network of ground terminals end up building highly specialized optical receivers that are operable as receivers for that specific mission only. Significant Non-Recurring Engineering (NRE) cost is invested to build highly specialized one-of-a-kind ground terminals that go into storage after that particular mission is over. This is not an economical approach and does nothing to grow the number of optical ground stations available to future missions. In essence each mission that wants to take advantage of the benefits of lasercom has to start from scratch to provide a ground terminal network to support it. As long as this is the case, the cost for using laser communications will be too high for most missions to consider. LCOT intends to close this gap in technology by designing and developing a standard optical ground terminal design that is flexible enough to serve as a receiver for a wide range of future missions – a ground terminal that can be quickly reconfigured to receive downlinks at different wavelengths using different signal formats. Not only does LCOT have the industry-building objectives of utilizing commercial-off-the-shelf (COTS) components to the maximum extent possible, but also spurs the commercial development of other necessary lasercomm components not currently offered by industry. Finally, LCOT will give NASA scientists and engineers a facility where they can gain real-world experience with optical communications. It will give engineers a cost-effective way to try out new concepts and processes by providing the infrastructure for such testing. In this way it is hoped LCOT will serve as a stimulus for innovation in optical communications and speed its widespread adoption by future missions. The LCOT is comprised of five subsystems: Free-Space Optical, Transceiver, Amplifier, Monitor and Control, and Observatory Infrastructure. In August 2021, the LCOT team installed a 70 cm telescope, developed by Planewave Instruments that was optimized for optical communications. Free-Space Optical subsystem comprises of the telescope and its associated hardware, including a transmitter optical assembly, wide field cameras, two optical benches, and an adaptive optics subsystem. The transmit optical assembly, a unique concept design, is a cluster of four functionally independent transmit subassemblies located on the receive telescope. In addition to receiving optical signals and directing the expanded beam with high precision to the space terminal, it also performs tracking functions. The transmit optical assembly will support operations from Low Earth Orbit (LEO) through lunar and will be used as a template for industry manufacturing. The Optical Infrastructure subsystem is responsible for providing environmentally controlled shelters for LCOT equipment and various other systems. To maintain the safety and proper functionality of the telescope, a 16 ft Astrohaven clamshell dome procured which provides all-sky coverage without the need to rotate the dome. Additionally, Atmospheric Monitoring Assembly (AMA) will be part of optical infrastructure subsystem to ensure accurate performance of the LCOT. Like existing optical ground stations, LCOT will measure standard weather station parameters, infrared all sky image of cloud cover, and cloud height. LCOT, however, adds requirements for measuring night time seeing and, in the future, daytime seeing. Unlike other optical ground terminals, the LCOT is transceiver agnostic; user transceivers may be duplex transceivers, standalone receivers, or standalone transmitters with or without acquisition beacon functionality. As such, the LCOT project accommodates testing with external customer transceivers in a flexible manor, further complimenting its intended multi-mission goals. Another unique component of LCOT is the use of a new amplifier technology – the Very Large Mode Area (VLMA) amplifiers. This new technology allows LCOT to avoid the issues faced by previous laser communications ground terminals, gives users more flexibility and modular capability, and is capable of reaching an order of magnitude higher peak power than traditional High Power Optical Amplifiers (HPOA). One drawback of the VLMA HPOA approach is that the amplified light is output into free-space. The solution developed by LCOT is an optics train that couples the output of the VLMA amplifier into a short fiber for transport to the transmit telescopes with high efficiency. Like many of the LCOT components, a set of detailed manufacturing drawings have been created for the optics train to allow any machine shop with a multi-axis Computer Numerical Control (CNC) machine to fabricate the piece parts from commonly available materials. In line with the goals of LCOT, the monitor and control functions are developed as a modular and flexible system with the ability to support future hardware or algorithm changes, minimizing disruptions. A main priority of development in the Monitor and Control Subsystem (MCS) is the safety monitor system.

Haleh Safavi↗

ASK Talks With Judy Stokley

In the summer of 1997, Judy Stokley took over as Program Director of the Air-to-Air Joint System Project Office (JSPO) at Eglin Air Force Base in Florida. As the JSPO Program Director, she directed much of her attention to reforming the Advanced Medium Range Air to Air Missile (AMRAAM) program, which had been operational since 1991 and was presently being produced for the Air Force, Navy, Marine Corps, and many international customers. Upon careful analysis of the program, she found it rife with problems. Two of the most pressing included a bloated Average Unit Procurement Cost and an Air Force mandated draw down plan that had not been met. In this interview, following her presentation at the Fourth NASA Masters Forum of Program and Project Managers in Dallas last February, Stokley discusses some of the difficulties she experienced in carrying out the AMRAAM reforms. Stokley is presently Air Force Program Executive Officer for Weapons in Washington, D.C. She is responsible for the cost, schedule, and technical performance of a portfolio of air-to-air and air-to-ground weapons programs. These programs represent the leading edge of weapons technology, including developing the next generation of precision-guided munitions -- 'smart' bombs -- and air superiority missiles.

Stokley, Judy↗

Lunar COTS: An Economical and Sustainable Approach to Reaching Mars

The NASA COTS (Commercial Orbital Transportation Services) Program was a very successful program that developed and demonstrated cost-effective development and acquisition of commercial cargo transportation services to the International Space Station (ISS). The COTS acquisition strategy utilized a newer model than normally accepted in traditional procurement practices. This new model used Space Act Agreements where NASA entered into partnerships with industry to jointly share cost, development and operational risks to demonstrate new capabilities for mutual benefit. This model proved to be very beneficial to both NASA and its industry partners as NASA saved significantly in development and operational costs while industry partners successfully expanded their market share of the global launch transportation business. The authors, who contributed to the development of the COTS model, would like to extend this model to a lunar commercial services program that will push development of technologies and capabilities that will serve a Mars architecture and lead to an economical and sustainable pathway to transporting humans to Mars. Over the past few decades, several architectures for the Moon and Mars have been proposed and studied but ultimately halted or not even started due to the projected costs significantly exceeding NASA's budgets. Therefore a new strategy is needed that will fit within NASA's projected budgets and takes advantage of the US commercial industry along with its creative and entrepreneurial attributes. The authors propose a new COTS-like program to enter into partnerships with industry to demonstrate cost-effective, cis-lunar commercial services, such as lunar transportation, lunar ISRU operations, and cis-lunar propellant depots that can enable an economical and sustainable Mars architecture. Similar to the original COTS program, the goals of the proposed program, being notionally referred to as Lunar Commercial Orbital Transfer Services (LCOTS) program will be to: 1) reduce development and operational costs by sharing costs with industry; 2) create new markets in cis-lunar space to further reduce operational costs; and 3) enable NASA to develop an affordable and economical exploration Mars architecture. The paper will describe a plan for a proposed LCOTS program, its potential impact to an eventual Mars architecture and its many benefits to NASA, commercial space industry and the US economy.

Lunar ISRU↗

Thermal barrier coating life-prediction model development

The program focuses on predicting the lives of two types of strain-tolerant and oxidation-resistant thermal barrier coating (TBC) systems that are produced by commercial coating suppliers to the gas turbine industry. The plasma-sprayed TBC system, composed of a low-pressure plasma-spray (LPPS) or an argon shrouded plasma-spray (ASPS) applied oxidation resistant NiCrAlY or (CoNiCrAlY) bond coating and an air-plasma-sprayed yttria partially stabilized zirconia insulative layer, is applied by both Chromalloy, Klock, and Union Carbide. The second type of TBS is applied by the electron beam-physical vapor deposition (EB-PVD) process by Temescal. The second year of the program was focused on specimen procurement, TMC system characterization, nondestructive evaluation methods, life prediction model development, and TFE731 engine testing of thermal barrier coated blades. Materials testing is approaching completion. Thermomechanical characterization of the TBC systems, with toughness, and spalling strain tests, was completed. Thermochemical testing is approximately two-thirds complete. Preliminary materials life models for the bond coating oxidation and zirconia sintering failure modes were developed. Integration of these life models with airfoil component analysis methods is in progress. Testing of high pressure turbine blades coated with the program TBS systems is in progress in a TFE731 turbofan engine. Eddy current technology feasibility was established with respect to nondestructively measuring zirconia layer thickness of a TBC system.

Strangman, T. E.↗

Laser light scattering instrument advanced technology development

The objective of this advanced technology development (ATD) project has been to provide sturdy, miniaturized laser light scattering (LLS) instrumentation for use in microgravity experiments. To do this, we assessed user requirements, explored the capabilities of existing and prospective laser light scattering hardware, and both coordinated and participated in the hardware and software advances needed for a flight hardware instrument. We have successfully breadboarded and evaluated an engineering version of a single-angle glove-box instrument which uses solid state detectors and lasers, along with fiber optics, for beam delivery and detection. Additionally, we have provided the specifications and written verification procedures necessary for procuring a miniature multi-angle LLS instrument which will be used by the flight hardware project which resulted from this work and from this project's interaction with the laser light scattering community.

Wallace, J. F.↗

Case for real-time systems development - Quo vadis?

The paper focuses on the distinctive issues of computer-aided software engineering (CASE) products for the development of real-time systems. CASE technologies and associated standardization efforts are evolving from sets of conflicting interests. The majority of case products are intended for use in the development of management information systems. CASE products to support the development of large, complex real-time systems must provide additional capabilities. Generic concerns include the quality of the implementation of the required method for the phase of the system's development and whether the vendor is stable and committed to evolving the products in parallel with nonproprietary standards. The CASE market is undergoing considerable consolidation. The paper describes the major forces, cooperating entities, and remaining uncertainties that need to be weighed in near-term CASE procurements to limit risk of loss of investment in project time, trianing, and money.

Erb, Dona M.↗

Future directions in flight simulation: A user perspective

Langley Research Center was an early leader in simulation technology, including a special emphasis in space vehicle simulations such as the rendezvous and docking simulator for the Gemini program and the lunar landing simulator used before Apollo. In more recent times, Langley operated the first synergistic six degree of freedom motion platform (the Visual Motion Simulator, or VMS) and developed the first dual-dome air combat simulator, the Differential Maneuvering Simulator (DMS). Each Langley simulator was developed more or less independently from one another with different programming support. At present time, the various simulation cockpits, while supported by the same host computer system, run dissimilar software. The majority of recent investments in Langley's simulation facilities have been hardware procurements: host processors, visual systems, and most recently, an improved motion system. Investments in software improvements, however, have not been of the same order.

Jackson, Bruce↗

Genesis Solar Wind – Capture, Return, Curate and Analyze: Looking Backward and Creating a Timeline

Introduction: In 1997 NASA’S Discovery Program selected the Genesis mission proposal to return solar wind samples to Earth for laboratory analyses. Principal Investigator Donald S. Burnett and the science team defined the purity of collector materials and ability to analyze solar wind composition to the precision required for planetary science. As a small mission, focused on a well-defined science goal, yet needing careful attention to engineering details, the communication among scientists and engineers, nurtured by Don Burnett, was exceptional. Genesis Mission and Curation Legacy: Genesis, as the first U. S. spacecraft to return astromaterial samples since Apollo, not only integrated the mission planning and flight teams, but also the science and sample curation teams during the mission development period. Since Genesis is a sample return mission, the Science Team was essential in certifying the collectors (sample containers for solar atoms). From inception, Genesis established mission funding for returned sample curation. JSC was lead in contamination control during mission preparation, including establishment of an ISO 4 cleanroom facility and use of ultrapure water (UPW) for cleaning flight hardware (and, as it turned out, for cleaning collectors after the mishap). Reliable, fast communication among scientists, engineers and curators at the hands-on level established deep respect among team members and efficient decision-making. JSC’s 50-years of astromaterial sample curation provided experienced sample processors onsite during recovery in Utah (a deep bench for emergency response). Post-recovery curation included iterative collaboration with science sample users to clean or verify cleanliness of samples. The science legacy from Genesis is addressed by Burnett and Jurewicz, this volume. In The Beginning: After Apollo sample return, Burnett and Marcia Neugebauer at JPL began discussing a solar wind sample return, with Neugebauer arguing that separate collection of solar wind regimes was essential science. By 1992 a solar wind sample return mission was presented at a workshop, and by 1994 a mission was proposed named Suess-Urey. The mission was re-proposed under a new name GENESIS and selected in 1997. Susan Niebur captured the Genesis mission history and stories, from high level management documents and from many interviews with participants [2]. Her account lets readers glimpse personality of participants in quotations from interviews. Need and Scope for Detailed Technical Timeline: A timeline constructed from lower level task documents has been initiated to document the resources and skills actually used, as well as task sequence or concurrency. Timelines for high level mission events are captured in two documents [1] [2] and for detailed re-entry events in [3]. A detailed technical timeline for Genesis mission and curation activities will provide data points for lower level tasks, such as ISO 4 curation facility construction time, preparation for nominal sample field recovery, mishap recovery, and UPW expansion. Changes in technology context 1990-2024: Semiconductor technologies were easily accessible in the U.S.A. (1990-1999), and the Genesis team used those resources for cleanroom design and UPW system expansion. Image documentation was changing from film to digital during cleanroom construction and payload cleaning (1997-2001). Engineering design was done using computer aided design proprietary software, making more difficult the archiving of payload configuration and materials. Email of documents, tracked delivery service and virtual meeting capability greatly improved communication efficiency. Information sources – Pre-launch mission preparation: Examples of mission science, engineering and contamination control are collector purity testing, payload design/fabrication and ISO 4 cleanroom construction. Information on timing of these activities comes from facility readiness reviews, management reviews, shipping documents, procurement documents, test reports, travel documents, laboratory logs, Quality Assurance documents, dates on images, participant notebooks and emails. Information sources – Sample return re-entry and field recovery activities: Information comes from event timelines produced by Mid-Air Recovery team, Lockheed team lead notes and from chase video, JPL Quality Assurance. Information also comes from images and logbooks from UTTR cleanroom operations and from curatorial documents. Information sources – Resulting science and sample cleaning processes: Agendas from the annual gatherings of the science team initially trace testing for collector purity/cleanliness, and after sample recovery, include collector cleaning and cleanliness assessment. Post-recovery documents include curatorial orders and procedures, sample allocation documents and LPSC abstracts. Timeline Objectives: A simple spreadsheet timeline with headers DATE, EVENT, PEOPLE, COMMENT, INFORMATION SOURCE has been initiated and currently has over 90 entries. While this is not definitive historical research, it is a quick look at the evolution of Genesis curation with pointers to documents or people with information. Engineers for future missions may find useful points of comparison for development of facilities. References:[1] Genesis Mission Reference Document, (2011) JPL D-62382.[2] Niebur S. M., edited by Brown D. W. (2023) NASA’s Discovery Program: The First 20 Years of Competitive Planetary Exploration, NASA-SP-2023-4238.[3] Genesis Mishap Investigation Board Report, Vol. 1 (July 2005).

solar wind↗

Holographic Weapons Sight as Crew Optical Alignment Sight

Crew Optical Alignment Sights (COAS) are used by spacecraft pilots to provide a visual reference to a target spacecraft for lateral relative position during rendezvous and docking operations. NASA s Orion vehicle, which is currently under development, has not included a COAS in favor of automated sensors, but the crew office has requested such a device be added for situational awareness and contingency support. The current Space Shuttle COAS was adopted from Apollo heritage, weighs several pounds, and is no longer available for procurement which would make re-use difficult. In response, a study was conducted to examine the possibility of converting a commercially available weapons sight to a COAS for the Orion spacecraft. The device used in this study was the XPS series Holographic Weapon Sight (HWS) procured from L-3 EOTech. This device was selected because the targeting reticule can subtend several degrees, and display a graphic pattern tailored to rendezvous and docking operations. Evaluations of the COAS were performed in both the Orion low-fidelity mockup and rendezvous simulations in the Reconfigurable Operational Cockpit (ROC) by crewmembers, rendezvous engineering experts, and flight controllers at Johnson Space Center. These evaluations determined that this unit s size and mounting options can support proper operation and that the reticule visual qualities are as good as or better than the current Space Shuttle COAS. The results positively indicate that the device could be used as a functional COAS and supports a low-cost technology conversion solution.

Merancy, Nujoud↗

MISSE-11 Ground Experiment Control

Back during the Apollo missions, when astronauts were being sent to the moon to explore and further scientific knowledge by conducting experiments and collecting samples for scientists back on Earth, they were faced with a surprising problem. It was discovered that the moon’s surface is covered with dust that has electrostatic properties, which would stick to suit and equipment. This hindered the functionality of the astronauts’ space suits, solar panels, optical instruments, among other exposed surfaces due to the jagged geometry of the dust which would damage said equipment. To resolve this issue, the Electrostatics and Surface Physics Laboratory (ESPL) came up with the solution of using an Electrodynamic Dust Shield (EDS)1 that uses electrostatic forces to move particles across a surface. Varieties of this dust shield have been developed for different applications. The purpose of the Materials International Space Station Experiments 11 (MISSE-11) is to experiment a payload that contains the dust mitigation technology to be flown to space for one year and an identical payload will be on earth, under vacuum, in the Electrostatics and Surface Physics Laboratory. The space payload was prepared prior to our arrival and shipped to fly on the International Space Station (ISS). The payload staying on the ground is going to act as a control for the experiment so that we may compare it to the payload that was flown in space. During our time at Kennedy Space Center, we were tasked with building and start testing the ground control unit of the MISSE-11 payload. To complete our task for the ground control unit, we constructed a new vacuum chamber setup and added automated aspects, procured the necessary flight electronics, designed and communicated for the machining of the payload frame, and performed functional and thermal testing on the electronics to the same original operational standards. Some modifications were made where possible, without affecting the performance of the samples, to be efficient with the production of the control unit while keeping important aspects identical. The experiment is now nearly complete, and testing will be starting within the next few weeks.

MISSE↗