Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Radiation shielding for the Fermilab Vertical Cavity Test Facility

The results of radiation shielding studies for the vertical test cryostat VTS1 at Fermilab performed with the codes FISHPACT and MARS15 are presented and discussed. The analysis is focused on operations with two RF cavities in the cryostat. The vertical cavity test facility (VCTF) for superconducting RF cavities in Industrial Building 1 at Fermilab has been in operation since 2007. The facility currently consists of a single vertical test cryostat VTS1. Radiation shielding for VTS1 was designed for operations with single 9-cell 1.3 GHz cavities, and the shielding calculations were performed using a simplified model of field emission as the radiation source. The operations are proposed to be extended in such a way that two RF cavities will be in VTS1 at a time, one above the other, with tests for each cavity performed sequentially. In such a case the radiation emitted during the tests from the lower cavity can, in part, bypass the initially designed shielding which can lead to a higher dose in the building. Space for additional shielding, either internal or external to VTS1, is limited. Therefore, a re-evaluation of the radiation shielding was performed. An essential part of the present analysis is in using realistic models for cavity geometry and spatial, angular and energy distributions of field-emitted electrons inside the cavities. The calculations were performed with the computer codes FISHPACT and MARS15.

43 PARTICLE ACCELERATORS↗

Development of a machine protection system for the Superconducting Beam Test Facility at Fermilab

Fermilab's Superconducting RF Beam Test Facility currently under construction will produce electron beams capable of damaging the acceleration structures and the beam line vacuum chambers in the event of an aberrant accelerator pulse. The accelerator is being designed with the capability to operate with up to 3000 bunches per macro-pulse, 5Hz repetition rate and 1.5 GeV beam energy. It will be able to sustain an average beam power of 72 KW at the bunch charge of 3.2 nC. Operation at full intensity will deposit enough energy in niobium material to approach the melting point of 2500 C. In the early phase with only 3 cryomodules installed the facility will be capable of generating electron beam energies of 810 MeV and an average beam power that approaches 40 KW. In either case a robust Machine Protection System (MPS) is required to mitigate effects due to such large damage potentials. This paper will describe the MPS system being developed, the system requirements and the controls issues under consideration.

43 PARTICLE ACCELERATORS↗

STATUS OF NEW 2.5 MEV TEST FACILITY AT SNS

A new 2.5MeV beam test facility is being built at SNS. It consists of a 65 keV H- ion source, a 2.5MeV RFQ, a beam line with various beam diagnostics and a 6 kW beam dump. The facility is capable of producing one-ms-long pulses at 60Hz repetition rate with up to 50mA peak current. The commissioning with reduced average beam power is planned for fall 2014 to verify operation of all systems. The full power operation is scheduled to begin in 2015. The status of the facility will be presented as well as a discussion of the future R&D program.

Aleksandrov, Alexander V↗

New High Power Test Facility for VHF Power Amplifiers at LANSCE

A new test facility was designed and constructed at Los Alamos Neutron Science Center (LANSCE) for testing the Thales TH628 Diacrode{sup R} and TH781 tetrode power amplifiers. Anode power requirements for the TH628 are 28 kV DC, with peak currents of 190 Amperes in long pulses. A charging power supply was obtained by reconfiguring a 2 MW beam power supply remaining from another project. A traditional ignitron crowbar was designed to rapidly discharge the 88 kJ stored energy. The anode power supply was extensively tested using a pulsed tetrode switch and resistor load. A new Fast Protect and Monitor System (FPMS) was designed to take samples of RF reflected power, anode HV, and various tube currents, with outputs to quench the HV charging supply, remove RF drive and disable the conduction bias pulse to the grid of each tube during fault events. The entire test stand is controlled with a programmable logic controller (PLC), for normal startup sequencing and timing, protection against loss of cooling, and provision for operator GUI.

Accelerator Design, Technology, and Operations↗

A negative ion source test facility

Progress is being made in the development of an Ion Source Test Facility (ISTF) by D-Pace Inc. in collaboration with Buckley Systems Ltd. in Auckland, NZ. The first phase of the ISTF is to be commissioned in October 2015 with the second phase being commissioned in March 2016. The facility will primarily be used for the development and the commercialization of ion sources. It will also be used to characterize and further develop various D-Pace Inc. beam diagnostic devices.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

THE CRYOPLANT FOR THE ITER NEUTRAL BEAM TEST FACILITY TO BE BUILT AT RFX IN PADOVA, ITALY

The Neutral Beam Test Facility (NBTF), planned to be constructed in Padua (Italy), will constitute the prototype of the two Neutral Beam Injectors (NBI), which will be installed in the ITER plant (Cadarache-France). The NBTF is composed of a 1 MV accelerator that can produce a 40 A deuteron pulsed neutral beam particles. The necessary vacuum needed in the accelerator is achieved by two large cryopumps, designed by FZK-Karlsruhe, with radiation shields cooled between 65 K and 90 K and with cryopanels cooled by 4 bar supercritical helium (ScHe) between 4.5 K and 6.5 K. A new cryoplant facility will be installed with two large helium refrigerators: a Shield Refrigerator (SR), whose cooling capacity is up to 30 kW between 65 K and 90 K, and a helium Main Refrigerator (MR), whose equivalent cooling capacity is up to 800 W at 4.5 K. The cooling of the cryopanels is obtained with two (ScHe) 30 g/s pumps (one redundant), working in a closed cycle around 4 bar producing a pressure head of 100 mbar. Two heat exchangers are immersed in a buffer dewar connected to the MR. The MR and SR different operation modes are described in the paper, as well as the new cryoplant installation.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A high accuracy femto-/picosecond laser damage test facility dedicated to the study of optical thin films

A laser damage test facility delivering pulses from 100 fs to 3 ps and designed to operate at 1030 nm is presented. The different details of its implementation and performances are given. The originality of this system relies the online damage detection system based on Nomarski microscopy and the use of a non-conventional energy detection method based on the utilization of a cooled CCD that offers the possibility to obtain the laser induced damage threshold (LIDT) with high accuracy. Applications of this instrument to study thin films under laser irradiation are presented. Particularly the deterministic behavior of the sub-picosecond damage is investigated in the case of fused silica and oxide films. It is demonstrated that the transition of 0-1 damage probability is very sharp and the LIDT is perfectly deterministic at few hundreds of femtoseconds. The damage process in dielectric materials being the results of electronic processes, specific information such as the material bandgap is needed for the interpretation of results and applications of scaling laws. A review of the different approaches for the estimation of the absorption gap of optical dielectric coatings is conducted and the results given by the different methods are compared and discussed. The LIDT and gap of several oxide materials are then measured with the presented instrument: Al{sub 2}O{sub 3}, Nb{sub 2}O{sub 5}, HfO{sub 2}, SiO{sub 2}, Ta{sub 2}O{sub 5}, and ZrO{sub 2}. The obtained relation between the LIDT and gap at 1030 nm confirms the linear evolution of the threshold with the bandgap that exists at 800 nm, and our work expands the number of tested materials.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of an Improved RELAP5-3D Model for the High Temperature Test Facility

High-temperature gas-cooled reactors (HTGRs) are rapidly approaching deployment. Confidence in transient analysis of these systems for design, optimization, and licensing calculations requires modeling and simulation tools that have been validated against data relevant to HTGR conditions. The High Temperature Test Facility (HTTF) is an integral effects thermal hydraulics test facility for prismatic HTGRs. In spring and summer of 2019, HTTF was used for a series of experiments that now serve as the basis for the OECD/NEA Thermal Hydraulic Code Validation Benchmark for High Temperature Gas-Cooled Reactors using HTTF Data (HTGR T/H Benchmark). This benchmark contains problems for systems code, computational fluid dynamics (CFD), and coupled systems code/CFD modeling representing lower plenum mixing and both the depressurized and pressurized conduction cooldown (DCC and PCC respectively) transients. Benchmark problems include exercises for code-to-code and code-to-data comparisons as well as an exercise for error scaling between HTTF and the Modular High Temperature Gas-Cooled Reactor, which serves as the basis for the HTTF design. Previous analysis as part of the HTGR T/H benchmark used a RELAP5-3D model developed at Idaho National Laboratory (INL) and demonstrated an ability to reproduce trends in the measured data but difficulties reproducing experimental values within their uncertainty. These difficulties were largely attributed to assumptions made during the development of the initial RELAP5-3D model, which predated the HTTF experiments. A significant cause of difficulty reproducing the measured temperatures may be the radial nodalization of the previous RELAP5-3D model. The new model provides a finer nodalization to assess the impact of radial nodalization and allows for asymmetric heating within the core, which was a feature of multiple HTTF experiments. In this paper, we present the new RELAP5-3D model of HTTF. In addition to describing the new model, this paper compares the new and old models and provides results for a full-power steady state, a DCC, and a PCC in HTTF. These analyses are based on the code-to-code comparison exercises for the DCC and PCC problems of the HTGR T/H benchmark. We present the results of these exercises from the new model and compare them to the results of the old model.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Start-to-End Beam Dynamics Simulations for the SRF Accelerator Test Facility at Fermilab

Fermilab is currently building a superconducting RF (SCRF) linear-accelerator test facility. In addition to testing ILC-spec SCRF accelerating modules for ILC and Project-X, the facility will be capable of supporting a variety of advanced acc elerator R&D experiments. The accelerator facility includes a 40-MeV photoinjector capable of producing bunches with variable parameters. In this paper, we present start-to-end simulations of the accelerator beamline.

43 PARTICLE ACCELERATORS↗

Towards 20 A negative hydrogen ion beams for up to 1 h: Achievements of the ELISE test facility (invited)

The large-scale RF-driven ion source of the test facility extraction from a large ion source experiment is aimed to deliver an accelerated ion current of 20 A D{sup −} (23 A H{sup −}) with an extracted electron-to-ion ratio below one for up to 1 h. Since the first plasma pulses for 20 s in volume operation in early 2013, followed by caesiation of the ion source, substantial progress has been achieved in extending the pulse length and the RF power. The record pulses in hydrogen are stable 400 s pulses with an extracted ion current of 18.3 A at 180 kW total RF power and 9.3 A at 80 kW stable for 1 h. For deuterium pulse, length and RF power are limited by the amount of co-extracted electrons.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Beam dynamics simulations and measurements at the Project X Test Facility

Project X, under study at Fermilab, is a multitask high-power superconducting RF proton beam facility, aiming to provide high intensity protons for rare processes experiments and nuclear physics at low energy, and simultaneously for the production of neutrinos, as well as muon beams in the long term. A beam test facility - former known as High Intensity Neutrino Source (HINS) - is under commissioning for testing critical components of the project, e.g. dynamics and diagnostics at low beam energies, broadband beam chopping, RF power generation and distribution. In this paper we describe the layout of the test facility and present beam dynamics simulations and measurements.

43 PARTICLE ACCELERATORS↗

A mobile test facility based on a magnetic cumulative generator to study the stability of the power plants under impact of lightning currents

The report presents the results of the development and field testing of a mobile test facility based on a helical magnetic cumulative generator (MCGTF). The system is designed for full-scale modeling of lightning currents to study the safety of power plants of any type, including nuclear power plants. Advanced technologies of high-energy physics for solving both engineering and applied problems underlie this pilot project. The energy from the magnetic cumulative generator (MCG) is transferred to a high-impedance load with high efficiency of more than 50% using pulse transformer coupling. Modeling of the dynamics of the MEG that operates in a circuit with lumped parameters allows one to apply the law of inductance output during operation of the MCG, thus providing the required front of the current pulse in the load without using any switches. The results of field testing of the MCGTF are presented for both the ground loop and the model load. The ground loop generates a load resistance of 2–4 Ω. In the tests, the ohmic resistance of the model load is 10 Ω. It is shown that the current pulse parameters recorded in the resistive-inductive load are close to the calculated values.

42 ENGINEERING↗

Shielding design for a chip irradiation test facility at SNS - Paper 119

As digital and analog circuits are more and more sophisticatedly integrated, they become increasingly susceptible to single event upsets (SEU), a cause of electronic equipment malfunction induced by cosmic rays with particular hazard potential for aviation equipment. Electronic chips sensitive to SEU have to be tested in a simulated comic ray environment to ensure their reliability. It is found that the spallation induced fast neutron spectrum is very close to the neutron spectrum of the cosmic ray. Hence, a conceptual design study of a chip irradiation test facility is funded by FAA to be carried out at SNS, the world's most powerful accelerator driven facility for neutron scattering studies on materials. Compared to existing/being construct chip irradiation test facilities at LANL and ISIS, SNS can provide wider neutron energy range and much higher fluxes. This study focuses on the aspect of shielding design for such a chip irradiation facility. A number of medium-weighted and heavy materials were examined for efficiency in reducing radiation dose rate. In general, the smaller the target monolith is while satisfying the personnel-protection-driven radiation dose rate limit at its outside, the closer to the target chips could be placed and thus less beam power it demands to satisfy a given irradiation flux requirement. Before proceed to the shielding design, the neutron source coming off the target has to be determined for selecting a best spot for chip irradiation test, in which the incoming fast neutron spectrum approximate most to the atmospheric radiation condition. It also provides a source term for the following shielding design of the irradiation enclosure. (authors)

36 MATERIALS SCIENCE↗

The variable input coupler for the Fermilab Vertical Cavity Test Facility

A variable input coupler has been designed for the Fermilab vertical cavity test facility (VCTF), a facility for CW RF vertical testing of bare ILC 1.3 GHz 9-cell SRF cavities at 2K, to provide some flexibility in the test stand RF measurements. The variable coupler allows the cavity to be critically coupled for all RF tests, including all TM010 passband modes, which will simplify or make possible the measurement of those modes with very low end-cell fields, e.g., {pi}/9 mode. The variable coupler assembly mounts to the standard input coupler port on the cavity, and uses a cryogenic motor submerged in superfluid helium to control the antenna position. The RF and mechanical design and RF test results are described.

43 PARTICLE ACCELERATORS↗

Parametric Thermal Models of the Transient Reactor Test Facility (TREAT)

This work supports the restart of transient testing in the United States using the Department of Energy’s Transient Reactor Test Facility at the Idaho National Laboratory. It also supports the Global Threat Reduction Initiative by reducing proliferation risk of high enriched uranium fuel. The work involves the creation of a nuclear fuel assembly model using the fuel performance code known as BISON. The model simulates the thermal behavior of a nuclear fuel assembly during steady state and transient operational modes. Additional models of the same geometry but differing material properties are created to perform parametric studies. The results show that fuel and cladding thermal conductivity have the greatest effect on fuel temperature under the steady state operational mode. Fuel density and fuel specific heat have the greatest effect for transient operational model. When considering a new fuel type it is recommended to use materials that decrease the specific heat of the fuel and the thermal conductivity of the fuel’s cladding in order to deal with higher density fuels that accompany the LEU conversion process. Data on the latest operating conditions of TREAT need to be attained in order to validate BISON’s results. BISON’s models for TREAT (material models, boundary convection models) are modest and need additional work to ensure accuracy and confidence in results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design and commissioning of an e-beam irradiation beamline at the Upgraded Injector Test Facility at Jefferson Lab

We report the Upgraded Injector Test Facility (UITF) at Jefferson Lab is a continuous-wave superconducting linear accelerator capable of providing an electron beam with energy up to 10 MeV. A beamline for electron-beam irradiation has been designed, installed and successfully commissioned at this facility, aimed at the degradation study of 1,4-dioxane and per- and polyfluoroalkyl substances (PFAS) in wastewater treatment. A solenoid with a peak axial magnetic field of up to 0.28 T and a set of raster coils were used to obtain a Gaussian beam profile with a transverse standard deviation of ~ 15.0 mm at the target location. Monte-Carlo simulations using FLUKA were carried out to calculate the total absorbed dose and the dose distribution in the sample volume inside the target cell. The simulations were benchmarked experimentally by dosimetry mapping using optichromic dosimeters. The results of the irradiation experiments showed a ~ 95% reduction of 1,4-dioxane in ultra-pure water for a dose of 1 kGy, demonstrating the potential of electron-beam irradiation towards addressing growing challenges in environmental remediation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA White Sands Test Facility

This report focuses on the NASA White Sands Test Facility (WSTF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

33 ADVANCED PROPULSION SYSTEMS↗

BENCHMARK EVALUATION OF THE INITIAL ISOTHERMAL PHYSICS MEASUREMENTS AT THE FAST FLUX TEST FACILITY

The benchmark evaluation of the initial isothermal physics tests performed at the Fast Flux Test Facility, in support of Fuel Cycle Research and Development and Generation-IV activities at the Idaho National Laboratory, has been completed. The evaluation was performed using MCNP5 with ENDF/B-VII.0 nuclear data libraries and according to guidelines provided for inclusion in the International Reactor Physics Experiment Evaluation Project Handbook. Results provided include evaluation of the initial fully-loaded core critical, two neutron spectra measurements near the axial core center, 32 reactivity effects measurements (21 control rod worths, two control rod bank worths, six differential control rod worths, two shutdown margins, and one excess reactivity), isothermal temperature coefficient, and low-energy electron and gamma spectra measurements at the core center. All measurements were performed at 400 ºF. There was good agreement between the calculated and benchmark values for the fully-loaded core critical eigenvalue, reactivity effects measurements, and isothermal temperature coefficient. General agreement between benchmark experiment measurements and calculated spectra for neutrons and low-energy gammas at the core midplane exists, but calculations of the neutron spectra below the core and the low-energy gamma spectra at core midplane did not agree well. Homogenization of core components may have had a significant impact upon computational assessment of these effects. Future work includes development of a fully-heterogeneous model for comprehensive evaluation. The reactor physics measurement data can be used in nuclear data adjustment and validation of computational methods for advanced fuel cycle and nuclear reactor systems using Liquid Metal Fast Reactor technology.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗