Search NASA⌕ Search

SEARCH · Search NASA

Results for “time synchronization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Optical techniques for time and frequency transfer

Light has been used as a means for time synchronization for a long time. The flight time was supposed to be negligible. The first scientific determination of the velocity of the light was done by measuring a round trip flight time on a given distance. The well known flying clock experiment leading to Einstein's General Relativity is another example. The advent of lasers, particularly short pulse and modulated ones, as well as the improvements of the timing equipments have led to new concepts for time and frequency transfer. We describe some experiments using different techniques and configurations which have been proposed and tested in this field since the beginning of the space age. Added to that, we set out advantages, drawbacks, and performances achieved in the different cases.

Baumont, Francoise↗

Final Conversion of the Spallation Neutron Source Extraction Kicker Pulse Forming Network to a High Voltage Solid-State Switch

The Spallation Neutron Source (SNS) extraction kicker 60Hz pulsed system uses 14 Blumlein pulse-forming network (PFN) modulators that require timing synchronization with stable rise times. A replacement design has been investigated and the kickers have been converted over to use a solid-state switch design, eliminating the lifetime and stability issues associated with thyratrons and subsequent maintenance costs. All kickers have been converted, preventing thyratron jitter from impacting the beam performance and allowing higher-precision target impact. This paper discusses the completion of the conversion of the high-voltage switch from a thyratron to a solid-state switch with improved stability of the extraction system and associated accelerator beam stability.

Morris, B↗

Performance of PLL synchronized optical PPM communication systems

Receiver timing synchronization of an optical PPM communication system can be achieved using a phase-locked loop (PLL) if the photodetector output is properly processed. The synchronization performance is shown to improve with increasing signal power and decreasing loop bandwidth. The bit error rate performance of the PLL synchronized PPM system is analyzed and compared to that of the perfectly synchronized system. It is shown that the increase in signal power needed to compensate for the imperfect sychronization is small (less than 0.1 dB) for loop bandwidths less than 0.1 percent of the slot frequency.

Chen, C.-C.↗

The Galileo Orbiter - Command and telemetry subsystems on their way to Jupiter

An overview is given of the Galileo command and telemetry subsystems, which exemplify the rigid time-synchronized systems required by TDM (time division multiplexing). The spacecraft clock is examined, along with some of the rationale for the development of the clock structure and timing to give a sense of the design imperatives for rigidly synchronized systems. Additional subjects include the structure of the science and engineering frames, emphasizing the subcommutated structure of the engineering frame and its relationship to the spacecraft clock; ground processing for and basic uses of the telemetry; the various message types used to transmit commands to the spacecraft; and the generation processes for the command message types.

Erickson, James K.↗

A Robust State Estimation Framework Considering Measurement Correlations and Imperfect Synchronization

This paper develops a robust power system state estimation framework with the consideration of measurement correlations and imperfect synchronization. In the framework, correlations of SCADA and PMU measurements are calculated separately through unscented transformation and a vector autoregression (VAR) model. In particular, PMU measurements during the waiting period of two SCADA measurement scans are buffered to develop the VAR model. The latter takes into account the temporal and spatial correlations of PMU measurements and provides redundant measurements to suppress bad data and mitigate imperfect synchronization. In case of synchronization issues between SCADA and PMU measurements, either forecasted PMU measurements or prior SCADA measurements from the last estimation run are leveraged to restore system observability. After that, robust generalized maximum-likelihood (GM)-estimator is developed to integrate full measurement correlations and handle bad data in SCADA and PMU measurements. Thanks to the robustness and flexibility of the proposed robust estimator, bad data as well as imperfect measurement synchronization are mitigated, yielding high statistical efficiency. Comprehensive comparison results with other alternatives under various conditions demonstrate the benefits of the proposed framework.

Zhao, Junbo (ORCID:0000000284989666)↗

PTTI-aided ephemeris calculation and rapid data link acquisition for manned space flight

Complexity of future manned space flight mission control can be significantly reduced by integrating GPS, the PTTI source, into telemetry, tracking, and command (TT&C). Future telecommunications, space tracking electronic intelligence, metrology, navigation, and data acquisition will thereby be served, including: on-board ephemeris determination, reduced synchronization time for time division multiple access (TDMA) links, and in-flight clock calibration, increasing on-board autonomy and reducing ground support costs. Manned space transportation through the first quarter of the 21st century will probably depend on a mix of vehicles, including the Advanced Manned Launch System (AMLS), the Personnel Launch System (PLS), and continued use of the Shuttle Fleet. Precise Ephemeris is important on-board for mission success, status monitoring, also for rendezvous and docking. Use of GPS can eliminate ground based tracking/processing, enhancing autonomy and reducing communications bandwidth. GPS time can simplify complicated functions used in bandwidth efficient time division multiple access (TDMA) communications, such as: precise and realtime synchronization of receive reference timing, transmit-timing and acquisition control, unique synchronization word (UW) detection, and elastic buffering. High clock accuracy provides increased signal-to-noise (S/N) ratio during acquisition, permitting narrower acquisition frequency and time windows. Spaceborne systems requirements to provide capabilities such as: refinement of the GEM-72 gravity model based on satellite tracking observations from ATS-6 to GEOS-3, relativistic clock experiments, NASA crustal dynamics program for developing space geodetic techniques to study the earth's crust, its gravity field, and earthquake mechanisms, and multi-disciplinary space geodetic tracking for studying global climatic changes are also reviewed.

Anderman, Alfred↗

Resolution of the COBE Earth sensor anomaly

Since its launch on November 18, 1989, the Earth sensors on the Cosmic Background Explorer (COBE) have shown much greater noise than expected. The problem was traced to an error in Earth horizon acquisition-of-signal (AOS) times. Due to this error, the AOS timing correction was ignored, causing Earth sensor split-to-index (SI) angles to be incorrectly time-tagged to minor frame synchronization times. Resulting Earth sensor residuals, based on gyro-propagated fine attitude solutions, were as large as plus or minus 0.45 deg (much greater than plus or minus 0.10 deg from scanner specifications (Reference 1)). Also, discontinuities in single-frame coarse attitude pitch and roll angles (as large as 0.80 and 0.30 deg, respectively) were noted several times during each orbit. However, over the course of the mission, each Earth sensor was observed to independently and unexpectedly reset and then reactivate into a new configuration. Although the telemetered AOS timing corrections are still in error, a procedure has been developed to approximate and apply these corrections. This paper describes the approach, analysis, and results of approximating and applying AOS timing adjustments to correct Earth scanner data. Furthermore, due to the continuing degradation of COBE's gyroscopes, gyro-propagated fine attitude solutions may soon become unavailable, requiring an alternative method for attitude determination. By correcting Earth scanner AOS telemetry, as described in this paper, more accurate single-frame attitude solutions are obtained. All aforementioned pitch and roll discontinuities are removed. When proper AOS corrections are applied, the standard deviation of pitch residuals between coarse attitude and gyro-propagated fine attitude solutions decrease by a factor of 3. Also, the overall standard deviation of SI residuals from fine attitude solutions decrease by a factor of 4 (meeting sensor specifications) when AOS corrections are applied.

Sedler, J.↗

REAL TIME SYSTEM OPERATIONS 2006-2007

The Real Time System Operations (RTSO) 2006-2007 project focused on two parallel technical tasks: (1) Real-Time Applications of Phasors for Monitoring, Alarming and Control; and (2) Real-Time Voltage Security Assessment (RTVSA) Prototype Tool. The overall goal of the phasor applications project was to accelerate adoption and foster greater use of new, more accurate, time-synchronized phasor measurements by conducting research and prototyping applications on California ISO's phasor platform - Real-Time Dynamics Monitoring System (RTDMS) -- that provide previously unavailable information on the dynamic stability of the grid. Feasibility assessment studies were conducted on potential application of this technology for small-signal stability monitoring, validating/improving existing stability nomograms, conducting frequency response analysis, and obtaining real-time sensitivity information on key metrics to assess grid stress. Based on study findings, prototype applications for real-time visualization and alarming, small-signal stability monitoring, measurement based sensitivity analysis and frequency response assessment were developed, factory- and field-tested at the California ISO and at BPA. The goal of the RTVSA project was to provide California ISO with a prototype voltage security assessment tool that runs in real time within California ISO?s new reliability and congestion management system. CERTS conducted a technical assessment of appropriate algorithms, developed a prototype incorporating state-of-art algorithms (such as the continuation power flow, direct method, boundary orbiting method, and hyperplanes) into a framework most suitable for an operations environment. Based on study findings, a functional specification was prepared, which the California ISO has since used to procure a production-quality tool that is now a part of a suite of advanced computational tools that is used by California ISO for reliability and congestion management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Phase error statistics of a phase-locked loop synchronized direct detection optical PPM communication system

Receiver timing synchronization of an optical Pulse-Position Modulation (PPM) communication system can be achieved using a phased-locked loop (PLL), provided the photodetector output is suitably processed. The magnitude of the PLL phase error is a good indicator of the timing error at the receiver decoder. The statistics of the phase error are investigated while varying several key system parameters such as PPM order, signal and background strengths, and PPL bandwidth. A practical optical communication system utilizing a laser diode transmitter and an avalanche photodiode in the receiver is described, and the sampled phase error data are presented. A linear regression analysis is applied to the data to obtain estimates of the relational constants involving the phase error variance and incident signal power.

Natarajan, Suresh↗

Synchronization of Coupled Dynamical Systems: Tolerance to Weak Connectivity and Arbitrarily Bounded Time-Varying Delays

We study synchronization of coupled linear systems over networks with weak connectivity and time-varying delays. We focus on the case that the internal dynamics are time-varying but non-expansive. Both uniformly connected and infinitely connected communication topologies are considered. A new concept of P-synchronization is introduced and we first show that global asymptotic P-synchronization can be achieved over directed networks with uniform joint connectivity and arbitrarily bounded delays. We then study the case of the infinitely jointly connected communication topology. In particular, for the undirected communication topologies, it turns out that the existence of a uniform time interval for the communication topology is not necessary and P-synchronization can be achieved when the time varying delays are arbitrarily bounded. Simulations are given to validate the theoretical results.

Linear time-varying system, Synchronization, Switc↗

Response-time improved hydrothermal-method-grown ZnO scintillator for soft x-ray free-electron laser timing-observation

For pump and probe experiments in x-ray free-electron laser (XFEL) facilities, accurate timing synchronization between short-wavelength femtosecond pulses from XFELs and short optical pulses from other light sources is required. For this purpose, the response time of a hydrothermal-method-grown ZnO is improved by over one order of magnitude via intentional iron ion doping. The fluorescence rise- and decay-time constants are measured to be less than 10 and 100 ps, respectively. Owing to its intense fluorescence even for single pulse XFEL excitation, the timing jitter of the soft x-ray pulse and timing electronics are evaluated to be less than 70 ps.

43 PARTICLE ACCELERATORS↗

Synchronization Algorithms for Co-Simulation of Power Grid and Communication Networks

The ongoing modernization of power grids consists of integrating them with communication networks in order to achieve robust and resilient control of grid operations. To understand the operation of the new smart grid, one approach is to use simulation software. Unfortunately, current power grid simulators at best utilize inadequate approximations to simulate communication networks, if at all. Cooperative simulation of specialized power grid and communication network simulators promises to more accurately reproduce the interactions of real smart grid deployments. However, co-simulation is a challenging problem. A co-simulation must manage the exchange of informa- tion, including the synchronization of simulator clocks, between all simulators while maintaining adequate computational perfor- mance. This paper describes two new conservative algorithms for reducing the overhead of time synchronization, namely Active Set Conservative and Reactive Conservative. We provide a detailed analysis of their performance characteristics with respect to the current state of the art including both conservative and optimistic synchronization algorithms. In addition, we provide guidelines for selecting the appropriate synchronization algorithm based on the requirements of the co-simulation. The newly proposed algorithms are shown to achieve as much as 14% and 63% im- provement, respectively, over the existing conservative algorithm.

co-simulation↗

An Extended IEEE 118-Bus Test System With High Renewable Penetration

This article describes a new publicly available version of the IEEE 118-bus test system, named NREL-118. The database is based on the transmission representation (buses and lines) of the IEEE 118-bus test system, with a reconfigured generation representation using three regions of the US Western Interconnection from the latest Western Electricity Coordination Council (WECC) 2024 Common Case [1]. Time-synchronous hourly load, wind, and solar time series are provided for over one year (8784 hours). The public database presented and described in this manuscript will allow researchers to model a test power system using detailed transmission, generation, load, wind, and solar data. This database includes key additional features that add to the current IEEE 118-bus test model, such as: the inclusion of 10 generation technologies with different heat rate functions, minimum stable levels and ramping rates, GHG emissions rates, regulation and contingency reserves, and hourly time series data for one full year for load, wind and solar generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using the NAVSTAR Global Positioning System as a global timing system

The application of NAVSTAR GPS to the problems of PTTI dissemination is discussed. A short review of the GPS concept lead to a detailed description of the implementation of time transfer through NAVSTAR GPS. Time was followed from the U.S. Naval Observatory (USNO) through the ground control, satellite, and receiving segments of GPS to the user's clock system. The three options by which a user's system can receive from the GPS receivers, currently under development by the DOD, are defined in detail. The electrical/digital/mechanical interface parameters along with suggested methods for their use are outlined for each option. A detailed error model is also presented for the traceability of UTC (GPS) to UTC (USNO). Real time synchronization between stationary users on the time continent can be controlled to within a few nanoseconds, and absolute post processed time offset with UTC (USNO) measured within 25 nanoseconds or better. A discussion of some of the potential work around techniques and their applications are included.

Kovach, K. L.↗

The Role of Timing in Industrial Control Systems: A Primer

Accurate and synchronized time is an important dependency within an industrial control system. Manipulation or degradation of timing can result in varying impacts based on the critical infrastructure sector. As control systems continue to be digitized and automated, they require more precise timing elements which increases the potential impact of a cyber-attack on timing elements.

24 POWER TRANSMISSION AND DISTRIBUTION↗