Search NASA⌕ Search

SEARCH · Search NASA

Results for “utility programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Northwest Combined Heat and Power Technical Assistance Partnership: Final Scientific/Technical Report

During the years of 2018 through 2023, The Washington State University Energy Program (WSU EP) operated the Northwest Combined Heat and Power Technical Assistance Partnership under contract to the US Department of Energy’s Advanced Manufacturing Office (AMO), a part of DOE’s larger Office of Energy Efficiency and Renewable Energy. This contract provided direction and funding for providing technical outreach, information and technical/economic analysis services in support of expanding development of Combined Heat and Power (CHP) over a four state region in the Pacific Northwest. The states served included Alaska, Idaho, Oregon and Washington. During the duration of this contract, the WSU EP delivered performed specific assigned tasks and provided services of various generally prescribed types, with the overall goal of increasing adoption of CHP as an efficient heat and power supply in the region. Indications – though not formally evaluated to our knowledge – are that this goal was achieved. Over many years, the WSU team has provided support for CHP developments in these states under similar previous Department of Energy contracts, and many such projects have been built. While the early-phase outreach, education and techno-economic assessments that the NW CHP TAP provides rarely immediately result in project construction, there is no doubt that the WSU EP team has had substantial influence in the construction of a number of important CHP projects in the region. Examples of projects implemented directly under the current team’s guidance and services during this contract cycle include an 875 kilowatt biomass fueled CHP system installed at the University of Idaho, and 5 megawatt natural gas fueled CHP system at the University of Montana ( UM Breaks Ground on New Power Facility, Slashes Emissions 30% (umt.edu) ). Many other CHP systems recently installed are also either directly or at least partially the result of information and technical services provided by the team. Finally, though much more difficult to quantify and less glamorous, the team has helped countless organizations to understand CHP and determine whether and how CHP may be a fit for them, before they consider paying for engineering services. Whether the ultimate outcome has been to include CHP or not, the expert skills provided by the NW CHP TAP team have provided real value to these organizations considering this relatively complex technology. Over the duration of the contract our team provided 71 Initial Technical Assessments and 17 Advanced Technical Assessments; 53 End-User Engagements and 33 Stakeholder Engagements of various types; 42 Technical Profiles (Project Profiles, Program Profiles and Policy Profiles), and produced 14 technical articles for the Department of Energy. Unfortunately, these quantities provide no measure of the value that the team has provided. Only our clients can judge that, and we are confident that they are pleased with the benefits we have offered them.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Best Practices for Renewable Energy Installations in the National Parks

The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) and National Park Service (NPS) have partnered to support the development and utilization of renewable energy technology at federal facilities and on federal lands. FEMP provides technical support to NPS on renewable energy projects to identify and generate significant cost savings and efficiency benefits, investigate opportunities to reduce carbon footprint and/or achieve carbon neutrality, and improve resilience to NPS-owned facilities and sites. The purpose of this report is to support NPS staff as they evaluate whether and how to use renewable energy technologies in park operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Powered By ERAD [Slides]

Energy Resilience Analysis for Distribution Power System (ERAD) is a free, open-source Python toolkit for estimating the energy and service impacts of hazards like earthquakes and flooding. It uses a graph-based approach to capture high resolution connectivity among the grid, critical services, and customers and rapidly compute household level metrics and aggregated statistics across large distribution systems. It uses asset fragility curves that relate hazard severity to survival probability for power system equipment including cables, transformers, substations, etc. The tool is designed to be modular and extensible, allowing it to interface with third-party hazard simulators and integrate into broader resilience analysis workflows. ERAD enables researchers, students, communities, distribution utilities, and other stakeholders to understand hazard impacts and evaluate the effectiveness of different programs to improve energy resilience. The webinar was hosted by NLR researcher Aadil Latif.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2024 NSUF User Development Workshop on Irradiation Testing

Monday, May 20 – Thursday, May 23, 2024 at Center for Advanced Energy Studies at Idaho National Laboratory, Idaho Falls, Idaho. This pilot workshop was hosted to expand the NSUF user community and introduce irradiation testing of nuclear fuel and materials to new researchers, and to build long-term relationships between the NSUF program office, NSUF partner facilities, and NSUF university-affiliated users to provide better utilization of NSUF resources in addressing United States energy challenges.

Starks, Alexis↗

Energy Technology Innovation Partnership Project Strategic Energy Plan for Washington County, Maine

This Strategic Energy Plan (SEP) for Washington County, Maine was developed through the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to address local challenges related to electricity reliability, affordability, and safety. Grounded in a "relational infrastructure" approach, the plan recognizes that improved energy outcomes depend not only on physical grid investments but also on strengthened coordination and trust between utilities and communities. Using utility-provided reliability data, public datasets, and community input, the plan identifies key risks, including vegetation-related outages, high energy burden, and vulnerability among elderly and medically dependent populations. The SEP establishes three priority areas: hazard mitigation for energy infrastructure, outage safety and emergency readiness, and energy assistance and thermal safety. It outlines community-driven actions designed to complement utility-led system improvements, including targeted outreach, municipal coordination, and expanded access to energy programs. The plan also situates local conditions within broader state policy, market dynamics, and funding opportunities. Intended as a living document, this SEP provides a scalable framework for collaborative action to improve resilience, safety, and affordability in rural energy systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

University Data Management Pilot Utilizing the Nuclear Research Data System

Background In 2022, the Office of Science and Technology Policy (OSTP) issued a memo that significantly reshaped the landscape of access to federally funded research. The memo mandated that all taxpayer-funded research be made available to the public without delay upon publication, without an embargo period, superseding the 2013 OSTP public access policy. This public access policy promotes transparency and the democratization of knowledge, ensuring that the fruits of scientific endeavors funded by federal agencies could be immediately accessed and built upon by scientists, educators, students, and the public at large. To implement the requirements of the OSTP guidance and DOE Public Access Plan, the Office of Nuclear Energy (NE) has implemented public access plan guidance and has identified several areas where better data management practices would further expand public access to important nuclear energy related scientific data, reports, and other technical products. Significant NE supported efforts are already underway for data management and public access to important nuclear energy related data.1 2 To address gaps in data management practices, and improve retention and accessibility of data, NE is actively exploring enhanced data management options utilizing its high-performance computing resources administered by its Nuclear Scientific User Facility Program. A newly piloted system, the Nuclear Research Data System (NRDS) acts as a portal for data collection and dissemination. Nuclear Energy University Program Research and Development Portfolio According to Web of Science, NEUP has produced 2,345 journal publication that have been cited more than 61,000 times3 and countless conference proceedings. These publications are publicly available through OSTI.gov and in the open literature. Additional scientific and technical products including project milestones that are not publications and NEUP project final reports are vetted through OSTI.gov and released once reviewed and approved by DOE. Since 2009, NEUP has awarded close to 1,000 different R&D projects in technical areas across the NE research programs. As of June 2023, 512 NEUP reports are publicly available on OSTI. The underlying data for projects is still held at universities, and data transfer, co-location, and dissemination has not occurred in a systematic way. NEUP data is currently accessible through myriad university-based data repositories, or through direct requests to PIs. The program identified this patchwork of repositories, or often lack of publicly available data, as a significant barrier to an organized, accessible, and comprehensive solution to sharing data with the larger nuclear energy community. Approach The goal of this pilot project is to establish a pathway to a consolidated long-term repository for NEUP project data. To accomplish this goal, the pilot strives to accomplish the following objectives: Establish data collection standards, including a standard set of required supplementary information to contextualize and support raw data files. Work with the HPC group collect and upload information and to modify the NRDS system, as needed, to support a standardized approach. Resolve potential barriers to successful roll out of an expanded data collection strategy, including modifying data management plan guidelines and establishing a document and data release process that accounts for potential intellectual property and/or export control concerns. Results Overall, the pilot was successful in collecting 8,982 raw and processes data files, 220 reports, 56 calibration files, and 5,931 other supplementary documents. Supplementary documents included experimental plans, methods, journal publications and conference proceedings, milestone reports, and final reports. Figure 2 shows the number of data sets and supplementary project information provided by each project. Projects has significantly different input, depending on experimental data produced and completeness of the datasets provided.

Data collection↗

SPC-71188 Rev 0 MARVEL Control Drum Rotary Shaft Seal Procurement Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL Control Drum Rotary Shaft Seal.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-3186 Rev 8 Reactor Support Frame and Outer Shield Build to Print Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the Reactor Support Frame (RSF) and Outer Shield.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-71250 Rev 0 MARVEL Upper Shield Build to Print Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the Upper Shield Assembly.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70796 Rev 2 MetCar M-312 Bearings Procurement Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL MetCar M-312 bearings. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70525 Rev 2 Beryllium Metal Procurement Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. Key to this design are neutron reflector components constructed of Beryllium Metal (S-65) which is a structural grade of hot-pressed beryllium block. MARVEL will be located at the Transient Reactor Test (TREAT) facility. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-71123 Rev 1 MARVEL Control Drum Actuator Torsional Spring

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This specification defines the requirements for the procurement and factory acceptance testing of the MARVEL control drum actuator torsional spring. The purpose of this specification is to define the requirements to procure the MARVEL control drum actuator torsional spring component and witness a torsional spring rate Factory Acceptance Test (FAT) at the subcontractor’s facility with the contractor present. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Work In Progress: Using Internships as Means for Indirect Assessment of ABET Criteria 3 "1-7" Student Outcomes

PSU operates the Power Engineering Internship program with funding from two U.S. Department of Energy grants. The program is operated in partnership with the lead organizations of these grants, an investor-owned utility, Portland General Electric (PGE), and the Confederated Tribes of the Warm Springs (CTWS). One of the programmatic goals of the PEI is to create and sustain a clean energy engineering workforce pipeline on behalf of these lead organizations. Both grants support internships at PGE, which is also a partner on the CTWS grant. The PEI provides engineering students with year-long internships, spanning both the academic year and the summer. The interns work at PGE facilities located throughout the Portland metropolitan area. Interns are employed full-time during summers and part-time during the academic year. Proximity of the worksites to the PSU campus enables the interns to participate in the program while attending school full-time. During the academic year, students average fifteen hours per week, adjusting their work schedule according to their academic workload. The interns are allocated 930 hours per year, 480 in the summer and 450 during the academic year, which they can plan as they see fit. The internships provide meaningful financial support for the students, who can earn up to $21k if they use all of their allocated hours. Such funding is particularly important for the typical student who attends a minority serving institutions,

99 GENERAL AND MISCELLANEOUS↗

Active and passive cooling approaches for a Southern California residential community

This study assesses cooling strategies in a low-income community in Southern California that lacks air conditioning and struggles with heat and air pollution. We used an urban building energy model and an electric distribution system model to evaluate active and passive cooling measures. The most effective space cooling measures were high-performance air-source heat pumps, cool coatings, window films, and harnessing the space cooling effect from heat pump water heaters. The results show that combining heat pump water heaters with window films and cool coatings reduces heat index hazard hours within buildings by 95 % to 99 % but increases total energy costs (equipment costs plus changes in utility bills) by 20 % to 60 % where the higher end includes building electrical upgrades. These measures also led to increased space heater use during colder months to avoid overcooling. Replacing conventional heaters with air source heat pumps eliminated unsafe indoor temperatures and reduced total energy use, but increased cost by 125 % to 150 %. In total, using heat pumps for space and water heating could reduce primary energy use by up to 57 %. The higher cost of active and passive cooling measures can be mitigated by existing and emerging incentive programs, especially those that support heat pumps. Electric distribution upgrades to support community electrification are estimated to increase utility costs by $\$$25 to $\$$40 per ratepayer per year. The results underscore the potential and challenges of adapting building infrastructure in communities at risk from climate and environmental stressors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data-Driven Invertible Neural Surrogates of Atmospheric Transmission

We present Data-Driven Invertible Neural Surrogates of Atmospheric transmission, or DINSAT. DINSAT is a novel framework for inferring an atmospheric transmission profile from a spectral scene. This framework leverages a lightweight, physics-based simulator that is automatically tuned -- by virtue of autodifferentiation and differentiable programming -- to construct a surrogate atmospheric profile to model the observed data. The framework has utility in (i) performing atmospheric correction, (ii) recasting spectral data between various modalities (e.g. radiance and reflectance at the surface and at the sensor), and (iii) inferring atmospheric transmission profiles, such as absorbing bands and their relative magnitudes. We demonstrate the utility of these methods by performing a canonical atmospheric correction task for the purposes of further analysis - in this case, target detection within a scene.

Koch, James V.↗

Preparing MPICH for exascale

The advent of exascale supercomputers heralds a new era of scientific discovery, yet it introduces significant architectural challenges that must be overcome for MPI applications to fully exploit its potential. Among these challenges is the adoption of heterogeneous architectures, particularly the integration of GPUs to accelerate computation. Additionally, the complexity of multithreaded programming models has also become a critical factor in achieving performance at scale. The efficient utilization of hardware acceleration for communication, provided by modern NICs, is also essential for achieving low latency and high throughput communication in such complex systems. In response to these challenges, the MPICH library, a high-performance and widely used Message Passing Interface (MPI) implementation, has undergone significant enhancements. Here, this paper presents four major contributions that prepare MPICH for the exascale transition. First, we describe a lightweight communication stack that leverages the advanced features of modern NICs to maximize hardware acceleration. Second, our work showcases a highly scalable multithreaded communication model that addresses the complexities of concurrent environments. Third, we introduce GPU-aware communication capabilities that optimize data movement in GPU-integrated systems. Finally, we present a new datatype engine aimed at accelerating the use of MPI derived datatypes on GPUs. These improvements in the MPICH library not only address the immediate needs of exascale computing architectures but also set a foundation for exploiting future innovations in high-performance computing. By embracing these new designs and approaches, MPICH-derived libraries from HPE Cray and Intel were able to achieve real exascale performance on OLCF Frontier and ALCF Aurora respectively.

Guo, Yanfei [Argonne National Laboratory (ANL), Ar↗

Understanding Model Inadequacy in TRISO Nuclear Fuel Fission Products Release Models: Empirical and Mechanistic Approaches

The increasing use of tristructural isotropic (TRISO) particle fuel in both advanced and existing reactors necessitates a thorough evaluation of uncertainties and shortcomings in TRISO fission product release models. These inadequacies arise from the simplifications made in computational models compared to experimental data. Utilizing the BISON fuel performance code and experimental data from the Advanced Gas Reactor (AGR) program provides a unique chance to rigorously assess these inadequacies within a Bayesian uncertainty quantification (UQ) framework. This study contrasts the standard Bayesian framework with the Kennedy-O'Hagan (KOH) framework, which explicitly accounts for modeling inadequacies, in the context of UQ for TRISO silver release models. It examines both the traditional Arrhenius equation and a more advanced lower-length-scale (LLS)-informed model that incorporates microstructure information. The inverse UQ process applied to AGR-2 and AGR-3/4 datasets identified modeling inadequacy as the primary source of uncertainty, with experimental noise also being significant, while model parameter uncertainty was minimal. Both the Arrhenius and LLS-informed models showed similar levels of modeling inadequacy. For forward predictive UQ using the AGR-1 dataset, the KOH framework enhanced the accuracy and quality of quantified uncertainties by approximately 30% and 40%, respectively, compared to the standard Bayesian framework. This improvement was observed for both the Arrhenius and LLS-informed models. At the engineering scale, both models performed similarly, but the LLS-informed model outperformed the Arrhenius equation at the mesoscale. These findings underscore the importance of explicitly considering modeling inadequacy in the UQ process and highlight the need for ongoing refinement of physics-based models to address these shortcomings.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SPC-3184 Rev 7 MARVEL Reactor Structures Build to Print Fabrication Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL Primary Coolant System (PCS), Fuel and Core System (FCS), and Reactor Sub-Structure Assemblies, including the Upper Confinement Structure.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗