Search NASA⌕ Search

SEARCH · Search NASA

Results for “vitrification facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

OPERATIONS REVIEW OF THE SAVANNAH RIVER SITE INTEGRATED SALT DISPOSITION PROCESS - 11327

The Savannah River Site (SRS) is removing liquid radioactive waste from its Tank Farm. To treat waste streams that are low in Cs-137, Sr-90, and actinides, SRS developed the Actinide Removal Process and implemented the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU). The Actinide Removal Process contacts salt solution with monosodium titanate to sorb strontium and select actinides. After monosodium titanate contact, the resulting slurry is filtered to remove the monosodium titanate (and sorbed strontium and actinides) and entrained sludge. The filtrate is transferred to the MCU for further treatment to remove cesium. The solid particulates removed by the filter are concentrated to {approx} 5 wt %, washed to reduce the sodium concentration, and transferred to the Defense Waste Processing Facility for vitrification. The CSSX process extracts the cesium from the radioactive waste using a customized solvent to produce a Decontaminated Salt Solution (DSS), and strips and concentrates the cesium from the solvent with dilute nitric acid. The DSS is incorporated in grout while the strip acid solution is transferred to the Defense Waste Processing Facility for vitrification. The facilities began radiological processing in April 2008 and started processing of the third campaign ('MarcoBatch 3') of waste in June 2010. Campaigns to date have processed {approx}1.2 million gallons of dissolved saltcake. Savannah River National Laboratory (SRNL) personnel performed tests using actual radioactive samples for each waste batch prior to processing. Testing included monosodium titanate sorption of strontium and actinides followed by CSSX batch contact tests to verify expected cesium mass transfer. This paper describes the tests conducted and compares results from facility operations. The results include strontium, plutonium, and cesium removal, cesium concentration, and organic entrainment and recovery data. Additionally, the poster describes lessons learned during operation of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SECONDARY WASTE MANAGEMENT FOR HANFORD EARLY LOW ACTIVITY WASTE VITRIFICATION

More than 200 million liters (53 million gallons) of highly radioactive and hazardous waste is stored at the U.S. Department of Energy's Hanford Site in southeastern Washington State. The DOE's Hanford Site River Protection Project (RPP) mission includes tank waste retrieval, waste treatment, waste disposal, and tank farms closure activities. This mission will largely be accomplished by the construction and operation of three large treatment facilities at the Waste Treatment and Immobilization Plant (WTP): (1) a Pretreatment (PT) facility intended to separate the tank waste into High Level Waste (HLW) and Low Activity Waste (LAW); (2) a HLW vitrification facility intended to immobilize the HLW for disposal at a geologic repository in Yucca Mountain; and (3) a LAW vitrification facility intended to immobilize the LAW for shallow land burial at Hanford's Integrated Disposal Facility (IDF). The LAW facility is on target to be completed in 2014, five years prior to the completion of the rest of the WTP. In order to gain experience in the operation of the LAW vitrification facility, accelerate retrieval from single-shell tank (SST) farms, and hasten the completion of the LAW immobilization, it has been proposed to begin treatment of the low-activity waste five years before the conclusion of the WTP's construction. A challenge with this strategy is that the stream containing the LAW vitrification facility off-gas treatment condensates will not have the option of recycling back to pretreatment, and will instead be treated by the Hanford Effluent Treatment Facility (ETF). Here the off-gas condensates will be immobilized into a secondary waste form; ETF solid waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Exchange Processing of AP-105 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System

The U.S. Department of Energy (DOE) is working to expedite processing of Hanford tank waste supernate at the Hanford Waste Treatment and Immobilization Plant (WTP). To support this goal, Washington River Protection Solutions, LLC (WRPS, Richland, WA) is designing a system for suspended solids and cesium (Cs/ 137 Cs) removal from Hanford tank waste supernate. The effluent will then be sent to the WTP Low-Activity Waste (LAW) Facility for vitrification. The Cs removal is critical for eliminating the high dose rate associated with 137 Cs and facilitating a contact maintenance philosophy for the LAW Facility. The maximum 137 Cs concentration in the LAW sent to the WTP is targeted to be below the 3.18E-5 Ci 137 Cs/mole of Na waste acceptance criteria (WAC) limit. The filtration and ion exchange systems will be placed near the Hanford tanks and are collectively termed the Tank Side Cesium Removal (TSCR) system.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Quality Objectives for Direct LAW Feed Acceptance and Qualification - 17122

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility has been designed to operate under two scenarios. In the primary operating scenario, the Pretreatment Facility configuration, waste is first processed through the WTP Pretreatment Facility. Then the low-activity liquid is transferred to the WTP LAW Facility for vitrification. Alternately, under a direct feed operating scenario, known as Direct Feed LAW (DFLAW), the supernatant portion of the tank waste, referred to as the LAW feed, is treated in a Low-Activity Waste Pretreatment System (LAWPS) prior to transfer of treated feed to LAW Facility. The DFLAW scenario is a strategy to begin treating Hanford tank wastes as soon as 2022. A program has been established as part of One System to integrate and align the waste feed acceptance and qualification requirements for processing in the LAWPS and the LAW facility. One key activity of the program is the development of integrated data quality objectives (DQO) using U.S. Environmental Protection Agency guidance for the DQO process. [1] The integrated approach focused on one sampling event that will provide sufficient and necessary data to meet both LAWPS and LAW Facility criteria. Existing data and historical information were taken into account to develop sampling and data collection requirements necessary to meet waste acceptance criteria and processing requirements for both LAWPS and LAW Facility. Using a conceptual model for the sampling and decision process, the seven steps of the DQO process were completed. This paper discusses the details of the integrated DQO process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Direct Feed Low Activity Waste Program Throughput Optimization Through Modeling - 18587

The Direct Feed Low Activity Waste (DFLAW) program at Hanford allows for the early treatment of tank wastes years earlier than previously planned. Operational Research (OR) modeling is being used to provide invaluable insight into how complex and integrated processes will operate. The DFLAW OR models are used to help optimize the design and operation of the integrated system. The DFLAW OR models include the processes and real-life complexities involved in the day-to-day operation of the systems and equipment, and can predict key performance characteristics including throughput, mission timescale, equipment and labor utilization, lag storage and capacity requirements. The DFLAW OR models also have the in-built capability to simulate random events such as equipment failures. Adding random variability to models introduces a real-life element to model results. For example, OR modeling breakdown analysis of equipment failure and restoration times may inform specific improvements to a design and plant operation, including areas where the provision of spare (duty/standby) equipment would prove beneficial; the optimum number and capacity of lag storage tanks (for waste intermediate storage, reagents, etc.); operational issues, including scheduling constraints, labor resource constraints, effect of shift schedules (e.g. days only, extended shifts, 24/7),, maintenance strategies, including planned maintenance, equipment upgrades, on-hand spare part stockholding, etc. At Hanford, standalone OR models to date, have been used to help identify key operational issues and improve the design and operation of individual systems within the Tank Farms, Low Activity Waste Pretreatment System (LAWPS), Low Activity Waste (LAW) Vitrification and Effluent Management Facility (EMF) and Integrated Disposal Facility (IDF), logistics and infrastructure, 222-S laboratory [References 1 and 2] including: - Identification of critical spares including transfer pumps; - Underpin size and number of lag storage tanks to maintain continuous LAW feed to the LAW melters; - Underpin sample turnaround times at the 222-S Laboratory (e.g. feed prequalification and evaporator campaign samples) and determine how targets can be achieved without impacting waste feed delivery to LAWPS and the LAW Vitrification Facility; - Determine operational strategy required at IDF including shift schedules and sizes and the number of ILAW transporters that can support DFLAW throughput; - Identification of lag storage management strategies for glass formers, reagents, other consumables due to delivery distance and delays due to bad weather; and - Truck delivery badging needs to support 24/7 operation and management of shift in/out times required to reduce congestion. An Integrated DFLAW OR model has been developed and combines the standalone OR models such that integrated throughput and availability can be assessed from a program perspective. The Integrated OR model will provide a more detailed understanding of the interactions between Tank Farms, LAWPS, LAW VIT and IDF such that key bottleneck areas can be identified and ensure improvements are focused. Examples of future improvements that may be considered include identification of critical spare parts, required on-site maintenance capabilities, shift scheduling, and craft and labor availability. The methods, results and insights derived by DFLAW OR modeling efforts are expected to provide useful applications to other projects that involve combinations of mechanical handling, chemical processing, waste treatment/packaging or environmental remediation operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Treatment Plant - 12508

The Waste Treatment Plant (WTP) will immobilize millions of gallons of Hanford's tank waste into solid glass using a proven technology called vitrification. The vitrification process will turn the waste into a stable glass form that is safe for long-term storage. Our discussion of the WTP will include a description of the ongoing design and construction of this large, complex, first-of-a-kind project. The concept for the operation of the WTP is to separate high-level and low-activity waste fractions, and immobilize those fractions in glass using vitrification. The WTP includes four major nuclear facilities and various support facilities. Waste from the Tank Farms is first pumped to the Pretreatment Facility at the WTP through an underground pipe-in-pipe system. When construction is complete, the Pretreatment Facility will be 12 stories high, 540 feet long and 215 feet wide, making it the largest of the four major nuclear facilities that compose the WTP. The total size of this facility will be more than 490,000 square feet. More than 8.2 million craft hours are required to construct this facility. Currently, the Pretreatment Facility is 51 percent complete. At the Pretreatment Facility the waste is pumped to the interior waste feed receipt vessels. Each of these four vessels is 55-feet tall and has a 375,000 gallon capacity, which makes them the largest vessels inside the Pretreatment Facility. These vessels contain a series of internal pulse-jet mixers to keep incoming waste properly mixed. The vessels are inside the black-cell areas, completely enclosed behind thick steel-laced, high strength concrete walls. The black cells are designed to be maintenance free with no moving parts. Once hot operations commence the black-cell area will be inaccessible. Surrounded by black cells, is the 'hot cell canyon'. The hot cell contains all the moving and replaceable components to remove solids and extract liquids. In this area, there is ultrafiltration equipment, cesium-ion exchange columns, evaporator boilers and recirculation pumps, and various mechanical process pumps for transferring process fluids. During the first phase of pretreatment, the waste will be concentrated using an evaporation process. Solids will be filtered out, and the remaining soluble, highly radioactive isotopes will be removed using an ion-exchange process. The high-level solids will be sent to the High-Level Waste (HLW) Vitrification Facility, and the low activity liquids will be sent to the Low-Activity Waste (LAW) Vitrification Facility for further processing. The high-level waste will be transferred via underground pipes to the HLW Facility from the Pretreatment Facility. The waste first arrives at the wet cell, which rests inside a black-cell area. The pretreated waste is transferred through shielded pipes into a series of melter preparation and feed vessels before reaching the melters. Liquids from various facility processes also return to the wet cell for interim storage before recycling back to the Pretreatment Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pulse Jet Mixer Overblow Testing for Assessment of Loadings During Multiple Overblows

The U.S. Department of Energy (DOE) Office of River Protection’s Waste Treatment Plant (WTP) is being designed and built to pretreat and then vitrify a large portion of the wastes in Hanford’s 177 underground waste storage tanks. The WTP consists of three primary facilities: pretreatment, low-activity waste (LAW) vitrification, and high-level waste (HLW) vitrification. The pretreatment facility will receive waste feed from the Hanford tank farms and separate it into 1) a high-volume, low-activity liquid stream stripped of most solids and radionuclides and 2) a much smaller volume of HLW slurry containing most of the solids and most of the radioactivity. Many of the vessels in the pretreatment facility will contain pulse jet mixers (PJMs) that will provide some or all of the mixing in the vessels. This technology was selected for use in so-called “black cell” regions of the WTP, where maintenance capability will not be available for the operating life of the WTP. PJM technology was selected for use in these regions because it has no moving mechanical parts that require maintenance. The vessels with the most concentrated slurries will also be mixed with air spargers and/or steady jets in addition to the mixing provided by the PJMs. This report contains the results of single and multiple PJM overblow tests conducted in a large, ~13 ft-diameter × 15-ft-tall tank located in the high bay of the Pacific Northwest National Laboratory (PNNL) 336 Building test facility. These single and multiple PJM overblow tests were conducted using water and a clay simulant to bound the lower and upper rheological properties of the waste streams anticipated to be processed in the WTP. Hydrodynamic pressures were measured at a number of locations in the test vessel using an array of nine pressure sensors and four hydrophones. These measurements were made under normal and limiting vessel operating conditions (i.e., maximum PJM fluid emptying velocity, maximum and minimum vessel contents for PJM operation, and maximum and minimum rheological properties). Test data collected from the PJM overblow tests were provided to Bechtel National, Inc. (BNI) for assessing hydrostatic, dynamic, and acoustic pressure loadings on in-tank structures during 1) single overblows; 2) multiple overlapping overblows of two to four PJMs; 3) simultaneous overblows of pairs of PJMs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pulse Jet Mixer Overblow Testing for Assessment of Loadings During Multiple Overblows

The U.S. Department of Energy (DOE) Office of River Protection’s Waste Treatment Plant (WTP) is being designed and built to pretreat and then vitrify a large portion of the wastes in Hanford’s 177 underground waste storage tanks. The WTP consists of three primary facilities: pretreatment, low-activity waste (LAW) vitrification, and high-level waste (HLW) vitrification. The pretreatment facility will receive waste feed from the Hanford tank farms and separate it into 1) a high-volume, low-activity liquid stream stripped of most solids and radionuclides and 2) a much smaller volume of HLW slurry containing most of the solids and most of the radioactivity. Many of the vessels in the pretreatment facility will contain pulse jet mixers (PJMs) that will provide some or all of the mixing in the vessels. This technology was selected for use in so-called “black cell” regions of the WTP, where maintenance capability will not be available for the operating life of the WTP. PJM technology was selected for use in these regions because it has no moving mechanical parts that require maintenance. The vessels with the most concentrated slurries will also be mixed with air spargers and/or steady jets in addition to the mixing provided by the PJMs. This report contains the results of single and multiple PJM overblow tests conducted in a large, ~13 ft-diameter × 15-ft-tall tank located in the high bay of the Pacific Northwest National Laboratory (PNNL) 336 Building test facility. These single and multiple PJM overblow tests were conducted using water and a clay simulant to bound the lower and upper rheological properties of the waste streams anticipated to be processed in the WTP. Hydrodynamic pressures were measured at a number of locations in the test vessel using an array of nine pressure sensors and four hydrophones. These measurements were made under normal and limiting vessel operating conditions (i.e., maximum PJM fluid emptying velocity, maximum and minimum vessel contents for PJM operation, and maximum and minimum rheological properties). Test data collected from the PJM overblow tests were provided to Bechtel National, Inc. (BNI) for assessing hydrostatic, dynamic, and acoustic pressure loadings on in-tank structures during 1) single overblows; 2) multiple overlapping overblows of two to four PJMs; 3) simultaneous overblows of pairs of PJMs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PJM Controller Testing with Prototypic PJM Nozzle Configuration

The U.S. Department of Energy (DOE) Office of River Protection’s Waste Treatment Plant (WTP) is being designed and built to pre-treat and then vitrify a large portion of the wastes in Hanford’s 177 underground waste storage tanks. The WTP consists of three primary facilities—pretreatment, low-activity waste (LAW) vitrification, and high-level waste (HLW) vitrification. The pretreatment facility will receive waste piped from the Hanford tank farms and separate it into a high-volume, low-activity liquid stream stripped of most solids and radionuclides and a much smaller volume of HLW slurry containing most of the solids and most of the radioactivity. Many of the vessels in the pretreatment facility will contain pulse jet mixers (PJM) that will provide some or all of the mixing in the vessels. Pulse jet mixer technology was selected for use in black cell regions of the WTP, where maintenance cannot be performed once hot testing and operations commence. The PJMs have no moving mechanical parts that require maintenance. The vessels with the most concentrated slurries will also be mixed with air spargers and/or steady jets in addition to the mixing provided by the PJMs. Pulse jet mixers are susceptible to overblows that can generate large hydrodynamic forces, forces that can damage mixing vessels or their internal parts. The probability of an overblow increases if a PJM does not fill completely. The purpose of the testing performed for this report was to determine how reliable and repeatable the primary and safety (or backup) PJM control systems are at detecting drive overblows (DOB) and charge vessel full (CVF) conditions. Testing was performed on the ABB 800xA and Triconex control systems. The controllers operated an array of four PJMs installed in an approximately 13 ft diameter × 15 ft tall tank located in the high bay of the Pacific Northwest National Laboratory (PNNL) 336 Building test facility. The PJMs were fitted with 4 inch diameter discharge nozzles representative of the nozzles to be used in the WTP. This work supplemented earlier controller tests done on PJMs with 2 inch nozzles (Bontha et al. 2007). Those earlier tests enabled the selection of appropriate pressure transmitters with associated piping and resulted in an alternate overblow detection algorithm that uses data from pressure transmitters mounted in a water flush line on the PJM airlines. Much of that earlier work was only qualitative, however, due to a data logger equipment failure that occurred during the 2007 testing. The objectives of the current work focused on providing quantitative determinations of the ability of the BNI controllers to detect DOB and CVF conditions. On both control systems, a DOB or CVF is indicated when the values of particular internal functions, called confidence values, cross predetermined thresholds. There are two types of confidence values; one based on a transformation of jet pump pair (JPP) drive and suction pressures, the other based on the pressure in the flush line. In the present testing, we collected confidence levels output from the ABB and Triconex controllers. These data were analyzed in terms of the true and noise confidence peaks generated during multiple cycles of DOB and CVF events. The distributions of peak and noise amplitudes were compared to see if thresholds could be set that would enable the detection of DOB and CVF events at high probabilities, while keeping false detections to low probabilities. Supporting data were also collected on PJM operation, including data on PJM pressures and levels, to provide direct experimental evidence of when PJMs were filling, full, driving, or overblowing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (CY2019)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2019. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2019 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2017

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2017. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2017. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2017 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2018

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2018. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2018 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

VARIABILITY STUDY WITH FRIT 510 TO SUPPORT A SECOND TANK 40 DECANT

Sludge Batch 4 (SB4) is currently being processed in the Defense Waste Processing Facility (DWPF) using Frit 510. The slurry pumps in Tank 40 are experiencing in-leakage of bearing water, which is causing the sludge slurry in Tank 40 to become dilute at a rapid rate. Currently, the DWPF is removing this dilution water by performing caustic boiling during the Sludge Receipt and Adjustment Tank (SRAT) cycle. In order to alleviate prolonged SRAT cycle times, which may eventually impact canister production rates, the Liquid Waste Organization (LWO) performed a 100K gallon supernate decant of Tank 40 in April 2008. SRNL performed a supplemental glass variability study to support the April 2008 100K gallon decant incorporating the impact of coupled operations (addition of the Actinide Removal Process (ARP) stream). Recently LWO requested that SRNL assess the impact of a second decant (up to 100K gallon) to the Frit 510-SB4 system. This second decant occurred in June 2008. LWO provided nominal compositions on May 6, 2008 representing Tank 40 prior to the second decant, following the second decant, and the SB4 Heel prior to blending with Tank 51 to constitute SB5. Paper study assessments were performed for these options based on sludge-only and coupled operations processing (ARP addition), as well as possible Na{sub 2}O additions (via NaOH additions) to both flowsheets. A review of the ComProTM database relative to the compositional region defined by the projections after the second decant coupled with Frit 510 identified only a few glasses with similar glass compositions. These glasses were acceptable from a durability perspective, but did not sufficiently cover the new glass compositional region. Therefore, SRNL recommended that a supplemental variability study be performed to support the June 2008 Tank 40 decant. Glasses were selected for the variability study based on three sludge compositional projections (sludge-only, coupled and coupled + 2 wt% Na{sub 2}O) at waste loadings (WLs) of interest to DWPF (32%, 35% and 38%). These nine glasses were fabricated and characterized using chemical composition analysis, X-ray Diffraction (XRD) and the Product Consistency Test (PCT). All of the glasses that were selected for this study satisfy the Product Composition Control System (PCCS) criteria and are deemed processable and acceptable for the DWPF, except for the SB4VS2-03 (sludge-only at 38% WL) target composition. This glass fails the T{sub L} criterion and would not be considered processable based on Slurry Mix Evaporator (SME) acceptability decisions. The durabilities of all of the study glasses (both quenched and ccc) are well below that of the normalized leachate for boron (NL [B]) of the reference EA glass (16.695 g/L) and are predictable using the current PCCS models. Very little variation exists between the NL [B] of the quenched and ccc versions of the glasses. There is some evidence of a trend toward a less durable glass as WL increases for some of the sludge projections. Frit 510 is a viable option for the processing of SB4 after a second Tank 40 decant with or without the addition of products from the ARP stream as well as the 2 wt% Na{sub 2}O addition. The addition of ARP had no negative impacts on the acceptability and predictability of the variability study glasses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The NUMO Strategy for HLW and TRU Waste Disposal

Shortly after the Nuclear Waste Management Organization of Japan (NUMO) was established, we initiated an open call to all municipalities, requesting volunteers to host a repository for vitrified HLW. The first volunteer applied for a preliminary literature survey phase last January but, unfortunately, it withdrew the application in April. This failure provided an invaluable lesson for both the relevant authorities and NUMO; subsequently the Atomic Energy Commission of Japan and associated organizations are examining a support plan to back up NUMO's open solicitation. On another front, a recent amendment of 'The Specified Radioactive Waste Final Disposal Act' also allocates specific 'TRU' waste for deep geological disposal, requiring a demonstration of safety to a similar level as that for HLW. To implement the radioactive waste disposal project, NUMO has developed a methodology appropriate to our specific boundary conditions - the NUMO Structured Approach. This takes into account, in particular, our need to balance competing goals, such as operational safety, post-closure safety and cost, during repository tailoring to specific sites. The most important challenge for NUMO is, however, to attract volunteers. We believe that our open and structured R and D program is critical to demonstrate technical competence which, in turn, enhances the credibility of our various public relations activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Twenty years of dry interim storage of spent nuclear fuel (SNF) in Germany- History and developments - 15575

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office of Radiation Protection. In 1983 a license to store spent nuclear fuel (SNF) and later expanded for vitrified high level waste (HAW) for the interim storage facility in Gorleben was granted. Dry Interim storage at the NPP sites in its actual form started in 2002 in the interim storage facility next to the NPP Lingen. Since this time each NPP erected its own storage facility and three central storage facilities have been built. All of these facilities use dry storage in metallic casks. The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years starting with the first cask emplacement. As no opening of the cask is intended during the storage period the condition of the inventory and the cask before loading has to be known in detail. This requires for instance detailed knowledge of the history of the SNF loaded as well as supervision of the manufacturing process of the cask. Within the last twenty years several mishaps influenced the regulatory point of view. During a loading campaign in a boiling water reactor traces of pool water remained in the gasket slot and during the drying procedure crystalline boron salts prevented the required tightness. After that event a long-term experiment was started and is still going on which studies the effects of water and minor damages to the gasket. As well changes in the loading procedure have been introduced. The pressure switch used to monitor the pressure in the space between primary and secondary lid has a self surveillance function. This indicated a malfunction 23 times in the last twenty years. Examinations of all events indicated no systematic failure, but a weak point seems to be the plug-in connection. The manufacturer introduced some modifications to improve the system. Introduction of FEM methods in safety analysis to amend the existing methods of testing allowed a new view on and in the cask safety analysis. Progress in this field is closely connected to the available computing capacity and stipulates experts to ongoing improvement. After expiring of the storage license which will be the case for the first cask loaded in 1992 and stored in Ahaus 2032 an extension or a new license can only be granted if the at this time relevant requirements are met. This will require detailed knowledge about the happenings and accidents during the previous storage period. All experience of the periodic safety assessment (PSA) which started in 2013 and accompanying experiments conducted till now and during the licensed storage time will be needed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Perspective of Dry Interim Storage of spent nuclear fuel (SNF) in Germany - 16504

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office of Radiation Protection (BfS). In 1995 a license to store spent nuclear fuel (SNF) and vitrified high level waste (HAW) for the interim storage facility in Gorleben was granted. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since this time each NPP erected its own storage facility and three central storage facilities have been built. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2035. During the last two years in Germany preparatory consultations to restart the process towards finding a repository took place, organised by a commission. This commission consists out of members of the scientific community, religious parties, social communities and environmental organizations as well as members of federal states governments and members of the German parliament (Bundestag). Recently the commission decided to extend its working period until summer 2016. Taking this background into account the BfS plans to intensify its research into extended interim storage with respect to potential material degradation leading to interference with safety functions (e.g. neutron shielding material). This includes topics like ageing of gasket materials which are already studied in ongoing experiments (e.g. at the Federal Institute for Materials Research and Testing) as well as studies of long term relaxation processes. Because of the need for transportation towards a repository another important field is the behaviour of the inventory under mechanical loads. For SNF, first calculations showed that because of the lower decay heat load after 60 years due to hydride reorientation the cladding might become much less ductile. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Filtration Improvements in Support of Increased Salt Waste Processing Throughput at the Savannah River Site - 16173

Crossflow Filtration is currently used at the U.S. Department of Energy (DOE) Savannah River Site (SRS) for the removal of actinides, strontium and sludge solids from the high-level salt waste stored in underground tanks. At SRS, crossflow filtration is deployed in the Actinide Removal Process (ARP). Salt waste is transferred from an underground waste tank to one of two strike tanks where it is struck with Monosodium Titanate (MST), which adsorbs uranium, plutonium and strontium. The MST laden salt waste is then transferred to the ARP filtration facility, which contains the crossflow filter. The filtrate, which is called Clarified Salt Solution (CSS), is sent to a downstream facility for cesium removal, while the MST and sludge solids are concentrated at the filtration facility and eventually sent to the Defense Waste Processing Facility (DWPF) for vitrification. ARP and the downstream cesium removal facility, the Modular Caustic Side Solvent Extraction Unit (MCU), were both developed as an interim salt waste processing technology and as smaller scale radioactive demonstration plants for the Salt Waste Processing Facility (SWPF), which is currently under construction. Since the beginning of ARP in 2008, there have been challenges with achieving desired filtration rates through the crossflow filter system. Historically the crossflow filter system has been the flow limiter in salt waste processing and many changes have been made and are planned to achieve desired throughput, especially as MCU increases its processing capacity. Some of these changes include the design of a new crossflow filter, the implementation of a new process chemistry flowsheet and several operational changes. The modifications to the ARP crossflow filter have helped contribute to periods of record throughput in salt waste processing in FY 2015. This paper will discuss the technical challenges and system limitations of retrofitting an older facility as well as past, present and future modifications to the ARP filtration process in order to achieve salt waste processing goals at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Level Waste Remote Handling Equipment in the Melter Cave Support Handling System at the Hanford Waste Treatment Plant

Cold war plutonium production led to extensive amounts of radioactive waste stored in tanks at the Department of Energy's (DOE) Hanford site. Bechtel National, Inc. is building the largest nuclear Waste Treatment Plant in the world located at the Department of Energy's Hanford site to immobilize the millions of gallons of radioactive waste. The site comprises five main facilities; Pretreatment, High Level Waste vitrification, Low Active Waste vitrification, an Analytical Lab and the Balance of Facilities. The pretreatment facilities will separate the high and low level waste. The high level waste will then proceed to the HLW facility for vitrification. Vitrification is a process of utilizing a melter to mix molten glass with radioactive waste to form a stable product for storage. The melter cave is designated as the High Level Waste Melter Cave Support Handling System (HSH). There are several key processes that occur in the HSH cell that are necessary for vitrification and include: feed preparation, mixing, pouring, cooling and all maintenance and repair of the process equipment. Due to the cell's high level radiation, remote handling equipment provided by PaR Systems, Inc. is required to install and remove all equipment in the HSH cell. The remote handling crane is composed of a bridge and trolley. The trolley supports a telescoping tube set that rigidly deploys a TR 4350 manipulator arm with seven degrees of freedom. A rotating, extending, and retracting slewing hoist is mounted to the bottom of the trolley and is centered about the telescoping tube set. Both the manipulator and slewer are unique to this cell. The slewer can reach into corners and the manipulator's cross pivoting wrist provides better operational dexterity and camera viewing angles at the end of the arm. Since the crane functions will be operated remotely, the entire cell and crane have been modeled with 3-D software. Model simulations have been used to confirm operational and maintenance functional and timing studies throughout the design process. Since no humans can go in or out of the cell, there are several recovery options that have been designed into the system including jack-down wheels for the bridge and trolley, recovery drums for the manipulator hoist, and a wire rope cable cutter for the slewer jib hoist. If the entire crane fails in cell, the large diameter cable reel that provides power, signal, and control to the crane can be used to retrieve the crane from the cell into the crane maintenance area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗