Search NASA⌕ Search

SEARCH · Search NASA

Results for “well injection data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Modeling of 10 GeV-1 TeV laser-plasma accelerators using Lorentz boosted simulations

Modeling of laser-plasma wakefield accelerators in an optimal frame of reference [J.-L. Vay, Phys. Rev. Lett. 98, 130405 (2007)] allows direct and efficient full-scale modeling of deeply depleted and beam loaded laser-plasma stages of 10 GeV-1 TeV (parameters not computationally accessible otherwise). This verifies the scaling of plasma accelerators to very high energies and accurately models the laser evolution and the accelerated electron beam transverse dynamics and energy spread. Over 4, 5, and 6 orders of magnitude speedup is achieved for the modeling of 10 GeV, 100 GeV, and 1 TeV class stages, respectively. Agreement at the percentage level is demonstrated between simulations using different frames of reference for a 0.1 GeV class stage. Obtaining these speedups and levels of accuracy was permitted by solutions for handling data input (in particular, particle and laser beams injection) and output in a relativistically boosted frame of reference, as well as mitigation of a high-frequency instability that otherwise limits effectiveness.

43 PARTICLE ACCELERATORS↗

Conceptual Model Summary Report Simulation Framework for Regional Geologic CO 2 Storage Along Arches Province of Midwestern United States

A conceptual model was developed for the Arches Province that integrates geologic and hydrologic information on the Eau Claire and Mt. Simon formations into a geocellular model. The conceptual model describes the geologic setting, stratigraphy, geologic structures, hydrologic features, and distribution of key hydraulic parameters. The conceptual model is focused on the Mt. Simon sandstone and Eau Claire formations. The geocellular model depicts the parameters and conditions in a numerical array that may be imported into the numerical simulations of carbon dioxide (CO 2 ) storage. Geophysical well logs, rock samples, drilling logs, geotechnical test results, and reservoir tests were evaluated for a 500,000 km2 study area centered on the Arches Province. The geologic and hydraulic data were integrated into a three-dimensional (3D) grid of porosity and permeability, which are key parameters regarding fluid flow and pressure buildup due to CO 2 injection. Permeability data were corrected in locations where reservoir tests have been performed in Mt. Simon injection wells. The final geocellular model covers an area of 600 km by 600 km centered on the Arches Province. The geocellular model includes a total of 24,500,000 cells representing estimated porosity and permeability distribution. CO 2 injection scenarios were developed for on-site and regional injection fields at rates of 70 to 140 million metric tons per year.

54 ENVIRONMENTAL SCIENCES↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 6.0: Evaluation of Class VI Readiness

Introduction. Project OASIS is approximately 30 miles southeast of Birmingham, Alabama, and approximately 5 miles north-northwest of Alabama Power Company's Plant Gaston. Geologically, the Project area is in the Alabama fold and thrust belt province. This work builds on the initiatives of the Southeast Regional Carbon Utilization and Storage Acceleration Partnership (SECARB-USA, DE-FE0031830) that identified nearly 500 million metric tonnes of CO 2 emitted on an annual basis that is not collocated with prospective storage geology (the Coastal Plain of the Southeastern US in this context). This observation suggests costly investments in connective infrastructure (e.g., pipelines) or exploratory well drilling campaigns to identify CO 2 storage opportunities in under explored areas. While not traditionally thought of for saline storage, these studies suggest that storage prospects in the Valley and Ridge Province occur in relatively flat lying structural panels between thrust faults. For the Project OASIS region, available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The Project OASIS surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage in an under explored region. This initiative benefits the regions emitters as the data generated from this study can inform their own internal decision making. The field program included geological and geophysical evaluations, reservoir engineering analyses, and risk assessments. This report evaluates existing data, as well as a variety of modeling scenarios to evaluate project readiness. Importantly, the impact of this study is not limited to Alabama as there are numerous large emitters throughout Appalachia, in similar geologic settings, contemplating their decarbonization options.

20 FOSSIL-FUELED POWER PLANTS↗

Seismic Monitoring at the Farnsworth CO2-EOR Field Using Time-Lapse Elastic-Waveform Inversion of 3D-3C VSP Data

During the Development Phase of the U.S. Southwest Regional Partnership on Carbon Sequestration, supercritical CO2 was continuously injected into the deep oil-bearing Morrow B formation of the Farnsworth Unit in Texas for Enhanced Oil Recovery (EOR). The project injected approximately 94 kilotons of CO2 to study geologic carbon storage during CO2-EOR. A three-dimensional (3D) surface seismic dataset was acquired in 2013 to characterize the subsurface structures of the Farnsworth site. Following this data acquisition, the baseline and three time-lapse three-dimensional three-component (3D-3C) vertical seismic profiling (VSP) data were acquired at a narrower surface area surrounding the CO2 injection and oil/gas production wells between 2014 and 2017 for monitoring CO2 injection and migration. With these VSP datasets, we inverted for subsurface velocity models to quantitatively monitor the CO2 plume within the Morrow B formation. We first built 1D initial P-wave (Vp) and S-wave (Vs) velocity models by upscaling the sonic logs. We improved the deep region of the Vp and Vs models by incorporating the deep part of a migration velocity model derived from the 3D surface seismic data. We improved the shallow region of 3D Vp and Vs models using 3D traveltime tomography of first arrivals of VSP downgoing waves. We further improved the 3D baseline velocity models using elastic-waveform inversion (EWI) of the 3D baseline VSP upgoing data. Our advanced EWI method employs alternative tomographic and conventional gradients and total-variation-based regularization to ensure the high-fidelity updates of the 3D baseline Vp and Vs models. We then sequentially applied our 3D EWI method to the three time-lapse datasets to invert for spatiotemporal changes of Vp and Vs in the reservoir. Our inversion results reveal the volumetric changes of the time-lapse Vp and Vs models and show the evolution of the CO2 plume from the CO2 injection well to the oil/gas production wells.

42 ENGINEERING↗

Bayesian Approach to Estimation of Water Table Elevations Using Historical Rasters as Prior Information 2019 - 20430

In cases of complex but only partially known geology and a lack of spatial control in observation well locations, water table elevation estimation is very challenging. In some cases, auxiliary information, such as observations of the movement of tracers, operation of injection and extraction wells, and calibration of groundwater models against the historical elevation data, can be combined with expert judgement to estimate flow directions in areas of sparse data and to aid in the production of more reliable contour maps (and associated rasters) than could be produced by relying on sparse well elevation data alone. Given a historical sequence of these raster maps, the question arises how to automate, to the extent possible, the process of producing new raster maps to reflect data from previous times, the current data and the operation of expert judgement. One solution is to adopt a Bayesian point of view and to regard the historical well elevation data, auxiliary information and historical raster maps as prior information. The well elevations for water table wells, as well as those for injection/extraction wells and the data associated with other relevant variables, can be viewed as predictors for the raster surface. From this prior information, we can, conditional on the values of these predictors for a new time period, compute an expected value map and a standard deviation map for the new raster. These then can be taken to specify a prior predictive distribution for the pixels in the new raster map. Then we condition the pixels, corresponding to water level observation wells within the raster, on the observed values in those wells (which in general will differ from the regression estimate) for the new time period. Given the smoothness of the water table surface, we then smooth the surface of deviations from the mean surface, based on the variograms of the historical rasters, and add this smoothed surface to the regression mean surface. The error structure of the produced raster map is defined by the regression error structure and the error due to smoothing based on the estimated variograms. This methodology has been developed and is being further refined for groundwater monitoring and remediation at LANL. It is a very flexible method that can also be applied with a variety of other predictors applied to model the water level wells in the area of interest over the historical record. The smoothness of the spatial process and its possible evolution over time can then be estimated from the residuals from this regression. This can be augmented by expert hydrogeological opinion based on site topography and hydrogeology. (authors)

54 ENVIRONMENTAL SCIENCES↗

Site Characterization of the Highest-Priority Geologic Formations for CO2 Storage in Wyoming

The project Site Characterization of the Highest-Priority Geologic Formations for CO2 Storage in Wyoming is one of 9 site characterization projects that were implemented as part of ARRA (American Recovery and Reinvestment Act). Data from this project was used to improve resolution of data in NATCARB in the area of study. Data related to this study has already been incorporated in NATCARB Atlas. The Wyoming Carbon Underground Storage Project (WY-CUSP) consisted of CO2 storage site characterization and evaluation, focusing on Wyoming’s most promising CO2 storage reservoirs (the Pennsylvanian Weber/Tensleep Sandstone and Mississippian Madison Limestone) and premier CO2 storage site (Rock Springs Uplift). Results from the WY-CUSP project suggest the two reservoirs could store up to 17,000 million tons of CO2. The WY-CUSP team drilled a stratigraphic test well and acquired a 3-D seismic survey covering 25 square miles of the Rock Springs Uplift site. The team retrieved 916 feet of core from the 12,810-foot-deep well, along with a complete log suite, borehole images, fluid samples, and other data. Project partners (1) provided continuous visual documentation of the core, including grain size, mineralogy, facies distribution, and porosity; (2) performed continuous permeability and velocity scans of selected reservoir intervals; and (3) chemically analyzed the fluid samples. WY-CUSP scientists integrated seismic attributes with observations from log suites, a VSP survey, core, fluid samples, and laboratory analyses, including continuous permeability scans. From these integrations, researchers constructed 3-D spatial distribution volumes of reservoir and seal properties that represent geological heterogeneity at the targeted CO2 storage site. The WY-CUSP team used this data to perform new CO2 plume migration simulations. Baker Hughes, Inc., completed a series of small-scale, in-situ water injectivity measurements. A database was formed when observations, analyses, and experiments from the stratigraphic test well were integrated. Correlation of these data allowed petrophysical parameters to be extrapolated from the test well out into the storage domain (5x5 mile 3-D seismic survey volume). This resulted in an improved, realistic understanding of performance assessments for potential CO2 storage scenarios. The WY-CUSP team worked on (1) improving CO2 storage resource estimates, (2) establishing long-term integrity and permanence of confining layers, (3) designing a profitable strategy for pressure management, and (4) evaluating the utilization of stored CO2 at the Rock Spring Uplift. Finally, Baker Hughes developed a microseismic baseline for the test site using in-bore geophones to complete field operations.

3-D seismic↗

Geologic Map of the Neal Hot Springs Geothermal Area - GIS Data

Neal Hot Springs—ESRI Geodatabase (ArcGeology v1.3): - Contains all the geologic map data, including faults, contacts, folds, unit polygons, and attitudes of strata and faults. - List of stratigraphic units and stratigraphic correlation diagram. - Three cross‐sections. - Locations of production, injection, and exploration wells. - Locations of 40Ar/39Ar samples. - Location of XRF geochemical samples. - 3D model constructed with EarthVision using geologic map data, cross‐sections, drill‐hole data, and geophysics (model not in the ESRI geodatabase).

15 GEOTHERMAL ENERGY↗

SECARB Permits for Seismic and Other Site Preparation Plan

The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. This project is one of the first and the largest fully integrated commercial prototype coal-fired carbon capture and storage projects in the USA. Drilled in January 2011, a deep characterization well provided geologic data confirming that the test site represented an attractive location for safe, long-term storage of CO 2 . Two Class V Experimental Injection Well underground injection control (UIC) permits were issued in November 2011 and subsequently the project’s injection wells were installed. A robust monitoring, verification and accounting (MVA) plan has been developed to monitor and track the CO 2 plume and the associated pressure field. The CO 2 MVA effort for the Anthropogenic Test CO 2 (Test) injection demonstration includes two wellbore seismic methods, specifically time-lapse Croswell seismic and vertical seismic profiles (VSP). Due to the unique challenges presented by this Test (injection depth of 9,500+ ft. into thin, stacked reservoir sands and limited injection volumes) surface seismic was eliminated as a Monitoring, Verification, and Accounting (MVA) tool. However, the newly drilled project wells provided ample casing diameters (prior to running tubing) to accommodate wellbore seismic receivers (wireline and tubing deployed) and a Croswell source.

54 ENVIRONMENTAL SCIENCES↗

A phased workflow to define permit‐ready locations for large volume CO 2 injection and storage

Abstract To‐date, only two UIC Class VI permits have been issued by the US Environmental Protection Agency. We illustrate a four‐phase workflow to first identify regional storage resources and then down‐select sites to yield permit‐ready locations that can accept and store large volumes of CO 2 . Specific permit requirements should guide objectives and define deliverables of respective workflow phases. In the first phase we used available regional data and screened structure and injection zones to locate resources that match CO 2 volumes planned to be captured. Available data were also used to assess presence and depth of usable groundwater, the key resource being protected via permitting. We then used advanced, closed‐form, analytical solutions (EASiTool) to estimate CO 2 injectivity into each hydrologically connected injection compartment. In the second phase we acquired and conditioned additional wireline logs and leased available seismic datasets. We interpreted the depositional systems from wireline well‐log character and mapped sandbody geometry to interpolate injection and confining‐zone distribution. Using available data, we mapped faults and locations of freshwater and overpressure (or other capacity‐limiting geologic parameters) in more detail. In the third phase, we used the augmented geologic data to develop a static model for the selected area, extracted the areas of highest interest, and generated and ran dynamic (flow) models. In a fourth phase, we reduced major uncertainties identified in earlier phases. Our case study indicates that to complete preparation of a permit application requires (1) improved lithologic characterization information (thicknesses and horizontal and vertical connectivity) and (2) better definition of poorly defined local faults. © 2023 The Authors. Greenhouse Gases: Science and Technology published by Society of Chemical Industry and John Wiley & Sons Ltd.

58 GEOSCIENCES↗

Photosensitivity of Pb{sub 1-x}Sn{sub x}Te:In films in the region of intrinsic absorption

The steady-state photocurrent in the fundamental absorption region of Pb{sub 1-x}Sn{sub x} Te:In films is calculated with the field injection of electrons from the contact and their capture by traps in the bulk taken into account. The calculated and experimental current-voltage characteristics are compared at liquid-helium temperature. The represented experimental data on the dependence of the Hall effect on the injection level agree well with the considered model.

36 MATERIALS SCIENCE↗

Photosensitivity of Pb{sub 1-x}Sn{sub x}Te:In films in the region of intrinsic absorption

The steady-state photocurrent in the fundamental absorption region of Pb{sub 1-x}Sn{sub x} Te:In films is calculated with the field injection of electrons from the contact and their capture by traps in the bulk taken into account. The calculated and experimental current-voltage characteristics are compared at liquid-helium temperature. The represented experimental data on the dependence of the Hall effect on the injection level agree well with the considered model.

36 MATERIALS SCIENCE↗

In Situ Bioremediation System Pantex Plant, Amarillo, Texas

Seepage velocity was low/measurable in wells with low saturated thickness, RDX/chrome not detected by PFM in injection wells but was detected in some nearby MWs - consistent with GW concentration data

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Jurassic deserts and CO2 sequestration: the Glen Canyon Group in Utah, western USA

The Early Jurassic in the Western Interior of USA consisted of an extensive desert environment, including one of the largest ergs in geologic history. The Navajo erg has been estimated to extend as much as 2.2 million square kilometers, though the preserved extent is somewhat smaller. The Mesozoic was a global greenhouse phase, and during the Jurassic this region experienced fluctuations in climate aridity, reflected in the depositional environment. In addition to extensive dunefields, interdune deposits (lakes and oases) and fluvial systems are also documented within formations of the Glen Canyon Group. The Navajo Sandstone has received much attention as a potential CO2 injection target in recent years. It consists of thick, aeolian sandstones with high porosity and permeability, occurs in both outcrop and subcrop, and has industry data. Mapping of stratigraphic and sedimentologic changes within the Navajo Sandstone has been undertaken in localized areas, however piecing together these studies and developing regional models for CO2 potential has not received as much attention. There is significant industry data across Utah, and utilizing this data to pivot from a focus on hydrocarbon extraction to CO2 injection is an effective way to move forward with green energy, and to meet carbon neutral emission goals. Using legacy well data, we are developing a more comprehensive study of the Navajo Sandstone as a potential CO2 reservoir, in addition to identifying other zones of interest within the Glen Canyon Group, and improving understanding of stratigraphic complexity within one of the most significant aeolian systems in the world.

Mahon, Elizabeth↗

Detection Limits of Low-mass, Long-period Exoplanets Using Gaussian Processes Applied to HARPS-N Solar Radial Velocities

Radial velocity (RV) searches for Earth-mass exoplanets in the habitable zone around Sun-like stars are limited by the effects of stellar variability on the host star. In particular, suppression of convective blueshift and brightness inhomogeneities due to photospheric faculae/plage and starspots are the dominant contribution to the variability of such stellar RVs. Gaussian process (GP) regression is a powerful tool for statistically modeling these quasi-periodic variations. We investigate the limits of this technique using 800 days of RVs from the solar telescope on the High Accuracy Radial velocity Planet Searcher for the Northern hemisphere (HARPS-N) spectrograph. These data provide a well-sampled time series of stellar RV variations. Into this data set, we inject Keplerian signals with periods between 100 and 500 days and amplitudes between 0.6 and 2.4 m s{sup −1}. We use GP regression to fit the resulting RVs and determine the statistical significance of recovered periods and amplitudes. We then generate synthetic RVs with the same covariance properties as the solar data to determine a lower bound on the observational baseline necessary to detect low-mass planets in Venus-like orbits around a Sun-like star. Our simulations show that discovering planets with a larger mass (∼0.5 m s{sup −1}) using current-generation spectrographs and GP regression will require more than 12 yr of densely sampled RV observations. Furthermore, even with a perfect model of stellar variability, discovering a true exo-Venus (∼0.1 m s{sup −1}) with current instruments would take over 15 yr. Therefore, next-generation spectrographs and better models of stellar variability are required for detection of such planets.

47 OTHER INSTRUMENTATION↗

Leveraging Regional Exploration to Develop Geologic Framework for CO2 Storage in Deep Formations in Midwestern United States

Obtaining subsurface data for developing a regional framework for geologic storage of CO{sub 2} can require drilling and characterization in a large number of deep wells, especially in areas with limited pre-existing data. One approach for achieving this objective, without the prohibitive costs of drilling costly standalone test wells, is to collaborate with the oil and gas drilling efforts in a piggyback approach that can provide substantial cost savings and help fill data gaps in areas that may not otherwise get characterized. This leveraging with oil/gas drilling also mitigates some of the risk involved in standalone wells. This collaborative approach has been used for characterizing in a number of locations in the midwestern USA between 2005 and 2009 with funding from U.S. Department of Energy's National Energy Technology Laboratory (DOE award: DE-FC26-05NT42434) and in-kind contributions from a number of oil and gas operators. The results are presented in this final technical report. In addition to data collected under current award, selected data from related projects such as the Midwestern Regional Carbon Sequestration Partnership (MRCSP), the Ohio River Valley CO{sub 2} storage project at and near the Mountaineer Plant, and the drilling of the Ohio Stratigraphic well in Eastern Ohio are discussed and used in the report. Data from this effort are also being incorporated into the MRCSP geologic mapping. The project activities were organized into tracking and evaluation of characterization opportunities; participation in the incremental drilling, basic and advanced logging in selected wells; and data analysis and reporting. Although a large number of opportunities were identified and evaluated, only a small subset was carried into the field stage. Typical selection factors included reaching an acceptable agreement with the operator, drilling and logging risks, and extent of pre-existing data near the candidate wells. The region of study is primarily along the Ohio River Valley corridor in the Appalachian Basin, which underlies large concentrations of CO{sub 2} emission sources. In addition, some wells in the Michigan basin are included. Assessment of the geologic and petrophysical properties of zones of interest has been conducted. Although a large number of formations have been evaluated across the geologic column, the primary focus has been on evaluating the Cambrian sandstones (Mt. Simon, Rose Run, Kerbel) and carbonates layers (Knox Dolomite) as well as on the Silurian-Devonian carbonates (Bass Island, Salina) and sandstones (Clinton, Oriskany, Berea). Factors controlling the development of porosity and permeability, such as the depositional setting have been explored. In northern Michigan the Bass Islands Dolomite appears to have favorable reservoir development. In west central Michigan the St. Peter sandstone exhibits excellent porosity in the Hart and Feuring well and looks promising. In Southeastern Kentucky in the Appalachian Basin, the Batten and Baird well provided valuable data on sequestration potential in organic shales through adsorption. In central and eastern Ohio and western West Virginia, the majority of the wells provided an insight to the complex geologic framework of the relatively little known Precambrian through Silurian potential injection targets. Although valuable data was acquired and a number of critical data gaps were filled through this effort, there are still many challenges ahead and questions that need answered. The lateral extent to which favorable potential injection conditions exist in most reservoirs is still generally uncertain. The prolongation of the characterization of regional geologic framework through partnership would continue to build confidence and greatly benefit the overall CO{sub 2} sequestration effort.

54 ENVIRONMENTAL SCIENCES↗

Well Design, Operation and Maintenance and Proactive Rehabilitation to Optimize Remediation Well Performance - 18605

Optimizing performance of extraction, injection and monitoring wells, which are integral components of groundwater remediation systems, result in lower life cycle costs and a higher probability of meeting project objectives. These wells provide the means to extract contaminated groundwater, inject reagents, treated water and clean water to create groundwater reaction/flushing zones, and to provide groundwater level, contaminant concentration and geochemical data. Initial costs associated with well installation and associated pipelines and treatment systems are significant project expenditures related to site remediation. However, the life cycle costs for wells are dominated by the long-term operation and maintenance (O and M) expenditures. Remediation wells are particularly susceptible to various types of fouling that impact well performance and, therefore, drive up operating costs. Simply defined, fouling is the result of any biological, geochemical or physical process that negatively impacts the intended performance of a remediation well. Fouling decreases well performance by effectively reducing hydraulic communication between the well and the surrounding formation. Oftentimes this occurs via clogging screens and/or gravel pack/formation pore space by bacterial or chemical byproducts and gases, which can lead to corrosion of metal components and spreading fouling deposits to pipelines and surface treatment systems. Ultimately, this results in reduced hydraulic performance in extraction and injection wells and result in erroneous water level and chemical parameter concentration measurements in monitoring wells. Remediation well fouling cannot be eliminated, and natural fouling processes are exacerbated by the installation and operation of remedial systems. Steps required to extend the life of remediation wells and to lower life cycle costs are discussed in this paper in order to establish the required approach to effective system management. These optimization approaches have been developed through years of operation and maintenance of complex large-scale plume remediation systems utilizing a variety of subsurface in-situ and ex-situ technologies. Remediation well performance can be improved by: - careful site characterization, - appropriate well design, - proper well installation and development, - thoughtful and adaptable operation and maintenance, - well performance maintenance tracking and, - proactive well rehabilitation. Clear understanding of the site hydro-stratigraphy and geochemical settings places constraints on the compatibility of well materials and the configurations of well screens. Proper well design, including collection and analysis (sieve/grain-size) of screen zone formation samples, assures that wells can be optimally installed, developed and redeveloped during well rehabilitation. Design considerations should include proper sizing of filter packs and well screens, casing/screen diameter, well material selection/compatibility, expected life/use, and well head configuration to allow for future access. Applying appropriate and effective well installation and development methods are of paramount importance and rely on a good understanding of site characteristics (e.g., geologic setting) as well as local drilling company expertise and experience. Different approaches to operation and maintenance can greatly affect the degree of fouling, these include limiting reagent concentrations, maintaining submerged well screens and filtering injection water to prevent the introduction of fouling enhancing constituents. Tracking well performance by monitoring changes in system operation and metrics such as specific capacity or injectivity for extraction and injection wells, respectively, or turbidity and chemical analyses for monitoring wells is key to identifying well maintenance issues early when well rehabilitation can be most effective. Proactive well rehabilitation can include mechanical brushing, surging and jetting, chemical treatment or other specialized approaches; however, the approach needs to be based on a site-specific understanding of the predominant fouling mechanisms. Collection and analyses of fouling deposits can provide guidance for selection of rehabilitation methods and chemicals that will be most effective. Application of these approaches have led to extended operational life for reagent injection wells, which can foul quickly, from months to years. Additionally, proper maintenance will often lead to increased and extended productivity of the well. For extraction wells, this translates to a higher sustainable yield, which means shorter cleanup times. Similarly, for injection wells, proper maintenance allows for the introduction of a greater volume of reagents over a shorter period, thus, shorter cleanup times that reduce overall project costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efficiency and emissions of NH3-diesel/bio-pilot dual-fuel combustion in a high-speed four-stroke engine

While dual-fuel ammonia engines are starting to be commercialized for the large low-speed 2-stroke marine engine market, there are still challenges with utilizing ammonia on 4-stroke engines used as auxiliary engines for ocean going vessels and within inland and coastal marine applications. The shorter timescales for high-speed engines pose a particular challenge for low-cetane, high ignition energy fuels like ammonia. In addition to achieving maximum ammonia substitution levels, N2O emissions are a key factor that needs to be understood. This paper reports the results of experiments using a single-cylinder 107mm bore Cummins B-series diesel engine modified for port-fuel injection of gaseous anhydrous ammonia with a direct injection of diesel fuel near-TDC to ignite the premixed ammonia. Combustion data as well as emissions data from an FTIR including NO, NO2, N2O, and unburned ammonia are presented for selected operating points with a focus on high-load operation at 1200rpm with high ammonia energy substitution (over 95% by fuel energy). Several air/fuel ratio conditions are included, sweeping from diesel-like airflow to stoichiometric conditions. The impact of biofuels (biodiesel and renewable diesel) as pilot fuels is also considered. Comparisons for emissions, greenhouse gas performance, and efficiency are made with a conventional diesel combustion baseline. The impact of fuel injection strategy on NOx, N2O, and NH3 emissions is quantified, and the dual-fuel ammonia results on this high-speed 4-stroke engine are expected to provide fundamental insights into further combustion development opportunities for the larger engines used across marine applications.

Kaul, Brian [ORNL] (ORCID:0000000184813620)↗

Analysis of Geothermal Reservoir and Well Operational Conditions using Monthly Production Reports from Nevada and California

When conducting techno-economic analysis of geothermal systems, assumptions are typically necessary for reservoir and wellbore parameters such as producer/injector well ratio, production temperature drawdown, and production/injection temperature, pressure and flow rate. To decrease uncertainty of several of these parameters, we analyzed field data reported by operators in monthly production reports. This paper presents results of a statistical analysis conducted on monthly production reports at 19 power plants in California and Nevada covering 196 production wells and 175 injection wells. The average production temperature was 304 degrees F (151 degrees C) for binary plants and 310 degrees F (154 degrees C) for flash plants. The average injection temperature was 169 degrees F (76 degrees C) for binary plants and 173 degrees F (78 degrees C) for flash plants. The average production temperature drawdown was 0.5% per year for binary plants and 0.8% per year for flash plants. The average production well flow rate was 112 L/s for binary plant wells and 62 L/s for flash plant wells. For all 19 plants combined, the median injectivity index value was 3.8 L/s/bar, and the average producer/injector well ratio was 1.6. As an additional example of analysis using data from monthly production reports, a coupled reservoir-wellbore model was developed to derive productivity curves at various pump horsepower settings. The workflow and model were applied to two example production wells.

15 GEOTHERMAL ENERGY↗