Search NASA⌕ Search

SEARCH · Search NASA

Results for “wind farm design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

154 records · Page 9

Control Design and EMT Simulation Toward the Restoration of Faulted Wind-Dominant Grids

Present power engineers have been challenged to employ electromagnetic transient (EMT) simulations to study the restoration of wind-dominant grids. This paper addresses this hurdle by developing strategies to: (i) reliably control the dc-link voltage of grid-forming wind turbines with dc-coupled batteries, (ii) tune controllers to stably interconnect wind power plants into a grid under recovery, and (iii) autonomously make restoration decisions if transmission faults occur during restoration. These contributions are assessed via EMT simulations of wind-dominant versions of the WSCC 9-bus grid and a 22-bus power system. Furthermore, this paper is significant to address recommendations by the North American Electric Reliability Corporation.

17 WIND ENERGY↗

IEA Wind TCP Task 49: Reference Site Conditions for Floating Wind Arrays

This report, prepared within Work package 1 of IEA Wind Task 49, presents reference site conditions for floating wind arrays to serve as a design basis for the techno-economic design of reference floating wind arrays. Data of the reference sites presented here are publicly available in an open database and thus support fast development and comparable design of floating wind arrays for various relevant conditions. The development of these reference sites drew on existing open access datasets and ongoing research projects of task participants. Six classes were identified that describe relevant key conditions for the design and development of floating wind arrays: met-ocean conditions, seabed conditions, coastal infrastructure, environmental impact, socio-economic impact, as well as regulations and permissions. The reference sites for the techno-economic design of floating wind arrays are based on a concept with building blocks to synthesize purpose-built site representations. In each of the identified classes with influencing design factors, building blocks are used to describe the characteristic properties and their spread. However, the latter three classes (i.e., environmental impact, socio-economic impact, regulations and permissions) are not included in the reference site conditions due to limited knowledge and lack of reliable criteria to quantify their impact on the techno-economic design in numeric parameters. Building blocks with key parameters for the techno-economic design of floating wind arrays are provided for met-ocean conditions, seabed conditions, and coastal infrastructure. For met-ocean conditions, multiple sites were selected for detailed analysis that represent a range of conditions across the pipeline of floating wind projects. Wind conditions and sea states are separated, and each location considers both the severity of wind and waves e.g. one site may have a moderate wave condition but severe wind condition. From this pipeline, eleven representative sites were selected where both site-specific analysis was available within the consortium, and where they represent different parts of the global pipeline. The eleven sites are: Hannibal (Italy), Humboldt (US), Ulsan (South Korea), MoneyPoint One (Ireland), Havbredey (UK), Fukushima (Japan), Utsira Nord (Norway), Gulf of Maine (US), Sud de la Bretagne II (France), Sorlige Nordsjo II (Norway). Each of these sites is summarized in the main report while more details about the studies and analyses behind the datasets are provided in the appendix. For seabed conditions, general information about the geotechnical parameters is provided and a baseline is established for the geotechnical parameters and stratigraphy that may be encountered on the sites. A set of six 'synthetic cases' is defined as building blocks providing the different parameters required for design under each case/soil condition. For the coastal infrastructure, general information about the main requirements is provided that a port should comply with to provide a satisfactory service during the construction of floating offshore wind arrays. Minimum port infrastructural requirements are provided for three types of ports.

17 WIND ENERGY↗

Machine-learning identification of the variability of mean velocity and turbulence intensity for wakes generated by onshore wind turbines: Cluster analysis of wind LiDAR measurements

Light detection and ranging (LiDAR) measurements of isolated wakes generated by wind turbines installed at an onshore wind farm are leveraged to characterize the variability of the wake mean velocity and turbulence intensity during typical operations, which encompass a breadth of atmospheric stability regimes and rotor thrust coefficients. The LiDAR measurements are clustered through the k-means algorithm, which enables identifying the most representative realizations of wind turbine wakes while avoiding the imposition of thresholds for the various wind and turbine parameters. Considering the large number of LiDAR samples collected to probe the wake velocity field, the dimensionality of the experimental dataset is reduced by projecting the LiDAR data on an intelligently truncated basis obtained with the proper orthogonal decomposition (POD). The coefficients of only five physics-informed POD modes are then injected in the k-means algorithm for clustering the LiDAR dataset. The analysis of the clustered LiDAR data and the associated supervisory control and data acquisition and meteorological data enables the study of the variability of the wake velocity deficit, wake extent, and wake-added turbulence intensity for different thrust coefficients of the turbine rotor and regimes of atmospheric stability. Furthermore, the cluster analysis of the LiDAR data allows for the identification of systematic off-design operations with a certain yaw misalignment of the turbine rotor with the mean wind direction.

17 WIND ENERGY↗

DOE Hanford Tank Side Cesium Removal System (TSCR) Update: Fabrication and Factory Acceptance Testing - 20300

The Tank Side Cesium Removal (TSCR) System is a modular, quickly-deployable, and passively safe system for efficiently removing solids and cesium from alkaline liquid waste raffinate created by fuel processing on the Hanford site. This paper provides an overview of the project with particular emphasis on completion of fabrication and factory acceptance testing (FAT). All TSCR System components are inside three enclosures known as the Process Enclosure, Ancillary Enclosure, and Control Enclosure. The Process Enclosure is seismic design category II (SDC-II) and built to withstand the rigors of transportation and lifting, high winds, volcanic ash fall, and heavy precipitation (snow) over a temperature range of -25 to 115 deg. F. The Process Enclosure and Control Enclosure were fabricated in AVANTech's Columbia, SC facility, while the Ancillary Enclosure was fabricated in AVANTech's Richland, WA facility. The design and preliminary documented safety analysis were completed in December 2019, with all work being performed in accordance with ASME NQA-1 quality assurance requirements. The Process Enclosure, Ion Exchange Columns (IXCs), and several other TSCR components have a nuclear safety function and are designated as safety significant structures, systems, and components (SS-SSCs). The NQA-1 Commercial Grade Dedication (CGD) process was used to identify critical characteristics in order to accept materials and items used for fabrication of several safety significant TSCR components. This paper also addresses unique aspects and challenges of implementing CGD in DOE facilities and systems. After fabrication and preliminary testing, the Process and Control Enclosures were shipped to AVANTech's Richland facility where the complete TSCR System was setup and connected in a represented layout and configuration that will be used on the Hanford site. Test tanks and pumps were put in place and connected to the TSCR Process Enclosure in a manner that mimicked interfacing Double Shell Tanks in the 241-AP Tank Farm. The TSCR System was then tested/operated under conditions equivalent to those planned for onsite operation. Testing was separated into five separate phases as defined below: - Phase 1: Confirmation of TSCR System readiness for the FAT; - Phase 2: Verification of TSCR System operation under standard conditions; - Phase 3: Demonstration of TSCR System operation under non-standard conditions; - Phase 4: Demonstration of ion exchange media removal from an IXC; and - Phase 5: Completion of TSCR System lift plans and site mobilization. The Hanford Tank Operations Contractor, Washington River Protection Solutions (WRPS), participated in all phases of testing. Testing at AVANTech's Richland Facility allowed WRPS personnel to familiarize themselves with TSCR operations in a radiologically clean facility prior to onsite mobilization. Engineering and operations personnel gained valuable experience that allowed them to better refine onsite operational protocols and procedures - including handling and movement of IXCs with a forklift. This paper describes the technologies used by the TSCR System as well as how these technologies are deployed and operated to advance the Hanford mission of safely, efficiently, and effectively treating tank waste. It also provides detailed information on fabrication and FAT, including operational data from simulated tank waste runs. A project schedule for WRPS' planned construction acceptance testing, operational acceptance testing, and actual tank waste treatment is provided. This presentation should be of great interest to parties responsible for the design, testing, and mobilization of modular NQA-1 technologies for the treatment of raffinate and similar liquid wastes containing high concentrations of radioactive cesium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Assessment of Tidal Energy Extraction in the Western Passage

Numerical models have been widely used for the resource characterization and assessment of tidal instream energy. The accurate assessment of tidal stream energy resources at a feasibility or project-design scale requires detailed hydrodynamic model simulations or high-quality field measurements. This study applied a three-dimensional finite-volume community ocean model (FVCOM) to simulate the tidal hydrodynamics in the Passamaquoddy–Cobscook Bay archipelago, with a focus on the Western Passage, to assist tidal energy resource assessment. IEC Technical specifications were considered in the model configurations and simulations. The model was calibrated and validated with field measurements. Energy fluxes and power densities along selected cross sections were calculated to evaluate the feasibility of the tidal energy development at several hotspots that feature strong currents. When taking both the high current speed and water depth into account, the model results showed that the Western Passage has great potential for the deployment of tidal energy farms. The maximum extractable power in the Western Passage was estimated using the Garrett and Cummins method. Different criteria and methods recommended by the IEC for resource characterization were evaluated and discussed using a sensitivity analysis of energy extraction for a hypothetical tidal turbine farm in the Western Passage.

16 TIDAL AND WAVE POWER↗

Progress Towards a Predictive Eagle Behavior and Risk Modeling Framework: Overview and Recent Validation Efforts

This presentation summarizes progress to date of the U.S. Department of Energy project, "Development of a computational framework for modeling golden eagles (Aquila chrysaetos) near wind farms," which focuses on stochastic behavioral modeling of soaring raptors across landscape, facility, and turbine spatiotemporal scales. This publicly available, open-source modeling framework includes behavioral models based on three different underlying principles: energy minimization at landscape scale, behavioral heuristics at landscape-facility scale, and data-driven behaviors at the facility-micro-scale. We will briefly overview the key advancements in the behavioral modeling state of the art, which leverages multiple high-resolution telemetry data sources combined with high-fidelity atmospheric flow modeling insights. We then present preliminary results from a validation study in Altamont, California. This new study involves a novel application of the Stochastic Soaring Raptor Simulator (SSRS), in a new geographic locale, to understand facility scale eagle movement patterns over time scales representative of a wind project's lifetime. For this desktop analysis (that does not depend on any high-performance computing resources), SSRS simultaneously considers a variety of wind conditions and eagle approach vectors toward a project site of interest. This work demonstrates the integration of publicly available landscape-scale atmospheric datasets, our recently improved engineering updraft models (see presentation from Thedin et al.), and our energy minimization behavioral models within the SSRS framework. While we only present results from a single behavioral model, the integration of these three modeling components forms the foundation for our more sophisticated behavioral models (see presentations from Brandes et al., Sandhu et al.) that are under active development. Results are presented in the form of presence maps, which may be applied to estimate risk to wildlife, augment ground survey data, inform wind-plant operations, or incorporated into wind-plant designs.

agent-based modeling↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

Turbine scale and siting considerations in wind plant layout optimization and implications for capacity density

Improvements in wind energy technology, reduced costs, and ambitious clean energy goals have led to projections of high wind contribution in coming years. Developing methodologies to design wind plants with a variety of siting constraints and turbine sizes helps enable high wind penetration, and gain a better understanding of how wind plants are sensitive to setback constraints and turbine design. In this paper, we present a two-step optimization method to simultaneously determine the optimal number of turbines and their locations in a wind plant domain divided into many small, discrete parcels. We present the optimized performance metrics of a wind plant optimized with different turbine sizes and ratings, and with different siting restrictions within the wind plant. Our results indicate that taller and larger turbines are more sensitive to increasing siting constraints. We also compare the optimal wind plant layouts and performance for wind plants optimized for minimum COE and maximum profit. Wind plants optimized for profit had 130%-190% of the capacity of plants optimized for COE, which demonstrates that the optimal results are greatly affected by the objective function, which should be carefully considered. Finally, in this paper we demonstrate the effect of increasing siting constraints on wind plant capacity density, and how the results change when different land areas are used to calculate capacity density. When using the entire wind plant boundary area to determine capacity density, increasing siting constraints decreases the capacity density. However, when we only use the available area (the area left after removing the siting constraints) to calculate the capacity density, increasing the siting constraints increases capacity density. This is a critical insight because of how capacity density is typically defined and used in research, and has important implications for assessment of technical potential and capacity expansion modeling, as well as future wind deployment potential.

17 WIND ENERGY↗

Floating platform effects on power generation in spar and semisubmersible wind turbines

The design and financing of commercial-scale floating offshore wind projects require a better understanding of how power generation differs between newer floating turbines and well-established fixed-bottom turbines. In floating turbines, platform mobility causes additional rotor motion that can change the time-averaged power generation. In this work, OpenFAST simulations examine the power generated by the National Renewable Energy Laboratory's 5-MW reference turbine mounted on the OC3-UMaine spar and OC4-DeepCWind semisubmersible floating platforms, subjected to extreme irregular waves and below-rated turbulent inflow wind from large-eddy simulations of a neutral atmospheric boundary layer. For these below-rated conditions, average power generation in floating turbines is most affected by two types of turbine displacements: an average rotor pitch angle that reduces power, caused by platform pitch; and rotor motion upwind-downwind that increases power, caused by platform surge and pitch. The relative balance between these two effects determines whether a floating platform causes power gains or losses compared to a fixed-bottom turbine; for example, the spar creates modest (3.1%–4.5%) power gains, whereas the semisubmersible creates insignificant (0.1%–0.2%) power gains for the simulated conditions. Furthermore, platform surge and pitch motions must be analyzed concurrently to fully capture power generation in floating turbines, which is not yet universal practice. Finally, a simple analytical model for predicting average power in floating turbines under below-rated wind speeds is proposed, incorporating effects from both the time-averaged pitch displacement and the dynamic upwind-downwind displacements.

17 WIND ENERGY↗

FORCE Update 2024

The Framework for Optimization of Resources and Economics (FORCE) tool suite is the U.S. Department of Energy’s Nuclear Integrated Energy Systems (IES) Program flagship tool suite for technoeconomic IES analysis of IES. This tool suite is useful for analysis designed to evaluate and improve the technoeconomics of energy production systems, particularly for systems including nuclear technology. In this report, we document the development activity for the FORCE tool suite to extend its capabilities as performed during fiscal year 2024. In addition to reliability and accessibility, capability is one of the three standards guiding the development of the FORCE tool suite and the software codes that are its constituent parts. Extending the capabilities of the FORCE tool suite allows analysis both within the IES program as well as industry, university, and laboratory partners to perform analysis with more accuracy, insight, and impactful narrative. Four areas of capability development were the focus of activity this year: economic parameter uncertainty quantification, multiresolution analysis, components-to-optimization workflow automation, and statespace construction workflows for real-time optimal control. In economic parameter uncertainty quantification, the ability of HERON to capture risk due to scenarios (weather and energy demand uncertainty) was expanded to also include uncertainties in financial parameters such as capital cost or operation and maintenance costs. By including these sources of uncertainty, which are sometimes very large compared with scenario uncertainty, HERON is better able to capture the risk posed by investment in various IES technology. Because of this, analysts can also consider the reduction in risks that can be realized by choice of some technologies. In multiresolution analysis, development activity extended on work completed previously. In fiscal year 2023, methods for decomposing time series signals, such as demand, solar and wind availability, and price profiles, were analyzed and down-selected to those most effective at splitting signals into different resolutions. These resolutions allow considering the influence of different energy demand and supply behaviors across different time scales. For example, energy demand might be divided into seasonal, weekly, and hourly profiles. In fiscal year 2024, this preliminary work was extended and implemented within the Risk Analysis Virtual Environment (RAVEN) risk and uncertainty analysis platform, which is used throughout the FORCE framework. This development of the “multi-resolution time series analysis” (MR-TSA) module in RAVEN allows training synthetic history generators on complex time series. These synthetic history generators can then be used in HERON for generating scenarios that represent possible market and weather scenarios that can be analyzed on different time scales. We envision completing this work in the future, implementing multiresolution dispatch optimization strategies that can make the most beneficial use of these stratified time histories. In components-to-optimization workflow development, workflows for translating user inputs of components into algorithms for algebraic optimization were selected and implemented. Similar algorithms within the Holistic Energy Resource Optimization Network (HERON) were separated from the main code base of HERON and gathered with the components-to-optimization workflows in the new Dispatch Optimization Variable Engine (DOVE) software library. This modularization allows FORCE users to analyze dispatch optimization and energy system duty cycles independently of HERON, which previously was a burdensome task. Additionally, these dispatch optimization algorithms, set up in an independent library, can now be used across all software applications within FORCE, especially including the real-time optimal control software Optimization of Real-time Capacity Allocation (ORCA). Allowing FORCE software to share dispatch optimization algorithms within a single library allows for improved software maintenance and reliability. In statespace characterization workflow development, alternative workflows for optimizing dispatch with additional technical accuracy was the focus, particularly to improve the real-time optimization decision making in ORCA. Using algorithms and workflows initially developed for the Feasible Actuator Range Modifier (FARM), workflows for determining the statespace representation of IES were identified and demonstrated. The resulting dispatch optimization required a more robust optimization algorithm than that originally used in HERON (and moved to DOVE), which required adding an alternate workflow to DOVE that can more accurately match the behavior of physical systems using a partial differential equation representation. In conclusion, capability developments in the FORCE tool suite in fiscal year 2024 have improved the ability of the FORCE tool suite to perform

29 ENERGY PLANNING, POLICY, AND ECONOMY↗